3 US-41: June-Sept
Mill and resurface 2 miles in LAnse.
Lane closures under flag control.
4 US-2: May-Sept
Resurface 1 mile in Crystal Falls,
reconstruct 2.3 miles south of Crystal
Falls. Lane closures under flag control
and temporary traffic signal.
5 US-41/M-28: May-Sept
Resurface 1.1 miles and pave
shoulders from Carp River to
Nicolet Blvd in Marquette. 1 lane
open in each direction.
6 M-35: May-Sept
Resurface 5.9 miles and pave
shoulders from 48th Ave in
Menominee to Ingallston. Lane
closures under flag control and
temporary traffic signal.
7 US-2: May-Sept
Replace bridge over Ogontz River.
Maintain traffic on temporary bridge.
8 US-2: June-Aug
Resurface 9.5 miles from Tannery Rd
to east of County Rd 434. 1 lane open
under flag control.
9 I-75 BS: June-Oct
Reconstruct 0.3 miles from Easterday
Ave to power canal in Sault Ste. Marie,
plus streetscape. Closed with posted
detour.
10 I-75: Apr-July
Replace 2 culverts immediately south
of M-28. Closed with posted detour.
11 I-75: July-Oct
Resurface 10 miles from Mackinac/
Chippewa county line to M-80.
1 lane open in each direction.
12 I-75: May-Oct
Reconstruct 0.3 miles from
Mackinac Trail to north end of I-75
BL in St. Ignace; repair Castle Rock
overpass bridge. 1 lane open in
each direction until after Labor Day.
Intermittent detours after Labor Day.
13 US-23: Mar-Aug
Replace bridge over Little Black River.
Temporary traffic signal.
14 US-31: Apr-Oct
Reconstruct and resurface 4.2 miles
from Camp Daggett Rd to US-131
in Petoskey. 1-way detour between
Eppler Rd and US-131 before July 4.
Traffic shifts.
15 US-31: Sept-Nov
Resurface 3.5 miles from Holiday Rd
to Brackett Rd in Acme. 1 lane open in
each direction.
16 M-72: Mar-Nov
Reconstruct and widen 1 mile from
east of US-31 to Lautner Rd in Acme,
plus construct 2 roundabouts and
pedestrian tunnel. Temporary traffic
shift; intermittent flag control.
17 US-31: Mar-July
Reconstruct 1.6 miles from 3 Mile Rd
to Holiday Rd in East Bay Township.
1 lane open in each direction.
18 I-75: Aug-Oct
Resurface 7.5 miles from Crawford
County line to south of Charles
Brink Rd. 1 lane open in each
direction.
19 M-33/M-72: July
Resurface 1.1 miles west of Fairview
School to Home Dr, and M-33/M-72
intersection to east of Maple Dr in
Fairview. Flag control.
20 M-33: June-July
Chip seal 17.8 miles from I-75 to south
of M-55, north of Engle Rd to north
of Houghton Creek Rd, and north of
Oyster Rd to north of Borden Rd.
Flag control.
21 US-31: Sept
Resurface 2.9 miles from north of
Pere Marquette Hwy to US-10. Lane
closures and traffic shifts on ramps.
22 US-131: Apr-Sept
Reconstruct 5.7 miles from south of
Mecosta County line to north of US-10
in Reed City. Lane closures and traffic
shifts on ramps.
41
LUCE
95
67
69
Crystal
Falls
ALGER
35
8
7
Iron Mountain
23 M-66: Sept-Oct
Replace bridge over west branch of
Middle Branch River. Detour on M-61
and M-115.
24 US-131: Jan-Oct
Repair bridge over Muskegon River.
1 lane open at all times with 5 total
closures between mid-May and
mid-Aug.
25 M-37: Sept-Oct
Mill and resurface 4.4 miles from the
White River to 3 Mile Rd, and M-20
from M-37 to Swain St. 1 lane open
under flag control.
26 M-82: June-Aug
Mill and resurface 10 miles from Main
St in Fremont to M-37. 1 lane open
under flag control.
27 US-31 BR (Seaway Dr): Apr-Sept
Mill and resurface 5.5 miles from
US-31 to Shoreline Dr. 1 lane open
at all times.
28 US-31: June-July
Construct indirect left-turn lanes and
right-turn lanes at Taylor St. 1 lane
open at all times.
29 M-104: Sept-Nov
Mill and resurface 4.4 miles from
Lake Ave to 124th Ave. 1 lane open
at all times.
