AUGUST-2014
Last date for e-tendering is as under
1 . D ownloading of e-Tender doc uments
2 . O nline submission of e - Tender
3 . Physical submission of EMD, Tender fee
and other required documents as per
Financ ial, Experience etc .
4 . Verification of submitted doc uments
8 . Bid Validity
PART-I
Section-1
Section-2
PART-II
Section-3
Section-4
Technic al Specifications
Schedule of Drawings
PART-III
Bill of Quantities
ABBREVIATIONS
Statem ent sho wing the detail s of abb reviations.
Ful l Form
Abbrev iati on
Addl.City E ngineer
ACE
O&M
NP V
EP C
GEB
CPM
RCC
HGL R
Kilometer
KM
Mild Steel
MS
BIS
AWWA
API
MLD
HYS D
CRS
OP C
ASTM
FCM A
CI F
Free On Boa rd
FOB
EX Wo rks
EXW
IN DE X
Sr
No
1
Particulars
Invitation to Bid
Instruction to Bidder s
Form ats
Technical specifications
Schedule of Drawin gs
Bill of Quantities
PART - I
SECTION - 1
INVITATION FOR BIDS
Name of work
CEMENT CONCRETE ROAD WORK INSID E PEDAK a) Rs.14,47,875/INSTI TUTE IN WARD NO .6 (3rd Attempt)
b) Rs.14,478/c) Rs.1125/d) 3 M onths
e) E2 and Above
Last date for e-t endering is as under
8 . Bid Va lidity
1.
2.
3.
All bidders must submit a bid security in person as above either directly
deposited in Account No.01018640000035 (Rajkot Municipal Corporation) IFSC
Code HDFC0000101 or submit in form of Demand draft in favor of "Rajk ot
Municipal Corpoation", Rajkot, from any Schedule d bank (except Co-operative
Bank) in India. The physical submission of required documents is to be done at
the below mentioned address. All documents submitted for verification should
be duly Certified by Gazetted Officer.
Office of the Addl. City Enginee r
Rajkot Municipal Corporation.
Shree Zhavercha nd Meghani Bhava n, Ea st Zone,
Bhavnagar Road, RAJKOT-360 003.
The e-Tender fee will be accepted in form of Demand Draft only, in favor of
"Rajkot M unicipal Corporation", Rajkot, from any Nationalized Bank or
Scheduled bank (except Co-operative Bank) in India and must be delivered to
above address.
The pre-qualification requirement is as under:
i)
Financial Criteria:
1.
An average annual turnover of last seven years should not be less than
50% of tender amount.
2.
Working capital should not be less than 25% of the estimated amount.
3.
Solvency should not be less than Rs.1.00 Lacs
4.
Class of Registration E-2 and Above.
ii)
1.
2.
Year
Year of inviting tender (eg. 2013-14)
-1 (2012-13)
-2 (2011-12)
-3 (2010-11)
-4 (2009-10)
-5 (2008-09)
-6 (2007-08)
-7 (2006-07)
Enha nce
Factor
1.00
1.10
1.21
1.33
1.46
1.61
1.77
1.95
4.
Bidder who fails to submit the required documents physically within the date
and tim e prescribed, their offer will be treated as non-responsive
5.
Addl.City Engineer
Rajkot Municipal Corporation
INSTRUCTIONS
TO
BIDDERS
TO
TENDERER
IT 1.
GENERAL
T he contrac t documents may be sec ured in ac cordanc e with the Notic e Inviting E TENDER for the work called. The work shall include s upply of materials necessary
for c ons truc tion of the work.
IT 2.
INVITATIO N TO E-TENDER
T he Rajkot M unic ipal C orporation hereinafter referred as the C orporation will
receive e-T enders for the work of as per the s pec ifications and sc hedule of pric es in
the e-T ender document. T he e-T enders s hall be opened online as specified in the eT ender notic e in the pres enc e of interes ted Tenderers or their repres entatives . The
C orporation res erves the right to rejec t the lowes t or any ot her or all e-Tenders or
part of it whic h in the opinion o f the C orporation does not a ppear to be in its bes t
interes t, and the Tenderer s hall have no cause of ac tion or claim agains t the
C orporation or its offic ers , employees, s uc c ess ors or as signees for rejection of his
e-T ender.
IT 3.
LANGUAGE OF e-TENDER
E -TE NDE Rs shall be s ubmitted in E nglis h, and all information in the e-T ender s hall
also be in E nglish, Information in any other language s hall be acc ompanied by its
trans lation in E nglish. Failure to comply with this may make the e-T ender liable to
rejec tion.
IT 4.
A.
B.
e-TENDER DO CUMENTS
T he e-T ender doc uments and dra wings shall c omprehens ively be refer red to as eTENDER document. T he s everal sec tions form in the document are t he ess ential
parts of the c ontract and a req uirement occ urring in one s hall be as binding as
though occ urring in all, they are to be taken as mutually, explanatory and des c ribe
and p rovide for complete works.
IT 6.
A.
B.
T he e-T ender is invited on ..%. rat e and c ontrac tor s hall have to quote his pric e
on % bases above or below in the schedule -B./ Price Schedule. The works
10
s hall have to be c ompleted in all res pec t as stated in the e-T ender doc ument to the
s atis fac tion of the C orporation .
C.
D.
C opy of the E -TENDE R Doc ument s hould be c ompleted, checked in a res ponsible
manner, digitally signed, and s ubmitted. Security Bond s hall be s ubmitted in
pers on by t he s tipulate date, whic h s hall fo rm the e-T ender.
T he e-T ender is required to c omplete with all the pages in which entries are
required to be made by the T enderer are c ontained in the e-T ender doc uments and
the Tenderer s hall not take out or add to or amend the text of any o f the
doc uments exc ept in so far as may be nec essary to c omply with any addenda
issued purs uant to Claus e IT . 19 hereof.
IT 7.
A.
B.
The E arnest Money Depos it will be refunded to the uns uc c ess ful Tenderers after an
award has been finalized.
C.
The E arnest M oney Deposit (T ender Guarantee ) will be fo rfeited in the event, the
successful Tenderer fails to acc ept the c ontract and fails to submit the P erformanc e
Guarantee Bonds to the O wner as s tipulated in this e-Tender doc uments within ten
days. (10 ) days after rec eipt of notice of a ward of c ontract.
D.
The E arnes t M oney Deposit of the s ucc essful T enderer s hall be returned after the
performance g uarantee bond, as required , is furnished by the c ontrac tor.
11
E.
IT 8.
IT 9.
A.
E -TE NDE R s hall be s ubmitted on the E -TE NDER form bound here in Englis h. All
s tatements shall be properly filled in. Numbers shall be s tated both in wor ds and in
figures whe re s o indic ated.
B.
A ll entries or pric es and arithmetic shall be c hecked before submis sion of the E TENDERs. I f there is disc repanc y between the rates quoted in figures and in words ,
the rates expres sed in words s hall be considered as bindin g.
C.
E ac h e-T ender shall be accompanied by the presc ribed e-Tender sec urity bond and
other required doc uments and drawings . All witnesses and s ureties s hall be persons
of s tatus and probity and their full names, occ upations and addres s es shall be
s tated below their s ignature.
D.
V ariation to the c ontract Doc uments requested by the Tenderer may be affixed and
duly signed and s tamped. Suc h variations may be approved or refused by the
C orporation is not obliged to give reason fo r his dec is ions .
12
IT 13
IT 14 WITHDRAWAL O F TENDERS
I f, during t he ten der validity period , the T enderer withdra ws his T ender, Tender
s ec urity (E arnest M oney) shall be forfeited and T enderer will be debarred for next
three years to quote in R.M .C .
13
IT 17
MODIFICATION OF DOCUMENTS
M odific ation of specific ations and extens ion of the c losing date of the e-T ender, if
required will be made by an addendum. E ac h addendum will be made available
online to all Tenderers . T hes e s hall form a part of e-T ender. T he Tenderer s hall not
add to or amend the text of any of the doc uments except in so far as may be
nec ess ary to c omply with any addendum .
ADDENDA
A ddenda form part of the Contrac t Doc uments , and full c ons ideration s hall be given
to all A ddenda in the preparation of e-T ender. Tenderers shall verify the number of
A ddenda is sued, if any and ac knowledge the receipt of all A ddenda in the E TENDER Failure to so acknowledge may cause the e-T ender to be rejected.
A . T he O wner may
issue
A ddenda
to advis e
T enderers
of
requirements. Suc h a ddenda may modify previous ly is sued A ddenda.
c hanged
B. No addendum may be is sued after the time stated in the notic e inviting eT enders .
IT 18.
IT 19
14
be permitted to c hange the s ubs tance of his e-T ender after e-T enders have been
opened. This inc ludes any pos t T ender pric e revis ion. Non-c ompliance with his
provision s hall make the T ender liable fo r rejec tion.
IT 22
PRICES A ND PAYMENTS
T he Tenderer mus t unders tand c learly that the pric es quoted are for the total works
or the part of the total works quoted for and inc lude all c osts due to materials ,
labour, equipment , supervis ion, other s ervices , royalties , taxes etc . and to inc lude
all extra to c over the c ost. No claim for additional payment beyond the pric es
quoted will be entertained a nd the Tenderer will not be entitled s ubs equently to
make any c laim on any ground.
IT 23
PAYMENT TERMS
T he terms of payment are defined in the General Conditions of C ontrac t and
T ec hnic al s pec ific ations. T he Corporation s hall not under any c irc ums tanc es relax
thes e terms of payment and will not consider any alternative payment terms .
T enderers s hould therefore in their o wn interes t note t his provision to avoid
rejec tion of their e-Tenders.
IT 24
AW ARD
A ward of the c ontrac t or the rejec tion or E -TENDE Rs will be made during the
T ender validity period. A s eparate Sc hedule-B (P rice Sc hedule) is given. The
c ontrac tors are reques ted to quote their price offer in % below or above on the
given price in the schedule-B only.
A.
After all c ontract c ontingenc ies are satisfied and the Notice of A ward is iss ued, the
s ucc ess ful T enderer s hall execute the C ontrac t A greement within the time s tated
and shall furnis h the Bo nd as required herein . T he contrac t A greement shall be
exec uted, in form s tipulated by the O wner.
B.
I f the Tenderer rec eiving the Notice of Award fails or refus es to exec ute the
C ontrac t A greement within the s tated time limit or fails or refuses to furnis h the
Bond as required herein . T he O wner may annul his awar d and dec lare the eT ender s ec urity forfeited and will take action as deemed fit.
C.
A c orporation, partnership firm or othe r c ons ortium ac ting as the T enderer and
receiving the awar d s hall furnis h evidence of its exis tence and evidence that the
offic er s igning the contrac t agreement and Bonds for the c orporation, partnership
firm or other c ons ortium acting as the T enderer is duly authorize d to do so.
IT 25 SIGNING OF CO NTRACT
T he s ucc es s ful Tenderer s hall be required to exec ute the c ontrac t agreement within
1 0 days of receipt of intimation to execute the contract, failing which the
C orporation will be entitled annul to the a ward a nd forfeit the Earnes t M oney
Deposit. T he pers on to sign the contrac t doc ument s hall be person as detailed in
A rtic le I T. 13 (s igning of e-Tender documents).
IT 26 DISQ UALIFICA TION
A e-Tender shall be disqualified and will not be taken for c ons ideration if,
(a) T he Tender Sec urity Deposit is not deposited in full and in the man ner as s pec ified
as per A rticle IT . 7 i.e. Earnes t M oney Deposit.
(b) T he e-T ender is in a language other than Englis h or does not contain its Englis h
T ranslation in c as e of other lang uage adopted for e-Tender prepa ration.
(c ) T he e-T ender doc uments are not signed by an authorized person (as per A rtic le IT .
1 3 i.e. s igning o f e-Tender doc uments).
(d) T he general performance data fo r qualification is not s ubmitted fully (as per A rtic le
IT 1 2 i.e. General performanc e Data).
15
(e) T enderer does not agree to payment terms defined as per Article IT . 23 i.e.
payment terms .
A.
16
c onditions of his own e-T ender, then the Corporation s hall, without preju dic e to any
other right or remedy, be at liberty to reject the e-T ender and forfeit the earnes t
money in full.
IT 33 CHA NGE IN QUANTITY
T he Corporation reserves the right to waive any information in any e-T ender and to
rejec t one or all e-Tenders without as s igning any reasons for s uc h rejec tion and
also to vary the quantities of items or group as s pec ified in the scheduled of pric es
as may be nec ess ary.
IT 34 NEW EQ UIP MENT AND MATERIAL
A ll materials, equipment and s pare parts thereof shall be new, unus ed and
originally c oming from manufac turers plant to the Corporation. The rebuilt or
overhauled equipment/materials will not be allo wed to be us ed on works .
IT 35 RIGHTS RESERVED
T he owner res erves the right to reject any or all e-T enders , to waive any
informality or irregularity in any e-T ender without ass igning any reas on. T he owner
further res erves the right to withhold is suanc e of the notice to proc eed, even after
exec ution of the c ontrac t agreement. No payment will be made to the s ucc essful
T enderer on ac count of s uch withholdi ng. T he owner is not obliged to give reas ons
for a ny s uc h ac tion.
IT 36 A DDITIONA L RIGHTS RESERVED
T he Commiss ioner, Rajkot M unicipal C orporation, reserves right to reduc e the
scope of wo rk & s plit the e-Tender on two or more pa rts wit hout as s igning any
reas on even after t he a war ds of c ontrac t.
IT 37 MOBILIZATIO N A DVANCE
No mobilization advanc e or adva nce on mac hinery will be given.
17
D EC LARATION
I/W e hereby declared that I/We am/are not partner(s) blacklisted or connected with
firm blacklisted in any States, CPWD / MES / Railways or any Governm ent, SemiGovernment or Private bo dy.
At p resent I/W e am/are reg istered as app roved co ntracto r (s ), firm s in
State, CPW D / MES / Railway s.
____
We, the partners / o wner s of this firm , hereby give an un dertakin g that we ar e
jointly and sev erally r esponsible to m eet all the liabilities ever and above the business of this
firm and m ake goo d the abov e finan cial loss sustain ed by the Rajkot Municip al Corporation
as a result of our aban doning the work s entrusted to us.
Date:
Seal and Signature of the Bidder
18
Declaration
Of
Depositing Provident Fund contribution
This to certify that we hav e deducted the employees P.F. an d deposited the same
alon g with employers contribution to war ds provident f und on labo ur ch ar ges / wages
paid by us to the labo u rers en gag ed fo r t he w o rk of
with
Provident
Fu n d A uth o rit y un d er o ur Pro v ident Fun d Co d e N o.
We produce herewith the copies of the ch allans for the provident fun d
deduction and contribution deposited as m entioned above.
Date:
19
19
2012-2013
2011-2012
2010-2011
2009-2010
2008-2009
Net
w orth
Rs
.
Net Ca sh
Rs .
W orki ng
C a pital
Rs .
Note :1)
2)
3)
4)
Figures to be taken from audited balance sh eets. Du ly certified attested true cop y
Copies of the balance sheet to b e attached..
The bidder shall have to provide tha t fo r a period of at least 6 Month s the
bidder ha s ability to sustain negative ca sh balan ce and ho w he proposes to
m eet with the sam e.
Ca sh Plan / Cash flo w S tatement.
20
20
2009-10
2010-11
2011-12
2012-13
Value of work s
executed in Rs.
Crores.
The available bid cap acity will be worked o ut as follo ws.
Available bid capacity = ( A x
N x 2) B, where
A = Max im um of updated total amount of work executed in any on e year of
the last five fin ancial years.
B = The am ount of the existin g commitm ents and ongoing works to be discharge
during tim e interval of N years from the bid due date.
N = Number of years prescribed for completion of the proposed works
21
C om po nents
1.
Methodolo gy
2.
3.
22
SECTION - 2
GENERAL CONDITIONS
OF CONTRACT
23
:: TABLE OF CO NTESTS ::
No.
GC-1
GC-2
GC-3
GC-4
GC-5
GC-6
GC-7
GC-8
GC-9
GC-10
GC-11
GC-12
GC-13
GC-14
GC-15
GC-16
GC-17
GC-18
GC-19
GC-20
GC-21
GC-22
GC-23
GC-24
GC-25
GC-26
GC-27
GC-28
GC-29
GC-30
GC-31
GC-32
GC-33
GC-34
GC-35
GC-36
GC-37
GC-38
GC-39
GC-40
GC-41
GC-42
GC-43
GC-44
GC-45
GC-46
GC-47
GC-48
GC-49
GC-50
Description
Definitions and I nterpretations
Location of s ite and ac c ess ibility
Scope of work
Ruling language
I nterpretation of C ontract Doc ument
C ontrac tor to understand hims elf fully
E rrors in submissions
Suffic iency of E -TE NDE R
Disc repanc ies
P erformanc e Guarantee (Sec urity Depos it)
I nspection of work
Defec t Liability
P ower o f Engineer-I n-C harge to give furthe r ins truc tions.
P rogramme
Sub-letting of work
Sub-Contrac ts for temporary works, etc .
T ime for completion
E xtension of time
C ontrac t Agreement
Liquidated damages
Forfeiture o f Sec urity Deposit
Action of Forfeiture of Sec urity Depos it
No c ompens ation for alteration in or res tric tion in work
I n the event of death of c ontractor
M embers of the owner not individually liable
O wner not bound by pers onal repres entations
C ontrac tor's office at s ite
C ontrac tor's subordinate s taff an d their c onduc t
T ermination of s ub-contrac t by o wner
P ower o f ent ry
C ontrac tor's res ponsibility with the other Contractor and
A gencies .
O ther A genc ies at s ite
Notic es
Rights of various interests
P ric e adjus tments
T erms of Payment
Retention M oney
P ayments due fr om the Contractor
C ontingent Fee
Breac h of C ontract by C ontrac tor
Default of C ontrac tor
Bankruptcy
O wners hip
Dec laration agains t waiver
Laws governing the contract
O ver payment and under payment
Settlement of disputes
Disputes of differences to be refe rred to
A rbitration
T ermination of the Contrac t
24
GC-51
GC-52
GC-53
GC-54
GC-55
GC-56
GC-57
GC-58
GC-59
GC-60
GC-61
GC-62
GC-63
GC-64
GC-65
GC-66
GC-67
GC-68
GC-69
GC-70
GC-71
GC-72
GC-73
GC-74
GC-75
GC-76
GC-77
GC-78
GC-79
GC-80
GC-81
GC-82
GC-83
GC-84
GC-85
GC-86
GC-87
GC-88
GC-89
GC-90
GC-91
GC-92
GC-93
GC-94
GC-95
25
GC-01
1 .0
1 .1
T he "O wner / Corporation" s hall mean Rajkot M unic ipal Corporation and
s hall inc lude its M unic ipal C ommiss ioner or other O ffic ers authorized by
the C orporation and also inc lude owner's s ucc essors and ass ignees.
