ALCATEL-LUCENT
RRH60_21ASB Test Strategy
:
:
:
WCDMA NodeB
RRH
System Test
ABSTRACT
The present document describes the test strategy of China WRRH system.
Name
App.
ZHANG Jianlin
TPM
Approvals
LI Chunting
TPM
HUANG Jincao
TPL
REVIEW
Ed. 01 Proposal 01
2009-07-27
Ed. 01 Proposal 01
Ed. 01 Proposal 02
Ed. 01 Proposal 03
2009-07-27
2009-08-10
2009-08-24
Ed. 01 Proposal 04
2009-09-14
Ed. 01 Proposal 05
2009-09-24
Ed. 01 Proposal 06
2009-11-11
HISTORY
ED01P04
1/49
TABLE OF CONTENTS
TABLE OF CONTENTS .....................................................................................................................................2
LIST OF FIGURES .............................................................................................................................................4
LIST OF TABLE .................................................................................................................................................5
REFERENCED DOCUMENTS...........................................................................................................................5
PREFACE ...........................................................................................................................................................6
1 SCOPE ..........................................................................................................................................................7
2 GENERAL .....................................................................................................................................................8
2.1 RRH Architecture and Requirements.................................................................................................8
2.2 Test Definition ......................................................................................................................................9
2.3 Test Work Flow ..................................................................................................................................10
3 SIT1 .............................................................................................................................................................12
3.1 TRX Board Test ..................................................................................................................................12
3.1.1 Test Configuration .....................................................................................................................12
3.1.2 Test Equipment and Tool ..........................................................................................................14
3.1.3 Test Domain ..............................................................................................................................14
3.1.4 SIT1 TRX board PQ SW Test ...................................................................................................17
3.2 Power Amplifier Test .........................................................................................................................19
3.2.1 Test Configuration .....................................................................................................................19
3.2.2 Test Equipment and Tool ..........................................................................................................20
3.2.3 Test Domain ..............................................................................................................................21
3.3 FEU board Test ..................................................................................................................................22
3.3.1 Test Configuration .....................................................................................................................22
3.3.2 Test Equipment and Tool ..........................................................................................................23
3.3.3 Test Domain ..............................................................................................................................24
3.4 Mainframe/TRX/PA/FEU Reliability Test .........................................................................................25
3.4.1 EMC Test(Zhang ke) .................................................................................................................25
3.4.2 Safety Test(Zhang ke) ...............................................................................................................26
3.4.3 Lightning Protection Test(Zhang ke) .........................................................................................26
3.4.4 Thermal Test(JIA JUN)..............................................................................................................26
3.4.5 Environment test(Zhao hui) .......................................................................................................26
4 SIT2 .............................................................................................................................................................29
4.1 DL Pre-integration Test .....................................................................................................................29
4.1.1 Test Equipment and Tool ..........................................................................................................29
4.1.2 Test Equipment and Tool ..........................................................................................................30
4.1.3 Test Domain ..............................................................................................................................31
4.2 UL Pre-integration Test .....................................................................................................................32
4.2.1 Test Configuration .....................................................................................................................33
4.2.2 Test Equipment and Tool ..........................................................................................................34
4.2.3 Test Domain ..............................................................................................................................34
4.3 SW Pre-integration Test ....................................................................................................................34
4.3.1 Test Configuration .....................................................................................................................34
4.3.2 Test Equipment and Tool ..........................................................................................................34
4.3.3 Test Domain ..............................................................................................................................34
5 SIT3 .............................................................................................................................................................34
5.1 RRH Standalone Initial Test ..............................................................................................................34
5.1.1 Test Configuration .....................................................................................................................34
5.1.2 Test Equipment and Tool ..........................................................................................................34
5.1.3 Test Domain ..............................................................................................................................34
5.2 RRH Functional Test..........................................................................................................................34
ED01P04
2/49
ED01P04
3/49
LIST OF FIGURES
FIGURE 2-1 RRH ARCHITECTURE ........................................................................................................................................ 8
FIGURE 2-2 TEST WORK FLOW .......................................................................................................................................... 11
FIGURE 3-1 CPRI L1/L2 INTEGRATION.............................................................................................................................. 12
