RAJKOT MUNICIPAL CORPORATION

e-TENDER No.: RMC/PWD/EZ/13-14/74

Bid Documents For


CEMENT CONCRETE ROAD WORK INSIDE
PEDAK INSTI TUTE I N WARD NO.6
(3rd Attempt)

AUGUST-2014
Last date for e-tendering is as under
1 . D ownloading of e-Tender doc uments
2 . O nline submission of e - Tender
3 . Physical submission of EMD, Tender fee
and other required documents as per
Financ ial, Experience etc .
4 . Verification of submitted doc uments

05-08-2014 To 16-08-2014 upto 18 .00 H rs .


16-08-2014 upto 18 .00 H rs.
19-08-2014 upto 18.00 H rs .

5 . O pening of online Primary Bid

19-08-2014 at 10 .30 Hours onwards

6 . Agency to remain present in person along


with original documents for verification
7 . O pening of online Price Bid

20-08-2014 between 16 .00 to 18 .00 H ours

8 . Bid Validity

20-08-2014 at 10 .30 Hours onwards

21-08-2014 at 10 .30 Hours onwards (I f


Possible)
120 D ays

ADDL. CITY ENGINEER


RAJKOT MUNICIPAL CORPORATION
SHREE ZHAVERCHAND MEGHANI BHAVAN
EAST ZONE,
BHAVNAGAR ROAD,
RAJKOT - 360 003

RAJKOT MUNICIPAL CORPORATION


BID DOCUMENT FOR
CEMENT CO NCRETE ROAD WORK INSIDE PEDAK INS TITUTE IN
WARD NO.6

PART-I

Section-1
Section-2

Invitation to Bid, Instructions to Bidders


and Formats.
General Conditions of Contract

PART-II
Section-3
Section-4

Technic al Specifications
Schedule of Drawings

PART-III
Bill of Quantities

ABBREVIATIONS
Statem ent sho wing the detail s of abb reviations.
Ful l Form

Abbrev iati on

Addl.City E ngineer

ACE

Operation and Maintenance

O&M

Net Pre sent Value

NP V

Engineering Procurement and Con st ruction

EP C

Gujarat Ele ctricity Board

GEB

Critical Path Method

CPM

Reinforced Cem ent Concrete

RCC

High Ground Level Re servoir

HGL R

Kilometer

KM

Mild Steel

MS

Bureau of Indian Standard

BIS

American Wate r Wo rks Association

AWWA

American Petroleum Indu strie s

API

Million Liter per Day

MLD

High Yield Stren gth Deform ed bar

HYS D

Corrosion Residen ce Steel

CRS

Ordinary Portland Cem ent

OP C

American Standard for Te sting of Material

ASTM

Flux Compensated Magnetic Amplifier

FCM A

Cost In suran ce and fright

CI F

Free On Boa rd

FOB

EX Wo rks

EXW

IN DE X
Sr
No
1

Particulars
Invitation to Bid

Instruction to Bidder s

Form ats

Gener al Con ditions of Contract

Technical specifications

Schedule of Drawin gs

Bill of Quantities

PART - I
SECTION - 1
INVITATION FOR BIDS

RAJKOT MUNI CIPA L CORPORATIO N


e-Tender Notice
The e-Tenders are invited with two bid system by e-Tendering by Addl. City Engineer,
Rajkot Municipal Corporation, Shree Zhaverchand Meghani Bhavan, East Zone,
Bhavnagar Road, Rajkot-360003, from the contractors registered in GW SSB/ State
Government/ Central Government in appropriate class for belo w m entioned work as
detaile d below.
Sr
No

a) Estimated cost in Rs.


b) EMD
c) E-TENDER fee
d) Time limit for
c ompletion of work
e) Class of Regn.

Name of work

CEMENT CONCRETE ROAD WORK INSID E PEDAK a) Rs.14,47,875/INSTI TUTE IN WARD NO .6 (3rd Attempt)
b) Rs.14,478/c) Rs.1125/d) 3 M onths
e) E2 and Above
Last date for e-t endering is as under

1 . D ownloading of e-Tender doc ume nts


2 . O nline submission of e - Te nder
3 . P hysical submission of EMD, Te nde r fee
a nd other re quired docume nts as pe r
F inanc ial, Ex perience etc .
4 . Ve rification of submitted docume nts

05-08-2014 To 16-08-2014 upto 18 .00 H rs .


16-08-2014 upto 18 .00 H rs.
19-08-2014 upto 18.00 Hrs .