1 .2
T he "C ontractor" s hall mean the person or the pers ons, firm or Company
whos e e-T ender has been acc epted by the O wner and inc ludes the
C ontrac tors legal representative, his suc cessors and permitted as signed.
1 .3
1 .4
DELETED
T he "E ngineer-I n-Charge" s hall mean the person designated as s uch by
the owner from time to time an d s hall inc lude thos e who are expres sly
authorized by the Corporation to ac t for a nd on its behalf for all functions
pertaining to the operation of this c ontract.
1 .5
E ngineer-I n-C harge's Repres entative s hall mean any resident E ngineer or
Ass is tant to the E ngineer-I n-Charge appointed from time to time by the
owner to per form duties s et forth in the E -TE NDE R Doc ument whose
authority s hall be notified in writing to the Contrac tor by the Engineer-I nC harge.
1 .6
1 .7
"Contrac t P ric e" s hall mean total money payable to the Contrac tor under
the c ontrac t.
1 .8
"Addenda" shall mean the written or graphic notices iss ued prior to
s ubmis sion of e-T ender whic h modify o r interpret t he c ontrac t documents.
1 .9
1 .1 0
"Contrac t" s hall mean agreement between t he parties for the exec ution of
works including therein all contract doc uments .
1 .1 1
1 .1 2
"The Sub-C ontrac tor" shall mean any pers on, firm or c ompany (other than
the Contrac tor) to whom any part of the work has been ent rus ted by the
C ontrac tor with the written consent of the E ngineer-I n-Charge and the
legal repres entative s ucc es s ors and permitted assignee of suc h pers on,
firm or c ompany.
1 .1 3
T he "Spec ific ations" shall mean all directions , the various Tec hnical
Spec ific ations , provisions and requirements attac hed to the c ontrac t which
pertains to the method and manner of per forming the work, to the
quantities and qualities of the wo rk and the materials to be fu rnis hed
under t he c ontrac t for the work and a ny orde r(s ) or ins truc tion(s ) there
under. I t s hall als o mean the lates t Indian Standard I ns titute Spec ification
relative to the partic ular work or part thereo f, so far as they are n ot
26
c ontrary to the E -TE NDE R spec ific ations and in absence of any other
C ountry applied in Indian as a matter of standard engineering practice and
approved in writing by the E ngineer-In-Charge with or witho ut
modific ation.
1 .1 4
T he "Drawings " s hall inc lude maps , plans , tracings, or prints thereof with
any modific ation approved in writing by the Engineer-I n-C harge and as
s uc h other dra wings as may, from time to time, be furnis hed or approved
in writing by the E ngineer-In-Charge in c onnec tion with the work .
1 .1 5
T he "Work" s hall mean the works to be exec uted in acc ordanc e with the
c ontrac t or the part thereof as the cas e may be and s hall inc lude extra,
additional, altered or s ubs tituted wo rks as required for the purpose of the
c ontrac t.
It shall mean the totality of the work by expres s ion or
implication envis aged in the c ontrac t and s hall include all materials ,
equipment and labour require d for or relative or inc idental to or in
c onnec tion with the c ommencement, performanc e and c ompletion of any
work an d / or incorporation in the wo rk.
1 .1 6
T he "Permanent Work" s hall mean works whic h will be inc orporated in and
form part of the work to be handed over to the owner by the Contrac tor on
c ompletion of the c ontrac t.
1 .1 7
T he "T emporary Work" s hall mean all temporary works of every kind
required in or about the execution, c ompletion and maintenance of the
work.
1 .1 8
"Site" s hall mean the land and other places , on, under, in o r through
whic h the permanent works are to be c arried out and any other lands or
plac es provided by the Corporation for the purp ose of the c ontrac t
together with any othe r plac es des ignated in the c ontrac t as forming part
of the s ite.
1 .1 9
T he "C ons truc tion Equipment" s hall mean all appliances / equipment of
whatever nature required in or for exec ution, completion or maintenance
of works or temporary works (as herein be fore defined) but does not
include materials or other things intended to form or forming part of the
permanent work.
1 .2 0
1 .2 1
1 .2 2
"Final T es t Certific ate" s hall mean the final test c ertific ate iss ued by the
owner within the provisions of t he c ontract.
1 .2 3
T he "Completion C ertific ate" shall mean the c ertific ate to be iss ued by the
E ngineer-I n-C harge when the work has been c ompleted and tes ted to his
s atis fac tion.
27
1 .2 4
T he "Final Certific ate" s hall mean the final c ertificate issued by the
E ngineer-I n-C harge after the pe riod of defec ts liability is over and the
work is finally acc epted by the o wner .
1 .2 5
"Defec ts Liability P eriod" s hall mean the specified period between the iss ue
of C ompletion Certific ate and the is s ue of final certific ate during which the
C ontrac tor is responsible for rec tifying all defects that may appear in the
works.
1 .2 6
1 .2 7
1 .2 8
"O rder" and "I ns truc tions " s hall res pec tively mean any written order or
instruc tion given by the E ngineer-I n-Charge within the s c ope of his powers
in terms of t he contrac t.
1 .2 9
"Running Ac count Bill" s hall mean a bill for the payment of "O n Account"
money to the C ontrac tor during the pro gres s of work on the bas is of wo rk
done and t he s upply of non-peris hable materials to be incorporated in the
work.
1 .3 0
"Sec urity Deposit" s hall mean the depos it to be held by the owner as
s ec urity for the due pe rfo rmanc e of t he c ontrac tual obligations.
1 .3 1
1 .3 2 .
"Retention M oney" s hall mean the money retained from R.A .Bills for the
due c ompletion of the "LE T WORS".
1 .3 3
U nless otherwis e s pec ific ally s tated, the masc uline gender s hall include the
feminine and neuter gen ders and vic e-vers a and the s ingular s hall inc lude
the plural and vic e-versa.
GC-02
GC-03
SCOPE OF WORK :
T he sc ope of work is defined broadly in the s pecial c onditions of c ontract
and specific ations . T he C ontrac tor shall provide all nec ess ary materials ,
equipment and labour etc . for the exec ution and maintenanc e of the work.
A ll material that go with the wo rk s hall be approved by the E ngineer-I nC harge prior to procurement and us e.
Pow er Supply :
T he Contrac tor shall make his own arra ngement for po wer s upply during
installation.
28
Land f or Cont ract or's Field Of f ice, Godown Etc.:
O wner will not be in a position to provide land required for C ontractor's
field office, godo wn, etc . T he Contractor s hall have to make his own
arrangement for the s ame.
GC-04
GC-05
1.
2.
Works s hown upon the dra win gs but not des cribed in the s pec ific ations or
des c ribed in the s pec ifications without s howing on the dra wi ngs s hall be
taken as desc ribed in the s pec ific ations and sho wn on the dra wings.
3.
4.
5.
6.
7.
T he materials , des ign, and workmans hip s hall s atis fy the relevant I SS, and
c odes referred to.
I f additional requirements are s hown in the
s pecific ations, the same s hall be s atis fied over and above I SS and other
c odes.
8.
I f the s pecifications mention that the C ontractor s hall perform c ertain work
or provide c ertain fac ilities , it shall mean that the Contractor shall do s o at
his own cos t.
29
9.
Cont ractor to Collect His Own Inf ormation T he details given in the e-T ender are arranged making nec ess ary
inves tigations for framing an es timate. However , when t he work is being
exec uted, c hanges in s oil conditions are likely to be met with in view of the
formation of s oil, s trata in Rajkot District. I t is, therefore, des irable that
the Contrac tor makes his own inves tigations or additional inves tigations as
may be required fo r c orrectly as s ess ing the c os t of different items of wo rk
and submit his e-T ender acc ordingly. Any c hange in desc ription or
quantity of an item s hall not vitiate the contract or releas e the Contrac tor
from exec uting the work c ompris ed in the contrac t acc ording to the
dra wings and s pec ific ations at the e-Tendered rates .
He is deemed to have kno w the sc ope, nature and magnitude o f the wo rk
and the requirements of materials and labour involved and as to whatever
work he has to complete in acc ordanc e with the c ontrac t. T he Contrac tor
is expec ted to vis it the s ite and surroundings to s atis fy himself as to the
nature o f all existing s tructures , if any, and als o as to the nature a nd the
c onditions of railways , roads , bridges and c ulverts , means of transport and
c ommunic ations whether by land , air or water and as to poss ible
interruptions thereto and t he acc ess and gross from the site, to have
examined and s atisfied hims elf as to the s ites for obtaining sand, s tones ,
bric ks and other materials, the site for dis pos al of s urplus materials, the
available accommodation and make s uch enquiries as may be nec ess ary
for exec uting and completing the work , to have loc al enquiries as to the
s ub-soil, s ubs oil water and variation thereof, s torms, prevailing winds,
c limatic conditions and all other s imilar matters , effec ting work. He is
expected to be familiar with his liability for payment of Government taxes ,
c us toms and exc ise duty and other c harges etc. in c ontrac t with the
exec ution of this c ontrac t.
GC-06
GC-07
ERRORS IN SUBMISSIO NS :
T he Contractor s hall be res ponsible for any errors or omiss ions in the
particulars s upplied by him, whet her s uch particulars have been approved
by the E nginee r-I n-Charge or not.
GC-08
SUFFICIENCY OF e-TENDER :
T he Contractor s hall be deemed to have s atis fied hims elf before eT endering as to the c orrectness of the e-T ender rates whic h rates s hall,
exc ept as otherwis e provides for, c over all the C ontrac tor's liabilities and
obligations set forth or implied in the c ontrac t for the pro per exec ution of
the work fo r c omplianc e with requirements of A rtic le GC-19 thereof.
GC-09
DISCREPA NCIES :
T he drawin gs and s pec ific ations are to be c ons idered as mutually
explanatory of eac h other , detailed dra win gs being follo wed in pre ference
to s mall-sc ale drawings and figured dimens ions in preferenc e to sc ale and
30
s pecial conditions in preferenc e to General C onditions.
T he s pec ial
direc tions or dimens ions given in the specifications s hall superc ede all
else.
Should
any disc repancies however , appear o r s hould a ny
mis unders tanding arise as to the meaning and intent of the s aid
s pecific ations or drawings , or as to the dimensions or the quality of the
materials or the due and proper exec ution of the works, or as to the
measurement or quality and valuation of the work executed under this
c ontrac t or as extra there upon, the same shall be explained by the
E ngineer-I n-C harge and his explanation shall be s ubjec t to the final
dec is ion of the M unic ipal Corporation in c ase referenc e be made to it, be
binding upo n the Contrac tor and the Contrac tor shall exec ute the work
acc ording to s uch explanation and without addition o r to deduc tion from
the c ontrac t price and shall also do all s uch works and things nec ess ary for
the proper completion of the works as implied by the dra wings and
s pecific ations, even though s uch wo rks and things are not s pec ially shown
and des cribed in the said s pec ific ations. I n cas es where no partic ular
s pecific ations are given for a ny artic le to be us ed un der t he contrac t, the
relevant specifications of the I ndian Sta ndard I nstitution s hall apply.
GC-10
1.
b.
c.
d.
2.
31
GC-11
1.
INSPECTIO N OF WORK :
T he Engineer-I n-C harge s hall have full power and authority to inspect the
work at any time wherever in progress either on the s ite or at the
C ontrac tor's or any other manufac turer's workshop or factories wherever
s ituated and the Contractor s hall afford to E ngineer-I n-Charge every
facility and as sis tanc e to c arry out s uc h ins pec tion, C ontrac tor or his
authorized repres entative shall, at all time during the us ual working hours
and all times when s o notified, remain pres ent to rec eive orders and
instruc tions .
O rders given to C ontrac tor's repres entative s hall be c onsidered to have
the same forc e as if they had been given to the C ontractor hims elf.
C ontrac tor shall give not less than ten (10 ) days notice in writing to the
E ngineer-I n-C harge before c overing up or otherwis e plac ing beyond reach
of inspection and measurement any work in order that the same may be
inspected and measured. I n the event of breach of the above, the s ame
s hall be unc overed at Contractor's expens es for c arrying out s uch
inspection or meas urement.
2.
T he material s hall be dis patc hed from Contrac tor's s tore on site of wo rk
before obtaining approval in writing of the E ngineer-I n-C harge. Contrac tor
s hall provide at all times during the progres s of work and maintenance
period of proper means of access with ladders , gangways , etc. and make
nec ess ary arrangement as direc ted for ins pec tion or meas urement of wo rk
by E ngineer-I n-Charge.
GC-12
1.
DEFECT LIABILITY :
C ontrac tor shall guarantee the work for a period of 06 months from the
date of iss ue of C ompletion Certific ate. A ny damage or defec t that may
aris e or that may remain undis c overed at the time of is s ue of C ompletion
C ertific ate c onnec ted in any way with the e quipment or materials s upplied
by him or in the workmanship s hall be rec tified or replac ed by C ontrac tor
at his own expense as desired by Engineer-I n-C harge or in default
E ngineer-I n-C harge may c ause the s ame to be made good by other
agency and de duc t expens es of whic h the certific ate of Engineer-I nC harge shall be final from any s ums that may then or any time thereafter
bec ome due to Contractor or from his s ec urity depos it or the proc eeds of
s ale thereof or of a su ffic ient portion thereo f.
2.
From the c ommencement to completion of work C ontrac tor shall take full
res pons ibility for the c are of the work including all temporary works and in
c as e any damages , oc cur from any cause whatsoever he s hall at his own
c os t, repair and make good the s ame s o that on c ompletion, wo rk s hall be
in good order and in c onformity, in every respect, with the requirements of
c ontrac t and as per t he ins tructions of the E ngineer-I n-Charge.
3.
Dec ide that any wo rk done or materials us ed by the C ontrac tor are
defec tive or not in acc ordance with the contrac t or that work or any
portion thereo f is defective or do not ful fill the requirements of c ontract
(all s uc h materials being herein after c alled defec ts in this claus e) he s hall,
as s oon as reasonably prac ticably, give notic e to Contractor in writing of
the s aid defec t specifying partic ulars of the s ame then C ontrac tor s hall at
his own expens e an d with all speed make good the de fec ts s o specified.
32
b)
GC-13
GC-14
PRO GRAMME :
T he time allowed for exec ution of works s hall be the es sence of the
c ontrac t. T he contrac t period s hall commenc e from the date of notic e of
intimation to proc eed. T he Tenderer at the time of s ubmitting his eT ender shall indic ate in the c ons truc tion s c hedule his programme of
exec ution of work c ommenc ement with the total time s pec ified. T he
C ontrac tor shall provide the Engineer-I n-C harge a detailed programme of
time sc hedule for exec ution of t he works in ac cordance with the
s pecific ations and the c ompletion date. The entire programme to be
finalized by the Contrac tor, has to c onform to the execution period
mentioned along with the Bill of Q uantities in the e-T ender documents .
T he Engineer-I n-C harge upon s c rutiny of s uc h s ubmitted prog ramme by
C ontrac tor, shall examine s uitability of it to the requirement of c ontract
and s ugges t modifications , if foun d nec ess ary.
GC-15
SUB-LETTING OF WORK :
No part of the c ontract nor any s hare o f interest thereon s hall in any
manner or degree be trans ferred, as signed or s ublet by the Contrac tor
direc tly or indirec tly to any pers on, firm or Corporation whos oever exc ept
as provided for in the s uc c eeding s ub-c laus e, without the c ons ent in
writing o f the o wne r.
GC-16
33
2.
T he general time sc hedule for c ons truc tion is given in the e-Tender
doc ument.
C ontrac tor shall prepare a detailed weekly or monthly
c ons truc tion programme in c ons ultation with the E ngineer-I n-C harge s oon
after the agreement and the work s hall be s tric tly exec uted ac cordingly.
T he time for c ons truc tion inc ludes , the time required for testing,
rec tific ations, if any, retes ting and c ompletion of the work in all res pec ts to
the entire s atis fac tion of the Engineer-I n-C harge exc ept the items which
are not c oming in the way to commission the project.
GC-18
GC-19
GC-20
EXTENSIO N O F TIME :
T ime s hall be c ons idered as the es s enc e of the c ontract. If, ho wever, the
failure of the C ontrac tor to c omplete the work as per the stipulated dates
referred to a bove arises from delays on the part of C orporation in
s upplying the materials or equipment, it has undertaken to supply under
the c ontrac t or from delays on the qua ntity of work to be do ne un der the
c ontrac t, or force majeure an appropriate extens ion of time will be given
by the C orporation. T he Contrac tor shall request for s uc h extens ion within
one month of the c aus e of s uch delay and in any c as e before expiry of the
c ontrac t period.
CONTRACT AGREEMENT :
T he s uccessful T enderer s hall enter into and exec ute the c ontract
agreement within 1 0 (ten) days of the notic e of a war d, in t he fo rm shown
in e-Tender doc uments with s uc h modifications as may be necess ary in the
opinion of the C orporation. I t s hall be incumbent on the Contractor to pay
the s tamp duty and the legal c harges for the preparation of the c ontrac t
agreement.
LIQ UIDATED DA MA GES :
I f the C ontrac tor fails to c omplete the work or des ignated part thereof
within t he s tipulated c ompletion date for the work or for the pa rt, he s hall
pay liquidated damages at 0 .1 (zero point one) perc ent of c ontrac t value
for per day of delay s ubject to maximum of 1 0 % of the contrac t value or
as decided by M unicipal C ommiss ioner.
T he Contractor s hall complete one-s ixth quantum of wo rk within one
fourth period, fou r-tenth quant um of work within one-half period and
eight-tenth quant um of work withi n three-fourth period, failing whic h, the
34
C ontrac tor shall be liable to pay liquidated damages an amount as
s pecified above, or as dec ided by M unic ipal Commiss ioner.
T he amount of liquidated damages s hall, however, be s ubjec ted to a
maximum of 1 0 percent of the c ontract value.