FIGURE 3-2 TRX SIT1 TEST CONFIGURATION ................................................................................................................... 13
FIGURE 3-3 TRX SIT1 CPRI INTERFACE TEST CONFIGURATION....................................................................................... 14
FIGURE 3-4 PQ SW TEST ENV ........................................................................................................................................... 17
FIGURE 3-5 PA TEST BENCH 1 .......................................................................................................................................... 19
FIGURE 3-6 PA TEST BENCH 2 .......................................................................................................................................... 20
FIGURE 3-7 FEU TEST BENCH 1 ........................................................................................................................................ 23
FIGURE 3-8 FEU TEST BENCH 2 ........................................................................................................................................ 23
FIGURE 3-9 RRH ENVIRONMENT AND TEMPERATURE TEST ......................................................................................... 26
FIGURE 4-1 DL PRE-INTEGRATION TEST CONFIGURATION................................................................................................. 30
FIGURE 4-2 UL PRE-INTEGRATION TEST CONFIGURATION................................................................................................. 33
FIGURE 4-3 SW PRE-INTEGRATION TEST CONFIGURATION ................................................................................................ 34
FIGURE 5-1 RRH STANDALONE TEST CONFIGURATION ..................................................................................................... 34
FIGURE 5-2 RRH ENVIRONMENT TEST CONFIGURATION ................................................................................................... 34
ED01P04
4/49
LIST OF TABLE
TABLE 2-1 RRH FEATURE LIST ........................................................................................................................................... 9
TABLE 2-2 UNIT TEST DEFINITION....................................................................................................................................... 9
TABLE 2-3 SIT1 DEFINITION ............................................................................................................................................. 10
TABLE 2-4 SIT2 DEFINITION ............................................................................................................................................. 10
TABLE 2-5 SIT3 DEFINITION ............................................................................................................................................. 10
TABLE 3-1 SIT1 TRX BOARD TEST TOOL LIST ................................................................................................................. 14
TABLE 3-2 SIT1 TRX BOARD TEST DOMAIN LIST ............................................................................................................ 17
TABLE 3-3 SIT1 TRX BOARD PQ SW TEST TOOL LIST..................................................................................................... 17
TABLE 3-4 SIT1 TRX BOARD PQ SW TEST DOMAIN LIST ................................................................................................ 18
TABLE 3-5 SIT1 PA TEST TOOL LIST ................................................................................................................................ 20
TABLE 3-6 SIT1 PA TEST DOMAIN LIST............................................................................................................................ 22
TABLE 3-7 SIT1 FEU TEST TOOL LIST .............................................................................................................................. 24
TABLE 3-8 SIT1 FEU TEST DOMAIN LIST ......................................................................................................................... 25
TABLE 3-9 SIT1 ENVIRONMENT TEST TOOL LIST.............................................................................................................. 27
TABLE 3-10 SIT 1 ENVIRONMENT TEST DOMAIN LIST ...................................................................................................... 28
TABLE 4-1 SIT2 DL TEST TOOL LIST ................................................................................................................................ 31
TABLE 4-2 SIT2 DL TEST DOMAIN LIST ........................................................................................................................... 32
TABLE 4-3 SIT2 UL TEST TOOL LIST ................................................................................................................................ 34
TABLE 4-4 SIT2 UL TEST DOMAIN LIST ........................................................................................................................... 34
TABLE 4-5 SIT2 CM TEST TOOL LIST ........................................................................................................................... 34
TABLE 4-6 SIT2 CM TEST DOMAIN LIST....................................................................................................................... 34
TABLE 5-1 SIT3 STANDALONE TEST TOOL LIST ................................................................................................................ 34
TABLE 5-2 SIT3 STANDALONE TEST DOMAIN LIST ........................................................................................................... 34
TABLE 5-3 SIT3 FUNCTIONAL TEST TOOL LIST ............................................................................................................... 34
TABLE 5-4 SIT3 FUNCTIONAL TEST DOMAIN 1............................................................................................................... 34
TABLE 5-5 SIT3 FUNCTIONAL TEST DOMAIN 2............................................................................................................... 34
TABLE 5-6 SIT3 ENVIRONMENT TEST TOOL LIST ............................................................................................................ 34
TABLE 5-7 SIT3 ENVIRONMENT TEST DOMAIN LIST ....................................................................................................... 34
REFERENCED DOCUMENTS
[ 1 ] 3BK 10239 0041 DCZZA
RELATED DOCUMENTS
[ 1 ] 3BK 11251 0401 BEZZA
ED01P04
5/49
PREFACE
The present document describes the test strategy of ASB 60W RRH system. The information contained in
this document should allow the test engineer to develop test plan and related test tools.
This document should be used:
-
ED01P04
6/49
SCOPE
The present document describes the test strategy of ASB self-developed 60W WCDMA RRH. All the
necessary tests during RRH development will be described in this document, which including:
-
The unitary chip level functional test (Called Unit Test), which focus on unitary analog, digital
components or software functional test on host. The Unit Test carry out in the design teams in the
design evaluation phase and the detail is not include in this document.
Chip group level functional test (Called SIT1), which focus on one functional module constructed by
group of chips and circuit. Reliability test of some critical RRH asset is also included in this phase.
Board level functional test (Called SIT2), which focus on RRH internal DL/UL/C&M functional module
integration test.
RRH subsystem integration test (Called SIT3), which focus on RRH standalone initial test, RRH
downlink/uplink function, and pre-qualification test of whole RRH subsystem.
For Unit Test, as it has tight relationship with design, the test itself is a part of development activity. So the
test strategy of this test will be defined in related design documents and it is out of the present document
scope. For each of the other up-mentioned tests, the test domain/requirements, test environment and related
test tools should be included. The integration test with NodeB (d2U V2) is also out of this document scope, it
will be included in RRH60_21ASB E2E test strategy [ 1 ].
