KELANA JAYA (KLJ) AND AMPANG (AMG) LINE LRT EXTENSION PROJECT

TIME SHEET FOR THE MONTH OF

JANUARY 2015

STAFF NO

22321

NAME (IN CAPITAL LETTER)

KHAIRIL AZHAR B AZMI

COMPANY

OPUS-AV

POSITION

SR ENGINEER

DEPARTMENT

LRT EXTENSION PROJECT

DESCRIPTION OF WORKS

S TOTAL

5
4.0

6
8.0

10

11

12

13

14

15

16

17

18

19
5.0

20
3.0

21

22

23

24

25

26
4.0

27

28
6.0

29

30

31

AL

MC

0.0
0.0
0.0

0.0 0.0
0.0 0.0
0.0 0.0

Site Visit/Inspection
*
*
Meeting/Discussion
* Prasarana
* Government Agencies
* Contractors
* Internal
Document Review
*
*
Administration
*
*
*
*

4.0

N
E
W
8.0
Y
E
A
R
S

8.0

Normal Working Hours


Overtime
Total Hours

8.0
0.0
8.0

4.0

4.0

R
A
S
U
L

D
A
Y

Others
FAT (Italy)
*

M
A
U
L
I
D
U
R

8.0
0.0
8.0

0.0
0.0
0.0

3.0

3.0

MC

0.0
0.0
0.0

8.0
###
###

8.0
0.0
8.0

8.0
0.0
8.0

0.0
0.0
0.0

2.0

6.0

8.0

MC

0.0
0.0
0.0

4.0

EL

0.0
0.0
0.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

0.0
8.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

0.0
8.0
8.0

2.0

2.0

EL
8.0

0.0
0.0
0.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

0.0
0.0
0.0

0.0
0.0
0.0

8.0
8.0
8.0

0.0
0.0
0.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

Saturday & Sunday

AL

Annual Leave

MC

Medical Leave

Public Holiday

EL

Emergency Leave

CL

Compassionate Leave

Prepared By :
Date :

Checked By
Supervisor/Section Head

Verified By
Prasarana

136.0
16.0
152.0

KELANA JAYA (KLJ) AND AMPANG (AMG) LINE LRT EXTENSION PROJECT

TIME SHEET FOR THE MONTH OF

FEBRUARY 2015

STAFF NO

22321

NAME (IN CAPITAL LETTER)

KHAIRIL AZHAR B AZMI

COMPANY

OPUS-AV

POSITION

SR ENGINEER

DEPARTMENT

LRT EXTENSION PROJECT

DESCRIPTION OF WORKS

5
4.0

9
5.0

10

11

12

13

14

15

16
5.0

17

18
5.0

19

20

21

22

23
4.0

24

25
8.0

26

27
4.0

28

6.0

4.0

3.0

8.0

4.0

5.0

C
H
I
N
E
S
E

C
H
I
N
E
S
E

N
E
W

N
E
W

Y
E
A
R

Y
E
A
R

8.0

8.0

8.0
0.0
8.0

8.0
0.0
8.0

Site Visit/Inspection
*
*
Meeting/Discussion
* Prasarana
* Government Agencies
* Contractors
* Internal
Document Review
*
*
Administration
*
*
*
*
Others
*
*

F
E
D
E
R
A
L

8.0

2.0

4.0

4.0

3.0

3.0

4.0

3.0

T
H
A
I
P
U
S
A
M

T
E
R
R
I
T
O
R
Y

MC

5.0

5.0

4.0

3.0

3.0

4.0

8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
8.0
8.0

TOTAL

EL

8.0
D
A
Y

Normal Working Hours


Overtime
Total Hours

0.0
0.0
0.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

0.0
0.0
0.0

0.0
0.0
0.0

8.0
0.0
8.0

136.0
8.0
136.0

Saturday & Sunday

AL

Annual Leave

MC

Medical Leave

Public Holiday

EL

Emergency Leave

CL

Compassionate Leave

Prepared By :
Date :

Checked By
Supervisor/Section Head

Verified By
Prasarana

KELANA JAYA (KLJ) AND AMPANG (AMG) LINE LRT EXTENSION PROJECT

TIME SHEET FOR THE MONTH OF

March 2015

STAFF NO

22321

NAME (IN CAPITAL LETTER)