GC-21
GC-22
T o res cind the c ontrac t (of whic h recession notic e in writing to the
c ontrac tor under the hand o f the o wner s hall be conclusive evidence) in
whic h c ase the sec urity deposit of the C ontrac tor shall s tand forfeited and
be absolutely at the disposal of the o wner.
b)
T o employ labour and to supply materials to carry out the balanc e work
debiting C ontractor with the c ost of labour employed and the c os t of
materials s upplied for which a c ertific ate of the E ngineer-I n-C harge s hall
be final and c onc lusive against the C ontrac tor and 10% of c osts on above
to c over all departmental charges and c rediting him with the value of wo rk
done at the s ame rates as if it has been carried out by the Contrac tor
under the terms of his c ontrac t. T he c ertificate of E ngineer-In-Charge as
to the value of the work done shall be final and c onc lusive against the
C ontrac tor.
c)
T o meas ure up the work of the c ontrac tor and to take suc h part thereof as
s hall be unexecuted out of his hand and give it to another Contrac tor to
c omplete, the same. in this c ase the exc ess expenditure inc urred than
what would have bee n paid to the original C ontractor, if the whole wo rk
had been exec uted by him, s hall be bo rne a nd paid by the o riginal
C ontrac tor and s hall be deduc ted from any money due to him by the
owner unde r the c ontrac t or otherwis e and for the exc ess expenditure, the
c ertific ate of the E ngineer-In-Charge shall be final and conclusive.
I n the event any of the above c ourses being adopted by the o wne r, the
C ontrac tor s hall have no c laims for c ompensation for any loss s us tained by
him by reason of his having purc has ed or proc ured any materials or
entered into any agreements or made any advanc e on acc ount of or with a
view to the execution of the work or the per formance o f the c ontrac t.
I n purc has e the C ontrac tor s hall not be entitled to rec over or be paid a ny
s um for any work actually performed unde r this contrac t unles s the
E ngineer-I n-C harge will c ertify in writing the per formance of s uc h work
and the value payable in res pec t thereof and he s hall only be entitled to be
paid the value s o c ertified.
35
GC-24
GC-25
36
GC-26
GC-27
GC-28
1.
2.
I f and whe never any of the Contrac tor's or s ub-c ontrac tor's agents , s ubagents , as sistants , foreman or other employees s hall, in the opinion of the
E ngineer-I n-C harge, be guilty o f any mis conduc t or be inc ompetent or
insuffic iently qualified or negligent in the per formanc e of their duties or
that in the opinion of the o wner o r Engineer-I n-C harge, it is undesirable
for adminis trative or any other reas on for person or pers ons to be
employed in the works, the Contrac tor if s o direc ted by the E ngineer-I nC harge, shall at onc e remove s uc h person or persons from employment
thereon. Any person or pers ons so removed shall not again be reemployed in c onnection with the wo rks without the written permis s ion of
the E ngineer-I n-C harge. Any person, s o removed from the works s hall be
immediately replac ed at the expens e of the C ontrac tor by a qualified and
c ompetent s ubs titute. Should the C ontrac tor be required to repatriate any
pers on removed from the works he s hall do s o after approval of EngineerI n-C harge and s hall bear all c os ts in connec tion therewith .
3.
T he Contrac tor shall be respons ible for the proper behavior of all the s taff,
foreman , workmen and othe rs and s hall exerc is e proper c ontrol over them
and in partic ular and without preju dic e to the s aid generality, the
C ontrac tor shall be boun d to prohibit and prevent any employee from
tres pass ing or ac ting in any way detrimental or prejudic ial to the interest
of the c ommunity or of the properties or oc cupiers of land and properties
in the neighbor hood and in the event of s uc h employees s o trespassing,
the Contrac tor shall be responsible therefore and relieve the owner of all
c ons equent c laims , ac tions for damages or injury o r any ot her ground
whatsoever. T he dec is ion of the Engineer-I n-C harge upon any matter
aris ing under this c laim s hall be final .
37
4.
I f and when re quired by the o wner , t he C ontrac tor's pers onnel entering
upon the o wne r's premis es s hall be properly identified by badges of a type
acc eptable to the owner which must be wo rn at all times on o wne r's
premis es.
GC-29
GC-30
POW ER OF ENTRY :
I f the C ontrac tor s hall not c ommence the work in the manner previously
des c ribed in the c ontract documents or if he s hall at any time, in the
opinion of E ngineer-I n-Charge
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
Fail to c arry out works in c onformity with the c ontrac t doc uments , or
Fail to c arry out t he wo rks in ac c ordanc e with the time sc hedule, or
Subs tantially s us pend work or the wo rks for a pe riod of s even days
witho ut aut hority from Engineer-I n-C harge, or
Fail to c arry out and exec ute the work to the s atis fac tion of the EngineerI n-C harge, or
Fail to s upply sufficient or s uitable construction plant, temporary wo rks ,
labour, materials or things , or
C ommit breac h of any other provis ions of the c ontract on his part to be
performed or observed or persis ts in any of the above mentioned breac hes
of the c ontrac t for seven days after notice in writing s hall have been given
to the C ontrac tor by the Engineer-I n-C harge requiring s uch breac h to be
remedied, o r
A bandon the work, or
During the continuance of the contract bec omes bankrupt, make any
arrangement or c ompromise with his c reditors , or permit any exec ution to
be levied or go into liquidation whether compulsory or voluntary not being
merely a voluntary liquidation for the purpos e of amalgamation or
rec ons truc tion then i n any suc h c as e.
T he owner shall have the po wer to enter upo n the works and take
pos s ess ion thereof and of the materials , temporary works, c ons tructional
plant and s tores therein a nd to revoke the Contractor's license to use the
s ame and to complete the works by his agents, other Contrac tor or
workmen, to relate the s ame upon any terms to s uch other pers on firm or
C orporation as the owner in his absolute disc retion may think proper to
employ, and fo r the purpose afores aid to use or a uthorize the use of a ny
materials, temporary works , constructional plant, and s tores as afores aid
with making payments or allo wance to the C ontrac tor for the s aid
materials other than s uc h as may be c ertified in writing by the EngineerI n-C harge to be reas onable and without making any payment or allowance
to the C ontrac tor for the use of s aid temporary works , construc tional plant
and stoc k or being liable for loss or damage thereto. If the owner s hall be
reas on of his taking posses sion of the wo rks or of the work being g ot
38
c ompleted by other C ontrac tor inc urred excess expenditure be deduc ted
from any money whic h may be due for the work do ne by the Contrac tor
under the c ontrac t and not paid for. Any defic ienc y s hall forthwith be
made good and paid to the owner by the Contrac tor and the owner s hall
have po wer to sell in suc h manner a nd for suc h pric e as he may think fit
all or any of the c ons tructional plant, materials etc ., c ons ist c ons truc ted by
or belonging to an d to recoup and retain t he said defic ienc y or any part
thereof out of the p roc eeds of the s ale.
GC-31
GC-32
GC-33
NOTICES :
A ny notice under this c ontrac t may be s erved on the C ontractor or his duly
authorized repres entative at the job s ite or may be s erved by Registered
P os t direct to the offic ial addres s of the Contractor. P roof of is s ue of any
s uc h notic e c ould be c onc lus ive of the Contractor having been duly
informed o f all c ontents therein.
GC-34
GC-35
PRICE ADJUSTMENTS :
No adjustment in pric e s hall be allowed and no pric e esc alation will be
allowed .
39
GC-36
GC-37
RETENTIO N MONEY :
P urs uance to c laus e GC-36 (Terms of P ayment) any on at money due to
the Contrac tor for wo rk done, C orporation will hold as Retention mo ney
five (5 ) percent of the value of work . The retention money will not
normally be due for payment until the completion of the entire work and
till s uc h period the work has been finally ac cepted by the Corporation and
a c ompletion c ertificate issued by the Corporation in pursuant to ClauseGC 79 (Completion Certificate).
GC-38
GC-39
i)
ii)
GC-40
CONTINGENT FEE :
T he Contrac tor warrants that he has not employed a person to s olic it or
s ec ure the contrac t upo n any agreement for a c ommiss ion, perc entage,
and br okerage contingent fee. Breac h of this wa rranty s hall give the
C orporation the right to c anc el the c ontrac t or to take any drastic meas ure
as the Corporation may deem fit. The warranty does not apply to
c ommiss ions payable by the Contrac tor to es tablis h c ommercial or selling
agent for t he p urpose of s ec uring bus iness .
No offic er, employer o r agent o f the Corporation s hall be admitted to a ny
s hare or pa rt o f this c ontract or to any bene fit that may ris e there from.
BREACH OF CONTRA CT BY CO NTRACTO R :
I f the C ontrac tor fails to per form the work unde r the c ontrac t with due
diligenc e or shall refus e or neglec t to c omply with ins tructions given to him
in writing by the E ngineer-I n-C harge in accordance with the c ontract, or
s hall c ontravene the provisions of the c ontrac t, the C orporation may give
notic e in writing to the C ontrac tor to make good suc h failure, neglec t, or
c ontravention. Should the Contrac tor fail to c omply with suc h written
notic e within 1 4 (fourteen) days of rec eipt, it shall be lawful for the
C orporation, without pre judic e to any other rights the Corporation may
have under the c ontract, to terminate the contract for all or part of the
works, and make any other arrangements it s hall deem nec es s ary to
c omplete the work outs tanding unde r the c ontract at the time of
termination. I n this event, the performanc e Bond s hall immediately
bec ome due and payable to the Corporation. The value of the work done
40
on the date o f termination a nd not paid fo r s hall be kept as deposit for
adjus tment of exc ess expenditure incurred in getting the remaining wo rk
c ompleted and the Corporation s hall have free us e of any wo rks which the
C ontrac tor may have at the s ite at the time of termination of the contrac t.
GC-41
i)
DEFAUL T OF CONTRACTOR :
T he Corporation may upon written notic e of default to the Contrac tor
terminate the c ontrac t circ umstanc es detailed as under :
a)
b)
I f in the opinion of the Corporation, the Contrac tor fails to comply with any
of the other provis ions of t his contract.
ii)
iii)
A ny completed wo rks
Suc h partially c ompleted information and c ontrac t rights as the Contrac tor
has specific ally produc ed or ac quired for the performanc e of the c ontrac t
s o terminated.
iv)
I n the event, the C orporation does not terminate the contrac t as provided
in the para graph GC -50 (T ermination of Contrac t) the Contractor s hall
c ontinue performance of the contract, in whic h c ase, he shall be liable to
the Corporation for liquidate d damages for delay until the works are
c ompleted and ac c epted.
GC-42
BANKRUP TCY :
I f the C ontrac tor s hall become bankrupt o r insolvent or has a rec eiving
order made agains t him, or compound with his creditors , or being the
C orporation c ommenc e to be wound u p not being a member volunta ry
windi ng up for the pu rpos e of amalgamation or rec ons truction, or c arry on
its business under a rec eiver for the benefit of his creditors or any of
them, the Corporation s hall be at liberty to either (a) terminate the
c ontrac t forthwith by giving notice in writing to the Contrac tor or to the
rec eiver or liquidator or to any pers on or O rganization in whom the
c ontrac t may bec ome ves ted and to ac t in the manner provided in Article
GC-41 (Default of Contractor) as thou ght the las t mentioned notic e had
been the notic e referred to in s uc h artic le or (b) to give s uc h receiver,
liquidator or other persons in whom the c ontract may become ves ted the
option of c arrying out the c ontract subjec t to his providing a s atis fac tory
guarantee for the due and faithful , per formanc e of the c ontrac t up to an
amount to be agreed . I n the event that the Corporation terminates the
41
c ontrac t in accordanc e with this article, the performanc e bond s hall
immediately become due and payable on demand to C orporation .
GC-43
OWNERSHIP :
Works hand over purs uant to the c ontrac t s hall bec ome the property of
the Corporation from whic hever is the earlier of the following times ,
namely;
a)
b)
GC-44
GC-45
GC-46
GC-47
SETTLEMENT OF DISPUTES :
E xc ept as otherwise specific ally provided in the c ontrac t, all disputes
c onc erning questions of fact arising under the c ontrac t s hall be dec ided by
the Engineer-I n-C harge s ubject to a written a ppeal by the Contrac tor to
the Engineer-I n-C harge and thos e dec is ions s hall be final and binding on
the parties hereto. A ny disputes or differences inc luding those c ons idered
as s uch by only one of the pa rties aris ing out of or in connec tion with this
c ontrac t s hall be to the extent possible settled amic ably between the
parties . If amic able s ettlement c annot be reac hed then all disputed iss ues
42
s hall be settled as provided in A rtic le GC-48 (Disputes or differences to be
referred to) an d A rtic le No.GC -49 (A rbitration).
GC-48
GC-49
ARBITRATION :
I n c ase of any dis pute arising during the c ourse of exec ution, the matter
s hould be referred to M unic ipal Commissioner who will be s ole Arbitrator
whos e dec isions will be final and bin ding to the Contractor.
GC-50
i)
ii)
T he Contrac tor s hall be paid for all works approved by the Engineer-I nC harge and for any other legitimate expens es due to him.
b)
c)
T he Corporation s hall als o releas e all bonds and guarantees at its disposal
exc ept in cas es where the total amount of payment made to the
C ontrac tor exc eeds the final amount due to him in which cas e the
C ontrac tor s hall refund the excess amount within thirty (3 0) days after the
termination and the Corporation thereafter s hall releas e all bonds and
guarantees . S hould the C ontrac tor fail to refund t he amounts received in
exc ess within the said period s uch amounts s hall be deduc ted from the
bonds or guara ntees provided.
43
iii)
O n termination of t he contrac t for any cause the Contrac tor shall s ee the
orderly sus pension and termination of operations , with d ue consideration
to the interests of the Corporation with res pec t to completion safeguarding
of s toring materials proc ured for the pe rfo rmanc e of the contrac t and the
s alvage and res ale thereof.
GC-51
SPECIAL RISKS :
I f during the c ontrac t, there shall be an outbreak of war (whet her war is
dec lared or not), major e pidemic , earthquake or s imilar occ urrence in any
part of the world beyond the control o f either party to the c ontrac t which
financially or otherwis e materially affec ts the exec ution of the contract, the
C ontrac tor shall unless and until, the contrac t is terminated under the
provisions of this artic le use his bes t endeavors to complete the execution
of the c ontrac t, provided always that the Corporation s hall be entitled at
any item after the ons et of s uch special ris ks, to terminate the c ontract by
giving written notice to the c ontrac tor and upon suc h notic e being given
this contrac t s hall terminate but without prejudic e to the rights of either
party in res pec t of any antec edent breac h thereof.
T he Contrac tor shall not be liable for payment of compens ation for delay
or for failure to per form the c ontrac t for reasons of Forc e M ajeure s uc h as
acts of public enemy, ac ts of Government, fires , floods, cyc lones ,
epidemics, quarantine restrictions , loc kouts, strikes , freight embargoes
and provided that the C ontrac tor shall within 10 (ten) days from the
beginning of s uch delay noti fy the Engineer-I n-C harge in writing, of the
c aus e of delay, the Corporation s hall verify the facts and grant s uch
extens ion as the facts jus tify.
GC-52
GC-53
b)
c)
P rotect and preserve the rights of t he Corporation a nd the Engineer-I nC harge with res pec t to the works to be per formed under the s ubc ontrac ting party will not prejudic e s uc h rights .
Require that s uch work be performed in ac c ordanc e with the requirements
of c ontract doc uments .
Require un der suc h contrac t to whic h the c ontrac tor is a party, the
s ubmis sion to the C ontractor of applic ation for payment and claims for
additional c os ts , extension of time, damages for delay or other wis e with
res pec t to the sub-contracted portions of the work in suffic ient time, t hat
the Contrac tor may apply fo r payment c omply in acc ordanc e with the
c ontrac t doc uments for like c laims by the C ontrac tor upon the C orporation.
44
d)
e)
Waive all rights the c ontrac ting parties may have agains t one a nother for
damages c aus ed by fire or other perils covered by the property ins urance
exc ept s uc h rights as they may have to the proc eeds of s uch ins urance
held by t he Corporation as trustee and,
O bligate each sub-contractor s pec ifically to c ons ent to the provis ions of
this Article.
GC-54
1.
PATENTS A ND ROYALTIES :
C ontrac tor, if licensed under any patent c overing eq uipment, mac hinery,
materials or c omposition of matter to be us ed or s upplied or methods and
proc ess to be prac tic ed or employed in the performanc e of this c ontrac t
agrees to pay all royalties and lic ens e fees , which may be due with res pect
thereto. I f any equipment, mac hinery, materials , composition matters , to
be used or supplied or methods prac tic ed or employed in the performance
of this contrac t, is c overed by a patent under whic h C ontrac tor is not
licensed, then the C ontrac tor before s upplying / using the equipment,
mac hinery, materials , compositions , methods of proc ess shall obtain s uch
license and pay s uch royalties and lic ens e fees as may be nec ess ary for
performanc e of this c ontrac t. I n the event C ontrac tor fails to pay s uch
royalty or to obtain any suc h license, any s uit for infringement of s uch
patents which is brought agains t the Contractor or the owner as a result of
s uc h failure will be defended by the C ontractor at his own expens es and
the Contrac tor will pay any damages and c os ts awarded in s uch suit. T he
C ontrac tor shall promptly notify the owner if the Contrac tor has ac quired
knowled ge of any plant under which a s uit for infringement c ould be
reas onably brought because of the us e by the owner of any equipment
mac hinery, materials , proc ess methods to be supplied in hereunder.
C ontrac tor agrees to and does hereby grant to o wner together with the
right to extend the s ame to any of the subsidiaries of the owner an
irrevoc able royalty fee lic ens e to us e in any C ountry , any invention made
by the C ontrac tor or his employees in or as a res ult of the performanc e of
work under contrac t.
2.
With res pec t to any s ub-contract entered into by Contractor purs uant to
the provis ions of the relevant c laus e hereof, t he Contractor s hall obtain
from the s ub-c ontrac tor an unders tanding to provide the o wner with the
s ame patent protection that c ontracts is required to provide under the
provisions of the c laus e.
3.
T he Contrac tor shall indemnify and s ave harmless the owner from any loss
on acc ount of claims agains t owner for the c ontributory in frin gement of
patent rights aris ing out o f a nd bas ed u pon t he c laim that the use by the
C orporation of the proc es s included in the design prepared by the
C ontrac tor and us ed in t he ope ration o f the plant infri nges on a ny pate nt
rights.
GC-55
LIEN :
I f, at any time, t here should be evidence of any lien o r c laim for which
owner might have bec ome liable and which is c hargeable to the
C ontrac tor, the owner s hall have the right to retain out of any payment
then due or thereafter to bec ome due an amount su ffic ient to c ompletely
indemnify the o wner agains t suc h lien or c laim or if s uc h lien or c laim be
valid the o wner may pay an d dis charge the s ame and de duc t the amou nt
as paid from any money whic h may be due or bec ome due and payable to
the Contractor.
If any lien or c laims remaining unsettled after all
payments are made, the Contractor s hall refund or pay to the owner all
45
money that the latter may be c ompelled to pay in disc harging s uch lien or
c laim inc luding all c os ts and reas onable expens es .