ED01P04
7/49
GENERAL
2.1
TX
TXRF
DPDfeedback
PA
DC28v
DC12V
FEU
TX
RX1&RX2
Power
Supply
TRX
DC48V
SFP1&SFP2
OAM
Requirements
Frequency Range
60W/47.8dBm
RRH capability
UMTS 5MHz,10MHz,15MHz,20MHz
R99
HSDPA
HSUPA
HSPA+
Dimension
ED01P04
8/49
Power interface
2 DC
Grounding terminal / 2 hole lug
RF interface
Maintenance/Configuration/Test
interfaces
External_reference (15MHz)
External_triger
RJ45 for OCI / Debug
Test Definition
The general test scope and input/ending criteria of each test phase are described below:
Unit Test:
Objective
Test Domain
Responsible
Input Criteria
Ending Criteria
Unit Test
The purpose of this test is to verify unitary analog, digital components and software
function.
The sample chip of following components should be tested (e.g. AMP, SAW, Switch,
Mixer, BPF, DSA, Filter, VGA, PLL, Sensor, MPU, DDR2, Flash, EEPROM, CPLD,
ADC, DAC, 88E1111, etc). The software running on MPU should also be tested on host
PC environment or emulator board.
HW/SW development team
Basically after HW/SW design finish, but for some critical components, the evaluation
test should be taken in parallel with design
The perform and reliability meets the requirements of RRH MTBF, and pass rate of test
case reach 100%
Test Domain
SIT1
The purpose of this test is to verify a functional module constructed by group of chips
and circuit. The input/output and reliability of this function module will be checked.
The performance and function of following module/board will be tested:
- TRX (include the power supply)
- PA
- FEU
- Mechanical shell
For de-risk the reliability requirements of RRH system, the EMC test of the upmentioned modules should be taken.
ED01P04
9/49
Responsible
Input Criteria
HW/SW development team, Mechanical shell/EMC/Safety team, RRH system test team
After PEM1 and Unit test finished
Ending Criteria
SIT1 cases pass and the critical modules meet the requirements of EMC/Safety test.
SIT2
The purpose of this test is to verify the DL/UL data path and the MPU software
integration(including CPRI L1/L2 & CM, OAM)
TX pre-integration
RX pre-integration
SW pre-integration
RRH system test team
SIT1 basic function test is finished exclude the Mechanical shell/EMC/Safety test and
90% test case is pass
All the test case in the SIT2 is pass
Responsible
Input Criteria
SIT3
The purpose of this test is to verify whole RRH function and performance, which
including
- RRH standalone initial test
- RRH functional test
- RRH pre-qualification test
RRH system test team
SIT1 TX test and SW test is finished
Ending Criteria
Objective
Test Domain
The sequence of test phases and the relationship between them are listed in Figure 2-2. Although each
test is an input criterion of its following test, SIT1/SIT2 and SIT2/SIT3 will overlap due to the tight schedule.
The subsequence of detail test cases will be defined in test plan, and the related test will also be arranged
cannily to make the test to be carried in parallel as possible.
ED01P04
10/49
ED01P04
RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010
11/49
SIT1
3.1
TRX board is the main asset of RRH system, which terminating CPRI interface at NodeB side, providing
one TX channel to PA and two RX channels to LNA at the other side. The general architecture of TRX is
illustrated in [ 5 ]. In this test, the outside interfaces will be simulated and the internal behaviour of TRX will be
checked.
3.1.1
Test Configuration
For TRX SIT1, we can set up the test bench as Figure 3-2. The test bench will be tailored to adapt different
tests.
RS232
For CPRI L1/L2 integration, pre-saved data will be fetched from RAM and sent as CPRI payload. The data
can be decoded by TRX or loopback to xCCM and displayed on BCI command window. The software tools,
BCI command menu and xCCM host tool (including ping, telnet, tcpdump) should be used depending on
tests.
Ethernet2
ED01P04
12/49
For TRX internal chipsets/module and TX/RX verification, pre-saved the I/Q test vector will be used as DL
test signal, and the performance is analysed by VSA. In uplink, VSG is used to generate the wanted test
signal. The test vector we need to two kinds, for ADC,DAC, FPGA test good or not test, we need only CW
test vector, 1ms, period sent. For other performance test, standard WCDMA modulated signal will be
generate, 1ms, period send.
