Progress Report To FRA - 2Q2014

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

p

Grant No.

FR-HSR-0040-11-01-00

WBS No.

Knowledge Corridor Restore Vermonter Project

Date:

$51 ' 174 ,515.00

End Date:

$23 ,875,489.00
68%

Project will enable Amtrak's Vermonter train to again travel the historic 50-mile Massachusetts "Knowledge Corridor" route between Springfield , MA,
East Northfield, MA. The Project will utilize a $75 million Federal Railroad Administration (FRA) grant from the American Recovery and Reinvestment
(ARRA) to undertake rail improvements in the Pioneer Valley in Western Massachusetts. The Project also includes bicycle/pedestrian improvements in
the City of Northampton, MA with the construction of an underpass that runs under the rail line. An additional benefit of the rail line rehabilitation will be
improved freight service for customers along the line and within western Massachusetts.
The improvements to the Knowledge Corridor will occur on the Connecticut River mainline of the Pan Am Southern (PAS) railroad , a joint venture between
Pan Am Railways and Norfolk Southern . MassDOT, through its Rail and Transit Division, has designated the Massachusetts Bay Transportation Authority's
(MBTA) Design and Construction Department to oversee the implementation of the Project through final design and construction and has entered into a

-KNOWLEDGE CORRIDOR STATION AND UNDERPASS- The design for the stations at Northampton and Greenfield is currently being revised to
provide 400' high level platforms . The underpass and Damon Rd . Civil & Signal work will be bid as a separate contract from Stations.
- KNOWLEDGE CORRIDOR PAN AM - new track materials and grade crossing signal materials continue to arrive at MassDOT's South Deerfield site and
at other locations to support laying of CWR by NS forces in July. PAS completed grade crossings track work nortth of Greenfield. PAS Signal crew installing
conduit & panels at grade crossings. PAS crew preparing Greenfield & Northampton track beds and clear ROW edge.

Cumulative Financial Trends

Project Progress
8000 0
0%
A

20%

40%

60%

80%

100%

120%

_....--

6000 0
5000 au;

....,.,..-

7000 0

.A

- --

4000 Q5

_::::.

3000
2000 0

1000 0
0
Jan

- + - Estimated

uar

Apr

May

June

~ Actua l

- Complete the Station redesign;support advertising & bidding Underpass &


NS track crew installing CWR, welding Main Line Track, and Surfacing. PAS continuing with installation of track panels at grade crossing and turnouts Grade Crossing and
signal work ongoing.
MASSDOT - Provide additional fu nding for the project. Continue with procurement of blidge repair contract.
MBTA- Advertise & Procure Underpass & Damon Rd. Continue matenal procurement.
URS- Continue Program and Construction Management