February 2, 2010

1
Existing Buildings- Looking SW from Capitol

2
Aerial

14th Avenue

12th Avenue
ue
13th Avenu
Capitol
Colfax

Lincoln
co

Ralph L Carr History


Colorado Parking Colorado
Judicial Complex Garage Center
Si
Site Site Site

Broadway

Library

Civic Center

3
State Projects’ Overview
• Replace obsolete buildings on State owned block at 14th/Broadway/13th/Lincoln
• Relocate History Center to Civic Center Cultural District site adjacent to Public
Parking
• Museum – 190,000 SF; $111 Million
• Consolidate 7 Judicial-related agencies from 10 locations – save lease & operating
costs
• Judicial – 600,000 SF; $258 Million including new parking facility (325 spaces)
• Financing – July, 2009: $39M Tax-Exempt COP and $300M Taxable Build America
COP at net 4.24% rate; Gaming Revenues, Court Fees and Lease Revenues pay debt
service
• Saved over $200M (26%) in financing cost over Legislature’s approval (SB08-206)
($5M+/year) and $77M savings over tax-exempt issuance
• Approximately 2,000 direct jobs created

4
Project Timeline
2000: July 2008: June 2009: February 2010: September 2011:
ory Center

• New Vision Plan • SB08-206 Signed • Complete 100% DD • Begin Temporary • TCO and History Center
• Tryba Architects Documents Relocation Begin Move-In
Contract • Close Land
August 2008: May 2010:
• Hensel Phelps July 2009:
• Complete Temporary
Selected • Sell COPs ($345M) Fall 2011:
Relocation
September 2008: • Begin Demolition of
Histo

• Site Selected
History Center
August 2009: Block
• Start Construction Project Complete
November 2008:
• Complete 100%
Schematic Design

P 2008
Pre 2008 2009 2010 2011 - 2013
2005: July 2008: June 2009: January 2010: December 2012:
mplex

• ULI Report • SB08-206 Signed • Select Fentress Architects • Complete Schematic Design • Temporary Certificate of
• Select Mortenson Occupancy
February 2010:
stice Com

• Begin Temp Relocation Januaryy 2013:


2006:
2006
July 2009: • Begin Move In
• Trammell Crow Selected as
• Sell COPs ($345M) May 2010:
Program Manager
• Begin Conceptual Design • Complete Temp Relocation February 2013:
• Feasibility Report Issued
• Begin Demo of Block • Justice Relocated
July 2010:
• Complete
C l t DD D
Documents
t
Jus

Spring 2013:
September 2010:
• Start Construction Justice Complex
Project Complete

5
History Colorado Center

6
History Colorado Center

7
Massing Study Respecting View Planes

Sc hematic D e s i gn J a nuar y 2 0 10

8
Access
14thh Avenue
e Lincoln Paths

13thh Avenue
e
Broadway

Sc hematic D e s i gn J a nuar y 2 0 10

9
Aerial

Sc hematic D e s i gn J a nuar y 2 0 10

10
Proposed Building - Looking SW from Capitol

Sc hematic D e s i gn J a nuar y 2 0 10

11
Proposed Building - Looking SE from Civic
Center

Sc hematic D e s i gn J a nuar y 2 0 10

12
Proposed Building - Looking NE from Art
Museum

Sc hematic D e s i gn J a nuar y 2 0 10

13
Atrium

Sc hematic D e s i gn J a nuar y 2 0 10

14