ATT
PA alarms
Frame trigger
15MHz Ref
RS485
TX (QMA)
Loopback
VSG
NI PXI
Ethernet
AISG
Debug port
TRX
(DUT)
RJ45
RS485
RX (SMB)
JTAG
RS232
DC power
Power alarms
Logic Analyzer
Or
USB download cable
PC1
Power
Supply -48V
Multimeter(A)
PC2
ED01P04
13/49
3.1.2
The test equipment which is used within the TRX board test environment is listed in the following table:
Equipment
Designation
Purpose
Power Meter
NRP-Z11
Power Supply
Agilent N6700
VSG
SMU/E4438C
VSA
FSQ/E4445
Logical Analyzer
Agilent 16901A
NI PXI485
PXI DIO
Test Domain
Index
Test Domain
Description
Tx performance test
ED01P04
14/49
SIT1-TRX-02
EVM
Tx performance test
SIT1-TRX-03
Tx performance test
SIT1-TRX-04
TX Spurious Test
Tx performance test
SIT1-TRX-05
ACLR
Tx performance test
SIT1-TRX-06
PAPR
Tx performance test
SIT1-TRX-07
Tx Frequency
configure
Tx performance test
Rx performance test
Rx Frequency
configure
Rx performance test
Rx performance test
DFR Frequency
configure
Rx performance test
SIT1-TRX-08
SIT1-TRX-09
SIT1-TRX-10
SIT1-TRX-11
SIT1-TRX-12
-40C to +65C
Environment test
SIT1-TRX-14
SIT1-TRX-15
PA interface test
SIT1-TRX-16
SIT1-TRX-17
AISG&ALM interface
test
SIT1-TRX-18
SIT1-TRX-19
SIT1-TRX-20
SIT1-TRX-23
SIT1-TRX-24
Reset test
SIT1-TRX-21
SIT1-TRX-22
SIT1-TRX-25
TRX Board CPRI inteface Test
ED01P04
15/49
SIT1-TRX-26
SIT1-TRX-27
SIT1-TRX-28
DDR test
SIT1-TRX-29
SIT1-TRX-30
SIT1-TRX-31
SIT1-TRX-33
SIT1-TRX-34
RRH IP configuration
Test the file transfer on C&M link, catch Ethernet packets and
analyze C&M link quality
SIT1-TRX-35
SIT1-TRX-36
SIT1-TRX-37
SIT1-TRX-38
SIT1-TRX-39
Ping test
SIT1-TRX-40
Telnet test
OS startup
SW
SIT1-TRX-41
RAM
SIT1-TRX-42
Serial Port
SIT1-TRX-43
Ethernet Port
SIT1-TRX-44
IQ integration
SW
SIT1-TRX-45
IQ data loopback
SIT1-TRX-46
SIT1-TRX-47
BER test
SIT1-TRX-48
ED01P04
16/49
SIT1-TRX-49
PQ SW is software running on RRH PQ2 CPU. During PQ SW test, the object under test is whole PQ SW
only with the cooperation with TRX board hardware (i.e. FPGA, ADC, DAC, etc).
3.1.4.1
Test Configuration
In real condition, RRH is connected to BBU via fiber line based on CPRI. The control between RRH and
BBU is all triggered by ARD546 message based on CPRI L1/L2.
But during PQ SW test, FPGA CPRI function will not be involved. We use Ethernet instead to transport
ARD546 message.
Test configuration is as below, The PC with linux OS is connected to RRH via Ethernet line. Test software
NodeB simulator runs on the PC and trigger the test with RRH
PC
RRH
Eth
Normal PC
NodeB Simulator
Software running
on linux PC
Test Domain
Description
ED01P04
17/49
PQ SW Test
SIT1-TRX-50
startup
Startup sequence
SIT1-TRX-51
cell setup
SIT1-TRX-52
cell delete
SIT1-TRX-53
Indication enable/disable
SIT1-TRX-54
measurement report
SIT1-TRX-55
SIT1-TRX-56
counter report
Alarm report
SIT1-TRX-57
SIT1-TRX-58
SIT1-TRX-59
selftest report
SIT1-TRX-60
Flr enable
SIT1-TRX-61
SIT1-TRX-62
SIT1-TRX-63
SIT1-TRX-64
Save recsnapshot
SIT1-TRX-65
Led status
SIT1-TRX-66
TmaAccess
SIT1-TRX-67
setvswrthreshold
SIT1-TRX-68
ED01P04
18/49
3.2
Power amplifier is another critical asset of RRH system, a Doherty PA with three stages amplifier, digital
part, forward/backward power detect and DPD channel will be used in this RRH system. The general
architecture of PA is illustrated in [ 5 ]. In PA SIT1 test, the components inside PA as well as PA outside
interface should also be verified.
3.2.1
Test Configuration
Figure 3-5 shows the test configuration for most PA function and outside interface test. A RS485 interface
is used for PA alarm, which can be controlled by PC with RS485 to RS232 converter.