30 I-96: June-Sept
Repair bridges over Deer Creek,
Sand Creek and 24th Ave. 1 lane
open at all times.
31 M-44 (Belding Rd): May-Sept
Mill and resurface 9.9 miles from
Myers Lake Ave to Kent/Ionia
county line. 1 lane open at all
times. Westbound traffic detoured
at Ramsdell Dr; eastbound traffic
maintained.
32 M-21 (Fulton St): Aug-Oct
Mill and resurface 2.3 miles from
Valley Vista Dr to Kent/Ionia county line.
Lane closures during off-peak hours.
33 US-31: Mar-Aug
Mill and resurface 1.5 miles from
Allegan/Ottawa county line to 8th
St and reconstruct CSX Railroad
crossing. 1 lane open at all times.
34 M-222: Feb-July
Reconstruct bridge over US-131
in Martin. Bridge closed Feb-June.
All ramps remain open. Nighttime
lane closures on US-131.
35 I-196: Sept-Oct
Repave northbound lanes from
M-63 to Van Buren Trail bridge.
Single-lane closures.
36 M-63 (Niles Rd): June-July
Repair bridge over Hickory Creek.
Northbound traffic maintained;
southbound traffic detoured.
37 I-94: Apr-June
Repair bridge over St. Joseph
River. Daytime single-lane closures;
nighttime double-lane closures.
38 I-94: May-Sept
Replace eastbound bridge over
Hickory Creek. 2 lanes open in
each direction.
39 M-139 (E Main St): Jan-Nov
Replace bridge over St. Joseph River.
Traffic detoured.
40 M-139: Mar-Aug
Reconstruct 3.7 miles from M-140
to Fairland Rd. 1 lane open under
flag control.
41 I-94: May-Nov
Resurface westbound lanes from
CR 687 to M-51, plus reconstruct
median shoulder, replace culvert,
resurface ramp, extend ramp
acceleration lane, reconstruct under
5 bridges, replace guardrail, and
reconstruct cable median barrier. 1
lane open.
42 I-94: Sept-Nov
Repair 2.9 miles from MM 58
to MM 61. Nighttime single-lane
closures.
43 I-94: Mar-Aug
Replace bridge over east branch of
Paw Paw River. 2 lanes open in each
direction.
Escanaba
10
129
CHIPPEWA
11
MACKINAC
48
75
41
DELTA
69
117
SCHOOLCRAFT
94
28
123
77
DICKINSON
Newberry
28
94
553
Gwinn
123
221
Munising
35
IRON
28
Ishpeming
141
77
Marquette
45
1 US-2: May-Oct
Reconstruct 1 mile from Curry St to
Roosevelt St in Ironwood. Westbound
traffic detoured on Jackson Rd to
Greenbush Rd. Eastbound traffic
maintained on US-2.
2 US-41/M-26: Dec 2014-Apr 2016
Repair Portage Lake Lift Bridge.1 lane
open in each direction on bridge for
majority of project. 16 2-hour nighttime
closures Jan-Apr, and approximately
200 15- to 20-minute daytime and
nighttime closures through Apr 2016.
38
64
Real-time
Travel Information
PAVING
THE WAY
Road Repair Projects
KEWEENAW
134
149
48
St. Ignace
Manistique
185
12
183
Mackinaw City
Map Explanation
13
Cheboygan
MENOMINEE
41
35
23
EMMET
119
31
33
Petoskey
14
Charlevoix
www.michigan.gov/mdotprojects
75
CHEBOYGAN
204
22
Gaylord
BENZIE
131
Grayling
37
Manistee
LAKE
131
23
18
66
24
25
20
66
131
46
31 29
45
33
40
31
34
222
South Haven
Benton Harbor
St. Joseph
140
VAN BUREN
41
37
38
139
43 44 Kalamazoo
94
63
45
42
51
131
40
39
216
94
46
60
62
12
96
47
ST. JOSEPH
496
EATON
99
50
78
227
311
52
99
60
57
52
69
96
127
Detroit
WAYNE
61
275
60
12
124
75
MONROE
50
59
Adrian
LENAWEE
223
49
99
153
94
WASHTENAW
HILLSDALE
94
23
Hillsdale
BRANCH
62
Ann Arbor
50
34
696
96
12
53
12
56
JACKSON
29
94
14
Jackson
106
94
66
60
63
127
CALHOUN
MACOMB
59
INGHAM
50
53
Brighton
36
51
Battle
Creek
Port
Huron
19
OAKLAND
96
55
66
65
75
LIVINGSTON
43
69
49
24
136
69
67
69
SHIAWASSEE
86
40
BERRIEN
37
KALAMAZOO
CASS
31
79
48
89
64
GENESEE
54
Charlotte
43
ST. CLAIR
68
15
71
100
66
BARRY
475
23
43
179
LAPEER
13
Lansing
89
36
21
37
ALLEGAN
90
Flint
52
B.R.