5 . O pening of online Primary Bid


6 . A gency to remain present in person along
with origina l docume nts for v erification
7 . O pening of online P rice Bid

19-08-2014 at 10 .30 Hours onwa rds


20-08-2014 between 16 .00 to 18 .00 Hours

8 . Bid Va lidity

1.

2.

3.

20-08-2014 at 10 .30 Hours onwa rds

21-08-2014 at 10 .30 Hours onwa rds (I f


P ossible )
120 Days

All bidders must submit a bid security in person as above either directly
deposited in Account No.01018640000035 (Rajkot Municipal Corporation) IFSC
Code HDFC0000101 or submit in form of Demand draft in favor of "Rajk ot
Municipal Corpoation", Rajkot, from any Schedule d bank (except Co-operative
Bank) in India. The physical submission of required documents is to be done at
the below mentioned address. All documents submitted for verification should
be duly Certified by Gazetted Officer.
Office of the Addl. City Enginee r
Rajkot Municipal Corporation.
Shree Zhavercha nd Meghani Bhava n, Ea st Zone,
Bhavnagar Road, RAJKOT-360 003.
The e-Tender fee will be accepted in form of Demand Draft only, in favor of
"Rajkot M unicipal Corporation", Rajkot, from any Nationalized Bank or
Scheduled bank (except Co-operative Bank) in India and must be delivered to
above address.
The pre-qualification requirement is as under:
i)
Financial Criteria:
1.
An average annual turnover of last seven years should not be less than
50% of tender amount.
2.
Working capital should not be less than 25% of the estimated amount.
3.
Solvency should not be less than Rs.1.00 Lacs
4.
Class of Registration E-2 and Above.

ii)
1.
2.

Experie nce Criteria:


The bidder should posses following minimum experience
Bidder should have comple ted at least one work of sim ilar nature of 60%
or two works of 50% of tender amount of either Government or SemiGovernment as a main contractor in period of last seven years.
Bidder should have enough machin ery and experie nced personnel to
supervise the work.
Note: Enhancement factor will be applicable as shown in below given
table to arrive average annual turnover and finalize the magnitude of
work done in last seven years.
Sr.
No.
1
2
3
4
5
6
7
8

Year
Year of inviting tender (eg. 2013-14)
-1 (2012-13)
-2 (2011-12)
-3 (2010-11)
-4 (2009-10)
-5 (2008-09)
-6 (2007-08)
-7 (2006-07)

Enha nce
Factor
1.00
1.10
1.21
1.33
1.46
1.61
1.77
1.95

4.

Bidder who fails to submit the required documents physically within the date
and tim e prescribed, their offer will be treated as non-responsive

5.

Commissioner, Rajkot Municipal Corporation, Rajkot, reserves the right to


accept / reject any or all e-tender(s) without assigning any reasons thereof.

Addl.City Engineer
Rajkot Municipal Corporation

INSTRUCTIONS
TO
BIDDERS

INS TRUC TIONS

TO

TENDERER

IT 1.

GENERAL
T he contrac t documents may be sec ured in ac cordanc e with the Notic e Inviting E TENDER for the work called. The work shall include s upply of materials necessary
for c ons truc tion of the work.

IT 2.

INVITATIO N TO E-TENDER
T he Rajkot M unic ipal C orporation hereinafter referred as the C orporation will
receive e-T enders for the work of as per the s pec ifications and sc hedule of pric es in
the e-T ender document. T he e-T enders s hall be opened online as specified in the eT ender notic e in the pres enc e of interes ted Tenderers or their repres entatives . The
C orporation res erves the right to rejec t the lowes t or any ot her or all e-Tenders or
part of it whic h in the opinion o f the C orporation does not a ppear to be in its bes t
interes t, and the Tenderer s hall have no cause of ac tion or claim agains t the
C orporation or its offic ers , employees, s uc c ess ors or as signees for rejection of his
e-T ender.

IT 3.

LANGUAGE OF e-TENDER
E -TE NDE Rs shall be s ubmitted in E nglis h, and all information in the e-T ender s hall
also be in E nglish, Information in any other language s hall be acc ompanied by its
trans lation in E nglish. Failure to comply with this may make the e-T ender liable to
rejec tion.

IT 4.
A.

