SOW
For survey,commissioning,ATP,Dismantle,document requirement,follow Huawei requirement.
1.1 BTS Installation SOW: Installation(including receiving material on site,Must offer document as GCI required )
Standard SOW
Unit
Quantity
BTS Rack
Site
1 or 2
Battery Rack
Site
Feeder system
Site
Antenna system
Site
Mounting Bracket
Site
Others
Site
1 LOT
No.
1.2 MW Installation SOW:MW Installation&Pointing(including receiving material on site,Must offer document as GCI required )
No.
Standard SOW
Unit
Quantity
1
IDU
Hop
IF Cable
Hop
ODU
Hop
1
1 or 2
Antenna
Hop
5
Others
Hop
1 LOT Including accessories such as LAN cable,g
2.PriceIncluding all duties and expenses.
(if can provide NPWP number,deduct 2% PPH23-Withold Tax,if can not provide NPWP number,deduct 4% PPH23-With hold Ta
3.Payment terms:
For survey:100% payment after submit TSSR(PASS Huawei verification)
4.Reciept or Invoice: Must have signature with Team Leader/PM/Other GCI Staff
5.Project Regulation
All the subcons, engineers must obey the following regulations. Any subcon disobeys these rules we will stop the contract and g
damage, any engineer disobeys this rules, which will be given warning letter and be kicked out from the project until stop contra
a.Firstly before any activity you must get permission letter.Secondly when you enter and leave the site you must inform NOC.Es
site you must confirm with NOC everything is ok then you can leave site.
b. Activity of power supply, when you change MCB or any other power/rectifier work you must report to Huawei and NOC first, e
of these activities you must get approval from Huawei and Operator by email or hardcopy.
c. Immediate communication and information feedback. Once any issue or trouble happens you must report to GCI PM ASAP (
regarded as disobeying this rule.
d. Personal safety of subcon teams. According to the contract between GCI and subcon,all the subcon should take full respons
memberes/engineers.please pay more attention to this issue
and take enough protection actions and ensure the personal safety of your guys.
Partner
PT.GCI Indonesia
Signature:
Signature:
Date:
Date:
s GCI required )
ort to Huawei and NOC first, especially for the existing equipments. All
Item Description
Unit
01 Survey
BTS0101_Survey: BTS or BTS&MW Engineering Survey + Report
Site
Site
02 New
BTS0201_New: BTS/NodeB (1 system) + Power System + Antenna&Feeder
site
site
site
site
site
site
site
site
site
site
site
site
site
site
site
site
site
site
site
site
site
site
site
site
04 Codeploy with MW
BTS0401_Codeploy with MW: BTS/NodeB (1 system) + Power System + Antenna&Feeder
site
Item Description
Unit
site
site
site
BTS0405_Codeploy with MW: DBS RRU on tower (1 system) + Power System + Antenna
site
BTS0406_Codeploy with MW: DBS RRU on tower (1 system) + Power System + No Antenna
site
BTS0407_Codeploy with MW: DBS RRU on tower (1 system) + No Power System + Antenna
site
BTS0408_Codeploy with MW: DBS RRU on tower (1 system) + No Power System + No Antenna
site
site
site
site
site
BTS0413_Codeploy with MW: DBS RRU on tower (2 system) + Power System + Antenna
site
BTS0414_Codeploy with MW: DBS RRU on tower (2 system) + Power System + No Antenna
site
BTS0415_Codeploy with MW: DBS RRU on tower (2 system) + No Power System + Antenna
site
BTS0416_Codeploy with MW: DBS RRU on tower (2 system) + No Power System + No Antenna
site
site
site
site
site