GC-56
EXECUTIO N OF W ORK :
T he whole work s hall be c arried out in s tric t c onformity with the provis ions
of the contrac t doc ument, detailed drawings, specifications and the
instruc tions of the Engineer-I n-C harge from time to time. T he Contrac tor
s hall ensure that the whole work is executed in the mos t s ubs tantial, and
proper man ner with bes t workmans hip us ing materials of bes t quality in
s tric t accordance with t he s pec ific ations to the entire s atis fac tion of the
E ngineer-I n-C harge.
GC-57
WORK IN MO NSO ON :
When the work c ontinues in mons oon if require d, t he Contractor s hall
maintain minimum labour forc e required for the work and plan and
exec ute the c ons truc tion and erec tion work acc ording to the prescribed
schedule. No extra rate will be c ons idered for suc h work in mons oon.
During monsoon and entire c ons truc tion period, the C ontrac tor shall keep
the s ite free from water at his o wn c os t.
GC-58
GC-59
GC-60
GC-61
46
C ertified
true
for .P ro ject
No ..
A greement
Signed .
Cont ractor
Engineer-In-Charge
Drawings will be approved within three (3 weeks of the rec eipt of the same by the
E ngineer-I n-C harge.
GC-62
SETTING O UT WORK :
T he Contractor s hall set out the work on t he s ite handed over by the
E ngineer-I n-C harge and shall be respons ible for the c orrec tness of the
s ame. T he work s hall be carried out to the entire satisfaction of EngineerI n-C harge. The approval thereof or pa rtaking by E ngineer-In-Charge or
s etting out work s hall not relieve C ontrac tor of any of his respons ibilities .
T he Contractor s hall provide at his own c os t all necessary level pos ts ,
pegs , bamboos , flags , ranging rods, strings and other materials and
labourers required for proper setting out of the work . The C ontractor s hall
provide fix and be res ponsible for the maintenanc e of all s takes ,
templates, level markets , profiles and s imilar other things and shall take
all nec essary prec autions to prevent their removal or dis turbanc e and s hall
be respons ible for the consequences for s uch removal or dis turbanc e. T he
C ontrac tor shall also be res ponsible for the maintenanc e of all exis ting
s urvey marks , boundary marks , and dis tance marks and centerline marks
either exis ting or fac e lines and c ros s lines shall be marked by small
mas onry pillars . Eac h pillar s hall have distance mark at the center for
s etting up the theodolite. T he work shall not be s tarted unless the s etting
out is c hoked and approved by E ngineer-I n-Charge in writing but s uch
approval s hall not relieve the C ontrac tor of his respons ibilities about the
c orrectnes s of s etting out. The C ontrac tor s hall provide all materials ,
labour and other facilities necess ary for c hec king at his own c ost. Pillars
bearing geodetic marks on s ite s hall be protec ted by the C ontractor. On
c ompletion of the work, the C ontractor s hall s ubmit the geodetic
doc uments acc ording to whic h the work has been c arried o ut.
GC-63
1.
47
2.
GC-64
1.
2.
GC-65
48
beyond the control of the owner , the o wner c arries no respons ibilities . In
no c as e the Contractor s hall be entitled to c laim any c ompens ation for loss
s uffered by him on this ac count.
None of the materials issued to the contrac tor, s hall be us ed by the
C ontrac tor for manufac turing items whic h c an be obtained from the
manufac turer's . T he materials issued by the owner s hall be us ed for the
work only and no other purpose.
C ontrac tor shall be required to exec ute indemnity bond in the prescribed
form for the safe c ustody and ac c ount of materials iss ued by the owner .
C ontrac tor shall furnish s uffic iently in advanc e a s tatement of his
requirements of quantities of materials to be supplied by the owner and
the time when the s ame will be required for the work , so as to enable
E ngineer-I n-C harge to make arrangements to proc ure and s upply the
materials.
A daily acc ount of materials iss ued by the owner shall be maintained by
the c ontrac tor showing receipt, consumption and balanc e on hand in the
form laid down by Engineer-I n-C harge with all c onnected paper and s hall
be al ways available for ins pec tion in the site office.
C ontrac tor shall s ee that only the required qua ntities of materials are got
issued and no more. T he C ontrac tor shall be respons ible to return the
s urplus materials at o wner's s tore at his own c ost.
GC-66
GC-67
GC-68
49
s hall be found in, under or upo n s ite s hall be the property of the owner
and the Contractor s hall properly p res erve the same to the s atis fac tion of
the E ngineer-I n-C harge and s hall hand over the s ame to the o wner.
GC-69
GC-70
a)
I f the rates fo r additional , altered or s ubs titutes work are s pec ified in the
c ontrac t for work , the C ontractor is bound to carry out suc h work at the
s ame rates as s pecified in the contract.
b)
I f the rates for additional, altered or s ubs tituted work are not s pec ific ally
provided in the c ontract for the work, the rates will be derived from the
rates of s imilar items of work in the c ontract work. T he opinion of
E ngineer-I n-C harge as to whethe r the rates c an be reas onably s o derived
the items of contract will be final and bin ding to the C ontrac tors .
c)
d)
50
GC-71
GC-72
ABNORMA L RATES :
C ontrac tor is expec ted to quote rate for eac h item after c areful analys is of
c os t involved for the pe rformance of the c ompleted item c ons idering all
s pecific ations and c onditions of c ontrac t.
GC-73
ASSISTANCE TO ENGINEER-IN-CHARGE:
C ontrac tor shall make available to E ngineer-In-Charge free of c os t all
nec ess ary ins truments and ass is tance in c hec king of any work made by
the C ontrac tor setting out for taking measurement of work etc .
GC-74
1.
A ll workmans hip s hall be of the bes t kind des cribed in the c ontract
doc uments and in ac c ordanc e with t he ins truc tions of Engineer-I n-Charge
and shall be s ubjec ted from time to time to s uc h tes ts at Contractor's c ost
as the Engineer-I n-C harge may direc t at the plac e of manufac ture of
fabrication or on the s ite or at any suc h plac e. Contrac tor shall provide
ass is tance, ins truments, labour and materials as are normally required for
examining, measuring and testing of any work of workmans hip as may be
s elec ted and required by E ngineer-I n-C harge.
2.
A ll tests nec ess ary in connec tion with the exec ution of wo rk as dec ided by
E ngineer-I n-C harge s hall be c arried out at an approved laboratory at
C ontrac tor's c ost.
3.
C ontrac tor shall furnis h the Engineer-I n-C harge for approval when
reques ted or if required by the s pec ific ation, adequate s amples of all
materials and finis hed goods to be used in wo rk s uffic iently in advanc e to
permit tes ts and examination thereof. All materials furnis hed and finis hed
goods applied in work shall be exac tly as per the a pproved s amples .
GC-75
51
GC-76
SUSPENSION WO RK :
C ontrac tor shall, if orde red in writing by Engineer-I n-C harge or his
representative temporarily s us pended the wo rk or a ny part t hereof for
s uc h time (not exceeding one month) as ordered and s hall not after
rec eiving s uch written notic e proc eed with the work u ntil he s hall have
rec eived a written order to proc eed therewith. The C ontractor s hall not be
entitled to c laim c ompens ation for any loss or damage sustained by him by
reas on of temporary sus pension of work as afores aid. An extens ion of
time for completion of work will be granted to the Contrac tor
c orresponding to the delay caused by s uch s us pension of work if he
applies for the same provided the s us pens ion was not c ons equent upon
any defa ult or failure on the part of the Contrac tor.
GC-77
GC-78
GC-79
52
portion of work within one month after t he date fixed by c ontract for
c ompletion of work, o wner s hall be at liberty to use work or any portion
thereof in res pec t of whic h a completion c ertificate has been iss ued,
provided that work or t he portion t hereof so us ed as aforesaid s hall be
affor ded reasonable opportunity for c ompletion of that work o r the portion
thereof so used as afores aid shall be afforded reasonable opportunity for
c ompletion of that work for the is sue of c ompletion certific ate.
GC-80
1.
SCHEDULE OF RATES :
T he rates quoted by the C ontrac tor shall remain firm till the completion of
the work and s hall not be subjec t to es c alation. Schedule of rates s hall be
deemed to inc lude an d c over all c osts , expenses and liabilities of every
des c ription and ris ks or every kind to be taken in exec uting, c ompleting
and handing over the work to o wner by C ontrac tor. The c ontractor s hall
be deemed to have known the nature, s cope, magnitude and the extent of
work and materials required though contrac t documents may not fully and
prec isely furnis h them. He s hall make suc h provision in the Sc hedule of
Rates as he may consider nec essary to c over the c ost of s uc h items of
work and materials as may be reas onable and nec es s ary to complete the
work. T he opinion of Engineer-I n-C harge as to the item of work which are
nec ess ary and reasonable for c ompletion of the work s hall be final and
binding on Contrac tor although the same may be not s hown on dra wings
or desc ribed s pec ifically in c ontract doc uments .
2.
T he Sc hedule of Rates shall be deemed to include and cover the cos t of all
c ons truc tional plant, temporary work , materials , labour and all other
matters in connec tion with each item in Schedule of Rates and the
exec ution of work or any portion thereo f finis hed c omplete in every
res pec t and maintained as s hown or des cribed in the c ontrac t document or
as may be ordered in writing duri ng t he continuanc e o f the c ontract.
3.
T he Sc hedule of Rates shall be deemed to include and cover the cos t of all
royalties and fees for the artic les and proc ess es, protec ted by letters
patent or other wis e incorporated in or used in connec tion with work , also
all royalties , rents and other payments in connec tion with obtaining
material of whats oever kind for work and s hall inc lude an indemnity to
owner whic h Contrac tor hereby gives against all ac tion, proceedings ,
c laims, damages, cos ts and expens es aris ing from the incorporation in or
use on the works of any s uch articles , proc ess es or materials. O ther
M unicipal or local Board c harges if levied on material, equipment or
mac hineries to be brought to s ite for use on work s hall be borne by the
C ontrac tor.
4.
5.
53
6.
For work under u nit rate bas is, no alteration will be allowed in the
Schedule of Rates by reas ons of wo rk or any part of them being modified,
altered, extended, diminis hed or omitted.
GC-81
1.
2.
C ontrac tor will submit a bill in approved proforma in quadru plic ate to the
E ngineer-I n-C harge of the
work giving abs trac t and detailed
measurements of various items exec uted during a month as mutually
agreed. T he E ngineer-I n-Charge s hall verify the bill and the claim, as far
as admiss ible, adjusted if poss ible, within 10 days of pres entation of the
bills .
GC-82
1.
2.
Five (5 ) percent o f the gros s R A Bill amount shall be retained from each
bill as retention amount and the s ame will be paid with the final bill.
GC-83
GC-84
1.
54
2.
No payment s hall be made for work cos ting less than Rs .1 ,00 ,00 0/- till the
work is completed and a certific ate of completion given. But in c as e of
work estimated to cos t more than Rs .1 ,00 ,000 /-.
C ontrac tor on
s ubmitting the bill thereof will be entitled to rec eive a monthly payment
proportionate to the part thereo f, approved and pas sed by Engineer-I nC harge, whos e c ertificate of s uch approval and pas sing of the s um so
payable shall be final and c onc lus ive agains t contractor. This payment
s hall be made after nec ess ary deductions as stipulated els ewhere in the
c ontrac t doc uments for materials , s ecurity depos it etc . T he payment s hall
be released to the C ontractor within one (1) month of s ubmis s ion of the
bill duly pre-occ upied on proper revenue stamp.
P ayment due to
C ontrac tor s hall be made by the owner by cros sed A ccount P ayee C heque
in I ndian c urrenc y for war ding the same to the registered office of the
C ontrac tor. O wner s hall not be respons ible if the c heque is mis laid of
mis appropriated by u nauthorized persons.
GC-85
FINAL BIL L :
T he final bill s hall be s ubmitted by C ontrac tor within one (1) mont h of the
date of physic al c ompletion of work, other wis e the E ngineer-I n-C harge's
c ertific ate of the meas urement and of total amou nt payable for work s hall
be final and binding on all parties .
GC-86
GC-87
1.
2.
Within one month of c ompletion of work in all res pec ts C ontrac tor s hall be
furnished with a c ertificate by the E ngineer-I n-Charge of suc h c ompletion
but no c ertific ate s hall be given nor s hall work be deemed to have been
exec uted until all (i) s caffolding, surplus materials and rubbish is c leaned
off s ite completely, (ii) until work s hall have been meas ured by the
E ngineer-I n-C harge whos e meas urement s hall be binding and c onc lus ive
and, (iii) until all the temporary works, labour and s taff colonies etc .
c ons truc ted are removed and the work site cleaned to the s atis fac tion of
the Engineer-I n-C harge.
I f C ontrac tor s hall fail to c omply with the
requirements as aforesaid or before date fixed for the completion of work,
the Engineer-I n-C harge may at the expense of Contrac tor remove s uch
55
scaffolding, surplus materials and rubbis h and dis pos e off the s ame as he
thinks fit.
3.
T he followin g documents will form the c ompletion doc uments :a) T ec hnic al documents acc ording to whic h the wo rk has bee n c arried o ut.
b)
T hree s ets of c ons truc tion drawings showin g therein the modi fic ations and
c orrections made during the cours e of execution signed by the EngineerI n-C harge.
c)
d)
e)
f)
M aterial appropriation s tatement for the materials iss ued by owner for
work and lis t of s urplus materials returned to owner's store duly supported
by neces sary doc uments .
4.
U pon expiry o f the period of defec t liability and sub jec t to Engineer-I nC harge being s atis fied that work has been duly maintained by Contrac tor
during the defec t liability period of fixed originally or as extended
s ubs equently and that Contrac tor has in all res pec ts made up any
s ubs idence and performed all his obligations under c ontract, the EngineerI n-C harge (without prejudic e to the rights of o wner in any way ) give final
c ertific ate to that effect. The C ontrac tor s hall not be c ons idered to have
fulfilled the whole of his obligation until final certific ate shall have been
given by the E ngineer-In-Charge.
5.
GC-88
1.
2.
C ontrac tor shall be res pons ible for c omplianc e with all obligations and
res trictions impos ed by the labour law or any other law a ffec ting
employer-employee relations hip.
56
3.
C ontrac tor further ag rees to comply and to s ec ure the complianc e of all
s ub contrac tors with applic able Central, State, M unicipal and loc al laws
and reg ulations and re quirement. C ontrac tor als o agrees to defe nd,
indemnify the hold harmless the owner from any liability or penalty which
may be impos ed by Central, State or loc al authority by reas ons of any
violation by C ontrac tor or s ub Contractor of s uch laws , regulations or
requirements and als o from all claims , suits or proc eedings that may be
brought agains t owner arising under , growing o ut of or by reasons or work
provided for by this Contract by third parties or by Central or State
Government autho rity or any administrative Sub-Divis ion thereof.
T he Sales T ax on work contract will be bor ne by C ontractor.
GC-89
INSURA NCE :
C ontrac tor shall at his own expens es carry and maintain the reputable
I ns uranc e C ompanies to the s atis fac tion of o wner as follows :
1.
C ontrac tor agrees to and us es hereby acc ept full and exc lus ive liability for
c ompliance with all obligations impos ed by the Employer's State Ins urance
Act, 194 8 and Contractor further agrees to defend, indemnify and hold
owner hard nes s from any liability or penalty whic h may be impos ed by the
C entral or State Government or loc al authority by reasons of any assorted
violation by Contrac tor or Sub-C ontrac tor or the E mployees State
I ns uranc e Act, 19 48 and als o from all claims , s uits or proceedings that
may be brought agains t owne r aris ing under, g rowing out of or by reas ons
of the work provided for by this c ontrac t whether brou ght by employees of
C ontrac tor by third parties or by Central or State Government authority or
any adminis trative Sub-divis ion thereof.
C ontrac tor agrees to fill in with t he E mployees State Ins urance
C orporation, the declaration form and all fo rms whic h may be required in
res pec t of Contrac tor's or s ub-Contrac tor's employees whose aggregate
remuneration is Rs.4 00/- p.m. or les s and who are employed in wo rk
provided for or thos e c overed by E SI from time to time under the
agreement. T he C ontrac tor s hall deduc t and s ec ure the agreement of the
s ub-Contrac tor to deduc t the employees c ontribution as per the first
schedule of the E mployees State I nsuranc e Act from wages . C ontrac tor
s hall remit and s ecure the agreement of sub-contractor to remit to the
State Bank of I ndian Employees State I nsuranc e Acc ounts , the employee's
c ontribution as required by the Ac t. Contrac tor agrees to maintain all
c ards and rec ords as required under the Act in respect of employees and
payments and C ontrac tor shall s ec ure the agreements of the s ub
c ontrac tors to maintain in s uc h rec ords, any expenses inc urred for the
c ontributions, making c ontributions or maintaining rec ords s hall be to
C ontrac tors or sub-contractors own ac c ount. o wner s hall retain suc h s um
as may be nec ess ary from the c ontrac t value until Contractor s hall furnish
s atis fac tory proof that all contribution as required by the Employees State
I ns uranc e Act, 19 48 have been paid .
2.
3.
57
required un der any law or reg ulation from time to time. He shall also
c arry and maintain any ot her i ns urance, which may be re quired by o wner.
GC-90
1.
DAMAGE TO P ROPERTY :
C ontrac tor shall be res pons ible for making good to the s atis fac tion of
owner any loss of and any damage to all s truc tures and properties
belonging to o wner o r being executed or proc ured o r being procured by
owner o r o f othe r age nc ies within the premis es of all work o f owner , if
s uc h loss or damage is due to fault and / or the negligenc e of willful ac t or
omission of C ontrac tor, his employees , agent, repres entatives or s ubC ontrac tor s .
2.
C ontrac tor shall indemnify and keep owner ha rmless of all c laims for
damage to properties other than prope rty aris ing under by reas ons of this
agreement, suc h c laims res ult from the fault and / or negligenc e or willful
act or omission of C ontrac tor, his employees , agents repres entative or
s ub-contrac tor.
GC-91
1.
2.
3.
GC-92
58
GC-93
GC-94
SAFETY CO DE :
General :
C ontrac tor shall adhere to s afe construc tion prac tic e and guard against
hazardous and uns afe working c onditions and s hall c omply with o wne r's
rules as set forth herein.
1.0
1 .1
1 .2
C ontrac tor s hall make outside arrangements for ambulanc e s ervice and for
the treatment of indus trial injuries. Name of those providing these
s ervices s hall be furnis hed to E ngineer-I n-Charge prior to s tart of
c ons truc tion, and their telephone numbers shall be prominently pos ted in
C ontrac tor's field offic e.