Q UALIFICA TIONS O F TENDERERS


The Tenderers s hall abide by the la ws of the Union o f I ndia an d o f Gu jarat State
and legal juris diction of the plac e where the works are loc ated.
T he T enderer s hall furnish a written s tatement of financ ial and tec hnical parameters
with details and doc uments along with his e-T ender whic h c ontains namely as
below:

B.

i. The Tenderer s experienc e in the fields relevant to this c ontract.


ii. T he T enderers financ ial c apacity/res ources and s tanding over at least 3
(T hree) years .
iii. T he T enderers pres ent c ommitments (Jobs on hand ).
iv. T he T enderers capability and qualific ations of himself and his regular staff
etc .
v. Plants and M achinery available with the T enderer for the work e-T endered.
IT 5.

e-TENDER DO CUMENTS
T he e-T ender doc uments and dra wings shall c omprehens ively be refer red to as eTENDER document. T he s everal sec tions form in the document are t he ess ential
parts of the c ontract and a req uirement occ urring in one s hall be as binding as
though occ urring in all, they are to be taken as mutually, explanatory and des c ribe
and p rovide for complete works.

IT 6.
A.

EXA MINATIO N BY TENDERERS


A t this own expens e and prior to s ubmitting his e-Tender, each Tenderer s hall (a )
examine the C ontrac t Doc uments , (b ) visit the site and determine loc al c onditions
whic h may affect the wo rk including the prevailing wages and other pertinent cos t
factors , (c ) familiarize, hims elf with all c entral, s tate and loc al laws , ordinanc e,
rules regulations and c odes affec ting the material s upply including the cos t of
permits and lic ens es required for t he work and (d) c orrelate his observations ,
inves tigations, and determinations with the requirements of the e-TENDE R
Doc uments , site & subsoil inves tigation.

B.

T he e-T ender is invited on ..%. rat e and c ontrac tor s hall have to quote his pric e
on % bases above or below in the schedule -B./ Price Schedule. The works

10

s hall have to be c ompleted in all res pec t as stated in the e-T ender doc ument to the
s atis fac tion of the C orporation .
C.

T he following c ompris es in Contrac t Doc uments at a price of Rs.1 125-00 .


e-TENDER Document:
P art-I
1 . Notice inviting Tenderers .
2 . I nformation to the Tenderer.
3 . E -TENDER dec laration form
4 . C hec k list.
5 . I ns truc tions to the Tenderer.
6 . Formats
7 . General conditions of c ontrac t
Part-II
T ec hnic al s pec ific ations
Part-III
a. Bid Form (With Pric e )
b. P reamble to Price schedule
c . P ric e Sc hedule (Sc hedule-B)

D.

C opy of the E -TENDE R Doc ument s hould be c ompleted, checked in a res ponsible
manner, digitally signed, and s ubmitted. Security Bond s hall be s ubmitted in
pers on by t he s tipulate date, whic h s hall fo rm the e-T ender.
T he e-T ender is required to c omplete with all the pages in which entries are
required to be made by the T enderer are c ontained in the e-T ender doc uments and
the Tenderer s hall not take out or add to or amend the text of any o f the
doc uments exc ept in so far as may be nec essary to c omply with any addenda
issued purs uant to Claus e IT . 19 hereof.

IT 7.

EARNEST MONEY DEPO SIT:

A.

E ac h T enderer must submit a rec eipt of depos it as T ender guarantee towards


Earnest
money amou nting to Rs.14,478/- in the form of c ros s ed Demand
Draft in fav or of "Rajkot Municipal C orporation", from any Scheduled bank (exc ept Cooperativ e Bank) in India ac ceptable to owner paya ble at Rajkot. The T ender Bond ,
s hall be valid for a period of not less than hundred an d twenty (1 20 ) days from the
date the e-T enders are opened and s hall c omply with the requirements for Bond as
s tipulated in the General c onditions of c ontrac t. T he T ender guarantee bond will be
held by the owner as a guarantee that the Tenderer, if awa rded the c ontrac t, will
enter into the c ontract agreement in good faith and furnis h the required bonds . Any
e-T ender not acc ompanied by a Tender guarantee in the form of ear nes t money
deposited for the sum s tipulated in the e-T ender Doc ument will be s ummarily
rejec ted.

B.

The E arnest Money Depos it will be refunded to the uns uc c ess ful Tenderers after an
award has been finalized.

C.

The E arnest M oney Deposit (T ender Guarantee ) will be fo rfeited in the event, the
successful Tenderer fails to acc ept the c ontract and fails to submit the P erformanc e
Guarantee Bonds to the O wner as s tipulated in this e-Tender doc uments within ten
days. (10 ) days after rec eipt of notice of a ward of c ontract.

D.

The E arnes t M oney Deposit of the s ucc essful T enderer s hall be returned after the
performance g uarantee bond, as required , is furnished by the c ontrac tor.

11

E.

