Professional Documents
Culture Documents
FoundOcean Company Presentation
FoundOcean Company Presentation
FoundOcean Company Presentation
Our Heritage
FoundOcean was founded in 1966 and is headquartered in the
UK. We are a privately held company.
1966 1993
Wimpey Laboratories later
becomes Wimpey Geotech
1981 - 2006
SeaMark Systems acquires the offshore
division of Wimpey Geotech in 1993
2006
SeaMark Systems changes its
name to FoundOcean
Maintaining the
equipment
FoundOcean RJM
Recirculating Jet Mixer
FoundOcean Winch
FoundOcean horizontal
cement silo
Projects in Development
Ormonde Wind Farm: 31 turbine jackets, Irish Sea
Akcakocca: 1 platform jacket, Black Sea
Walney Wind Farm: 1 substation jacket, Irish Sea
Talisman: FMD inspection work, North Sea
Leman AD1: Jacket repair work, North Sea
Valhall: Re-development of jacket, North Sea
Average
# of
Personnel
Onshore
hours
# of
Offshore
projects
Offshore
days
Offshore
hours
Total
hours
Lost time
incidents
2002
19
28,168
12
922
11,064
39,232
2003
22
26,783
16
2,171
26,052
52,835
2004
24
30,842
22
2,061
24,732
55,574
2005
26
33,712
26
2,176
26,112
59,824
2006
28
36,392
25
2,327
27,924
64,316
2007
25
36,561
22
1,308
15,696
52,257
2008
32
37,946
24
2,635
31,620
69,566
2009
34
37,128
23
2,525
30,980
68,128
1984 Invents
the ScourMat
FoundOcean Services
Grout Connectors
Pipeline and
Consulting
Cable Protection
Hydrascope
Flooded Member
Detection
Pipeline Support
and Stabilisation
Structural Repair
and
Strengthening
Ballasting and
Underbase
Grouting
Structural Pile
Grouting
Hydroscope FMD
Grout Connectors
Pile grouting
completed by
FoundOcean
in 1988
Recent Projects
Pentland Firth, UK
One of the best sites anywhere in the world
for tidal turbine power generation
Water depth 45m
Tidal flows up to 4 knots
Pile grouting
Working window 45mins every 4 hours
Image courtesy of
Tidal Generation Limited
Recent Projects
Walney Offshore Windfarm, UK
Installation grouting of the substation
Water depth ~ 30m
Grouting completed in record time
Grouting 4 pile sleeves
Irish Sea
Recent Projects
Ormonde Offshore Windfarm, UK
Grouting 31 jackets: 30 turbine and 1 substation
Water depths from 17m 21m
The largest multiple jacket installation project
for FoundOcean
Grouting is expected to take 60 days
Recent Projects
Equipment Locations
Livingston
Louisiana
Rotterdam
Ortona
Jebel Ali
Batam
Louisiana
Rotterdam
Ortona
Jebel Ali
Batam
Contact
Head Office
99 High Street
Marlow
Buckinghamshire SL7 1AB
T +44 (0)1628 567 000
W www.foundocean.com
Service Base
Units 3 & 4
Telford Square Business Park
Telford Square
Houston Industrial Estate
Livingston EH54 5PQ