Tunnel Shotcrete Design-1
Tunnel Shotcrete Design-1
Tunnel Shotcrete Design-1
W
weq
2
Wedge
m
Wedge
m
kN/m3
kN
=B9*(IF(B6="Wedge",1/3*B5^2*B5/2/TAN(RADIANS(B7)),B8*B5^2))
13.9
kN/m
=B8/B5^2
0.15
fy
MPa
fa
1
0.03
0.075
MPa
m
m
a
t
Adhesion
Ca
240
kN
Square Block
30
24
55.4
=4*B12*B5*B13*1000
OK
7.97
kNm
=1/8*(B9*B5^2*(1+0.15))
3.75
kNm
=1/6*B11*B5*B14^2*1000
Not OK
Square Block
h
j
Note
In good ground adhesion may be relied upon. In poor ground flexural capacity must be provided.
W
weq
3.6
Wedge
m
Wedge
m
kN/m3
kN
=B9*(IF(B6="Wedge",1/3*B5^2*B5/2/TAN(RADIANS(B7)),B8*B5^2))
24.9
kN/m
=B8/B5^2
0.15
fy
MPa
fa
1
0.03
0.075
MPa
m
m
a
t
Adhesion
Ca
432
kN
Square Block
30
24
323.2
=4*B12*B5*B13*1000
Not OK
46.47
kNm
=1/8*(B9*B5^2*(1+0.15))
6.75
kNm
=1/6*B11*B5*B14^2*1000
Not OK
Square Block
h
j
Note
In good ground adhesion may be relied upon. In poor ground flexural capacity must be provided.