The Indian Navy is augmenting capability to emerge as a truly blue-water Navy with
strategic reach to operate from Africa's eastern coast right up to the Malacca Straits. It
is working towards becoming a networked-force with capabilities to manage and
control the entire Indian Ocean Region (IOR).
While some acquisitions of the Indian Navy have been beset with delays and
protracted procurement procedures, the strategic blueprint and planned expansion of
capability gives reassurance of efforts to meet the desired objectives
Guided Missile Destroyer In 2009, the DAC ascertained that the total
project cost will be USD 9,780 Million, or USD
Currently being built at MAZAGAON 1,127 Million for each frigate.
DOCKS (MDL), India
These will be the first vessels to be built by the
Plan to build 3 vessels.
modular construction method. This method is
INS KOLKATA to be delivered in MAY
also being used in the manufacture of the
2010, followed by INS KOCHI in MAY
Indigenous Aircraft Carrier. Since the 2
2011 and the third (un-named) vessel
shortlisted shipyards did not have any prior
in MAY 2012.
experience in this form of construction, the
Navy had insisted that the first 2 frigates be
FAX:
In 2008 and 2009, there were issues wrt the +91 (11) 3912 5051,
offset obligation fulfillment for the contract, +91 (11) 3912 5052
which now seem to have been resolved. Col. K. V. Kuber (Retd.)
Sr. Vice President
Investment Banking
Col.kuber@religare.in
Rahul Gangal
Sr. Vice President
Strategic Advisory Services
Rahul.gangal@religare.in
Ankur Gupta
Senior Manager
Defence Advisory Services
Ankur.gupta1@religare.in
Any and all information contained herein is based on good faith assumptions and is provided for general information purposes only. This
information does not constitute an offer, promise, warranty, or guarantee of performance. This document should not be used or relied upon for
any purpose other than as intended by Religare Capital Markets Limited.
Strategic Advisory Services Exchange Rate Assumption for all figures: 1USD = Rs.45