KHAIRIL AZHAR B AZMI

COMPANY

OPUS-AV

POSITION

SR ENGINEER

DEPARTMENT

LRT EXTENSION PROJECT

DESCRIPTION OF WORKS

2
6.0

3
4.0

5
4.0

6
6.0

9
4.0

10
4.0

11
4.0

12
4.0

13

14

15

16
4.0

17

18

19
6.0

20
6.0

21
6.0

22

23

24
6.0

25
4.0

26

27
4.0

28

29

30
8.0

31

5.0

4.0

4.0

8.0

8.0

5.0

4.0

6.0

4.0

Site Visit/Inspection
*
*
Meeting/Discussion
* Prasarana
* Government Agencies
* Contractors
* Internal
Document Review
*
*

2.0

4.0

3.0

4.0

2.0

4.0

4.0

4.0

3.0

4.0

2.0

2.0

2.0

4.0

2.0

TOTAL

2.0

Administration
*
*
*
*
Others
*
*

Normal Working Hours


Overtime
Total Hours

MC

0.0
0.0
0.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

0.0
0.0
0.0

0.0
0.0
0.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

0.0
0.0
0.0

0.0
0.0
0.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

0.0
8.0
8.0

0.0
0.0
0.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

0.0
0.0
0.0

0.0
0.0
0.0

8.0
0.0
8.0

Saturday & Sunday

AL

Annual Leave

MC

Medical Leave

Public Holiday

EL

Emergency Leave

CL

Compassionate Leave

Prepared By :
Date :

Checked By
Supervisor/Section Head

Verified By
Prasarana

0.0
0.0
0.0

168.0
8.0
176.0

KELANA JAYA (KLJ) AND AMPANG (AMG) LINE LRT EXTENSION PROJECT

TIME SHEET FOR THE MONTH OF

STAFF NO

NAME (IN CAPITAL LETTER)

COMPANY

OPUS-AV

POSITION

DEPARTMENT

LRT EXTENSION PROJECT

DESCRIPTION OF WORKS W
1

APRIL 2015

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

TOTAL

Site Visit/Inspection
*
*
Meeting/Discussion
* Prasarana
* Government Agencies
* Contractors
* Internal
Document Review
*
*

8.0

Administration
*
*
*
*
Others
*
*

Normal Working Hours


Overtime
Total Hours

0.0
0.0
0.0

8.0
0.0
8.0

Saturday & Sunday

AL

Annual Leave

MC

Medical Leave

Public Holiday

EL

Emergency Leave

CL

Compassionate Leave

Prepared By :
Date :

Checked By
Supervisor/Section Head

Verified By
Prasarana

8.0
0.0
8.0

KELANA JAYA (KLJ) AND AMPANG (AMG) LINE LRT EXTENSION PROJECT

TIME SHEET FOR THE MONTH OF

MAY 2015
KONSORTIUM
KINTA SAMUDRA-EMENEA-TECHART

STAFF NO

22321

NAME (IN CAPITAL LETTER)

KHAIRIL AZHAR B AZMI

COMPANY

OPUS-AV

POSITION

SR ENGINEER

DEPARTMENT

LRT EXTENSION PROJECT

DESCRIPTION OF WORKS

10

11

12

13

14

15

16

17

18
4.0

19

20

21

22

23

24

25

26

27

28

29

30

31

8.0

8.0

8.0

8.0

8.0

4.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

0.0
0.0
0.0

0.0
0.0
0.0

Site Visit/Inspection
*
*
Meeting/Discussion
* Prasarana
* Government Agencies
* Contractors
* Internal

L
A
B
O
U
R

W
E
S
A
K

D
A
Y

D
A
Y

Others
*
*

8.0

8.0

Normal Working Hours


Overtime
Total Hours

8.0
0.0
8.0

Document Review
*
*
Administration
*
*
*
*

4.0

0.0
0.0
0.0

0.0
0.0
0.0

8.0
0.0
8.0

CL

CL

CL

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

4.0

AL

8.0
0.0
8.0

0.0
8.0
8.0

0.0
0.0
0.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

0.0
0.0
0.0

AL

0.0
0.0
0.0

0.0
0.0
0.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

8.0
0.0
8.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

Saturday & Sunday

AL

Annual Leave

MC

Medical Leave

Public Holiday

EL

Emergency Leave

CL

Compassionate Leave

Prepared By :
Date :