ED01P04
19/49
The test equipment which is used for the PA board test environment is listed in the following table:
Equipment
Designation
Purpose
Power Meter
N1912A
N1912A
Power Supply
62012P-10050(Chroma)/
N6700
Series(Aglient)
VSG
SMU/E4438C
VSA
FSQ/E4445
Network Analyzer
E5071C
Attenuator
30Db/40Db
Coupler
30Db/40Db
20/49
3.2.3
Test Domain
Index
Test Domain
Description
PA Components Test
SIT1-PA-001
Gain/Gain Flatness
PA Lineup Performance
SIT1-PA-002
Delay
PA Lineup Performance
SIT1-PA-003
SIT1-PA-004
SIT1-PA-005
PA Lineup Performance
PA Lineup Performance
Spectrum
Emission Mask
PA Lineup Performance
SIT1-PA-006
Spurious Emission
PA Lineup Performance
SIT1-PA-007
SIT1-PA-008
PA Lineup Performance
Return Loss at
Input,Output and FB/Rev
Port
PA Lineup Performance
SIT1-PA-009
Dynamic Range
PA Lineup Performance
SIT1-PA-010
Tx Intermodulation
PA Lineup Performance
SIT1-PA-011
Check In-rush
SIT1-PA-012
SIT1-PA-013
SIT1-PA-014
SIT1-PA-015
SIT1-PA-016
Capability/Trip Point
PA Lineup Performance
CheckThreashold
adjustability
PA Lineup Performance
ON/Off
Timing Measurement
PA Lineup Performance
PA Lineup Performance
PA Lineup Performance
PA Lineup Performance
SIT1-PA-017
Dynamic range
SIT1-PA-018
SNR
ED01P04
21/49
SIT1-PA-019
SIT1-PA-020
isolation between
RX/TX
SIT1-PA-021
IP3
SIT1-PA-022
NF
SIT1-PA-023
ber
SIT1-PA-024
SIT1-PA-025
-40C to +85C
As a RF asset near to antenna port, FEU has two cavity filters and two LNAs. The general architecture of
FEU is illustrated in [ 5 ]. The FEU is assumed a third party asset which will be brought in pre-tested. The
FEU inside components verification is not necessary, but FEU board level performance and outside interface
should be tested.
3.3.1
Test Configuration
For FEU TX performance test, a PA board is necessary to send the high power signal. The control signal
can be delivered by RS485, illustrated in Figure 3-7. VNA is used to test gain, IL, VSWR, isolation and so on.
And NFA is used to test the noise figure. The test bench is illustrated in Figure 3-8.
ED01P04
22/49
The test equipment used for the FEU board test is listed in the following table:
Equipment
Designation
Purpose
ED01P04
23/49
Power Meter
N1912A
N1912A
Power Supply
62012P-10050(Chroma)/
N6700
Series(Aglient)
SG
SMU/E4438C
VSA
FSQ/E4445
Network Analyzer
E5071C
Attenuator
30Db/40Db
Coupler
30Db/40Db
NF analysis
N8973A
To test NF
Test Domain
Index
Test Domain
Description
FEU Board
Level Test
SIT1-FEU-001
performance test
SIT1-FEU-002
performance test
SIT1-FEU-003
Tx Rejection Tests
performance test
SIT1-FEU-004
performance test
SIT1-FEU-005
performance test
SIT1-FEU-006
Inter-modulation
Distortion ( IMD )Test
performance test
SIT1-FEU-007
performance test
SIT1-FEU-008
performance test
SIT1-FEU-009
Rx Rejection Tests
performance test
ED01P04
24/49
SIT1-FEU-010
performance test
SIT1-FEU-011
NF test
performance test
SIT1-FEU-012
performance test
SIT1-FEU-013
performance test
SIT1-FEU-014
performance test
SIT1-FEU-015
Receiver Spurious
Emission Tests
performance test
SIT1-FEU-016
Isolation between TX
port input to RX output
port
performance test
SIT1-FEU-017
performance test
SIT1-FEU-018
performance test
Isolation between
EAC1 and EAC2 ports
SIT1-FEU-019
performance test
The system reliability is much depends on the performance of its individual asset. After the TRX/PA/FEU
Module SIT1 function test, it should be validated to verify the reliability of the RRH mainframe and
modules(TRX/PA/FEU) inner the RRH ; the SIT1 reliability test is important and the purpose of the SIT1
reliability test is to validate 90% reliability issue for the RRH product, in SIT3 RRH reliability test only cover the
rest 10% validation on the reliability issue because it very hard to do the big inner modification at that time.
Because the RRH integration function test has not performed when the SIT1 reliability test begin, it will use
the simulation load mode to fit the SIT1 reliability test requirement on the EMC/Heat . The SIT1 reliability
test will be classified as:
-
EMC Test(TRX/PA)
Safety Test(Mainframe/TRX/PA/FEU)
Heat Test(Mainframe/TRX/PA/FEU)
Environment test(Mainframe/TRX/PA/FEU)
The reliability tests can be executed in 3 team of the ASB CCC lab in different test branch.
3.4.1
Abou the detail in the test configuration/test equipment/test domain, please find it in
reference_EMC_SATETY_LIGHTNING chapter 2 EMC test , only the SIT1 test will perform in this phase
ED01P04
25/49
3.4.2
Abou the detail in the test configuration/test equipment/test domain, please find it in
reference_EMC_SATETY_LIGHTNING chapter 3 safety test, only the SIT1 test will perform in this phase
3.4.4
In SIT1, it only perform the thermal simulation test in the system thermal design , and no thermal test in the
real environment in the SIT1 phase.
