Professional Documents
Culture Documents
2 Way Slab
2 Way Slab
f'c =
fy =
n
=
da
=
db
=
6
3.5
60
0
5
in
4.75
in
b1
0.85
Asmax
1.066
in2
Asmin
0.13
in2
Smax
12
in
Panel
Type
Area
in
Comments
Main Bar
#
Bar Area
in
(+)Asa
0.312
ok
0.2
(-)Asa(up)
0.472
ok
0.2
(-)Asa(down)
0.472
ok
0.2
(+)Asb
0.151
ok
0.11
(-)Asb(left)
0.355
ok
0.11
(-)Asb(right)
0.401
ok
0.11
Binder(up-down)
0.13
ok
0.11
Binder(left-right)
0.13
ok
0.11
(+)Asa
0.242
ok
0.11
(-)Asa(up)
0.358
ok
0.11
(-)Asa(down)
0.358
ok
0.11
(+)Asb
0.152
ok
0.11
(-)Asb(left)
0.401
ok
0.11
(-)Asb(right)
0.408
ok
0.11
Binder(up-down)
0.13
ok
0.11
Binder(left-right)
0.13
ok
0.11
(+)Asa
0.242
ok
0.11
(-)Asa(up)
0.358
ok
0.11
(-)Asa(down)
0.358
ok
0.11
(+)Asb
0.155
ok
0.11
(-)Asb(left)
0.408
ok
0.11
(-)Asb(right)
0.408
ok
0.11
Binder(up-down)
0.13
ok
0.11
Binder(left-right)
0.13
ok
0.11
(+)Asa
0.273
ok
0.2
(-)Asa(up)
0.7413763
ok
0.2
(-)Asa(down)
0.455
ok
0.2
(+)Asb
0.147
ok
0.11
in
ksi
ksi
password =123456
(-)Asb(left)
0.408
ok
0.11
(-)Asb(right)
0.25
ok
0.11
Binder(up-down)
0.13
ok
0.11
Binder(left-right)
0.13
ok
0.11
(+)Asa
0.13
ok
0.11
(-)Asa(up)
0.13
ok
0.11
(-)Asa(down)
0.7413763
ok
0.11
(+)Asb
0.13
ok
0.11
(-)Asb(left)
0.13
ok
0.11
(-)Asb(right)
0.13
ok
0.11
Binder(up-down)
0.13
ok
0.11
Binder(left-right)
0.13
ok
0.11
rd =123456
Bar Area
in
14
14
0.2
1.5
3.5
14
14
0.2
1.5
3.5
16
14
0.11
2.37
5.3333333
16
14
0.11
2.79
10
10
10
10
0.11
2.05
2.5
10
10
0.11
2.05
2.5
16
14
0.11
2.79
16
14
0.11
2.85
10
10
10
10
0.11
2.05
2.5
10
10
0.11
2.05
2.5
16
14
0.11
2.85
16
14
0.11
2.85
10
10
16
16
0.2
2.96
16
16
0.2
1.53
16
14
0.11
2.85
16
14
0.11
1.42
5.3333333
10
10
10
10
20
20
0.2
0.32
20
20
0.2
3.38
6.6666667
10
20
16
0.11
0.43
20
16
0.11
0.43
10
10
10
A
1
1
D
2
3
B
3
3
D
3
3
B
3
3
D
3
3
C
1
1
D
3
2
ft
in
factor
ft
in
20
20
20
21
20.5
20.5
7.5
7.5
10.5
0
0
0
4
3
3
3
3
4
5
6
6
7
6
5
1.88
10.50
11.50
0.00
10.00
1.50
Input data:
Case No
20.00
ft
30.00
ft
Caneg
f'c
ksi
Cbneg
fy
60
ksi
Cadl
DL add
0.1175
k/ft
Cbdl
LL
0.1
k/ft2
Call
h, cal
6.67
in
Cbll
h, used
in
Wa
Wb
Loads Calculation:
Moments Calculation:
DL wu
0.246
k/ft2