KHAIRIL AZHAR B AZMI

TOTAL

Checked By
Supervisor/Section Head

Verified By
Prasarana

128.0
8.0
136.0

KELANA JAYA (KLJ) AND AMPANG (AMG) LINE LRT EXTENSION PROJECT

TIME SHEET FOR THE MONTH OF

STAFF NO

NAME (IN CAPITAL LETTER)

JUNE 2015

COMPANY

OPUS-AV

POSITION

DEPARTMENT

LRT EXTENSION PROJECT

DESCRIPTION OF WORKS M

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

TOTAL

Site Visit/Inspection
*
*
Meeting/Discussion
* Prasarana
* Government Agencies
* Contractors
* Internal

A
G
O
N
G

Document Review
*
*

'
S
B
I
R
T
H
D
A
Y

Administration
*
*
*
*
Others
*
*

8.0

Normal Working Hours


Overtime
Total Hours

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

8.0
0.0
8.0

Saturday & Sunday

AL

Annual Leave

MC

Medical Leave

Public Holiday

EL

Emergency Leave

CL

Compassionate Leave

Prepared By :
Date :

Checked By
Supervisor/Section Head

Verified By
Prasarana

8.0
0.0
8.0

KELANA JAYA (KLJ) AND AMPANG (AMG) LINE LRT EXTENSION PROJECT

TIME SHEET FOR THE MONTH OF

STAFF NO

NAME (IN CAPITAL LETTER)

COMPANY

OPUS-AV

POSITION

DEPARTMENT

LRT EXTENSION PROJECT

DESCRIPTION OF WORKS W
1

JULY 2015

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

H
A
R
I

H
A
R
I

R
A
Y
A

R
A
Y
A

P
U
A
S
A

P
U
A
S
A

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

TOTAL

Site Visit/Inspection
*
*
Meeting/Discussion
* Prasarana
* Government Agencies
* Contractors
* Internal

N
U
Z
U
L

Document Review
*
*

A
L
Q
U
R
A
N

Administration
*
*
*
*
Others
*
*

Normal Working Hours


Overtime
Total Hours

8.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

8.0
0.0
8.0

0.0
0.0
0.0

Saturday & Sunday

AL

Annual Leave

MC

Medical Leave

Public Holiday

EL

Emergency Leave

CL

Compassionate Leave

Prepared By :
Date :

Checked By
Supervisor/Section Head

Verified By
Prasarana

8.0
0.0
8.0

KELANA JAYA (KLJ) AND AMPANG (AMG) LINE LRT EXTENSION PROJECT

TIME SHEET FOR THE MONTH OF

STAFF NO

NAME (IN CAPITAL LETTER)

COMPANY

OPUS-AV

POSITION

DEPARTMENT

LRT EXTENSION PROJECT

DESCRIPTION OF WORKS

AUGUST 2015

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

TOTAL

Site Visit/Inspection
*
*
Meeting/Discussion
* Prasarana
* Government Agencies
* Contractors
* Internal

N
A
T
I
O
N
A
L

Document Review
*
*
Administration
*
*
*
*

D
A
Y

Others
*
*

Normal Working Hours


Overtime
Total Hours

8.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

Saturday & Sunday

AL

Annual Leave

MC

Medical Leave

Public Holiday

EL

Emergency Leave

CL

Compassionate Leave

Prepared By :
Date :

Checked By
Supervisor/Section Head

Verified By
Prasarana

8.0
0.0
8.0

8.0
0.0
8.0

KELANA JAYA (KLJ) AND AMPANG (AMG) LINE LRT EXTENSION PROJECT

TIME SHEET FOR THE MONTH OF

STAFF NO

NAME (IN CAPITAL LETTER)

