FEASIBILITY STUDY - Physical and Economic Viability
FEASIBILITY STUDY - Physical and Economic Viability
Description of Land:
Area: .. acres
Irregular
Yes
Nearby the Highway (Lebuhraya Shah Alam)
Terrain, contour & topography (height < 250', class of slopes): Hill slope (The Modified Slope is Almost Vertical, 80 - 90 degrees)
Soil conditions (eg. marine clay, rocky land, reclaimed land):
Sand
Possibility of flooding (low lying area, proximity to river/sea - will drainage (backflow) be a problem?):
Miscellaneous site configuration & limitations:
Existing land use & development:
Land Search
Lot no.
Area
Tenure (Freehold /
Leasehold [? yrs])
(acres)
Express Conditions
(eg. 1st Grade)
Leasehold
Polluted River
Argiculture,
(Class III & IV) by
Power
Dept. of
Station, Parks
Environment
Land
Conservation Act
Zoning
Conv.?
Current Zoning
Rezone?
Yes
N/A
International Zone
(Inclusive Bukit JalilSeputeh Area)
No
Land Owner :
MARDI, PPJ, TNB
Page 1 of 3
Area: .. acres
Land Owner :
MARDI, PPJ, TNB
(Yes / No)
Page 2 of 3
Proceed only if the findings for BOTH "Preliminary Site Inspection, Investigation & Study" and "Land Search" are positive.
Town planner/Architect:
Market Research & Survey, Data Collection, Analysis & Assessment (Nature of proposed products/Development mix):
Maximum = . units/acre
Maximum = .
(b) Zoning =
Recreational & Open Space
Rezoning reqd.?
(eg. residential, institution, commercial, community, hotel, industry, hill land, agriculture, etc.)
(c) Permitted Development incl. "with conditions" & "restrictions":
(d) Height Control:
(e) State or Federal Master Plan:
Recreational Park
No
Storey Control:
No
None
Available
Page 3 of 3
Assumptions:
Put as CP in
Land SPA?
No.
Matters
1 Area prone to flood
2 Illegal dumping site near access road
3 retention pond are polluted
Scenario
Land Cost
(RM)
(RM)
Efficiency
(units/acre)
Notes
Land belongs to DBKL and refurbishement is for DBKL. No sale and purchases of land involve.
Conclusion
Cost of Development include refurbishment for recreational park and treatment of retention pond.
PBT:LC
ratio