Ma(-ve)
144.21
LL wu
0.16
k/ft2
Mb(-ve)
105.24
TL wu
0.406
k/ft
Ma(+ve)
97.27
Mb(+ve)
42.92
Steel Calculation:
da
in
db
5.75
in
b1
0.85
Asmax
1.475
in2
Asmin
0.151
in2
Smax
14
Moments
Asreq
#3(in c/c)
#4(in c/c)
Ma(-ve)
0.472
2.8
Mb(-ve)
0.355
3.7
Ma(+ve)
0.312
Mb(+ve)
0.151
0.784
0.506
3.0612245
4.743083
#5(in c/c)
#6(in c/c)
5.1
7.9
11.2
6.8
10.5
14
4.2
7.7
11.9
14
8.7
14
14
14
k-in
k-in
k-in
k-in
Input data:
Case No
Clear Span,la
15.63
ft
0.75
Clear Span,lb
20.84
ft
Caneg
0.061
f'c
ksi
Cbneg
0.036
fy
60
ksi
Cadl
0.036
DL add
Cbdl
0.013
LL
0.15
k/ft2
Call
0.049
h, cal
4.86
in
Cbll
0.016
h, used
in
Wa
0.610
Wb
0.390
118.83541
0.143835413 k/ft
Loads Calculation:
Moments Calculation:
DL wu
0.263
k/ft2
Ma(-ve)
89.89
k-in
LL wu
0.24
k/ft2
Mb(-ve)
94.37
k-in
TL wu
0.503
k/ft
Ma(+ve)
62.19
k-in
Mb(+ve)
37.83
k-in
Steel Calculation:
da
in
db
4.75
in
b1
0.85
Asmax
0.914
in2
Asmin
0.13
in2
Smax
12
Moments
Asreq
#3(in c/c)
#4(in c/c)
#5(in c/c)
#6(in c/c)
Ma(-ve)
0.358
3.7
6.7
10.4
12
Mb(-ve)
0.401
3.3
9.3
12
Ma(+ve)
0.242
5.5
9.9
12
12
Mb(+ve)
0.152
8.7
12
12
12
Input data:
Case No
Clear Span,la
15.63
ft
0.75
Clear Span,lb
21.00
ft
Caneg
0.061
f'c
ksi
Cbneg
0.036
fy
60
ksi
Cadl
0.036
DL add
Cbdl
0.013
LL
0.15
k/ft2
Call
0.049
h, cal
4.88
in
Cbll
0.016
h, used
in
Wa
0.610
Wb
0.390
118.83541
0.143835413 k/ft
Loads Calculation:
Moments Calculation:
DL wu
0.263
k/ft2
Ma(-ve)
89.89
k-in
LL wu
0.24
k/ft2
Mb(-ve)
95.83
k-in
TL wu
0.503
k/ft
Ma(+ve)
62.19
k-in
Mb(+ve)
38.41
k-in
Steel Calculation:
da
in
db
4.75
in
b1
0.85
Asmax
0.914
in2
Asmin
0.13
in2
Smax
12
Moments
Asreq
#3(in c/c)
#4(in c/c)
#5(in c/c)
#6(in c/c)
Ma(-ve)
0.358
3.7
6.7
10.4
12
Mb(-ve)
0.408
3.2
5.9
9.1
12
Ma(+ve)
0.242
5.5
9.9
12
12
Mb(+ve)
0.155
8.5
12
12
12
Input data:
Case No
Clear Span,la
15.63
ft
0.75
Clear Span,lb
20.50
ft
Caneg
0.076
f'c
ksi
Cbneg
0.024
fy
60
ksi
Cadl
0.043
DL add
Cbdl
0.013
LL
0.15
k/ft2
Call
0.052
h, cal
4.82
in
Cbll
0.016
h, used
in
Wa
0.760
Wb
0.240
118.83541
0.143835413 k/ft
Loads Calculation:
Moments Calculation:
DL wu
0.263
k/ft2
Ma(-ve)
112
k-in
LL wu
0.24
k/ft2
Mb(-ve)
60.88