1 .3
2.0
2 .1
General Rules :
C arrying and striking, matc hes , lighters ins ide the project area and
s moking within the job s ite is strictly prohibited. V iolators of s moking rules
s hall be dis charged immediately. Within the operation area, no hot wo rk
s hall be permitted, without valid gas , s afety, fire permits . T he Contrac tor
s hall als o be held liable and res pons ible for all laps es of his s ub-Contrac tor
s / employees in this regard.
3.0
3 .1
3 .2
C ontrac tor's employees and those of his sub-c ontractors shall bec ome
acquainted with owner's barric ading practic es and s hall respect the
provisions thereof.
3 .3
Barricades and hazardous areas adjac ent to but not located in normal
routes of t ravel shall be marked by red lantern at night .
4.0
4.1
Scaf folding :
Suitable sc affolding s hall be provided fo r workman for all works that
c annot
safely
be
done
from
ladde rs .
When a ladder is used, an extra mazdoor s hall be engaged fo r holding the
ladder and if t he ladder is us ed for c arrying materials as well s uitable
59
footholds and handholds shall be provided on the ladder and the s ame
s hall be given an inc lination not s teeper that 1 in 4 (1 horizontal and 4
vertical).
4 .2
4 .3
Working platfo rms , gang ways, and s tairways s hould be s o c ons truc ted
that they s hould not s ag unduly or inadequately and if t he height of the
platform or the gang way o f the s tairway is more than 3.6 (12') above
ground level or floor level, they should be c losely boarded, s hould have
adequate widt h an d s hould be s uitably fastened as des cribed in 4 .2 above.
4 .4
4 .5
Safe means of ac c ess shall be provided to all working platforms and other
working places . E very ladder s hall be sec urely fixed. No portable single
ladder s hall be over 9 .0 M . (30 ') in length while the width bet ween the
s ide rails in rung ladder s hall in no cas e be les s than 30 cms (1 2 inc hes )
for ladder up to and inc luding 3 .0 M . (10 '), in longer ladders this width
would be increased at leas t 6 mm (1 /4") for each addition 30 c.m. (1.0 ) of
length. Uniform s tep spacing s hall not exc eed 30 c ms. (12"). Adequate
prec aution s hall be taken to prevent danger from elec tric al equipment. No
materials on any of the s ide of wo rk s hall be so stac ked or placed as to
c aus e danger or inconvenience to any person or public . T he Contrac tor
s hall als o provide all nec ess ary all nec ess ary fenc ing and lights to protect
the workers and s taff from ac c idents , and s hall be bound to bear the
expens es of defenc e of every s uit ac tion or other proceedings at la w t hat
may be bro ught by a ny pers ons for in jury sus tained owning to ne glec t of
the above precautions and to pay damages and c os ts whic h may be
awar ded in any s uch s uit or action or proc eedings to any s uch pers on, or
whic h, may be with the c ons ent of t he Contrac tor be paid to c ompromise
any c laim by any s uc h person.
5.0
5 .1
Excavation :
A ll trenc hes 1 .2 M (4') or more in depth , s hall at all time be supplied with
at leas t one ladder .
5 .2
Ladder s hall be extended bottom o f the trenc h to at least 3" above the
s urface of the ground. T he side of the trenc h whic h are 1 .5 M (5') or more
in depth s hall be s topped bac k to give suitable s lope, or sec urely held by
timber brac ing, s o as to avoid the danger of s ides to c ollapse. T he
exc avated materials s hall not be placed within 1.5 M (5 ') of the trenc h of
half of the trenc h depth whic hever is more. C utting s hall be done from top
to bottom. Under no c ircums tanc es, undermining o r unde r c utting be
done.
60
6.0
6 .1
Demolition :
Before any demolition wo rk is c ommenc ed and als o during the prog res s of
the work all roads and o pen area a djac ent to the wo rk s ite s hall either be
c los ed or s uitably protected.
6 .2
6 .3
A ll prac tic al steps shall be taken to prevent danger to pers ons employed
from ris k of fire or explosion o f flooding. No floor or other part of the
building shall be s o over loaded with debris or materials as to render it
uns afe.
7.0
7 .1
7 .2
8.0
8 .1
Risky P lace :
When the work is done near any place where the re is a ris k of dro wning,
all nec essary s afety equipment shall be provided and kept ready for use
and all nec ess ary steps taken for prompt resc ue of any pers on in danger
and adequate provision s hould be made for prompt firs t-aid treatment of
all injuries likely to be sus tained during t he course of the work .
9.0
9 .1
Hoisting Equipment :
U se of hois ting mac hines and tac kles including their attac hments , and
s torage and s upports s hall c onform to the follo wing s tandards or
c onditions .
T hes e s hall be of good mechanic al c ons truction, sound material and
adequate s trength and free from patent defec t and s hall be kept in good
c ondition and in good workin g o rder .
E very rope us ed in hois ting or lo wering materials or as a means of
s us pens ion shall be of durable quality and adeq uate s trength an d free
from patent de fec ts.
E very c rane driver or hois ting applianc e operator s hall be properly
qualified and no pers on u nder t he age of 2 1 years s hould be in-charge of
any hois ting machine inc luding any s caffolding.
I n c ase of every hois ting machine and of every c hain ring hook, s hac kle,
s wivel and pulley block us ed in hois ting or lowering or as means of
s us pens ion, the s afe working load s hall be as certained by adequate
means . E very hoisting mac hine and all gear referred to a bove s hall be
plainly marked with the s afe workin g load and the conditions under which
it is applic able shall be c learly indic ated. No part of any machine or any
gear referred to above in this paragraph s hall be loaded beyond the s afe
working load except for the purpose of tes ting.
I n c ase of departmental mac hine, the s afe work load s hall be notified by
the Engineer-I n-C harge, as regards Contractor s mac hine, the Contrac tor
s hall, notify, the s afety working load o f the mac hine to the Engineer-I nC harge. Whenever the Contractor brings any mac hinery to s ite of work he
s hould get it verified by the E ngineer-I n-Charge c onc erned.
9 .2
9 .3
9 .4
9 .5
9 .6
61
10.0
11.0
12.0
13.0
14.0
1 4.1
No Exemption :
Notwiths tanding the above c laus e 1 .0 to 13.0 there is nothing to exempt
the Contrac tor from the operations of any other Ac t or Rules in forc e in the
Republic of I ndia.
I n addition to the above, the C ontrac tor s hall abide by the s afety c ode
provisions as per C .P .W.D. s afety code framed from time to time.
1 4.2
GC-95
ACCIDENTS :
I t s hall be Contractor's respons ibility to protect agains t acc idents on the
works. He shall indemnify the o wner a gainst any claim for damage or for
injury to pe rson or prope rty res ulting from, and in the c ours e of work and
also under the provis ions of the workman's c ompensation Ac t. On the
occ urrence of an acc ident arising out of the works whic h res ults in death
or whic h is so s erious as to be likely to res ult in death, the C ontractor s hall
within t wenty-fou r ho urs of s uch ac cident, report in writing to the
E ngineer-I n-C harge, the fac ts s tating clearly and in sufficient details the
c irc ums tanc es of suc h acc ident and the subsequent action. All other
acc idents on the works involving inju ries to person or damage to prope rty
other than that of the Contrac tor s hall be promptly reported to the
E ngineer-I n-C harge, s tating clearly and in suffic ient details the fac ts and
c irc ums tanc es of the acc idents and the action taken. In all c as es, the
C ontrac tor shall indemnity the owner against all loss or damage res ulting
direc tly or indirec tly from the C ontractor's failure to report in the manner
aforesaid. This inc ludes penalties or fines, if any, payable by the owne r as
a c ons equenc e of failure to give notic e under the Workman's
62
C ompensation Ac t, or failure to c onform to the provis ions of the said ac t in
regard to s uch ac c idents .
I n the event of an acc ident in res pec t of which compens ation may bec ome
payable under t he Workman's C ompens ation Act VIII of 1923 including all
modific ation thereof, the E ngineer-I n-C harge may retain out of money due
and payable to the C ontractor s uch sum of sums of money as may in the
opinion of Engineer-I n-C harge be sufficient to meet s uc h liability. On
rec eipt of award from the Labour C ommiss ioner in regard to quantum of
c ompensation, the difference in amount will be ad justed.
Addl.A .E.
R. M.C.
Dy.Ex.Engineer
R.M.C.
R.M.C.
63
PART-II
SECTION - 3
TECHNICAL
SPECIFICATIONS
64
PARTICULARS
GENERAL
1 Scope of Contract
2 Tender Price
3 Completion Schedule
4 Gener al Technical Guideline
65
:: TECHNICAL S PECIFICATION ::
(A) GENER AL
1.
SCO PE OF CONTRA CT :
The work entitled comprise of CEMENT CO NCRETE RO AD WO RK
INSID E PED AK INSTI TUTE IN W ARD NO.6
complete as per
specifications.
2.
TENDER P RI CE :
The rates quoted in the bill of quantities shall cover everything necessary
for the due and com plete execution of the work according to the dra wings
and other condition and stipulations of the contract including specifications
of the evident, intend and meaning of all or either of them or according to
custom ary usage and for periodical and final inspection and test and proof
of the wo rk in every respect and for measuring, num bering or weighing
the same, including setting out and laying or fixing in position and the
provision of all m aterials, power, tools, rammers, labour, tackle, platforms
with im pervious lapped joints for scaffolding, ranging roads, straight
edged, cantering and boxing, wedges, moulds, templates, posts, straight
rods, straight edged, cantering and boxing, wedges, moulds, templates,
posts, straight rails, boning staves strutting, barriers, fencing lighting
pumping apparatus, temporary arrangement for passage of traffic a ccess
to premises and continuance to drainage water supply and lighting (if
interrupted by contractors work) temporary sheds, painting, varnishing,
polishing establishm ent for efficient supervision and stating arrangements
for the efficient protective of life and property and all requisite plant and
machinery of every kind.
The contractor shall keep every portion of the work clear of accumula tion
from time to time and shall leave every portion of the work clean, clear,
perfect and at the conclusion of whole, providing at their o wn cost all such
material implement, appliances and labour as the Engineer in charge m ay
require to prove if it to be so.
3.
4.
4.1
4.2
Extra Claim in respect of extra work shall be allowed only if such work is
ordered to be carried out in writing by the Engineer in charge
4.3
66
instructions and orders from the Engineer in charge or his authorized
representative. The instruction and orders given to the contractor
representative on site shall be considered as it given to the contractor
himself.
4.4
The work orde r book as prescribed shall be m aintained on the site of the
work by the contactor and the contractor shall sign the orders given by
the inspecting offers and shall carry out them properly.
4.5
Quantities specified in the tender may very at the time of actual execution
and the contractor shall have no claim for com pensation on account of
such variation
4.6
4.7
4.8
4.9
4.10
-x-x-x-
67
(B)
1.
Material:
M-1
Water:
Water shall not be salty or brackish and shall be clean, reasonably clear
and free from objectionable quantities of silt and traces of oil and injurious
alkalis, salts, organic matter and other deleterious material which will
either weaken the m ortar of con crete o r cause efflorescence or atta ck the
steel in RCC container for transport, storage and handling of water shall
be clean. Water shall conform to the standards specified in I.S. 456 Latest edition.
If required by the engineer-in-charge, it shall be tested by comparison
with distilled wa ter. Com parison shall be m ade by means of standard
cem ent tests for soundness, change in time of setting and mortar strength
as specified in I.S. 269 (Latest edition). Any indication of unsoundness,
change in time of setting by 30 minutes or more or decrease of more than
10 per cint in strength of mortar prepared with wa ter sample when
com pared wi th the results obtained with mortar p repared with distilled
water shall be sufficient cause for rejection of water under test.
Water for curing mortar, concrete or m asonry should not be too acidic or
too alkaline. It shall be free of elements whi ch significantly affect the
hydration reaction or otherwise interfere with the hardening of mortar or
concrete during cu ring or those which produce obje ctionable stains or
other unsightly deposits on concrete or mortar surface.
Hard and bitter water shall not be used for curing.
Potable water will generally found suitable for curing mortar of concrete.
M-2
Lime:
Lime shall be hydraulic lime as per I S 712 - Latest Edition. Necessary
tests shall be carried out as per I S 6932 9 (Parts I to X) Latest edition.
The following field tests for limes are to be carried out:
i)
A very rough idea can be form ed about the type of lime by its visual
examination i.e. fat lim e bears pure whi te colour, lim e in form of
porous lumps of dirty white colour indicates quick lim e and solid
lum ps are the unburnt lime stone.
ii)
Acid tests for determ ining the carbonate content in lime, lime
Excessive amount of impurities and rough determ ination of lim e.
Storage shall comply with I S 712 - Latest Edition. The slaked lime, it
stored, shall be kept in a weather proof and dam p-proof shed with
impervious floor and sides to protect it against rain, moisture, and
weather and extraneous materials mixing with i t. All lime that has been
dam aged in any way shall be and all rejected m aterials shall be removed
from site of work.
68
Cement:
Cement shall be ordinary portland cement as per IS 269 or I S 455 or IS
1489 (P-I) or (P-II) or IS 8041 or IS 8043, IS 8812 or IS 12330, IS 12269
(All Latest edition).
M-4
M-5
Colored Cement :
Color cement shall be with white or grey portland cement as specified in
the item of the work.
The pigments used for colored cement shall be of approved quality and
shall not exceed 10% of cement used in the mix. The mixture of pigment
and cement shall be properly ground to have a uniform color and shade.
The pigments shall have such properties as to provide for durability under
exposure to sunlight and weather.
The pigment shall have the property such that it is neither affected by the
cem ent nor detrimental to it.
M-6
Sand:
Sand shall be natural sand, clean well graded, hard strong, du rable and
gritty parti cles free from injurious amounts of dust, clay, kankar nodules,
soft or flaky particles Shale, alkali, salts organic matter, loam, m ica or
other deleterious substances and shall be got approved from the
engineer-in-charge. The sand shall not contain m ore than 8 percent of silt
as determ ined by field test. If necessary, the sand shall be washed to
make it clean.
Coarse Sa nd:
The fitness m odules of coarse sand shall not be less than 2.5 and shall not
exceed 3.0. The sieve analysis of coarse shall be as under:
----------------------------------------------------------------------------------I .S. Sieve
Des ignation
I S Sieve percentage
Des ignation
by weight
perc entage pas s ing s ieve.
----------------------------------------------------------------------------------4 .7 5 mm
2 .3 6 mm
1 .1 8 mm
1 00
9 0 to 10 0
7 0-100
6 00 M ic ron
3 00 M ic ron
1 50 M ic ron
3 0-100
5 -7 0
0 -5 0
-----------------------------------------------------------------------------------
69
Fine Sa nd:
The fineness modules shall not exceed 1.0 The sieve analysis of fine sand
shall be as under:
----------------------------------------------------------------------------------I .S. Sieve
Des ignation
I S Sieve percentage
Des ignation
by weight
perc entage pas s ing s ieve.
----------------------------------------------------------------------------------4 .7 5 mm
2 .3 6 mm
1 .1 8 mm
1 00
1 00
7 5-100
6 00 M ic ron
3 00 M ic ron
1 50 M ic ron
4 0-85
5 -5 0
0 -1 0
----------------------------------------------------------------------------------M-7
Stone Dust:
This shall be obtained from crushing hard black trap or equivalent. It shall
not contain more than 8% of silt as determ ined by field test with
measuring cylinder. The m ethod of determ ining silt contents by fields test
is given as under:
A sample of stone dust to be tested shall be placed without drying in 200
mm measuring cylinder. The quantity if the sam ple shall be such that it
fills the cylinder upto 100 mm mark, the clean water shall be added upto
150 mm mark. The mixture shall be stirred vigorously and content
allowed to settle for 3 hours.
The height of silt visible as settled layer above the stone dust shall be
expressed as percentage of the height of the stone dust below. The stone
containing more than 8% silt shall be washed so as to bring the content
within the allo wable lim it.
The fitness nodules of stone dust shall not be less than 1.80
M-8
Stone Grit:
Gri t shall consist of crushed or broken stone and be hard, strong dense
durable clean of proper gradation and free from skin or coating likely to
prevent proper adhesion of mortar. Grit shall generally be cubical in shape
and as far as possible flaky elongated pieces shall be avoided. It shall
generally com ply with the provisions of IS 383 (Latest Edition). Unless
special stone of particular quarries is mentioned, grit shall be obtained
from the best black trap or equivalent hard stone as approved by the
engineer-in-charge. The grit shall have no deleterious reaction with
cem ent.
The grit shall conform to the following gradation as per sieve analysis:
----------------------------------------------------------------------------------I .S. Sieve
Des ignation
I S Sieve
Des ignation
----------------------------------------------------------------------------------1 2.50 mm
1 0.00 mm
1 00%
8 5-100%
4 .7 5 mm
2 .3 6 mm
0 -2 0%
0 -2 5%
-----------------------------------------------------------------------------------
70
The crushing strength will be such as to allow the concrete in which it
used to build up the specified strength of concrete.
The necessary tests for grit shall be carried out as per the requirements of
I S 2386 (Part I to VIII) Latest edition as per instruction of engineer-incharge. The necessity of test will be decided by the engineer-in-charge.
M-9
Cinder:
Cinder is well bu rnt furnace residue whi ch has been fused or sintered into
lum ps of varying sizes.
Cinder aggregates shall be well burn t furna ces residue obtained from
furnace using coal fuel only. It shall be sound clean and free from clay,
dirt, ash or other deleterious matter.
The average grading for cinder aggregate shall be as mentioned below:
----------------------------------------------------------------------------------I .S. Sieve
Des ignation
I S Sieve
Designation
----------------------------------------------------------------------------------2 0 mm
1 0 mm
1 00%
86
4 .7 5 mm
2 .3 6 mm
70
52
71
M-11 Cement M ort ar:
Water shall conform to specification M -1. Cement: Cement shall conform
to specifications M-3. Sand: Sand shall conform to M -6.
Proportion of M ix:
Cement and sand shall be mixed to specified proportion, sand being
measured by measuring boxes. The proportion of cem ent will be by
volume on the basis of 50 kg/Bag of cem ent being equal to 0.342 Cu.M.
The mortar m ay be hand mixed as directed.
Proportion of M ortar:
In hand mixed mortar, cement and sand in the specifications shall be
thoroughly m ixed dry on a clean im pervious platform by turning over at
least 3 times or m ore till a homogeneous mixture of uniform color is
obtained. mixing platform shall be so arranged that no dele terious
extraneous m aterial shall get mixed wi th mortar or mortar shall flow out.
While mixing, the water shall be gradually added and thoroughly mixed to
form a still plastic mass of uniform color so that each particle of sand shall
be com pletely covered wi th a film of wet cem ent. the water cem ent ratio
shall be adopted as directed.