COMPANY

OPUS-AV

POSITION

DEPARTMENT

LRT EXTENSION PROJECT

DESCRIPTION OF WORKS

SEPTEMBER 2015

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

TOTAL

Site Visit/Inspection
*
*
Meeting/Discussion
* Prasarana
* Government Agencies
* Contractors
* Internal
Document Review
*
*
Administration
*
*
*
*

R
A
Y
A

D
A
Y

Others
*
*

Normal Working Hours


Overtime
Total Hours

H
A
R
I

M
A
L
A
Y
S
I
A

Q
U
R
B
A
N
8.0

8.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

8.0
0.0
8.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

8.0
0.0
8.0

Saturday & Sunday

AL

Annual Leave

MC

Medical Leave

Public Holiday

EL

Emergency Leave

CL

Compassionate Leave

Prepared By :
Date :

Checked By
Supervisor/Section Head

Verified By
Prasarana

16.0
0.0
16.0

KELANA JAYA (KLJ) AND AMPANG (AMG) LINE LRT EXTENSION PROJECT

TIME SHEET FOR THE MONTH OF

STAFF NO

NAME (IN CAPITAL LETTER)

COMPANY

OPUS-AV

POSITION

DEPARTMENT

LRT EXTENSION PROJECT

DESCRIPTION OF WORKS

OCTOBER 2015

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

TOTAL

Site Visit/Inspection
*
*
Meeting/Discussion
* Prasarana
* Government Agencies
* Contractors
* Internal

A
W
A
L

Document Review
*
*

M
U
H
A
R
A
M

Administration
*
*
*
*
Others
*
*

Normal Working Hours


Overtime
Total Hours

8.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

8.0
0.0
8.0

Saturday & Sunday

AL

Annual Leave

MC

Medical Leave

Public Holiday

EL

Emergency Leave

CL

Compassionate Leave

Prepared By :
Date :

Checked By
Supervisor/Section Head

Verified By
Prasarana

8.0
0.0
8.0

KELANA JAYA (KLJ) AND AMPANG (AMG) LINE LRT EXTENSION PROJECT

TIME SHEET FOR THE MONTH OF

STAFF NO

NAME (IN CAPITAL LETTER)

COMPANY

OPUS-AV

POSITION

DEPARTMENT

LRT EXTENSION PROJECT

DESCRIPTION OF WORKS

NOVEMBER 2015

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

TOTAL

Site Visit/Inspection
*
*
Meeting/Discussion
* Prasarana
* Government Agencies
* Contractors
* Internal

D
E
E
P
A
V
A
L
I

Document Review
*
*
Administration
*
*
*
*
Others
*
*

Normal Working Hours


Overtime
Total Hours

8.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

8.0
0.0
8.0

Saturday & Sunday

AL

Annual Leave

MC

Medical Leave

Public Holiday

EL

Emergency Leave

CL

Compassionate Leave

Prepared By :
Date :

Checked By
Supervisor/Section Head

Verified By
Prasarana

8.0
0.0
8.0

KELANA JAYA (KLJ) AND AMPANG (AMG) LINE LRT EXTENSION PROJECT

TIME SHEET FOR THE MONTH OF

STAFF NO

NAME (IN CAPITAL LETTER)

COMPANY

OPUS-AV

POSITION

DEPARTMENT

LRT EXTENSION PROJECT

DESCRIPTION OF WORKS

DECEMBER 2015

10

11
S
U
L
T
A
N

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

Site Visit/Inspection
*
*
Meeting/Discussion
* Prasarana
* Government Agencies
* Contractors
* Internal

S
E
L
A
N
G
O
R
'
S

Document Review
*
*
Administration
*
*
*
*

Normal Working Hours


Overtime
Total Hours

C
H
R
I
S
T
M
A
S

B
I
R
T
8.0
D
A
Y

Others
*
*

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

8.0
0.0
8.0

8.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

8.0
0.0
8.0

Saturday & Sunday

AL

Annual Leave

MC

Medical Leave

Public Holiday

EL

Emergency Leave

CL

Compassionate Leave

Prepared By :
Date :

TOTAL

Checked By
Supervisor/Section Head

Verified By
Prasarana

16.0