k-in
TL wu
0.503
k/ft
Ma(+ve)
69.69
k-in
Mb(+ve)
36.61
k-in
Steel Calculation:
da
in
db
4.75
in
b1
0.85
Asmax
0.914
in2
Asmin
0.13
in2
Smax
12
Moments
Asreq
#3(in c/c)
#4(in c/c)
#5(in c/c)
#6(in c/c)
Ma(-ve)
0.455
2.9
5.3
8.2
11.6
Mb(-ve)
0.25
5.3
9.6
12
12
Ma(+ve)
0.273
4.8
8.8
12
12
Mb(+ve)
0.147
12
12
12
Input data:
Case No
Clear Span,la
15.63
ft
0.75
Clear Span,lb
20.50
ft
Caneg
0.076
f'c
ksi
Cbneg
0.024
fy
60
ksi
Cadl
0.043
DL add
Cbdl
0.013
LL
0.15
k/ft2
Call
0.052
h, cal
4.82
in
Cbll
0.016
h, used
in
Wa
0.760
Wb
0.240
0.806818182 k/ft
0.7818182
Loads Calculation:
Moments Calculation:
DL wu
1.058
k/ft2
Ma(-ve)
289.01
k-in
LL wu
0.24
k/ft2
Mb(-ve)
157.1
k-in
TL wu
1.298
k/ft
Ma(+ve)
169.85
k-in
Mb(+ve)
88.73
k-in
Steel Calculation:
da
in
db
4.75
in
b1
0.85
Asmax
0.914
in2
Asmin
0.13
in2
Smax
12
Moments
Asreq
#3(in c/c)
#4(in c/c)
#5(in c/c)
#6(in c/c)
Ma(-ve)
1.529
0.9
1.6
2.4
3.5
Mb(-ve)
0.719
1.8
3.3
5.2
7.3
Ma(+ve)
0.735
1.8
3.3
5.1
7.2
Mb(+ve)
0.375
3.5
6.4
9.9
12
150
lb/ft
mat
130
lb/ft3
back
120
30
lb/ft3
soil
=
=
B.C
3360
lb/ft2
TL
1120
lb/ft
Va
27
Ka
1.25
1
3
1.25
3.25
3
4.5
ft2
41.48148 lb/ft2
0.333
=
=
=
=
=
=
13.81333
13.81
0.5
39.96
19.98
0.33
TL/ Area
TOP STEP
Tli
P1
y1
BFLi
P2
y2
w1
3
2
3
S.No
W,lb
x,ft
M=w x
0
780
780
1
1
0
780
780
2
Sum
Over-Turning
Sliding
Tension Check at the heel
Over-Turning
Stabilizing Moment
Over-Turning Moment
Factor of Safety
=
=
=
780
13.4984
57.78
=
=
390.14
33.79
Sliding
Frictional Resistance
Sliding Force
[OK]
w2
=
=
=
Factor of Safety
11.55
[OK]
0.98
[OK]
a1
STEP#2
=
=
=
=
=
=
Tli
P3
y3
BFLi
P4
y4
13.81333
55.25
2
159.84
319.68
1.33
2.5
w1
1.25
4
2
w2
3.25
w3
S.No
W,lb
x,ft
M=w x
450
780
1267.5
2497.5
2.5
1
1.63
1125
780
2066.025
3971.025
2
3
Sum
Over-Turning
Sliding
Tension Check at the heel
Over-Turning
Stabilizing Moment
Over-Turning Moment
Factor of Safety
=
=
=
3971.025
535.6744
7.41
[OK]
=
=
=
1249.21
374.93
3.33
[OK]
1.38
[OK]
Sliding
Frictional Resistance
Sliding Force
Factor of Safety
Tension Check at the heel
a2
=
=
=
STEP# 3
=
=
=
=
=
=
Tli
P5
y5
BFLi
P6
y6
13.81333
96.69
3.5
279.72
979.02
2.33