50
43
Frankenmuth
96
131
25
70
83
127
196
Holland
35
72
SAGINAW
CLINTON
11
OTTAWA 121
28
46
57
Grand
IONIA
Rapids 32
231
TUSCOLA
136
71
44
Grand Haven
675
GRATIOT
31
SANILAC
81
138
KENT
30
96
19
25
13
46
Alma
MONTCALM
53
73
Saginaw
MIDLAND
91
Muskegon
75
Bay City
74
127
82
BAY
Midland
20
142
13
76
MECOSTA
120
Harbor
Beach
HURON
77
Mount
Pleasant
26
MUSKEGON
25
30
ISABELLA
NEWAYGO
20
27
Clare
10
Big Rapids
20
61
10
22
OCEANA
INTERSTATE BUSINESS
(LOOP OR SPUR)
ARENAC
75
GLADWIN
OSCEOLA
21
31
55
CLARE
37
127
IOSCO
127
10
Pentwater
OGEMAW
ROSCOMMON
115
MASON
Ludington
94
55
115
116
20
75
55
INTERSTATE ROUTE
33
18
Cadillac
WEXFORD
94
23
MISSAUKEE
MANISTEE
CONSTRUCTION
PROJECT
72
OSCODA
66
36
ALCONA
Mio
KALKASKA
113
42
31
19
CRAWFORD
72
22
53 M-60: June-Aug
Repave 0.7 miles at I-69. Flag control.
58 US-23: Apr-July
Repair from School Rd to Center Rd.
1 lane open in each direction.
15
ALPENA
65
MONTMORENCY
31
57 US-12: June-Aug
Resurface from US-127 to M-50.
Daytime single-lane closures. No work
during race weekend at Michigan
International Speedway (MIS).
37
Traverse City 17 16
GRAND
31
TRAVERSE
Frankfort
49 M-89: May-Sept
Repave 5.4 miles from Custer Dr
to I-94 BL in Battle Creek. 1 lane open
in each direction under flag control.
56 I-94: July-Sept
Repair bridge over US-127 BR/M-50.
I-94: all lanes open. US-127 BR/
M-50: single-lane closures. No work
during race weekend at Michigan
International Speedway (MIS).
18
ANTRIM
72
46 M-60: Mar-Sept
Reconstruct 1.1 miles through village
of Mendon, from Mendon Pkwy to
Congress Rd. Westbound lanes
closed and detoured.
55 US-127: Apr-Sept
Repair bridge over I-96. US-127:
daytime lane closures. I-96: nighttime
lane closures, short-term ramp
closures with detour posted.
22
AREA OF
CONSTRUCTION
Alpena
32
88
LEELANAU
45 I-94: Mar-Nov
Reconstruct interchange with
Sprinkle Rd. I-94: nighttime lane
closures. Sprinkle Rd: lane closures.
All ramps closed.
33
32
51 I-69: Apr-Aug
Bridge work on L Dr N over I-69. I-69:
1 lane open in each direction. L Dr N:
1 alternating lane open with temporary
traffic signals.
EATON
23
OTSEGO
66
50 M-66: Apr-June
Repave 1 mile from I-94 to Glenn
Cross Rd. 1 lane open in each
direction.
PRESQUE ISLE
65
Menominee
48 M-89: Aug-Oct
Repave 1.2 miles from Augusta Dr
to Custer Dr west of Battle Creek.
Lane closures under flag control.
68
CHARLEVOIX
75
31
FREEWAY
27
156
58
125
Monroe
24
52
69 I-69: Mar-Nov
Reconstruct 1 mile from M-54
(Dort Hwy) to Center Rd, including
bridge repairs/widening at Center Rd
and Averill Rd, and freeway lighting
upgrades. Replace bridge over M-54
(Dort Hwy). Single-lane closures,
traffic shifts and ramp closures.
70 M-15: Oct 2014-Oct 2015
Replace M-15 bridge over Cass River
in Vassar. Single-lane closures.
71 I-75: Apr-July
Repair M-54/M-83 bridge over I-75.
Single-lane closures.
