Project :

Doc. no. :
Ver. : 1

RRM SYSTEM SALES


ELECTRICAL SYSTEM ENGINEERING PACKAGE
FOR RRM EQUIPMENT

31.05.12

Version

Date
(dd-mm-yy)

Project specific scope defined

Description

JKH

Document
Owner

Checked
by

Table of Contents:
Page no. 1 of 6

Project :
Doc. no. :
Ver. : 1

PROJECT SPECIFIC SCOPE (RRM equipment integration) ................................................... 3


1.1
1.2
1.3
1.4
1.5
1.6

RRM equipment, main electrical interfaces ..................................................................................................... 3


RRM equipment, positioning ........................................................................................................................... 3
RRM equipment system engineering ................................................................................................................ 4
Summary of RRM equipment cable schedule ................................................................................................... 5
Automation and remote control system ........................................................................................................... 5
Review/comment by RRM on el. drawings which are made by third parties ..Error! Bookmark not defined.

EXCLUSIONS FROM THE SCOPE ............................................................................................. 6

TECHNICAL INPUT ...................................................................................................................... 6

Page no. 2 of 6

Project :
Doc. no. :
Ver. : 1

1 PROJECT SPECIFIC SCOPE (RRM EQUIPMENT INTEGRATION)


The documentation from RRM equipment suppliers are gathered and upgraded and prepared for
merging into final production information

1.1 RRM equipment, main electrical interfaces


1.1 RRM equip. main el. interfaces

Electrical interface list, RRM equipment

Comment

Showing main functional interactions between main


machinery control systems for:
RRM equipment RRM equipment
RRM equipment YARD equipment
Final list contain terminals marking on both sides
MS Excel file format.
NOTE:
This list is internal document and only part which
describe interface between RRM and Yard
equipment will be delivered to final customer

1.2 RRM equipment, positioning


1.2 RRM equip. positioning

Layout of Main Control Cabinets, RRM


equipment shown on GA

Comment

Indicating most appropriate positions (areas) for el.


cabinets and components on General arrangement.
Final positions to be decided and verified by Yard.

Page no. 3 of 6

Project :
Doc. no. :
Ver. : 1

1.3 RRM equipment system engineering


1.3 RRM equipment system
engineering.

Tunnel Thrusters control system,


cable block diagram
Tunnel Thruster drive system,
cable & connection diagram
Main propulsion drive system,
cable & connection diagram
Main propulsion remote control system,
cable block diagram
Main propulsion remote control system,
connection diagram
Main engines/generators control system,
cable block diagram
Main engines/generators control system,
connection diagram
POSCON Independent Joystick system,
cable block diagram
POSCON Independent Joystick system,
connection diagram

Main Switchboard control system,


cable and connection diagram
Emergency/Harbour Switchboard control
system, cable and connection diagram
Main one line diagram (MSBD, ESBD)
Power distribution, cable block diagram
Bridge alarm system, cable block diagram
Bridge alarm system, connection diagram
Emergency telegraph, cable block diagram
ACON, Pumps and valves remote control
system, cable and connection diagram
ACON, Machinery alarm system, cable and
connection diagram

Comment

CABLE DIAGRAMS:
Adapting and marking-up of el. equipment and
cables on the RRM suppliers documentation for
electrical equipment.
Making of unique drawings for each particular RRM
component (f.i.. 4 generators = 4 drawings)
Defining the el. cables according to suppliers
recommendations (using suppliers catalogue
provided by Yard).
Indicating most appropriate positions (areas) for el.
cabinets and components (final positions to be
decided and verified by Yard).
Marking of equipment in a way to be clear which
component belongs to which system and according
to Yard standards (if available).
Marking of special notes related for particular
systems which will help to Yard during installation
CONNECTION DIAGRAMS:
Upgrading of RRM equipment suppliers
documentation with coordinated information for
connection.
No internal connection diagrams are provided for
motor starters etc
NOTES:
For some of systems, cable and connection
diagrams are merged in one common drawing for
practical reasons

Starter list, RRM equipment

Page no. 4 of 6

Project :
Doc. no. :
Ver. : 1

1.4 Summary of RRM equipment cable schedule


1.4 Summary of RRM equipment cable
schedule

Cable booklet, Power cables


Cable booklet, Signal cables
Cable booklet, Special cables

Comment

Cable booklets showing cable id, cable type (using


suppliers catalogue provided by Yard) and EMC
class, to and from equipment.
NOTE: Routing and project length are not included

1.5 Automation and remote control system


1.5 Automation and remote control
system

Instrumentation and automation list


(Alarm list unmanned engine room)

Extension of Instrumentation and automation


list with Pumps and Valves remote control
system I/O

Comment

List of all remote alarms and indications required


by class based on machinery system diagrams
and equipment vendor's information.
Contains:
- Pre-warning and failure indication
- Read-outs of temperatures and pressures
- Flow meter reading
- Hour counting (rotating equipment)
- General start/stop control for remotely controlled
machinery
- Control/indication of remote controlled valves

Page no. 5 of 6

Project :
Doc. no. :
Ver. : 1

2 EXCLUSIONS FROM THE SCOPE


The following documents/actions are not included within scope described above and are assumed
to be received/performed by the Shipyard / 3rd parties :
a) Electrical initial/basic design drawings/documents which have to be approved by Class
b) Elaboration of drawings for production of machinery systems Mimic diagrams
c) Definition of machinery process parameters range and alarm set points
d) Various systems safety equipment documentation (CO2, safety stops, power failures) which has
to be signalized within ACON plant
e) List of equipment to be remotely controlled (stand-by pumps starting is assumed to be activated
automatically but locally, using e.g. a locally mounted pressure switch; only signalization of pump
stand-by start activated or equivalent will be signalized within ACON plant)
f) List of tanks to be remotely monitored

3 TECHNICAL INPUT
The Yard is responsible to provide all necessary input (General arrangement, Tank Plan,
Hazardous areas plan, Machinery system drawings, Yards Electrical system drawings, List of
alarms for Yard equipment, etc) for the above work except for the RRM equipment which is
responsibility of RRM.

Page no. 6 of 6