2.5
w1
1.25
2
w2
1.25
3.25
w3
S.No
W,lb
x,ft
M=w x
1(a)
450
900
780
1267.5
1755
5152.5
2.5
2.75
1
1.63
2.25
1125
2475
780
2066.025
3948.75
10394.78
1(b)
2
3
4
Sum
Over-Turning
Sliding
Over-Turning
Stabilizing Moment
Over-Turning Moment
Factor of Safety
=
=
=
10394.78
2619.532
3.97
[OK]
=
=
=
2577.19
1075.71
2.4
[OK]
1.51
[OK]
Sliding
Frictional Resistance
Sliding Force
Factor of Safety
Tension Check at the heel
a3
w4
4.5
=
=
=
2
1
[OK]
[OK]
[OK]
0
2
1
3
[OK]
[OK]
[OK]
0
2
1
3
3
[OK]
[OK]
[OK]
150
lb/ft3
back
120
lb/ft3
soil
30
B.C
3306
w4
w5
w2
w3
lb/ft2
Ka
P
y
=
=
=
0.333
2417.58
3.67
4.5
w1
6.5
S.No
W,lb
x,ft
M=w x
1
2
3
4
5
Sum
0
3300
3712.5
2970
0
9982.5
3.25
1
3.5
5
6.5
0
3300
12993.8
14850
0
31143.8
Over-Turning:
Sliding:
Tension:
Bearing:
Over-Turning
Stabilizing Moment
Over-Turning Moment
Factor of Safety
=
=
=
31143.8
8872.52
3.51 > 2.5
Sliding
Frictional Resistance
Sliding Force
Factor of Safety
=
=
=
4993.07
2417.58
2.07 > 1.5
2.23
[OK]
[OK]
[OK]
[OK]
[OK]
[OK]
N OF RETAINING WALL
11
150
lb/ft3
back
120
lb/ft3
soil
30
B.C
3306
w4
w5
w2
w3
lb/ft2
Ka
P
y
=
=
=
0.333
2417.58
3.67
2.75
w1
4.25
S.No
W,lb
x,ft
M=w x
1
2
3
4
5
Sum
0
2475
2268.75
1815
0
6558.75
2.13
0.75
2.42
3.33
4.25
0
1856.25
5490.38
6043.95
0
13390.6
Over-Turning:
Sliding:
Tension:
Bearing:
Over-Turning
Stabilizing Moment
Over-Turning Moment
Factor of Safety
=
=
=
13390.6
8872.52
1.51 < 2.5 [NG]
Sliding
Frictional Resistance
Sliding Force
Factor of Safety
=
=
=
3280.57
2417.58
1.36 <1.5 [NG]
0.69
[NG]
[NG]
[NG]
[NG]
11
Design of Footing
=
C1
fy
40
ksi
f'c
ksi
Col. side,b
12
in
S.Load, SL
144
F.Load, FL
208
B.Capacity,BC
ksf
How deep ?h
ft
Footing width,W
9.5
ft
Try( 9.8 )
Footing Depth,D
16.5
in
Try( 17.02 )
Footing Identification
Input Data:
[Ab =
0.79
in2]
SOLUTION:
Effective Bearing Capacity
qe = B.C. - 0.125 x h =
1.5
ksf
A = S.L./ qe =
96
ksf
B = ( A )1/2 =
9.8
ft
2.3
ksf
17.02
in
13
in
100
in
197.59
bo x d ]/1000 =
1/2
197.67
69.19
[OK]
1/2
(12 W) d]/1000 =
=
112.67
249.26
k-in
0.78
in2
[OK]
0.43
in2
0.78
in2
48
in
Required Length
36
in
12.2
in c/c)
= 0.04 fy / (fc)1/2 db =
[OK]