3.4.5
Designation
Purpose
Temperature Chamber
ESPEC
ESPEC LHU-213
ED01P04
26/49
ESPEC SET-Z-080U
Vibration Machine
WXASPR RT-50A
Vibration test
EPCU SD-24
Drop Machine
WXASPR PK-318
WXASPR PK-1000
WXASPR AHL-60-SS
WXASPR MC-225
Mildew test
WXASPR RI-1000
WXASPR SD-1500
Test Domain
Description
Temperature Test
SIT1-ENV-001
-40 storage for 8 hours and then power up, base function
must be executed after cold start;
SIT1-ENV-002
SIT1-ENV-003
SIT1-ENV-004
SIT1-ENV-005
SIT1-ENV-006
Vibration test
SIT1-ENV-008
Shock test
SIT1-ENV-009
ED01P04
27/49
SIT1-ENV-011
Mildew test
SIT1-ENV-012
SIT1-ENV-013
ED01P04
28/49
SIT2
After SIT1, each asset of RRH is verified individually. And in this test phase, all the assets are put together
for first pre-integration. The RRH inner interface between two assets will be checked to verify the middle
results satisfy the designed performance.
SIT2 focus on these aspects about the RRH inner integration and validation:
-
RRH DL function process validation except the SFP module connection on the CPRI interface
RRH UL function process validation except the SFP module connection on the CPRI interface
RRH OAM function process validation except the SFP module connection on the CPRI interface
SFP module connection loop test and FPGA L1/L2 process validation of the CPRI interface
4.1
DL Pre-integration Test
After the SIT1 validation, the TRX board and PA module and FEU module and Power module pass the
module individual test. All of these modules will assemble in the RRH rack and connect together with the
RF/Power/Control cable. About the RRH DL function, the following tests will be performed in the SIT2:
-
Module temperature validation when all the module is power-on and load current warm up
DL IQ SFP module connection loop test and FPGA L1/L2 process validation of the CPRI interface
4.1.1
ED01P04
29/49
4.1.2
Below is the detail requirement about the test tools in the environment
Equipment
Designation
Purpose
Multimeter
Agilent 34401A
Power supply voltage/current/ground test
ED01P04
30/49
Power meter
Signal generator
Spectrum analyzer
Network analyzer
Oscilloscope
Logical analyzer
Attenuator
TBD
Agilent E4438C
Agilent 4445A
TBD
Agilent DSA90604A
Agilent 17901A
10dB/40dB
Notch Filter
JRF-01-60/2140
JRF-01-3/13
Duplexer
WCDMA Duplexer
circulator
TBD
Test board
TAC board
PC1
PC2
Temperature chamber
TAC OM PC
OM PC
TBD
Test Domain
SIT2_DL_002
SIT2_DL_003
DL Frequency /Carrier
/Power/Gain/control
configuration test
DL IQ signal
gain/outputpower
ED01P04
31/49
DL gain/output power
SIT2_DL_007
DL IQ signal
intermodulation test
SIT2_DL_008
DL IQ signal
ACLR/Emission Mask
SIT2_DL_009
SIT2_DL_010
DL spurious test
SIT2_DL_011
SIT2_DL_012
SIT2_DL_013
SIT2_DL_014
SIT2_DL_015
SIT2_DL_016
DL IQ signal gain
integration test with
RRH temperature
calibration
DL IQ signal
ACLR/Emission Mask
in high output power
DL IQ signal
CCDF/EVM in high
output power
Overdrive alarm
protection test
DL forward and DPD
channel isolation test
SIT2_DL_018
SIT2_DL_019
Over-temperature test
SIT2_DL_020
DL to UL RX1 antenna
port isolation test
UL Pre-integration Test
After the SIT1 validation, the TRX board and LNA module and FEU module and Power module pass the
module individual test. All of these modules will assemble in the RRH rack and connect together with the
RF/Power/Control cable. About the RRH UL function, The following tests will be performed in the SIT2:
-
ED01P04
32/49
UL IQ SFP module connection loop test and FPGA L1/L2 process validation of the CPRI interface
4.2.1
Test Configuration
ED01P04
33/49
connect ADC output bus with the probe of the Logical Analyzer and capture the internal Digital signal into the
Vector Signal Analysis SW to do the detail analysis job.
About the synchronization and trigger connection between the test module and test tools, it not give the
description for the figure drawing limit.