BTS0421_Codeploy with MW: DBS RRU on tower (3 system) + Power System + Antenna
site
BTS0422_Codeploy with MW: DBS RRU on tower (3 system) + Power System + No Antenna
site
BTS0423_Codeploy with MW: DBS RRU on tower (3 system) + No Power System + Antenna
site
Item Description
BTS0424_Codeploy with MW: DBS RRU on tower (3 system) + No Power System + No Antenna
Unit
site
06 Redeploy
site
site
site
site
07 Additional-1
BTS0702_Expansion: BTS/NodeB RF/TRX Board
BTS0703_Expansion: BTS/NodeB Cabinet
BTS0704_Expansion: Sector + Antenna&Feeder
BTS0705_Expansion: Sector + No Antenna&Feeder
BTS0706_Expansion: RRU on Tower
08 Dismantlement&Packing
site
site
site
site
site
site
site
site
site
site
Item Description
Unit
site
site
site
site
site
site
site
10 Additional-2
BTS0901_E1 cross-connection from BTS/NodeB to BSC/RNC
BTS1003_Optional: Power System Replacement&Packing
BTS1004_Optional: Power Rectifier Installation
BTS1005_Optional: BTS/NodeB Battery Test with Dummy Load
BTS1006_Optional: E1 Checking
BTS1007_Optional: Antenna Replacement&Packing
BTS1008_Optional: Antenna Dismantlement&Packing
BTS1009_Optional: Feeder Dismantlement&Packing
BTS1010_Optional: Combiner/Diplexer/Triplexer/TMA/Filter Dismantlement&Packing
site
site
site
site
site
site
site
site
site
Scenario
CJ
Completed
SOW(Install+commission+ Installation SOW
document+atp)
Completed
SOW(Install+commission+
document+atp)
850,000
935,000
700,000
770,000
0
4,500,000
3500000
4,950,000
2,750,000
2000000
3,025,000
4,000,000
3000000
4,400,000
2,350,000
3,800,000
2,900,000
3,400,000
2,450,000
5,400,000
3,300,000
4,800,000
2,820,000
4,560,000
3,480,000
4,080,000
2,940,000
6,300,000
3,850,000
5,600,000
3,290,000
5,320,000
4,060,000
4,760,000
3,430,000
1700000
3000000
2000000
2600000
1700000
4200000
2400000
3600000
2040000
3600000
2400000
3120000
2040000
4900000
2800000
4200000
2380000
4200000
2800000
3640000
2380000
2,585,000
4,180,000
3,190,000
3,740,000
2,695,000
5,940,000
3,630,000
5,280,000
3,102,000
5,016,000
3,828,000
4,488,000
3,234,000
6,930,000
4,235,000
6,160,000
3,619,000
5,852,000
4,466,000
5,236,000
3,773,000
Scenario for BTS/NobeB codeploy with MW, need to used together with "Codeploy with BTS/NobeB in
MW BOQ.
0
3,600,000
3150000
3,960,000
Scenario
Completed
SOW(Install+commission+ Installation SOW
document+atp)
Completed
SOW(Install+commission+
document+atp)
2,200,000
1800000
2,420,000
3,200,000
2700000
3,520,000
1,880,000
1530000
2,068,000
3,040,000
2700000
3,344,000
2,320,000
1800000
2,552,000
2,720,000
2340000
2,992,000
1,960,000
1530000
2,156,000
4,320,000
3780000
4,752,000
2,640,000
2160000
2,904,000
3,840,000
3240000
4,224,000
2,256,000
1836000
2,481,600
3,648,000
3240000
4,012,800
2,784,000
2160000
3,062,400
3,264,000
2808000
3,590,400
2,352,000
1836000
2,587,200
5,040,000
4410000
5,544,000
3,080,000
2520000
3,388,000
4,480,000
3780000
4,928,000
2,632,000
2142000
2,895,200
4,256,000
3780000
4,681,600
3,248,000
2520000
3,572,800
3,808,000
3276000
4,188,800
Scenario
Completed
SOW(Install+commission+ Installation SOW
document+atp)
2,744,000
Completed
SOW(Install+commission+
document+atp)
2142000
exclude dismantlement&packing.
ONLY for 3rd party equipment redeploy; for Huawei equipment redeploy use "02 New".
3,018,400
0
complete redeploy, include BTS (or BBU, RRU), power system, antenna&feeder.
Can be used for Macro BTS, Micro BTS, DBS RRU on tower, DBS RRU not on tower.