72 I-75: Mar 2015-Nov 2016
Reconstruct 3.8 miles from Dixie Hwy
to Hess Rd. Replace Baker Rd, King
Rd, and Hess Rd bridges over I-75.
Local bridges over I-75 detoured.
Maintain 3 lanes in peak direction and
2 lanes in non-peak direction.
73 I-75: Apr-Dec
Replace US-10 bridge over I-75.
I-75: intermittent lane closures.
US-10: single-lane closures.
Ramp traffic detoured.
74 US-10: Apr-Sept
Replace Nine Mile Rd bridge over
US-10. 1 lane maintained with
crossovers.
75 US-10 BR: Apr-Nov
Reconstruct 1.5 miles and resurface
0.3 miles from Jerome St to Saginaw
St in Midland. 1 lane open in each
direction.
76 M-30: Mar-June
Construct roundabout at westbound
US-10 ramps. Lane closures with
traffic shifts on M-30. Short-term
detour on M-30; westbound US-10
ramps detoured for majority of project.
77 M-20: Jan-Nov
Construct narrow boulevard from east
of Summerton Rd to east of Leaton
Rd. Single-lane closures and traffic
shifts during off-peak hours.
Alpena...............877-404-6368
Cadillac.............800-943-6368
Gaylord..............989-731-5090
Traverse City.....888-457-6368
GRAND
1420 Front Ave., N.W.
Grand Rapids, MI 49504
866-815-6368
Grand Rapids....616-464-1800
Muskegon.........231-777-3451
BAY
5859 Sherman Road
Saginaw, MI 48604
989-754-7443
Bay City.............989-671-1555
Davison.............810-653-7470
Mt. Pleasant......989-773-7756
6 I-75: Mar-Aug
SOUTHWEST
1501 E. Kilgore Rd.
Kalamazoo, MI 49001
269-337-3900
Coloma..............877-321-6368
Kalamazoo........877-320-6368
Marshall.............877-324-6368
UNIVERSITY
4701 W. Michigan Ave.
Jackson, MI 49201
517-750-0401
Brighton.............810-227-4681
Jackson.............517-780-7540
Lansing..............517-335-3754
METRO
18101 W. Nine Mile Rd.
Southfield, MI 48075
248-483-5100
Detroit................ 313-965-6350
Macomb/St. Clair...586-421-3920
Oakland............. 248-451-0001
Taylor................. 313-375-2400
OAKLAND
53
696
96
696
Farmington
Hills
Novi
3
102
10
14
24
WAYNE
275
375
39
153
14 I-75: Apr-Nov
14
11
9 M-14: Apr-June
Click it or Ticket!
You can be fined $65 for not wearing your seat belt.
Worse than that, not being belted could result in
serious injury or death.
94
75
96
10
15
13
12
Detroit
75
94
Downtown
Detroit
94
12
Taylor
85
75
10
275
17
5
16
18
375
75
12
2015
PAVING
THE WAY
Road Repair Projects
12 I-94: May-Sept
10 I-275: Mar-June
85
37
44
96
FREEWAY
PAVED (TWO OR MORE LANES)
AND MULTI-LANE DIVIDED
CONSTRUCTION
PROJECT
94
INTERSTATE ROUTE
94
INTERSTATE BUSINESS
Grand Rapids
3 I-196: June-Sept
B.R.
131
11
196
45
OTTAWA
AREA OF
CONSTRUCTION
36
Walker
EATON
COUNTY LINE AND NAME
131
Map Explanation
St. Clair
Shores
Warren
97
75
24
Troy
59
59
4 M-59: Apr-June
NORTH
1088 M-32 East
Gaylord, MI 49735
888-304-6368
75
Crystal Falls.......866-584-8100
Ishpeming.........888-920-6368
Newberry...........866-740-6368
29
SUPERIOR
1818 Third Ave., North
Escanaba, MI 49829
888-414-6368
24
MACOMB
53
21
East
Grand Rapids
196
5 I-96: June-July
127
20
121
11
(LOOP OR SPUR)
8
KENT
Grandville
196
Wyoming
6
131
37
Kentwood
6
TRANSPORTATION
SERVICE CENTERS
REGION OFFICES
B.R.
96
9 I-196: May
Repair eastbound bridge over 22nd Ave.
1 lane open at all times.
75
59
2 I-75: Mar-Nov
Pontiac
24
150
www.michigan.gov/mdotprojects
75
1 I-75: Apr-Oct
19
Auburn
Hills
Metropolitan Detroit
2015
www.michigan.gov/drive
PAVING
THE WAY
Road Repair Projects
www.michigan.gov/drive