Strategy can be anything (since for the sales orders entered at DC 1100, the strategy 82 maintained at DC take
precedence over the strategy maintained at Plant 1300)
Once after entering material, quantity and Plant 1100, press enter to initiate the ATP. This will take you to the
production order directly. If the capacity availability check is active and there is an overload situation, system
will give you the message on Overload.
Also, most importantly, we can see that the production order is being created at the manufacturing plant 1300.
When we click the 'Production order' button, it will display the created production order.
Save the sales order.
Sale order number: 12257
Check the stock requirement list for the material ASSLY_PROC at the DC 1100.
We could see the sales order and the associated production order in the list and we can see the production
plant as 1300.
Now open the sales order and check the link back to the production order from the schedule line tab by clicking
the 'Procurement' button.
Now we will change the quantity of the order from 7 to 10 and we will check that it changes the production
order quantity also.
Check that the same released status is updated in Sales order schedule line.
Even after releasing the production order, sales order takes control of production and whatever changes made
to the sales order is updated in the production order.
Now change the production order quantity from 7 to 5. It does not change the sales order quantity, but the
confirmed quantity will get reduced to 5.
Redo the ATP check in sales order. This will reset the quantity of the production order back to 7.
Post the GR for the Production order. The location for GR will be selected automatically as DC 1100 and it will
e posted into sales order stock.
In the stock requirement list, we can see the stock updated at the location DC 1100 in sales order specific
stock.
In Plant 1300, the sales order and the production order are reduced from the stock/ requirement list.