4,950,000
3850000
5,445,000
3,025,000
2200000
3,327,500
4,400,000
3300000
4,840,000
2,585,000
1870000
2,843,500
0
550,000
825,000
1,430,000
770,000
825,000
0
500,000
750,000
1,300,000
700,000
750,000
1600000
dismantle&packing, include BTS (or BBU, RRU), power system, exclude antenna&feeder
850000
dismantle&packing, include BTS (or BBU, RRU), antenna&feeder, exclude power system.
1400000
dismantle&packing, include BTS (or BBU, RRU), exclude antenna&feeder, power system.
650000
1920000
Scenario
Completed
SOW(Install+commission+ Installation SOW
document+atp)
Completed
SOW(Install+commission+
document+atp)
1020000
1680000
780000
2240000
1190000
1960000
910000
700000
1000000
750000
450000
550000
950000
520000
700000
550000
0
0
0
0
0
0
0
0
0
0
CJ
Installation SOW
3850000
2200000
3300000
1870000
3300000
2200000
2860000
1870000
4620000
2640000
3960000
2244000
3960000
2640000
3432000
2244000
5390000
3080000
4620000
2618000
4620000
3080000
4004000
2618000
0
3465000
Installation SOW
1980000
2970000
1683000
2970000
1980000
2574000
1683000
4158000
2376000
3564000
2019600
3564000
2376000
3088800
2019600
4851000
2772000
4158000
2356200
4158000
2772000
3603600
Installation SOW
2356200
0
4235000
2420000
3630000
2057000
0
0
0
0
0
0
0
1760000
935000
1540000
715000
2112000
Installation SOW
1122000
1848000
858000
2464000
1309000
2156000
1001000
0
770000
1100000
825000
495000
605000
1045000
572000
770000
605000
L3.2 MW Baseline
Item Description
01 Survey
MW0101_MW Engineering Survey
MW0102_MW LOS survey
02 New
MW0201_New: MW 0.3/0.6m 2
MW0202_New: MW 0.3/0.6m 4
MW0203_New: MW 0.9/1.2m 2
MW0204_New: MW 0.9/1.2m 4
MW0205_New: MW 1.8m 2
MW0206_New: MW 1.8m 4
MW0207_New: MW >= 2.4m 2
MW0208_New: MW >= 2.4m 4
MW0209_New: MW(Without mounting pole) 0.3/0.6m 2
MW0210_New: MW(Without mounting pole) 0.9/1.2m 2
MW0211_New: MW(Without E2E commissioning) 0.3/0.6m 2
MW0212_New: MW(Without E2E commissioning) 0.9/1.2m 2
Unit
Site
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Hop
0.3/0.6m 2
0.3/0.6m 4
0.9/1.2m 2
0.9/1.2m 4
1.8m 2
1.8m 4
>= 2.4m 2
>= 2.4m 4
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Item Description
Unit
Hop
Hop
Hop
Pcs
Pcs
Pcs
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Site
Hop
Hop
Hop
Hop
Hop
Hop
Hop
Site
Hop
.2 MW Baseline
Jakarta
Quick SOW
survey+report
survey+report
Installation of IDU,Board,IF cable,ODU,Coupler,Antenna,+PAT
CJ
Completed
SOW(Install+c Installation
ommission+do SOW
cument+atp)
450,000
750,000
3,800,000
4,500,000
4,500,000
5,400,000
5,400,000
6,400,000
6,400,000
7,600,000
3,420,000
4,050,000
3,150,000
3,780,000
2,200,000
2,640,000
2,600,000
3,120,000
3,000,000
3,600,000
4,000,000
4,800,000
1,980,000
2,376,000
1,820,000
2,184,000
3,040,000
3,600,000
3,600,000
4,320,000
4,320,000
5,120,000
5,120,000
6,080,000
2,013,000
2,415,600
2,379,000
2,854,800
2,745,000
3,294,000
3,660,000
4,392,000
3,990,000
4,725,000
4,725,000
5,670,000
5,670,000
6,720,000
2,310,000
2,772,000
2,730,000
3,276,000
3,150,000
3,780,000
Completed
SOW(Install+commission+ Installation SOW