Analysis of Rates
By: Atif Ghani
Material Cost
S. No
Description of item
Unit
1.4.8
100 Cft
5
6
7
9
10
100 Sft
100 Sft
100 Cft
100 Cft
100 Cft
100 Cft
11
100 Cft
12
100 Cft
100 Cft
13
14
Material
Quantity
Cement
sand
crush
Bricks
cement
sand
Bricks
cement
sand
Cement
sand
Cement
sand
Cement
sand
Bricks
cement
sand
Bricks
cement
sand
Cement
sand
crush
Cement
sand
Cement
sand
crush
Cement
sand
crush
Cement
sand
crush
Cement
sand
crush
Pudlo
9.94 Bags
47.72 Cft
95.44 Cft
1450 Nos
3.3 Bags
23.76 cft
1450 Nos
3.3 Bags
23.76 cft
0.96 Bags
6.94 Cft
0.85 Bags
3.10 Cft
0.29 Bags
1.06 Cft
334 Nos
1.12 Bags
7.0 Cft
533 No
1.5 Bags
10.0 Cft
3.06 Bags
10.92 Cft
10.34 Cft
2.28 Bags
5.92 Cft
6.78 Bags
22.93 Cft
44.53 Cft
17.23 Bags
41.34 Cft
82.62 Cft
17.23 Bags
41.34 Cft
82.62 Cft
17.23 Bags
41.34 Cft
82.62 Cft
86.15 Lbs
15
Reinforcement
1 Cwt
Steel
1.04 CWT
16
Wooden Frames
1 Cft
Wood
1.25 Cft
17
1 Sft
Wood
0.15 Cft
18
1 Sft
0.10 Cft
1.0 Sft
19
1 Sft
Wood
Glass
5mm
Wood
20
1 Sft
21
1 Sft
0.13 Cft
1 Sft
0.06 Cft
1.0 Sft
22
1 Sft
Wood
Wire
Gauze
Wood
Wire
Gauze
Wood
0.12 Cft
0.1 Cft
Labour Cost
Nature of labour
Labour
Required
Mason
1/2 No
Labour
4.5 No
Mason
2.5 No
Labour
3 No
Mason
4 No
Labour
Mason
Labour
Mason
Labour
Mason
Labour
5 No
1 No
1 No
1 No
1.25 No
3/4 No
1 No
Mason
1.25 No
Labour
2 No
Mason
1.25 No
Labour
2.25 No
Mason
3/4 No
Labour
Mason
Labour
1 No
1 No
3/4 No
Mason
2 No
Labour
3 No
Mason
1 No
Labour
7 No
Mason
1 No
Labour
7 No
Mason
1 No
Labour
7 No
3/4 No
1/4 No
1/4 No
1/8 No
1/4 No
1/8 No
1/10 No
1/30 No
1/10 No
1/8 No
1/10 No
1/10 No
1/10 No
1/8 No
Mu(+or-)
2256
k-in
MainBar#
Critical,Vu
70
Stirrup#
f'c
ksi
No.ofRows
fy
40
ksi
Ln
16
no
c/c b/w
hmin
in
1.Rectangulr,
h, used
24
in
Choice
bw
12
in
hf
in
As,used
3.53
2.Tee,
h
Flexural Design:
bw
be
22
in
0.85
3.714
in2
a = As fy/(0.85 fc be) =
3.972
<
hf [Rect. Analysis]
12
in
Asmax
5.47
in2
(for b=bw)
Asmax
10.03
in2
(for b=be)
Asmin
1.253
in2
3.62
in2
[OK]
6.922
2213
in
k-in
Shear Design:
19.04
3.L-Beam
Av =
0.22
in2
10.4
in
47.6
3.9
d Beams
2.Tee,
no
no
no
10
ft
10
ft
3.L-Beam
1
no
20.875
in
hf
[OK]
[NG]