WWW - Maharashtra.gov - In: IEM/LOI/EOU/IL Obtain From Central Government or EM From State Government
WWW - Maharashtra.gov - In: IEM/LOI/EOU/IL Obtain From Central Government or EM From State Government
To,
Development Commissioner (Industries)
New Administrative Building, Madam Cama Road,
Opp. Mantralaya, Mumbai 400 032
Tel. No. :- 022 - 22023505
Fax No.:- 022 - 22026826
E-mail :- diland@maharashtra.gov.in
Website :- www.maharashtra.gov.in
Page
No.
(*)
10. Ack. Copy/Consent letter for power supply from Maharashtra State Electricity
Distribution Co. Ltd. (*)
Application of BTAL permission_REVISED
1 / 14
Sr.
Document Specification
No.
11. Layout plan along with Land use statement (*)
Page
No.
12. Marked Village Map showing Gut & Hissa No. (*)
13. List of Gut & Hissa No. of proposed area (*)
14. Talathi Report regarding crop pattern of proposed land i.e. Single Crop/ Double
Crop/Barren/Waste/Khajan/Pot Kharaba/Forest/Eco Sensitive etc. (*)
21. Copy of Power Purchase Agreement with Government (For Power Plant) (*)
22. Ack. copy of application for Long Term Coal Linkage (For Power Plant) (*)
23. Ack copy of application submitted for NOC to Construct CHIMNEY from
Airports Authority of India (For Power Plant) if proposed land is in the vicinity
of Airport.
24. Additional Copy of Project report, Gut & Survey No. List for Proposed area
falls in MIDC/MMRDA/MMB juridiction (*)
25. Infrastructure Clearance from MEDA (For Wind Mill Project) (*)
26. Letter of Reasonableness of Land requirement from MEDA (For Wind Mill
Project) (*)
27. CWET Chennai certified Micro setting plan (For Wind Mill Project) (*)
28. Grid Connectivity letter from MSETCL (For Wind Mill Project) (*)
Application of BTAL permission_REVISED
2 / 14
Sr.
Page
Document Specification
No.
No.
29. Letter from Executive Engineer, Public Works Department/Collector regarding
Ariel Distance between Existing & Proposed Sugar Factory (Sugar Industry) (*)
30. NOC from MEDA, Pune for co-gen. Plant (Sugar Industry) (*)
31. In principal Approval/Copy of Application for Setting up of Special Economic
Zone (SEZ) (*)
Additional documents
Issued by
Concerned
ADTP
office/ MMRDA
ADTP
office/ Municipal
ADTP
surrounding zoning and the details within 500 Mtrs. office/ Municipal
Distance from land under proposal (*)
Control
Contour plan
39. Whether water body like lakes, river, comes within the Architect
project boundary area (along with plan) (*)
40. Whether the project falls within the catchment Irrigation Department
command area of irrigation (with map) (*)
42. Whether the high tension line passes through the Architect
project boundary? (*)
43. Whether the project comes within the influence zone Concerned Department
Application of BTAL permission_REVISED
3 / 14
Sr.
No.
Page
No.
Document Specification
of any National Projects such as Tarapur Atomic
Energy Project, Places of Archeological importance,
National Park, Bird Sanctuary etc. (*)
44. Whether the project falls within eco-sensitive zone ADTP office
such as Matheran, Mahabaleshwar, Dahanu etc.? (*)
45. Whether the project falls within Costal Regulation Municipal Corporation /
Zone? If yes (alongwith plan) the D.P Remarks of Municipal
council/
Municipal Corporation / Municipal Council. (*)
ADTP office in case of
Regional plan Area.
Instructions & Document Required for Integrated Special Township Project
46. Locational Clearance Copy from Urban Development Department /Ack. Copy
(Special Township Project) (*)
The area shall be one continuous unbroken, uninterrupted and in any case shall
not be less than 40 Ha. (100 Acres) at one place.
The 100 Acre area shall not include forest, water bodies like river, lakes, creek,
canal, reservoir, lands falling within the belt of 500 Mtr. Area, lands falling within
the belt of 200 Mtr. From the historical monuments and places of Archeological
importance, heritage precincts and places, any restricted zone, gaothan areas or
congested areas, truck terminus specially earmarked on Regional Plan, wildlife
corridors and biosphere reserves, Eco Sensitive Zone/Area, Quarry Zone and
recreational tourism development zone, catchment areas of water bodies, defence
areas, cantonment areas, notified area of SEZ, designated Port/Harbour areas,
designated Airport areas (*)
47. Notification of declaration
Development Department
of
Hill
Station/Tourism
from
Urban
48. Applicant should scanned all documents and submit soft copy in CD format along
with application
49.
50.
51.
-: C E R T I F I C A T E :Certified that all the required documents mention above are submitted with
Application of BTAL permission_REVISED
4 / 14
this proposal
Date:Place:-
5 / 14
Project Details
1.1
1.2
1.3
1.4
:
:
:
:
1.5
1.6
Product(s) proposed to be :
manufactured/SEZ/Power Plant/ :
Wind Mill/ Tourism Project
:
A)
B)
1.7
1. _____________________________
2. _____________________________
3. _____________________________
Quantity (s)
Value (s)
:
:
1. _____________________________
2. _____________________________
3. _____________________________
PH-I
0-5 Years
PH-2
5-10 Years
PH-3
10-15 Years
1.8
1.9
6 / 14
Nos.