document+atp)
495,000
825,000
0
4,180,000
4,950,000
4,950,000
5,940,000
5,940,000
7,040,000
7,040,000
8,360,000
3,762,000
4,455,000
3,465,000
4,158,000
2420000
2904000
2860000
3432000
3300000
3960000
4400000
5280000
2178000
2613600
2002000
2402400
3,344,000
3,960,000
3,960,000
4,752,000
4,752,000
5,632,000
5,632,000
6,688,000
0
4,389,000
5,197,500
5,197,500
6,237,000
6,237,000
7,392,000
2214300
2657160
2616900
3140280
3019500
3623400
4026000
4831200
0
2541000
3049200
3003000
3603600
3465000
4158000
Quick SOW
Completed
SOW(Install+c Installation
ommission+do SOW
cument+atp)
6,720,000
7,980,000
4,200,000
5,040,000
1,200,000
1,400,000
1,400,000
1,600,000
2,000,000
2,500,000
3,200,000
3,800,000
1,200,000
1,400,000
1,400,000
1,600,000
2,000,000
2,500,000
3,200,000
3,800,000
500,000
1,000,000
2,800,000
3,300,000
4,000,000
6,500,000
450,000
800,000
2,200,000
2,600,000
3,000,000
4,000,000
2,000,000
350,000
550,000
2,000,000
Completed
SOW(Install+commission+ Installation SOW
document+atp)
7,392,000
8,778,000
0
1,320,000
1,540,000
1,540,000
1,760,000
2,200,000
2,750,000
3,520,000
4,180,000
0
550,000
1,100,000
3,080,000
3,630,000
4,400,000
7,150,000
0
2,200,000
385,000
605,000
4620000
5544000
0
1320000
1540000
1540000
1760000
2200000
2750000
3520000
4180000
0
495000
880000
2420000
2860000
3300000
4400000
0
2200000
0
0
2,500,000
2,750,000
1,800,000
1,980,000
1,100,000
1,375,000
1,650,000
880000
1100000
1375000
1,000,000
1,250,000
1,500,000
800,000
1,000,000
1,250,000
Unit
Jakarta
CJ
Subcon Price
Subcon Price
01 Survey
CN0101_Core Network Engineering Survey + Report
02 Hareware Installation and Supervision
CN0201_Hareware Installation and Supervision: Core Network Cabinet
CN0202_Hardware Installation and Supervision: Core Network Subrack
CN0204_Hardware Installation and Supervision: Rectifier Cabinet
CN0205_Hardware Installation and Supervision: Rectifier Module
CN0206_Hardware Installation and Supervision: Battery 300AH or below
CN0207_Hardware Installation and Supervision: Battery 400AH ~ 650AH
CN0208_Hardware Installation and Supervision: Battery 800AH ~ 1300AH
CN0209_Hardware Installation and Supervision: Battery 1600AH ~ 2600AH
CN0210_Hardware Installation and Supervision: Battery 3000AH and above
CN0211_Hardware Installation and Supervision: UPS system including battery: 10KVA or below
Site
1,200,000
Cabinet
Subrack
Cabinet
Site
BANK
BANK
BANK
BANK
BANK
Set
1,500,000
500,000
1,500,000
500,000
750,000
950,000
1,250,000
1,500,000
2,000,000
1,320,000
0
1,650,000
550,000
1,650,000
550,000
825,000
1,045,000
1,375,000
1,650,000
2,200,000
850,000
935,000
CN0212_Hardware Installation and Supervision: UPS system including battery: 20KVA ~ 30KVA
Set
1,700,000
1,870,000
CN0213_Hardware Installation and Supervision: UPS system including battery: 40KVA ~ 80KVA
Set
2,200,000
2,420,000
Set
Rack
350,000
450,000
Cabinet
Cabinet
BANK
BANK
BANK
BANK
BANK
Set
650,000
600,000
350,000
450,000
650,000
850,000
950,000
180,000
385,000
495,000
0
715,000
660,000
385,000
495,000
715,000
935,000
1,045,000
198,000