Executive Summary
Disasters happen all the time and it is extremely important that a business has a plan in place in
order to recover from the disaster and carryon with the business operations as quickly as possible.
The recovery plan of Omega Research Inc. was done using Information System Contingency
Plan (ISCP). The ISCP will provide a very accurate representation of the application, hardware,
software and other related components required for the recovery process.
Objectives
The SAP ISCP has the following objectives to be implemented in phases:
restored.
Activities, resources and procedures required to carry out SAP processing requirements
behind this approach is to ensure that system recovery efforts are implemented in a
sequence to maximize the effectiveness of the recovery effort and minimize outage of
system because of errors and omissions.
The three phases includes:
Activation - This phase will activate ISCP as soon as the outage of SAP goes beyond the
RTO established.
Recovery - This phase will design and determine the notifications and awareness
escalation procedures for communicating the recovery status to system owners and users.
Reconstitution - This phase will design the actions to be taken to test and validate the
functionality of system.
The recovery process takes approximately a year from date of identification of failure to
the documentation of updated version of ISCP.
Damage Assessment Team - is a technical group responsible for assessing the damage to
and carry out the inventory and the budgetary, funding, and acquisition processes
The Configuration Management Team is composed of individuals with teleprocessing
skills.
The Facilities Team is responsible for arranging for the primary and backup facilities and
all components.
The System Software Team consists of system software programmers responsible for
providing the system software support necessary for production of critical applications
recovery effort.
The User Assistance team is composed of individuals with application use knowledge.
Notification Procedures
Different notification standards have been established so that the appropriate team is notified of
an incident, which requires the teams response.
Incident notification: Through this procedure, facility managers who are located at different
plants are provided with telephone numbers of SAP Emergency Team members. These are the
locations, which have critical components of Omega Research Inc.
Internal Personnel Notification: This notification will be used for notifying the Crisis
Management team and other disaster Recovery team regarding specific responses actions
meant to be taken during response operations.
External Notification: This notification procedure will be used for notifying contingency
plan service providers, agencies, external contacts, etc.
Media Release: This notification will inform Department or Component Office of Public
Affairs (OPA) about the incidents.
Recovery Procedures
a) In the event of data or system loss, first determine the possible cause of the problem.
b) If data loss or corruption of data occurred, repair the problem prior to performing any
data restore.
c) If the client has suffered a disaster or hardware failure, repairing or rebuilding the system
is necessary.
d) Once the incident is resolved, the recovered system needs to be tested for system integrity
and data validity.
i)
Validation Data Testing - This phase will include test cycles to be run at regular
intervals for any hidden invalid data.
ii) Validation Functionality testing - This phase will ensure that system is back to its
status of normal operations.
e) Once the recovery procedures are completed, a full-system backup is taken according to a
pre-defined schedule. Depending on the size of the data, the data would be either stored
off-site on a remote location, or a cloud storage platform, or an internal storage platform
and if the size is too large, even Tapes are considered. The schedule of the backup is as
follows:
Day of week
Type of backup
Monday
Incremental backup
Tuesday
Incremental backup
Wednesday
Incremental backup
Thursday
Incremental backup
Friday
Incremental backup
Saturday
Incremental backup
Sunday
Full backup
Alternate sites for storage, processing and telecommunications in case the main site is not
functional and designed appropriate data backup schedule as well has been identified. Inventory
has been managed with tapes given a unique identifier. These sites are at located at Westford
Street, Norfolk, 23517 and 21 Lucas Street, Norfolk, 23503.
The company is currently working with many vendors. In order to have appropriate and on-time
services from them, Service Level Agreements (SLAs) have also identified. These SLAs will
help in raising the critical issue to the appropriate authorities and get them resolved with quality
results on time.
If the recovery procedures mentioned above are adhered to and followed then the company
should be able to recover from a disaster in a timely manner.