Nos.
Own
Bank/Fin.
Institution
YES/NO
2.4
2.5
Plinth Area
Requirement of land for open
storage
Any other requirement of land
(Please Specify)
Total land requirement
F.S.I.
3.
3.1
2.3
3.2
Total
SSI :
Phase-I
0-5 Years
2.1
2.2
Other
Phase-2
5-10 Years
Phase-3
10-15 Years
7 / 14
3.3
4.
Other Details
4.1
4.2
4.3
4.4
4.5
:
:
Place :-
Date :-
8 / 14
The utilisation of land may include the following information:1. Total area of the land to be required/purchased.
2. Total area available for construction.
3. Area to be occupied for main plant/production purpose.
4. Ancillary plant, area, if any
5. Laboratories, if any
6. R & D facilities, if any
7. Storage space required
8. Godown:-excise enclosures etc.
9. Office premises etc.
10. Other amenities to be provided related to the plant like effluent treatment
pollution control etc.
11. Area required, if any, for industrial workers.
12. Area required for amenities to be provided for industrial workers.
13. Open space to be left as per the rules.
14. Total built up area
15. Total area required for industrial housing.
16. Total of open area to be left out.
17. Total area for amenities to be provided for industrial workers.
18. Any other use of land related to the industrial activity.
9 / 14
Sr.
No.
Name Survey/
of the
Hissa
Village
No.
Taluka :-
Total
Land
(Ha.)
District :-
Single
Khajan
Pot
Eco
Kharaba Sensitive
1.
2.
3.
4.
Single
Double
Padik Barren
Khajan
Pot
Kharaba
Eco
Sensitive
Land in (Ha.)
(%) Total Land
10 / 14
MEbx BE/n/{bE/x/JVh/
{] J/x/<E ]iS i xxi i
EES x xVi |E{S {h {k:-
MS x:-
+. G.
iE:-
MS /
x
GE
V:-
VxS |E
BEh
Ij
BE n {bE x JVh {] x <E
(C])
J
]
1.
2.
3.
4.
BEh
Vx
BEh
(%)
BE
{E
n
{E
VxS |E/{E
{bE x JVh
{]
J
<E
])
VxS
i`/b +vE/inS
11 / 14
12 / 14
8.
9.
10.
11.
12.
I, on behalf of my above Company, undertake to use the entire land only for the
bonafide industrial use as mentioned in the application. Wherever in the project
land area, the existing approved land use plan under Maharashtra Regional Town
Planning Act does not permit industrial use (e.g. CRZ area, forest area, green
zone, No Development Zone etc.) Then, I will get the required permission/s
from the Competent Authorities of the State Government and Central
Government, including that from the Town Planning Authority of the Urban
Development Department, before undertaking project implementation.
I, on behalf of my Company, submit that the land proposed in my application is
to the critical minimum extent in terms of area required for viability of the project
and nothing excess and extra land has been requested.
The land is not the Government land or any other such land which can not be
used for development of the types of industries as proposed by us.
I undertake that I shall purchase the said land within two years from the date of
permission order issued by your office failing which my approval would
automatically stand cancelled.
Whatever is stated above is true and correct to the best of my belief and
information.
I, _____________________________________________________ undertake
that in our --------------------------, employment shall be given to land affected
persons and their families as well as to local persons. We have also mad the
required financial arrangement to the complete the project as under :(in Rs. Crores)
1.
2.
3.
4.
13.
14.
15.
Own Funds
FDI
Internal Accruals
Financial Institutions & Other Borrowings
We have the necessary financial capabilities in undertaking the project. The net
worth of all the promoters put together is more than Rs.________ Crores.
I undertake that rehabilitation package shall be given to the persons who shall be
affected while setting up the project and their resettlement shall be done to the
satisfaction of the Government.
I undertake that the land will not be used for trade not related to industry.
I solemnly declare that application for permission to purchase of agriculture land
under BTAL Act 1994 (Revised) submitted for _____ Hectares. The existing
13 / 14
17.
18.
19.
Type of Land
Waste Land
Barren Land
Single Crop Land
Double Crop Land
Forest & Ecological Land if
any ?
I am well acquainted with the proposed land and also with all the owners of the
land proposed in the application. Further, that all the land owners have voluntarily
agreed to sell lands to me at market determined price along with the adequate
compensation prevailing in that area, with rehabilitation package etc. and no land
owners have any objection to it to sell the land to us The land will be purchased
with full willingness of the land holders/owners.
No land owners of ____________________________________ Taluka
__________ have any objection to it, to sale the land to Us. The land will be
purchased with full willingness of the land owners/land holders
I/We have contacted the office of the regional town planning authority for
conversion of the proposed land for Industrial zone for the use of proposed
-----------------------------, they have confirmed that it may be converted for
Industrial zone. I/We undertake that such conversion of land to industrial zone
will be at my/our risk and no activity will be undertaken unless this land zone is
converted into industrial zone.
We also propose that the above land measure to ______ Hectares will used only
for Bonafide industrial purposes--------------------activities as defined in the BTAL
Act namely __________________ alone and not for residential nor for other
commercial purpose.
Date :- __/__/____
Place :- ________
Application of BTAL permission_REVISED
Signature
14 / 14