The mortar so prepared shall be used within 30 minutes of adding water.
Only such quantity of mortar shall be prepared as can used within 30
minutes.
M-12 Stone Coa rse A ggregate for Nom ina l M ix Concrete.
Coarse aggregate shall be of machine crushed stone of black trap or
equivalent and be hard, strong, dense, durable clean and free from skin
and coating likely to prevent proper adhesion of mortar.
The aggregate shall generally be cubical in shape. Unless special stones of
particular quarries are mentioned, aggregates shall be machine crushed
from the best black trap or equivalent hard tone as approved. Aggregate
shall have no deleterious reaction with cement. The size of the coarse
aggregate for plain cement concrete and ordinary reinforced cement
concrete shall generally be as per the table given below, however, in case
of reinforced cement concrete the maximum lim it may be restricted to 6
mm, less than the minimum lateral clear distance between bars of 6 mm
less than the cover whi chever is smaller.
IS
Sieve
des ignation
80 mm
--
--
--
--
--
--
63
40
20
16
100
85-100
0-2 0
-100
85-100
--100
8-1 00
0.5
----
-0.2 0
0.5 0
--
0 .30
0 .5
---
mm
mm
mm
mm
12 .5
mm
10 mm
4.7 5 mm
2.3 5 mm
--
72
Note:
This percentage may be the engineer-in-charge when considered
necessary for obtaining better density and strength of concrete.
The grading test shall be taken in the beginning and at the change of
source of materials. The necessary tests indicated in IS 383 Latest edition
and IS 456 Latest edition shall have to be carried out to ensure the
acceptability. The aggregates shall be stored separately and handled in
such a manner as to prevent the intermixing of different aggregates. If
the aggregates are covered with dust, they shall be washed with wa ter to
make them clean.
M-13 Bla ck Tra p or Equiva lent Ha rd Stone Coarse:
Aggregate for D esign Mix concrete:
Coarse aggregate shall be of machine crushed stone of black trap or
equivalent hard stone and be hard strong, dense, durable, clean and free
from skin and coating likely to prevent proper adhesion of mortar.
The aggregates shall generally be cubical in shape. Unless special stones
of particular quarries are mentioned, aggregates shall be m achine crushed
from the best, black trap or equivalent hard stones as approved.
Aggregate shall have no deleterious reaction with cement.
The necessary tests indicated in IS 383 Latest edition and IS 456 Latest
edition shall have to carried out to ensure the acceptability of the
material.
If aggregate is covered with dust, it shall be washed with wate r to m ake it
clean.
M-14 Brick Bats A ggregate :
Bri ck bat aggregate shall be broken from well burnt or slightly over burnt
and dense bricks. It shall be homogeneous in texture, roughly cubi cal in
shape, clean and free from dirt of any other foreign material. The brick
bats shall be of 40 mm to 50 mm size unless otherwise specified in the
item . The under burnt of over brunt bri ck bats shall not be allowed.
The brick bats shall be measured by suitable boxes as directed.
M-15 Bricks:
The bricks shall be hard or machine moulded and made from suitable soils
and burnt. They shall be free from cracks and flaws and nodules of free
lime. They shall have sm ooth rectangular faces wi th sharp corners and
shall be of uniform colors.
The bricks shall be moulded with a frog of 100 mm x 40 mm and 10 mm
to 20 mm deep on one of it's flat sides. The bricks shall not break when
thro wn on the ground from a height of 600 mm.
The size of modular bricks shall be 190 mm x 90 mm .
73
The size of the conventional bricks shall be as under:
(9" x 4.3/8" x 2,3/4") 225 x 110 x 75 mm
Only bricks of one standard size shall be used in one work. The following
tolerances shall be perm itted in the conventional size adopted in a
particular wo rk.
Length 1/8" (3mm ) width : 1/16" (1.5mm )
Height: 1/16" (1.5 mm)
The crushing strength of the bri ck shall not be less than 35 kg/sq.cm . The
average water absorption shall not be more than 20 percent by weight.
Necessary tests for crushing strength and water absorption etc., shall be
carried out as per IS: 3495 (Part I to IV) - latest edition.
M-16 Stone:
The stone shall be of the specified variety such as granite / trap stone /
quarzite or any other type of good hard stones. The stones shall be
obtained only from the approved quarry and shall be hard, sound, durable
and free from defects like cavities cracks, sand holes flaws, injurious
reins, patches of loose or soft m aterials etc. and weathered po rtion and
other stru ctu ral defects or imperfection tending to affected their
soundness and strength. The stone with round surface shall not be used.
The percentage of water absorption shall not be more than 5% dry or wet.
When tested in accordance wi th I.S.1124 - Latest edition. The minimum
crushing strength of the stone be 200 kg/sq.cm unless otherwise
specified.
The samples of the stone to be used shall be got approved before the
work is started.
The khanki facing stone shall be dressed by chisel as specified in the item
for khanki facing in required shape and size. The face of the stone shall be
so dressed that the bushing on the exposed face shall not project by more
than 40 mm from the general wall surface and on face to be plastered it
shall not project by more than 19 mm nor shall it have depressions more
than 10 mm from the average wall surface.
74
6 mm
8 mm
1 0 mm
1 2 mm
1 4 mm
1 6 mm
1 8 mm
0.2 2
0.3 9
0.6 2
0.8 9
1.2 1
1.5 8
2.0 0
Kg/Rmt
Kg/Rmt
Kg/Rmt
Kg/Rmt
Kg/Rmt
Kg/Rmt
Kg/Rmt
8
9
10
11
12
13
14
20
22
25
28
32
36
40
mm
mm
mm
mm
mm
mm
mm
2.4 7
2.9 8
3.8 5
4.8 3
6.3 1
7.9 9
9.8 6
Kg/Rmt
Kg/Rmt
Kg/Rmt
Kg/Rmt
Kg/Rmt
Kg/Rmt
Kg/Rmt
75
The P C steel bars shall be free from loose mill scale, rust, oil grease, or
any other harmful matter. Cleaning of steel bars may be carried out
immersion in solvent solution, wi re brushing or passing through a
pressure box containing carborandum.
M-21 Mild St ee l Binding Wire:
The mild steel wi re shall be of 1.63 mm, 22 mm (16 or 18 gauge)
diameter and shall conform to I S 280 Latest edition.
The use of black wire will be permitted to binding reinforcem ent bars. It
shall be free rust, oil paint, grease, loose mill scale or any other
undesirable coating which may prevent adhesion of cement mortar.
M-22 Structura l Stee l:
All stru ctu ral steel shall confirm to IS 226 Latest edition. The steel shall be
free from the defects mentioned in IS 226 Latest edition and shall have a
smooth finish. the material shall be free from loose mill scale, rust pits or
other defects affecting the strength and durability. River bars shall
conform to IS 1148 Latest edition.
When the steel is supplied by the contractor, test certificate of the
manufacturer shall be obtained according to IS 226 Latest edition and
other relevant Indian Standards.
M-23 Galv anize d I ron Sheets :
The galvanized iron sheets shall be plain or corrugated sheets of guages
as specified in item . The G.I. Sheets shall conform to I.S.latest edition.
The sheets shall be undam aged in carriage and handling either by rubbing
off of zinc coating or otherwise. They shall have clean and bright surface
and shall be free from bends, holes, rust or white po wdery deposit.
The length and width G.I. sheet shall be as directed as per site condition.
M-23-A : G.I. Va lleys gutter, ridges :
The G.I. ridges and hips shall be of plain galvanized sheets Class-3 of the
thickness as specified in item . These shall be 600 mm in and wid th and
properly bent up to shape without damage to the sheets an in process of
bending.
Valleys gutters and flashings shall also be of galvanized sheets of
thickness as specified in item . Valleys shall be 900 mm. wide overall and
flashing shall be 380 mm. wide overall. They shall be bent to the required
shape without damage to the sheet in the process of bending.
M-24. Asbestos Ceme nt She ets :
Asbestos cem ent sheets plain, corrugated or semi-corrugated shall conform shall conform to I.S. latest edition. The thickness of the sheets
shall be as specified in The item. the sheets shall be free from all defects
such as cracks, holes, deformities, edges or otherwise dam aged.
76
77
As far as pra cticable, clam ps shall be used to hold the forms together and
use of nails and spikes avoided.
The surface of timber shuttering that would come in contact with concrete
shall be well wetted and coated with soap solution before the concreting is
done. Alternatively, coat of ra w linseed oil or oil of approved manufacturer
may be applied in place of soap solution. In case of steel shuttering either
soap solution or raw linseed oil shall be applied after thoroughly cleaning
the surface. Under no circumstances, black or brunt oil shall be perm itted.
The shuttering for beams and slabs shall have camber of 4 mm per meter
(1 in 250) or as directed by the engineer-in-charge, so as to offset the
subsequent deflection for cantilevers, the cam ber of free end shall be 1/50
of the projected or as directed by the engineer-in-charge.
M-27. Ex pansion joints - Premoulded f ille r:
The item provides for expansion joints in R.C.C. fram e structu res for
internal joints, as well as exposed joints, with the use of prem oulded
bituminous joint filler.
Premoulded bituminous joint filler, i.e. performed strip of expansion
joint filler shall not got deformed or broken by twisting, bending or
other handling when exposed to atmospheric condition. Pieces of joint
filler that have been damaged shall be rejected.
Thickness of the pre-moulded joint filler shall be 25 mm. unless otherwise
specified.
Premoulded bituminous joint filler shall conform to I.S. Latest edition.
M-28. Expansion joints Coppe r strips & hold fasts :
The item provide for expansion joints in R.C.C. frame structu re for
internal joint as well as for exposed joints wi th the use of necessary
copper strip and holdfasts.
Copper sheet shall be of 1.25 mm thick and of 1.25 mm width and the "U"
shape in the middle.
Copper strip shall have holdfast of 3 mm diameter copper rod fixed to the
plate soldered on strip at intervals of about 30 cm or as shown in the
dra wing o r as directed. The width of each flange (horizontal side) of the
copper plate to be emvidded in the concrete work shall be 25 mm. depth
of "U" to be provided in the expansion joint, in the copper plate shall be of
25 mm.
78
Teak wood shall generally be free from large, loose, dead of cluster knots
flaws, shakes, warps, twists, bends; or any other defects. It shall
generally be uniform in substance and of straight fibres as far as possible.
It shall be free from rot, decay, harmful fungi and other defects of harmful
nature, which wi ll affect the strength, du rability or its usefulness for the
purpose for whi ch i t is required. The colour shall be uniform as far as
possible . Any effort like paining, using any adhesive resinous materials
made to hide the defects shall render the pieces liable to rejection by the
Engineer-in-Charge.
All scantlings, planks etc. shall be sawn in straight lines and planes in the
direction of grains and of uniform thickness.
The tolerances in the dimensions shall be allowed at the rate of 1.5 mm,
per face to be planed.
First class te ak wood :
First class teak wood shall have no individual hard and sound knots,
more than 6 sq.cm. in size and the aggregate area of such knots shall
hot be than 1 % of area of piece, the timber shall be closed grained.
Second Class Teak Wood :
No individual hard and sound knots shall be more than 15 sq.cm. in size
and aggregates area of such - knots shall not exceed 2 % of the area of
piece.
M-29. A Non-teak wood :
The non-teak wood shall be chem ically treated, seasoned as per I.S.
Specification and of good quality. The type of, wood shall be got approved
before collecting the same an site. Fabrication of wooden members shall
be started only after approval.
For this purpose wood of Bio, Kalai, Sires, Saded, Behda, Jamun, Sisoo
will be used for door where as only Kalai, Halda, Sires, Kalam etc. will be
permitted far shutters after proper seasoning and chem ical treatment,
The non-teak wood shall be free from large, loose dead of cluster knots,
flows, shakes, warps, bends or any other defects. It shall be uniform in
substance and of straight fibres as far as possible. It shall be free from
rots, decay, harm ful fungi and other defects of nature whi ch will effect the
straight durability o r its -usefulness for the purpose for whi ch it is required.
The colour of wood shall-be uniform as far as possible. The scantalings
planks etc. shall be saw in straight lines and planes in the direction of
grain and of uniform thickness. The departm ent will use the Agency to
produce certifi cate from Forest Department in event of Dispute and the
decision of the Department shall be final and binding to the contractor:
The tolerance in the dimension shall be allowed at 1.5 mm . per face to be
planed.
79
The tolerance in size of solid care type flush door shall be as under:
In Nom inal thickness 1.2 mm in Nom inal height 3 mm.
The thickness of the shutter shall be uniform throughout with a
permissible variation of not m ore than 0:8 mm: when measured at any
two points.
80
M-31. Aluminum doors, windows, ve ntilators :
Aluminum alloy used in the manufacture of extruded window sections
shall conform to I.S. designation HEA-WP of LS. : latest edition and also
to I.S. Designation WVG-.WP of I.S. latest edition. The section shall be as
specified in the dra wing and design. The fabrication shall be done as
directed.
The hinges shall be cast or extruded alum inum hinges of same type as in
window bu t of larger size.
The hinges shall normally be of 50 mm. projecting type. Non-projecting
type of hinges m ay also be u sed if directed. The handles of door shall be
of specified design. A suitable lock for the door operable from outside or
inside shall be provided. In double, shutter door, the first closing shutter
shall have concealed aluminum allo y bolt at top and bottom ,
M-32. Rolling Shutters.
The rolling shutters shall conform to I.S. latest edition. Rolling shutters
shall be supplied of specified type wi th accessories. The size of the rolling
shutters shill be specified in the drawings. The shutters shall be constructed wi th interlo cking lath sections formed from cold rolled steel strips
not less than 0.9 aim. thick and 80 mm. wide for shutters upto 3.5 mm,
width not less than 1.25 mm, thick and 80 mm. wide for shutter 3.5 mm
in width and above unless otherwise specified,
Hood covers shall be of mild steel deep channel section and of rolled
pressed or build up (fabricated) jointless construction. The thickness of
sheet used shall not be less than 3.5 mm.
Hood covers shall be m ade of M S Sheets not less than 0.90 mm. thick.
For shutters having width 3.5 M eter and above, the thickness of M.S.
sheet for the hood cover shall be not less than 1.25 mm.
The spring shall be of , best quality and shall be manufactured from tested
high tensile spring steel wi re or strip of adequate strength to balance the
shutters in all position. The spiting pipe shaft etc, shall be supported on
strong M.S. or m alleable C.I. brackets. The brackets shall be fixed on or
under the lintel as specified with rawl plugs and scre ws bolts etc.
The rolling shutters shall be of self rolling upto 8 Sq. m. clear area wi thout
ball bearing and up to 12 Sq. rn. clear area with ball bearing. If the rolling
shutters are of larger, than gear operated type shutters shall be used
The locking arrangement shall be provided at the bottom of shutter at
both ends. The shutters shall be opened from outside,
The shutters completed wi th door suspension shafts,
arrangements, pulling hooks handles and other accessories.
looking
81
82
jagged-and imperfect edges and other harm ful surface defect and shall
conform to I.S. latest edition.
M-37. Ply wood
The plywood for general purpose shall conform I.S. latest edition.
Plywood is m ade by cementing together thin boards or sheets of wood
into panels. There are alwa ys an odd num ber of layers, 3, 5, 7, 9 ply etc.
The plies are placed so that grain of each layer is at right angle to the
grain in the adjacent layer.
The chief advantages of plywood over a single board of the same
thickness is the more uniform strength of the plywood, along the length
and wid th of the plywood and greater ,resistance, to cracking and splitting
with change in m oisture content.
Usually synthetic resins are used for gluing, phenolic resions are usually
cured in a hot press whi ch compresses and simultaneously heats the plies
between hot plates whi ch maintain a temperature of 90 degree C to 140
degree and a pressure of 11 to 14 Kg/Sq. Cm. on the wood. The time of
heating may be anything from 2 to 60 minutes depending upon thickness.
When water glue are used the wood absorbs so much water that the
finished plywood must be dried carefully When synthetic resigs are used
as adhesive the finished plywood m ust be exposed to an atmosphere of
controlled humidity until the proper amount of m oisture has been
absorbed.
According to I.S. Latest edition, the plywood far general purpose shall be
of the grades namely BWR; WWR and CWR, depending upon the
adhesives used for bonding the veneers, and it will be further classified
into six type namely AA, AB, AC, BB, BC and CC, based on the quality of
the two fa ces, each face being moisture content not less than 8 percent
and riot more than 16 percent.
37.8. Thickness of plywood boards
Boa rd
3 ply
Thickness
3 mm
4 mm
5 mm
6 mm
Boa rd
3 ply
Thickness
5 mm
6 mm
8 mm
9 mm
B oa rd
3 ply
Thickness
9 mm
13 mm
16 mm
13 mm
B oa rd
3 ply
Thickness
16 mm
19 mm
19 mm
25 mm
M-38 Gla ss :
All glass shall be of the bet quality, from specks, bubbles, smokes, veins,
air, holes blisters, and other defects. The kind of glass to be used shall be
as mentioned in the item or specification or in the special provisions or as
shown in detailed dra wings. Thickness of glass panes shall be uniform.
The specifications for different kinds shall be as under:
83
84
85
Holdfa sts :
Holdfasts shall be m ade from mild steel flat 30 cm. length and one of the
holdfasts shall be bent at right angle and two nos. of 6 mm- diameter
holes, shall be made in it for fixing it to the fram e with screws. At the
other end, the holdfast shall be forked and bent at right angles in opposite
directions
Butt hinges:
Railway standard heavy type butt hinges shall be used when so specified.
Tee and strap hinges shall be manufactured from M.S. Sheet
Siding door-bolts (Aldrops):
The aldrops as specified in the item shall be used and shall be tot
approved.
Tower bolts (Ba rrel Type):
Tower bolts as specified in the item shall be used and shall be got
approved.
Door Latch
The size of door latch shall be taken as the length of latch.
Bat hroom Latch
Bathroom latch shall be similar to to wer bolt.
Handle
The size of the handles shall be determined by the inside grip length of
the handles. Handles shall have a base plate of length 50 mm . m ore than
the size of the handle.
Door Stoppers
Door Stoppers shall be either floor door stopper type or door catch type.
Floor stopper shall be of overall size as specified and shall have a rubber
cushion.
Door Catch
Door catch shall be fled at a height of about 900 mm. from the floor level
such that one part of the catch is fitted on the inside of the shutter and
the other part is fixed in the wall with necessary wooden plug
arrangements for appropriate fixity. The catch shall be fixed 20 mm.
inside the face of the door for easy operation of catch.
