REPORT
OF
NEW COMBINED
EFFLUENT AND SEWAGE TREATMENT PLANT
CAPACITY 150 M3/Day
INDEX
INTRODUCTION
WASTE WATER QUALITY & QUANTITY
REQUIREMENT OF COMBINED TREATED
EFFLUENT AND SEWAGE DISCHARGE
TREATMENT OF POLLUTION
SCHEME AND PROCESS DESCRIPTION
PROCESS UNITS
LIST OF CHARTS
SCHEMATIC FLOW DIAGRAM OF COMBINED EFFLUENT
AND SEWAGE TREATMENT PLANT
Water
Consumption
1.
2.
Total
Water
Required
2,000 lit/day
Floating
Population/
visitors
50
45 lit / Person /
Day
2,250 lit/day
Total
19,250 lit/day
Note: As per the Manual on Sewerage and Sewage Treatment, the water
requirement of commercial places like factories etc is 45 lpcd
Description
Water
in LPM
600
300
400
Qty Duration
of Total
washing in mins.
90
60
90
Water
Qty. in liters.
54,000
18,000
36,000
Washing/
Total
1,08,000
17,325
1,25,325
Sr.
Parameter
Unit
Effluent
Sewage
No.
4.
I.
Design Flow
M3/day
II.
PH
III.
BOD
IV.
126
24
6 -6.5
6.5 - 8.0
Mg/l
145 -200
200 - 250
COD
Mg/l
600 - 700
400 -450
V.
TDS
Mg/l
450 - 500
900 -1000
VI.
TSS
Mg/l
100
150 -200
VII.
Mg/l
10 -15
10-15
pH
III.
Unit
M3/day
Value
150
6.5 -8.0
COD
mg/l
< 250
IV.
BOD3 @ 27 C
mg/l
< 30
V.
TSS
mg/l
VI.
TDS
mg/l
< 100
< 2100
VII.
mg/l
<5
5. TREATMENT OF POLLUTION
5.1 TREATMENT SCHEME
The ETP is of modular construction and the treatment process will consists
of five stages.
For SEWAGE WATER
Effluent generated from all section of factory will be first passing through a
Screen Chamber cum Oil & Grease Trap for removal of floatable matter
& floating oil before collecting the Effluent in to the Effluent Equalization
Tank. In this tank air is provided for mixing & equalized. From equalization
tank the effluent will be pumped to Chemical treatment.
SLUDGE TREATMENT
The Primary (Chemical) Sludge generated from the primary treatment &
The Excess Secondary (Biological) sludge from secondary Treatment will
be send to Sludge Drying Beds for sludge dewatering. The dried sludge
will be put in impervious HDPE bags and stored in factory premises. Filtrate
water will send back to effluent collection tank by gravity.
TERTIARY TREATMENT
The Clarified water collected from the collection launder of the Secondary
tube settler tank is then goes to the Filter Feed Tank. Hypo chloride
solution is dosed in the clarified water for the disinfection of the treated
water. Then the treated effluent will be passed through the Pressure Sand
Filter and Activated Carbon Filter with the help of pump, which polishes
the water before the final discharge. It basically removes any residual
suspended matter or any kind of smell / colour present in the water. Outlet
of ACF is treated water can be used for gardening / irrigation purposes.
PROCESS UNIT
Screen Chamber cum Oil &
Grease Trap
BRIEF PURPOSE
For removal Floatable matter & oil from
the effluent & Sewage Water
Equalization Tank
Flash Mixer
Flocculator
Aeration Tank
Peak Factor
: 2
: one
Capacity,m3
: 18 (12 + 6)
Size, m x m x m
MOC
: RCC
: one
Screen Chamber m x m x m
MOC
: RCC/RBC
: one
: 75
Size m x m x m
MOC
: RCC
: one
Screen Chamber m x m x m
MOC
: RCC/RBC
MOC
: RCC/RBC
: one
Type
Capacity,m3/hr
: 6.5
MOC
: RCC
: one
: 100
Size m x m x m
MOC
: RCC
: 225
: Blower/Twin lobe
Type of diffusers
: Tubular/non/clog
: one
Type
Capacity,m3/hr
: 7.5
MOC
: RCC
: one
Capacity,m3
:9
Size m x m x m
MOC
: RCC
No. of units
:6
Capacity,m2
:9
Size m x m x m
: 3.0 x 3.0 x 1 m
Media
MOC
: BM
: one
Capacity,m3/hr
: 7.5
Size, mm
: 3.5
MOC
: MS internally coated
Media
: one
Capacity,m3/hr
: 7.5
Size, mm
: 3.5
MOC
: MS internally coated
Media
8. OTHER SPECIFICATIONS
A.
UNITS
1.
B.
R.C.C.
R.C.C.
L.C.C.
Plaster
Brick Masonry
EQUIPMENT
1.
Electric Motors
Kirloskar/Siemens/NGEF/Crompton.
2.
Tube Settler :
3.
Pumps
4.
5.
Valves
6.
Electricals
L & T/Siemens
7.
Cables
Aluminium-PVC Armoured
Blower
Dosing pumps
10.
Diffusers
MM AQUA/Cooldeck
:
Kirloskar.
9. MISCELLANEOUS INFORMATION
PERIOD OF COMPLETION
A period of about 3 months will be required for execution of proposed
scheme.
AVALIBILITY OF LAND
The factory has sufficient land to accommodate the proposed treatment
scheme. The scheme has also considered of reuse of treated waste water
for irrigation in garden and trees within the factory. The factory has 0.6
acres land available under parks and trees.
TREE PLANTATION
It is proposed to plant rows of spreading crown varieties of evergreen trees
all along the boundary wall of the factory for which sufficient land is
available.
Provision has been made for landscaping with roadside tree plantation and
development of open space.
General development in respect of proper roads, lighting, storm drains will
also be provided for clean environment.
Recommended Trees Silver Oak, Neem , Eucalyptus, Badam, Vad
b.
c.
Waste Plastic
d.
Waste Metal
GARDENING
WASTE
COMPOST BY
VERMICULTURE
STP SLUDGE
USED AS BIOFERTILIZER
PAPER BASED
WASTE
METAL WASTE
RESALE
PLASTIC WASTE
CONSTRUCTION
MALBA
LAND FILL