4.2.2
Below are the detail requirements about the test tools in the environment
Tool
Designation
Config/Debug/Monitor
Tool SW on the RRH
test, it is a internal
development
LMT
SW tool
Purpose
Do the configuration of the RRH modules
Debug the RRH modules and do the the
analysis/decode the UL signal
and CPRI
interface loop
Monitor the RRH module process and status
Instrument
to
generate the UL RF
test vector signal
Instrument on the RF
signal measurement
and capture . it has
the noise figure test
option
SW to analysis the
UL
vector
signal
modulation character
Network Analyzer
Instrument on the
module
and
connector character
measurement
Power Meter
Instrument
to
calibrate the test
system cable loss
Logical Analyzer
Instrument to capture
the digital signal in
the TRX board
Test Domain
ED01P04
34/49
SIT2_UL_002
SIT2_UL_003
SIT2_UL_004
SIT2_UL_005
SIT2_UL_006
SIT2_UL_007
SIT2_UL_008
SIT2_UL_009
SIT2_UL_010
SIT2_UL_011
SIT2_UL_012
SW Pre-integration Test
After the SIT1 validation, the TRX board and LNA module and FEU module and Power module pass the
module individual test. All of these module will assemble in the RRH rack and connect together with the
RF/Power/Control cable. About the RRH C&M function, the SIT2 only do the RRH inner integration and
validation, the C&M validation only cover the CPRI entity except the CPRI layer1/layer2 and do a individual
loop test on the CPRI layer1/layer2 process
The following tests will be performed in the SIT2:
-
C&M SFP module connection loop test and FPGA L1/L2 process validation of the CPRI interface
ED01P04
35/49
4.3.1
Test Configuration
4.3.2
Below are the detail requirements about the test tools in the environment
Equipment
Designation
Purpose
NodeB Simulator
PC with Linux OS
Run the NodeB simulator on the C&M message
and entity
Signal generator
Agilent E4438C
Generate the interference signal
Spectrum analyzer
Agilent 4445A
Spectrum analysis and vector signal analysis
ED01P04
36/49
Oscilloscope
Attenuator
Agilent DSA90604A
10dB/40dB
Test board
TAC board
PC1
PC2
TAC OM PC
OM PC
Test Domain
Description
SIT2_C&M_003
SIT2_C&M_004
SIT2_C&M_005
SIT2_C&M_006
SIT2_C&M_007
SIT2_C&M_008
SIT2_C&M_009
SIT2_C&M_010
SIT2_C&M_011
ED01P04
37/49
SIT3
After SIT2 test, the basic DL/UL function and SW can work properly. In SIT3, an assembly RRH will be
treated as a black box, the RF performance and pre-qualification for whole RRH system will be checked.
About the CPRI C&M test, SIT3 does not perform it because it is verified in the SIT1 and SIT2 and the C&M
only focus in the SW/Protocol aspect,
5.1
This is an initial test after full RRH system assembly, and the tests listed here should be taken prior to full
system function test.
5.1.1
Test Configuration
In this test phase, we suppose TRX adaptive card and related test tools are full ready, otherwise NI PAX
plus d2U solution will be used. The test configuration is illustrated in Figure 5-1. For some standalone initial
test, such as grounding, this test bench is not necessary, a multimeter and a RRH without power on are
enough.
ED01P04
38/49
5.1.2
Designation
Purpose
Multimeter
Agilent 34401A
VSG
SMU/E4438C
VSA
FSQ/E4445
Attenuator
30dB/40dB
Coupler
30dB/40dB
5.1.3
Test Domain
Index
Test Domain
Description
Isolation Test
SIT3-INI-002
Grounding Continuity
Test
Current Consumption
SIT3-INI-004
PA Voltage Set
LED Check
SIT3-INI-006
ED01P04
39/49
5.2
After initial test, PA and whole RRH is bring up into operating state, then RRH functional test can be carried
out. In this test, RF TX and RX performance according to TS25.141 will be tested.
5.2.1
Test Configuration
The test bench is same as Figure 5-1. For RF TX test, test vectors according to different TM will be sent
out from TRX adaptive card, and TX performance measured by VSA. For RX test, I/Q data captured by TRX
adaptive board will be sent to PC, ADS/Matlab will be used for uplink performance analysis, such as EVM,
BLER, etc.