86
Wooden D oor Stop with hinges
Wooden door stop of size 100 mm X 60 mm.X 40 mm . shall be fixed on
the door frame with a hinge of 75 mm . size and at a height of 900 mm.
from the floor level. The wooden door stop shall be provided with 3 coats
of approved oil paint.
Casement window Fa ste ne r
Casement windo w fastener for single leaf windo w shutter shall be left or
right handed as directed.
Casement st ays (Straight Peg St ay) :
The stays shall be made from a channel section having th ree holes at
appropriate position so that the window can be opened either fully or
partially as directed. Size of the stay shall be 250 mm to 300mm as
directed.
Ventilator Catch
The pattern and, shape of the catch shall be as approved.
Piv ot
The base and socket plate shall be made from minimum 3 mm. thick
plate, and projected pivot shall not be less than 12 mm. diameter and 12
mm. length and shall be firm ly riveted to the base plate in case of iron
and in single piece in the case of brass pivot.
M-44. Pa int s :
Oil paints shall be of the specified colour arid shade, and as approved. The
ready mixed paints shall only be used. However, if ready mixed paint of
specified shade or tint is not available while ready mixed paint with
approved stained will be allo wed. In such a case, the contractor shall
ensure that the shade of the paint so allowed shall be uniform .
All the paints shall meet with the following general requirements
(i)
Paint shall not show excessive setting in d freshly opened full can and
shall easily be redispresed wi th a paddle to a sm ooth homogeneous state.
The paint shall show no cu rdling, livering, caking or colour separation and
shall be free from lumps and skins.
(ii) The paints as received shall brush easily, Possess good leveling properties
and show no running or sagging tendencies.
(iii) The paint shall not skin within 48 hou r in a three quatereds filled closed
container.
(iv) The paint shall dry to d smooth uniform finish free from roughness, grift,
unevenness and other imperfections:
87
Enamel P aint s:
The enamel paint shall satisfy in general requirements in specification of
oil paints: Enamel paint shall conform to IS : latest edition.
M-45 Fre nch Polish
The French polish of required tint and shade shall be prepared with the
below mentioned ingredients and other necessary materials
(i) Denatured spirit of approved quality (ii) Chandras (iii) Pigment.
The French polish so prepared shall conform to IS: Latest edition.
M-46 Marble chips for marble mosa ic t errazzo :
The marble chips shall be of approved quality and shades: It shall be
hard, sound, dense and homogeneous in texture wi th crystalline and
coarse grains. !t shall be uniform in colour and free from stains, cracks,
decay and weathering.
The size of various colour of marble chips ranging from the smallest upto
20 mm. shall be used whe re the thickness of top wearing layer is 6 mm.
size. The marble chips of approved quality and colours only as per grading
as decided by the Engineer-in-charge shall be used for marble mosaic tiles
or works.
The marble chips shall be machine crushed. They shall be free from
foreign matter, dust etc, except as above, the chips shall conform to IS
latest edition.
M-47. Flooring Tiles :
(A). Plain Ceme nt tile s
The plain cement tiles shall be of general purpose type. These are the tiles
in the manufacture of whi ch no pigments are used. Cement used in the
manufacture of tiles shall be as per Indian Standards.
The tiles shall be manufactured from a mixture of cement and natural
aggregates by pressure process. During manufacture, the tiles shall be
subjected to pressure of not less than 140 Kg/Sq. Cm. The proportion of
cem ent to aggregate in the backing of the tiles shall be-not less than 1:3
by weight. the wearing face though the tiles are of plain cement, shall be
provided with stone chips of 1 to 2 mm. size. The proportions of cement
to aggregate in the wearing layer of the tiles shall be three parts of
cem ent to one parts chips by weight. The minim um thickness of wearing
layer shall be 3 mm. The colour and texture of wearing layer shall be
uniform throughout its face and thickness. O n removal from mould, the
tiles kept in moist condition continuously at least for seven days and
subsequently, if necessary, for such long periods would ensure their
conform ity to requi rements of IS. Latest edition regarding strength
resistance to wear and water absorption.
88
The wearing face of the tiles shall be plane, free from projections,
depressions and cracks and shall be reasonably parallel to the back face of
the tile. All angles shall be right angle and all edges shall be sharp and
true.
The size of tiles shall generally be square shape 24.85 Cm. x 24.85 Cm:
or 25 Cm. x 25 Cm. The thickness of tiles shall be 20 mm.
Tolerance of length and breadth shall be plus or minus one m illimeter.
Tolerance on thickness plus 5 mm.
The tiles shall satisfy the tests as regards transverse strength, resistance
to wear and water absorption as per I.S. : Latest edition.
(B) Pla in Coloured Tiles:
These tiles shall have the same specification as for plain cement tiles as
per (A) above expect that they shall have a plain wearing surface wherein
pigments are used. They shall conform to I.S. Latest edition.
The pigments used for colouring cement shall not exceed 10 percent by
weight of cem ent used in the mix. The pigments, synthetic or otherwise,
used for colouring tiles shall have perm anent colour and shall not contain
materials detrimental to concrete.
The colour of the tiles shall be specified in the item or as directed.
(C) Ma rble Mosaic Tiles:
The tiles same specification as per plain cement tiles except the
requirements as stated below:
The marble m osaic tiles shall conform to I.S. latest edition. The wearing
face of the tiles shall be mechanically ground and filled. The wearing face
of tiles shall be free from projections, depressions and cracks and shall be
reasonably parallel to the back face of the tiles. All angles shall be right
angles and all edges shall be sharp and true.
Chips used in the tiles be from smalle st upto 20 mm. size. The minimum
thickness of wearing layer of tiles shall be 6 mm. For pattern of chips to
be had on the wearing face, a few sam ples with or without thei r full size
photographs as directed shall be presented to the Engineer-in-charge for
approval.
Any parti cular sam ples, if found suitable shall be approved by the
Engineer- in-charge, or he may ask for a few more samples to be
presented. The sam ples shall have to be made by the contractor till a
suitable sample is finally approved for use in the work. The Contractor,
shall ensure that the tiles-supplied for the work shall be in conformity
with the approved sam ple only, in terms of its dimensions thickness of
89
backing layer and wearing surface, materials, ingredients, colour. shade
chips, distribution etc. required.
The tiles shall be prepared for cement conforming to Indian Standards or
coloured portland cement generally depending upon the colour of tiles to
be or as directed.
(D) Chequered Tile s : `
Chequered tiles shall be plain cement tiles or m arble mosaic tiles. The
former shall have the same specification as per (A) above and the latter
as per marble mosaic tiles as per (C) except as mentioned below
The tiles shall be of nominal size of 250 mm. X 250 mm. if specified. The
centre to centre distance of chequer shall not be less than 25 mm . and
not more than 50 mm. The overall thickness of the tiles shall be 22 mm.
The grooves in the chequers shall be uniform and straight. The depth of
the grooves shall not be less than 3 mm. The chequered tiles shall be
plain, coloured or mosaic as specified. The thickness of the upper layer
measured form the top of the chequers shall not be less than 6 mm. The
tiles shall be given the first grinding with m achine before delivery to site.
Tiles shall conform to relevant IS: latest edition.
(E) Chequered Tiles F or Sta ir Ca ses :
The requirem ents of these tiles shall be the sam e as chequered tiles as
per (D) above except in following respects :
(1) The length of a tile including note shall be 330 mm : (2) The
minimum thickness shall be 28 mm : (3) The nosing shall have also the
sam e wearing layer as at the top: (4) The nosing edge shall be rounded.
(5) The front portion of the tiles for minimum length of 75 mm. from and
including the nosing shall have grooves running parallel to nosing and at
centers not exceeding 25 mm. Beyond that the tiles shall have normal
chequer pattern.
M-48. Rough Kota h St one :
The kotah stones shall be hard, even, sound and regular in shape and
generally uniform in colour, The colour of the stone shall generally be
green. Bro wn coloured shall not be use. They shall be without any soft
veins, cranks or flaws.
The size of the stones to be used for flooring shall be of siz e 600 mm. X
600 mm. abd / or size 600 mm. X 450mm as directed. However smaller
sizes will be allo wed to be used to the extent of maintaining required
pattern. Thickness shall be as specified.
Tolerance of minus 30 mm. on accounts of chisel dressing of edges shall
be permitted for length as well as breadth. Tolerance in thi ckness shall be
+ 3 mm.
90
The edges of stones shall be truly chiselled and table rubbed wi th coarse
sand before paving. All angles and edges of the stone of shall be true,
square and free from chipping and the surface shall be true and plain.
When machine cut edges are specified, the exposed and the edges at
joints shall be machine cut. The thickness of the exposed machine cut
edges shall be uniform.
M-49. Polished Kot ah St ones :
Polished kot4h stone shall have the same specification as per rough kotah
stone except as mentioned below:
The stones shall have machine polished surface. W hen brought an site,
the stones shall be single polished or double polished depending upon its
use. The stones for paving shall generally be single polished. The stones
to be used for dedo, skiri thing sink, veneering, sills, steps, etc, whe re
machine polishing after the stone are fixed in situ is not possible shall be
double polished.
M-50. Dholpur Stone St ab :
Dholpur stone slab shall be of best quality as approved by the Engineerin-charge: The stone slab shall be without any veins, cra cks, and flaws.
The stone slab be even, sound and durable regular in shape and of
uniform colour.
The size of the stone shall be as specified in the item or detailed drawing
of as approved by the Engineer-in-charge. The thickness of the stone
shall be as specified in the item of work wi th the permissible tolerance of
plus or minus 2 mm. the provisions in respect of polishing as for polished
kotah stone shall apply to polished Dholpur stone also. All angle s and
edges of the face of the stone slab shall be fine chiselled or polished as
specified in the item of work and ai6 the four edges shall be machine
out. All angles and edges of the stone slab shall be true and plane.
The sample of stone shall be got approved by the Engineer-in-charge for
a particular work. It shall be ensured that the stones to be used in a
particular wo rk shall not differ m uch in shade or tint from the approved
sam ple.
M-51. Marble Slab :
Marble slab shall be white or of other and of best quality as approved by
the Engineer-in-charge.
Slabs shall be hard close, uniform and hom ogeneous in texture. They
shall have even crystalline grain and f ree from defects and cra cks. the
surface shall be machine polished to an even and perfect plane surface
and edges machine cut true and square. The rar face shall be rough to
provide key for the mortar.
91
Marble slabs with nature veins, if selected shall have to be laid as per the
pattern given by the Engineer-in-charge. Size of the slab minim um 460
mm. X 450 mm: and preferably 600 min. X 600 mm. However sm aller
sizes will be allo wed to be used to the extent of maintaining required
pattern.
The slab shall not be thinner than the specified thickness at its thinnest
part. A fe w specimen of finished slab to be used shall be deposited by
the Contractor in the office for reference.
Except as above, the marble slabs shall conform to IS: Latest edition.
M-52. Gra nit e Stone sla b :
Granite shall be of approved colour and quality. The stone shall be hard,
even sound and regular in shape and generally uniform in colour. It shall
be without any soft veins, cracks of flaws.
The thickness of the stone shall be as specified in item.
All exposed faces shall be double polished tender truly smooth and even
reflecting surface. The exposed edges and corners shall be rounded off as
directed. The exposed edges shall be machine cut and shall have uniform
thickness.
M-53. PV C F looring
PVC sheet for PVC, floor covering shall be of homogenous flexible type,
conforming to I.S. Latest edition. The PVC covering shall neither develop
any toxic effect while put to use for shall give off any disagreeable odour.
Thickness of flexible type covering Ales shall be as specified in the
description of the item.
The flexible shall be backed with hessian or other woven fabri c. The
following toleran ces shall be applicable on the nominal dimensions of the
folls or tiles :
(a) Thickness 15 mm.
(b) Lengh of Width :
1 . 3 00 rnm. s quare tiles 0 .20 mm
2 . 600 mm. Square tiles 0.4 0 mm.
A dhesive:
The adhesive for PVC flooring shall be of the type and m ake , recommended
by the manufactures of PVC sheets/tiles.
M-54 Facing Tiles
The facing tiles (burnt cla y facing bri cks) shall be free from cracks and
nodules of free lime. They shall be thoroughly burnt and shall have plane
rectangular faces with parallel sides and sharps straight right angled faces..
The texture of the finished surface that will be exposed when in place shall
conform to an approved sample consisting not le ss than four stretch bricks
each representing the texture desired. The facing tiles shall have a
92
pleasing appearance sufficient resistance to penetration by rain and greater
durability than comm on bricks. The tiles shall conform to I.S.Latest edition.
I
The standard size of facing brick tiles shall be 19 x 9 x 4 cms. The facing
brick tiles shall be provided wi th frog whi ch shall conform to IS: Latest
edition.
The permissible tolerance in dimensions specified above shall be as follows
:
Size
Tolerance for
1st class brick 2nd class brick
19
6 mm 10 mm
9
3 mm 7 mm
4
1.5 mm 3 mm
The tolerance for distortion or warpage of face or edges of individual
brick form a plane surface and from a straight line respectively shall be
as follows:
Ficing dimensions
Permissible tolerance
M ax. below 19 cm s
Max 2.5 mm
--do-- above 19 mm
Max 3.0 mm
The average com pressive strength obtained as a sample of five tiles when
tested in accordance with the) procedure laid as per IS: Latest edition
shall be not less than 175 Kg/Sq. Cm. The average compressive strength
of any individual bricks shall be not less than 160 Kg/Sq. Cm.
The average water absorption for five bricks tiles shall not exceed 12
percent of average weight of bri ck before testing. The absorption for each
individual bricks shall not exceed 25 percent.
The brick tiles when tested in accordance wi th IS: Latest edition, the rate
of efflorescence shall not be more than "Slightly effloresced'
M-55. White gla ze d t iles
The tiles shall be of best quaky as approved by the Engineer- in-charge.
They shall be foat and true to shape. They shall be free from cracks,
crazing spots, chipped edges and corners. The glazing shall be of uniform
shade.
Variation f rom the stated sizes, other than the thi ckness of tile shall be
plus or minus 1.5 mm . The thi ckness of ti le shall be 6 mm . Except as
above the tiles shall confo rm to I.S. La test edi tion.
M-56. Ga lva nized Iron Pipes and F itt ings:
Galvan ized iron pipe shall be of the medium type and of requi red
diameter and shall com ply with IS: latest edition. The specif ied
diameter of the pipes shall refer to the inside diam eter of the bore.
Clamps, scre w a nd all gal vanized i ron fittings shall be of the standard
'R' or equi valent make.
93
M-57. Bib cock and stop cock:
A bib cock is a dra w off tap wi th a horizontal in let and free outlet. A
stop co ck is a valve wi th a suitable means of co nnection for insertion in
a pipeline for con trolling o r s topping the flow.
They shall be of screw do wn type and or brass ch rom ium plated and of
diameter as specified in the descrip tion of the item . They shall confo rm
to IS: latest edition and they shall be of best Indian make. They shall
be polished brig ht.
The m inimum finished weig ht of bib cock and stop co ck shall be as
given belo w:
Diameter
8 mm
10 mm
Bib co ck
0.25 kg
0.30 kg
Stop co ck
0.25 kg
0.35 kg
Diam eter
15 mm
20 mm
Bib co ck
0.40 kg
0.75 kg
Stop cock
0.40 kg
0.75 kg
94
be free from blisters and surface defects and shall have chromium
plated brass h inges and rubber buffer of suitable size.
M-61. Orissa ty pe water closet:
The specifi ca tion of Orissa type whi te glazed wate r closet of fi rst quali ty
shall confo rm to IS: latest edition and relevant spe cifi cation of Indian
type wa ter closet except that pan will be wi th the integral squatting pan
of size 580 x 440 m m wi th raised footrest.
M-62. India n ty pe wate r closet:
The Indian type whi te glazed wa ter closet of fi rs t quali ty shall be of size
as specified in the i tem and conforming to I S: latest edi tion. Each pan
shall have in teg ral flushing. It shall also ha ve an inle t at back o r front
for connecting fl ush pipe as directed. The inside of the bottom of the
pan shall have sufficient slope from the front to wa rds the ou tlet and
surface shall be unifo rm and smooth. Pan shall be pro vided with 100
mm. diameter "P" or "S" trap with approximately 50 mm, Water seal and
50 mm . diameter vent horn.
M-62 A Foot Rests
A pair of white glazed ear-then ware rectangular foot of minimum size 250
mm . x 130 mm x 20 min shall be provided with the water closet.
M-63 Gla zed Earthen Ware Sink
The glazed earthen ware sink shall be of specified size, colour and quality.
The sink shall conform to I. S. latest edition. The brackets for sinks shall
conform to IS: latest edition.
The pipes shall conform to I.S. latest edition for steel and lead pipes
respectively. 32 min. brass waste coupling of standard pattern with brass
chain and rubber plug shall he provided with sink.
M-64. Glaze d e art he n-ware Lipped ty pe fla t back urinal / corner type
urinal.
The lipped type shall be flat. back or corner type as specifie d in the item
and shall conform to IS: Latest edition. It shall be of best Indian make and
size as specified arid approved by the Engineer-in-charge. The flat back or
corner type urinal m ust be of 1st quality free from any defects, cracks etc.
M. 65. Low level e namel flushing tank
The lo w level enamel flushing tank shall be of 15 litres capacity. It shall
conform to IS: latest edition. The flushing cistern shall be of best quality
and free from any defects. The flushing tank shall have outle t 32 mm.
diameter. The outlet shall he connected with WC. Pan by lead pipe or PVC
pipe as specified. The flushing cistern shall be provided with inlet and outlet
for fixing G.I. inlet pipes and overflow pipes The flushing cistern shall be
provided with ch rom ium plated handle for flushing. The flushing tank shall
be provided with bracket of cast iron so that it can be fixed on wall at
specified height. The, brackets shall conform to I.S. latest edition.
95
M-66. Cast iron flushing cistern.
The cast iron flushing cistern shall be of 15 litres capacity. It conform to IS.
latest edition, The flushing cistern shall be of best quality free from any
defects, The flushin g cistern shall have outlet of 32 mm. diameter. The lead
pipe shall conform IS: latest edition. For fixing G.I. inle t pipes and overflow
pipe 20 mm dia inlet and outlet shall he got provided. The flushing, cistern
shall be provided with galvanized iron chain and pull of sufficient length and
shall be got approved from the engineer-in-charge. The cast iron flushing
cistern shall be painted with one coat of anti-corrosive paint and two coats
of paints. The flushing cistern shall be fixed on two C.I. brackets. The C.I.
bracket shall conform to IS: latest edition.
M-67 Flush Cock
Half turn flush cock (Heavy weight) shall be of gun metal chromium plated
of diameter as specifie d in the description of the item. The flush cock shall
conform to relevant Indian Standard.
M-68 Cast iron pipes and fittings.
All soil, water, vent and antisyphonage pipe and fitting shall conform to IS:
latest edition. The pipe shall have spigot and socket ends with head on
spigot end. The pipes and fittings shall be true to shape, smooth, cylindrical
their inner and outer surfaces being as nearly as practicable concentric.
They shall be sound and nicely cast and shall be free from cracks, laps
pinholes or other imperfection and shall be neatly dressed and carefully
settled.
The end of pipes and fittings shall be, reasonable square to their axis.
The sand cast iron pipes shall be of the diameter as specified in the
description and shall be in lengths of 1.5 M , 1.8 M. and 2 M. including
socket ends of the pipe unless shorter lengths are either specified or
required at junctions etc. The pipes and fittings shall he supplie d. without
ears unless specified or directed otherwise.
Tole ra nces
The standard weights and thickness of pipes shall be as shown in the
following table:
Sr
No
Nom inal
dia. of bore
Thickness
75 mm
5.0 mm
100 mm
5.0 mm
O verall
Weight of
pipe
1.5
m 1.8
m
long
long
12.83 kg
16.52 kg
Excluding
ears
2 m long
18.37 kg
18.14 kg
24.15 kg
21.67 kg
96
A tolerance upto minus 15 percent in thickness and 20 mm in length will
be allowed. For fittings tolerance in lengths shall be plus 25 mm and
minus 10 mm.
The thickness of fittings and their socket and spigot dimensions shall
conform to the thickness and dimensions specified for the corresponding
sizes of straight pipes. The tolerance in weights and thickness shall be the
sam e as for straight pipes.
M-69. Na hni Tra p:
Nahni trap shall be of cast iron and shall be sound and free from porosity
or other defects which affect serviceability. The thi ckness of the base
metal shall not be less than 6.5 mm. The surface shall be smooth and free
from craze, chips and other flaws or any other kind of defect whi ch affect
serviceability. The size of nahni trap shall be as specified and shall be of
self cleaning design.
The nahni trap shall be of quality approved by the engineer-in-charge and
shall generally conform to the relevant Indian Standard.
The nahni provided shall be wi th deep seal, minim um 50 mm except at
places where trap with deep seal cannot be accomm odated. The cover
shall be cast iron perforated cover shall be provided on the trap of
appropriate size.
M-70. Gully Trap:
The gully trap shall conform to IS: latest edition. It shall be sound, free
from defects such as fire cracks or hair cracks. The glaze of the traps shall
be free from crazing. They shall give a sharp clear note when struck with
light hammer. There shall be no broken blisters.
The size of the gully trap shall be as specified in the item.
Each gull y trap shall have one C.I. grating of square size correspodning to
the dimensions, of inlet of gully trap. It will also have a water tight C.I.
cover with frame inside dimension 300 mm x 300 mm. The cover with
frame inside dimensio ns 300 mm x 300 mm the cover weighing not less
than 4.53 kg and the frame not less than 2.72 kg. The grating cover and
frame shall be of sound and good casting and shall have truly square
machined seating faces.
M-71. Gla ze d st one ware pipe and fitt ings:
The pipes and fittings shall be of best quality as approved by engineer-incharge. The pipe shall be of best quality m anufactured from stoneware of
fire clay, salt glazed thoroughly bu rnt through the whole thi ckness, of a
close even texture, free from air blows, fire blisters, cracks and other
imperfections, which affect the serviceability. The inner and outer surfaces
shall be smooth and pefectly glazed. the pipe shall be capable to
withstand presures of 1.5 m lead without showing sign of leakage. The
thickness of the wall shall not be less than 1/12th of the internal dia. the
depth of socket not be less than 38 mm. The socket shall be sufficiently
large to allow a joint of 6 mm around the pipe.
97
98
-x-x-x-x-x-
99
(C)
Item No.1:
1.0.0 (A) Ex cavat ion for foundation upto 0. 0 M to 1. 50 de pt h including
sorting out and sta cking of useful mate ria ls a nd disposing of t he
exca vated st uff within t he city limit as directed in soft murrum,
ha rd murrum
1.0
1.1
Genera l
Any soil whi ch generally yields to the application of pickaxes and
shovels, phawaras rakes or any such ordinary excavating , im plement or
organic soil, gravel, slit., sand turf loan, clay, peat etc. fall under this
category.
2.0
2.1
2.2.
3.0.
4.0
Excavation
The excavation in foundation shall be carried out in true line and level
and shall have the width and depth as shown in the drawings or as
directed. The contractor shall do the necessary shoring and shutting or
providing necessary slopes to a safe angle, at his o wn cost:. The
payment for such precautionary measures shall be paid separately if not
specified. The bottom of the excavated area shall be leveled both
longitudinally and transferely as directed by removing and watering as
required. No earth filling will be allo wed for brining it to level, if by
mistake or any other reason excavation is made deeper or wider than
that shown on the plan or directed. The extra depth or width shall be
made up with con crete of sam e proportion as specified for the foundation
concrete at the cost of the contra ctor. The excavation upto 1.5 m . depth
shall be m easured under this item.
5.0
100
5.1
5.2
6.0
6.1
Item No.2:
5.1.6. Providing a nd la ying in foundat ion a nd plint h/under floods lime
concrete wit h hard broken aggregate of 4 to 9 cm nominal size a nd 50%
mortar comprising of 1 Lime putty : 2 fine sand a nd curing complete
excluding cost of form work.
1.0. Mate ria ls:
1.1. W ater shall conform to M-l. Sand shall conform to M -6. Lim e shall conform
to M -2. Graded aggregated 4 to 9 cm nominal size shall conform to M-l2.
2.0. Workma nship:
2.1. General
2.1.1. Before starling the concrete the bed of the foundations trenches shall be
cleared of all loose materials and watered and ramm ed as directed.
101
mass is uniform in colour and consistency but in no case mixing shall be done for
less than 2 to 3 minutes.
2.4. Laying & Compact ing: 2. 4. 1. The concrete shall always be used while
quite fresh. It shall be laid (not thrown) in layers not exceeding 150 mm: in
thickness and shall be well and quickly_ rammed with wooden or iron rammers,
till the required compaction is achieved. The concrete laid shall not be of too
fluid consistency. After i t has been mixed no more wate r shall be added, but the
surface during and after com paction shall be kept damp. In laying consecutive
layers, the layer east shall be well watered and m ade rough before the upper
layer is laid. The concrete shall be kept continuously wet for period of 7 days
from the date of placing or until it is built over whicheve r is more.
2.5. Mode of measureme nt and payme nt:
2.5.1. The concrete wo rk shall be measured in length, breadth and depth as
specified on drawing or as directed, correct upto nearest centimetre and cubical
content shall be worked out nearest upto two places or decimals.
2.5.2. The rate shall be for a unit of one cubic metre.
5.1.8. Providing and laying in foundation and plinth/under floors lime concrete
with graded bricks aggregate 40 mm. nominal size and 40% mortar comprising
of 1 Lime Putty : 9 find sand and curing complete excluding cost of form work.
1.0. Mate ria ls :
1.1. Water shall conform to M -1. Lime mortar shall conform to M -10. Brick bats
aggregates 40 mm. nominal size shall con form to M -14.
2.0. Workma nship :
2.1. The relevant specifications of item No. 5.1.6. Shall be followed except that
brick aggregate shall be used instead of graded stone aggregate.
3.0. Mode of measureme nt and payme nt:
3.1. The concrete work shall be measured in length, breadth and depth as
specified in drawing or as directed, correct upto largest centimetre and cubical
content shall be worked out upto two places of decim als.
3 2. The rate shall be for a unit of one cubic m etre.
Item No.3
3.0
Providing a nd laying cement concret e 1:2:4 (1 cement: 2 coarse
sand: 4 gra ded stone-a ggregate 20 mm nominal size) and curing
complete excluding the cost pf form work in foundat ion a nd
plinth,
1.0.
1.1
Materials
Water shall conform to M-1. Cement shall conform shall conform to M-3.
Sand shall conform to M -6. Stones aggregate 20 mm . nom inal size shall
conform to M -12.
102
2.0
2.1
Workmanship
Genera l
2.1.1 Before starting concrete the bed of foundation trenches shall be cleared of
all loose materials, leveled, watered and rammed as directed.
2.2
Proportion of M ix
2.2.1 The proportion of cement, sand and coarse aggregate shall be one part of
cem ent, 2 parts of sand and 4 parts of stone aggregate; and shall be
measured by volume.
2.3.
Mixing
2.4.1 The concrete shall, be handed from the place of m ix ing to the final
position in not m ore than 15 minute by the method as directed and shall
be placed into its final position, com pacted and finished wi thin 30 m inutes
of m ixing with wate r i.e. before the setting commences. .
2.4.2 The concrete shall be laid in layers of 15 cms to 20 cms.
2.5. Compa cting:
2.5.1 The concrete shall be rammed with heavy i ron ramm ers and rapidly to get
the required com paction and to allow all the interstices to be filled with
mortar.
2.6.
Curing
2.6.1 After the final set, the concrete shall be kept continuously wet if required
by ponding for a period of not less then 7 days from the date of
placem ent.
2.7.
2.7.1 The concrete shall he measured for its length, breadth, and depth, limiting
dimensions to those specified on plan or as directed.
,
2.7.2 The rate shall be for a unit of one cubic metre.
103
Item No.4
Rem oval of excavated stuf f and laying w it hin RMC lim it as direct ed by
engineer-in-charge.
Dis pos al of exc avate d materi als is s ub jec t to t he followi ng.
U ns uitable materials obtai ned from c learanc e, site and exc avatio n s hall be
disposed o ff within RM C limit as directe d.
T he rate shall be fo r a unit o f one c ubic metre.
Addl.A .E.
R. M.C.
Dy.Ex.Engineer
R.M.C.
R.M.C.
104
The contracto r shall have to provide his own level instrum ent for this
work.
2.
Providing and fixing of precast RCC slab and column shall have to be
carried out in line and level.
3.
4.
For excavation of trench, use of JCB machine wil l not be perm itted directly
on the top surface of the road. After excavation upto minimum 1.00 mt.
depth from road surface or existing ground level, sam e shall have to be
carried out m anually or by using Breaker and after locating underground
services like; water supply pipeline, water connection lines, pipe gutters,
telephone cables, electric cables etc., and thereafter upon taking the prior
approval of the Engineer-In-Charge, the excavation can be carried out by
using JCB machine.
5.
6.
7.
105
excavation shall be paid as per the rate of related item mentioned in
Schedule-B.
8.
The safety of the trenches is the prime important factor. Along the
trenches on both the side, a hum p of excavated stuff of minim um height 3
to 5 ft shall have to be provided till the work is got completed. However,
where there is no defined road, in such area, the fencing/ lighting etc.,
requires to be provided as per clause 1.1.15. Sign Board shall have to be
provided at required locations, so that there will not be any fatal accident.
9.
10.
After entering into an agreement, the agency shall have to finalize the
agency for supply of the material like Precast RCC slab and colum n and
the name of manufacturer / supplier should immediately be informed to
Rajkot Municipal Corporation so that Rajkot M unicipal Corporation can also
expedite the manufacturer / supplier for the material. If necessary, Rajkot
Municipal Corporation will visit and inspect the facto ry. During the
inspection, if Rajkot Municipal Corporation is not satisfied then the
contractor shall have to procure the material from other manufacturer(s).
11.
12.
13.
14.
106
numbering or weighing the same including setting out and laying or fixing
in position and the provision of all materials,
Power, tool rammers, beaters, labour, tackle platform s with im pervious
lapped joints for scaffold ing ranging rods, straight edges, centering and
boxes, wedges, moulds, templates, post straight rails, boning-staves,
measuring rods, page boards, shores, barriers, fencing, lighting, pumping
apparatus, temporary arrangements of passage of traffic, access to
premises and continuance of drainage, water supply and lighting (if
interrupted b y the wo rk) lard tem porary sheds and buildings nahanis
roofed in or otherwise haulage, painting, varnishing, polishing,
establishments for efficient supervision and watching arrangements for
the efficient protection of life and property and all requisite plant,
implements and appliances every kind, except only such matter and
things as it may be distinctly s tated here in are to be supplied by the
contractors. A rate for anyone description of wo rk is to be held to include
such items of other classes of and for these on separate specific charge
will be admitted. The contra ctors shall keep every portion of the wo rk
clear of accumulation from time to time and shall leave every portion of
the wo rk clean, clear, perfect and at the conclusion of whole, providing at
their o wn cost all such material implement appliances and labour as the
Engineer may require to prove if it is to be so.
15.
The contracto rs are particula rly di rected to observe from the Arti cles of
Agreement and the specifications, what is to be included in their rates for
the several portions of the work and also under what conditions payments
are to be made.
1 6.
T he cos t of all tes ts required to be c arried out for concrete / material tes ting will
be borne by the c ontractor. No extra payment will be made from Rajkot M unicipal
C orporation. I f the quality of work is going to be s uffered then the whole
res pons ibility will rest on the c ontrac tor.
1 7.
T he contrac tor s hall have to avail P F C ode as per the prevailing C irc ular of
Government for the employees on work. T he proc ess for preparation of bill will be
taken up only afte r s ubmiss ion of the Challan for the amount o f P .F. depos ited
every month for the employees on work, whic h will binding to the c ontrac tor. T he
required doc uments s hall have to be s ubmitted every month by the contractor to
the c ompetent authority.
Addl.A .E.
R. M.C.
Dy.Ex.Engineer
R.M.C.
R.M.C.
107
PART - III
BILL OF QUANTITIES
108
109
Bidders a re required to fill up all bla nk spaces in this B id Form
The Com missioner
Rajkot Municipal Corporation
Dr. Am bedkar Bhavan
Dhebar Road
Rajkot
Dear Sir,
SUB :
CEMENT
CO NCRETE
ROAD
INSTI TUTE IN WA RD NO.6
WORK
INSIDE
PEDA K
Having visited the site and examined the Bid Docum ents, Drawings, Conditions of Contract,
Specifications, Schedules, Annex ures, Pream ble to Price Schedules, Price Schedules etc.
includin g Addenda/Am en dments to the above, for the execution of the above Contract, we
the under signed offer to carry out as given in Con ditions of Contract an d in conformity with
the Drawin gs, Con ditions of Contract, Specifications, Preamble to Price Schedules, Price
Schedules,
Annex ures,
Biddin g
Docum ents,
including
Adden da
Nos._______________( insert
num ber s)
for
_____________%age
(in
figure)
_______________________________________________________ (in wor ds) below /
abov e than the rates given in Price Sch edule.
2.
I / W e agree that
(a)
(b)
(c)
3.
W e un dertake, if our Bid is accepted, to complete and deliver the Works in accor dan ce
with the Contract within 3 m onths, from the date of W ork order issued to us by you.
4.
W e agree to abide by this Bid for a perio d of 120 days from the date fixed for receiving
the same and it shall rem ain bin din g upon us and may be accepted at any time before
the expiry of that period.
5.
In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract thereto annexed but until
such agreement is prepared this Bid together with your wr itten acceptance thereof shall
constitute a bindin g Contract bet ween us.
110
6.
W e agree, if our Bid is accepted, to f urnish Perform ance Bond/Security in the forms
and of value specified in the Conditions of Contract of a sum equivalent to 5% of the
Contract price for due performance of the Contract.
7.
8.
W e un der stand that you are not boun d to accept the lo west or any Bid yo u may receive.
Dated this _____________________day of___________________________ 2014.
___________________________
( Signat ure)
___________________________
(Nam e of the person)
___________________________
(In the capacity of)
_______________________
_______________________
_______________________
______________________
111
PREAMBLE TO
PRICE SCHEDULES
112
Note on Schedule
T he bid is percentage rate bid for CEMENT CO NCRETE ROAD WO RK INSIDE
T he rates and pric es s hall be s ubmitted in the formats given in the online P rice
Schedules . Rates and prices rec eived in any other formats will be rejected and
the Bids will be dis qualified.
2.
I t will be entirely at the disc retion of the E mployer to acc ept or rejec t the bidders
propos al, witho ut giving any reas ons whats oever.
3.
I n P ric e Sc hedule, bidder shall quote his perc entage above/belo w fo r items lis ted
in the schedule. Pric es quoted in Sc hedule only will be cons idered for price
evaluation & s hall form a part of the Contrac t A greement.
4.
O nly Price Schedule will be c ons idered for financial evaluation of the bid with the
s ucc ess ful bidder.
5.
T he bidder s hall be deemed to have allowed in his pric e for provis ion,
maintenanc e and final removal of all temporary works of whats oever nature
required for c ons truc tion inc luding temporary bun ds , diverting water , pumping,
dewate ring etc . for the proper exec ution of wo rks . The rates s hall als o be deemed
to include any works and setting out that may be required to be c arried out for
laying out o f all the wo rks involved.
6.
Where there is a disc repanc y between the unit rates and the amount entered, the
latter s hall govern.
7.
T he Pric e Sc hedules are to be read in c onjunc tion with the C onditions of Contract,
the Specifications and other s ec tions of thes e bid doc uments and these
doc uments are to be take n as mutually explanatory o f one anot her.
8.
P ric es quoted by the bidder s hall be firm for the entire period of Contract witho ut
any esc alation.
9.
T he bidder shall interpret the data fur nished and c arry o ut any additional s urvey
work, or inves tigation wo rk re quired at his o wn cos t.
1 0.
T he pric es quoted s hall als o include the c os t of materials utilized for tes ting.
1 1.
T he bidder should ac quaint hims elf with the site c onditions including the acc ess to
Worksite. T he succes sful bidder shall have to make s uitable ac cess to works ites
at his own c os t. T hes e acces ses will be us ed by the other c ontractors working for
RMC .
Signature of contractor.
113
PRICE SCHEDULE
114
Q nty.
Rate
Rs.
7 2 .00
7 50.00
2 50.00
3
4
2 50.00
9 38.00
Unit
Total
am ount Rs.
54000 .00
3 14750 .00
9 60500 .00
1 00366 .00
14,29,616.00
M
3
M
Total
Contribu tion fro m Govern ment of Gujarat 70 %
10,01,000.00
Corp oratorsh ri Grant 20%
2,86,000.00
Sup ervis ion ch arges 6 .25%
17,875.00
Contribu tion of Rajkot Mu nicipal C orporation 10 %
1,43,000.00
Total
14,47,875.00
(Rupees Fourteen lac s forty s even thous and eight hundred
Say
seventy five only)
14,47,875.00
Addl.A.E.
R.M.C.
Dy.Ex.Engineer
R.M. C.
R.M. C.
Signature of C ontractor.
115
116
117