5.2.2
quantity
Designation
Purpose
Do the configuration of the RRH
modules
1 pcs
Config/Debug/Monitor
Tool
SW on the RRH test, it is a
internal development LMT
SW tool
A self development SW to do
the
NodeB
side
C&M
simulator
Simulate
the
message/action
1 pcs
1 pcs
1 pcs
Power Meter
1 pcs
50dB Attenuator
2 pcs
40dB Attenuator
2 pcs
20dB Attenuator
2 pcs
8dB Attenuator
2 pcs
Duplexer
1 pcs
2110-2170MHz and
1980MHz duplexer
1 pcs
1920-1980MHz
filter
Notch Filter
1 pcs
1 pcs
NodeB simulator
Vector Signal Generator
(with WCDMA option)
Vector Signal Analyzer
(with WCDMA option)
1 pcs
band
ED01P04
1920pass
NodeB
C&M
40/49
2 pcs
LNA
1 pcs
Coupler
1 pcs
Circular
1 pcs
Isolator
1 pcs
Terminator
1 pcs
RF Cable
20 pcs
RF Connector
20 pcs
Test Domain
Test Number
Title
Description
Tx
Normal conditions
SIT3-FUN-001
6.2.1
Base
station
Maximum Output Power
(TM1)
SIT3-FUN-002
6.2.2 CPICH
accuracy (TM2)
Power
SIT3-FUN-003
6.3
Frequency error
(TM4)
SIT3-FUN-004
To verify those requirements for the power control step size and
response are met as specified by the minimum requirement
SIT3-FUN-005
SIT3-FUN-006
6.4.4
Total
power
dynamic range (TM1,
TM4)
SIT3-FUN-007
6.5.1
Bandwidth
Occupied
The test purpose is to verify that the emission of the BS does not
occupy an excessive bandwidth for the service to be provided
and is, therefore, not likely to create interference to other users
of the spectrum beyond undue limits
6.5.2.1
Spectrum
emission mask
(TM1)
SIT3-FUN-008
(TM1)
SIT3-FUN-009
SIT3-FUN-010
6.5.3
Spurious
ED01P04
41/49
emissions (TM1)
operation
SIT3-FUN-011
6.6
Transmit
intermodulation (TM1)
SIT3-FUN-012
SIT3-FUN-013
Rx
Normal conditions
SIT3-FUN-014
SIT3-FUN-015
7.3
Dynamic
(BER)
range
SIT3-FUN-016
SIT3-FUN-017
7.5
Blocking
characteristics (BER)
The test stresses the ability of the RH receiver to withstand highlevel interference from unwanted signals at frequency offsets of
10 MHz or more, without undue degradation of its sensitivity
SIT3-FUN-018
7.6
Intermodulation
Characteristics (BER)
SIT3-FUN-019
Environment
Test
Tx +Rx
Extreme conditions
6.2.1
Base
station
Maximum Output Power
(TM1)
6.3
Frequency error
(TM1, TM4-18dB, TM5)
6.5.2.2
ACLR
(Optional)
(TM1)
ED01P04
42/49
5.3
In order to identify the system design bugs as early as possible and repair these bugs in PEM2, the RRH
Reliability will be carried in this test phase based on PEM1. Basically the test cases listed below do not
depend on d2U environments. The complete qualification test will be defined in IT1 and tested with d2U
connected. Though SIT reliability test have validate the module level reliability, the RRH black box level test is
needed to validate the RRH general reliability in the real load environment. The RRH reliability test will be
classified as:
-
EMC Test(RRH)
Safety Test(RRH)
Thermal Test(RRH)
Environment test(RRH)
The reliability tests can be executed in 3 team of the ASB CCC lab in different test branch.
5.3.1
EMC Test
About the detail in the test configuration/test equipment/test domain, please find it in
reference_EMC_SATETY_LIGHTNING chapter 2 EMC test , only the SIT3 test case will perform in this
phase
5.3.2
Safety Test
About the detail in the test configuration/test equipment/test domain, please find it in
reference_EMC_SATETY_LIGHTNING chapter 3 safety test, only the SIT3 test case will perform in this
phase
5.3.3 Lightning Protection Test
About the detail in the test configuration/test equipment/test domain, please find it in
reference_EMC_SATETY_LIGHTNING chapter 4 lightning protection test , only the SIT3 test case will
perform in this phase
5.3.4
Thermal Test
About the detail in the test configuration/test equipment/test domain, please find it in reference_Thermal
5.3.5
Environment test
ED01P04
43/49
Designation
Purpose
Temperature Chamber
ESPEC
ESPEC LHU-213
ESPEC SET-Z-080U
Vibration Machine
WXASPR RT-50A
Vibration test
EPCU SD-24
Drop Machine
WXASPR PK-318
WXASPR PK-1000
WXASPR AHL-60-SS
WXASPR MC-225
Mildew test
WXASPR RI-1000
WXASPR SD-1500
Midwest M304541
ED01P04
44/49
Test Domain
Test Standard
SIT3_ENV_001
High Temperature
Operating
condition
SIT3_ENV_002
Low temperature
ETS 300 019-1-4
Cold start
-40
within 1 hour
Damp heat
Operating
condition
SIT3_ENV_005
-40,16 hours
Operating
condition
SIT3_ENV_004
55 16 hours
IEC 721-3-4
Operating
condition
SIT3_ENV_003
Description
28,100%RH,96 h
45,95%RH,96 h
Operation
condition
SIT3_ENV_006
Change
temperature
in
-40~ 55,1/min.
Operating
condition
SIT3_ENV_007
Vibration
Operating
condition
SIT3_ENV_008
Shock
Operating
condition
IEC 60721-3-4
SIT3_ENV_009
Earthquake
GR63 CORE
Zone 3
SIT3_ENV_010
Salt Fog
SIT3_ENV_011
Rain simulation
IEC 60529
IP65
SIT3_ENV_012
IEC 60529
IP65
ED01P04
45/49