No interes t shall be paid by the owner on any e-T ender g uarantee.

IT 8.

INCOME TA X CLEARANCE CERTIFICA TE : (DELETED) :


Lates t I nc ome T ax c learanc e Certific ates mus t acc ompany with the e-T ender
witho ut which the e-T ender is liable to be s ummarily rejec ted. T he I nc ome Tax
C learance C ertific ate obtained from the I nc ome Tax O ffic er s hall clearly indicate the
I nc ome Tax P an No/Circle/Ward, Dis tric t and the referenc e number of the
ass essment along with the as sess ment year.

IT 9.

PREPARATION OF E-TENDER DOCUMENTS


T enderers are required to note the followi ng while preparing the E -TENDE R
Doc uments :

A.

E -TE NDE R s hall be s ubmitted on the E -TE NDER form bound here in Englis h. All
s tatements shall be properly filled in. Numbers shall be s tated both in wor ds and in
figures whe re s o indic ated.

B.

A ll entries or pric es and arithmetic shall be c hecked before submis sion of the E TENDERs. I f there is disc repanc y between the rates quoted in figures and in words ,
the rates expres sed in words s hall be considered as bindin g.

C.

E ac h e-T ender shall be accompanied by the presc ribed e-Tender sec urity bond and
other required doc uments and drawings . All witnesses and s ureties s hall be persons
of s tatus and probity and their full names, occ upations and addres s es shall be
s tated below their s ignature.

D.

V ariation to the c ontract Doc uments requested by the Tenderer may be affixed and
duly signed and s tamped. Suc h variations may be approved or refused by the
C orporation is not obliged to give reason fo r his dec is ions .

IT 10. SUBMISSION OF E-TENDER DOCUMENTS


T enderers are reques ted to s ubmit the E -T ENDE R Doc uments on follo wing lines .
A.
V olume containing follo wing doc uments :
I.
II .
II I .
IV .
V.
VI .
VII .

E-TENDE R sec urity bond ( E arnest M oney )


Certific ates as regis tered c ontrac tor with Government of Guja rat or ap propriate
authority.
Tenderer s financ ial capability and standing over at leas t past three years
Current I ncome T ax clearance c ertific ate. (DELETED)
Tenderers experienc e in the field relevant to this contrac t.
A list of the equipment the T enderer pos sesses and that whic h he propos ed to
ac quire and use for the pur pos e related to the wo rk.
Tenderer s hould submit All the drawin gs whic h they have rec eived along with eTenders
The time limit for rec eipt of e-T ender shall s tric tly apply in all cas es . The
Tenderers s hould therefore ens ure that their e-Tender is rec eived by the
competent authority The Raj kot Municipal Corporation at the req uired plac e
before expiry of the time limit. No delay on acc ount of any cause for rec eipt of eTender s hall be entertained .
The e-Tender mus t c ontain the name addres s and res idenc e and plac e of
bus iness of the pers on o r pers ons submitting the e-Tender and mus t be digitally
signed.
E-TENDE Rs by partners hip firm mus t be furnished with the full names and
addres ses of all partners and be signed by one of the members of the partnership

12

or by a legally authorized repres entative holding po wer o f attorney follo wed by


signature and des ignation of the pers on o f person s igning.
E-TENDE Rs by c orporations /companies must be signed with the legal name of the
Corporation/C ompanies by the president/or by the sec retary or other pers on or
persons legally authorized to bind the Corporation/C ompany in t he matter .
IT 11 TENDER VAL IDITY PERIO D
T he validity period of the e-T ender s ubmitted for this work s hall be of O ne twenty
(12 0 ) calendar days from the date of opening of the e-Tender and that the
T enderer s hall not be allowed to withdra w or modi fy the e-T ender offe r on his own
during t he validity period . T he T enderer will not be allo wed to wit hdrawn the eT ender or make any modific ations or additions in the terms and c onditions on his
own e-T ender. I f t his is done then the o wner s hall, without pre judic e to any other
right or remedy , be at liberty to reject the e-T ender and forfeit the ear nes t money
deposit in full.
IT 12

GENERAL PERFO RMANCE DA TA


T enderers s hall pres ent all the information which sought fo r in the e-T ender
doc ument in form of various s chedules if given. E -TE NDERs may not be considered
if left blank or the s chedules are not properly filled in.

IT 13

SIGNING OF E-TENDER DOCUMENTS


I f the e-Tender is made by an individual it s hall be s igned with his full name above
his c urrent addres s . I f the e-T ender is made by a proprietary firm, it shall be signed
by the proprietor above his name and the name of his firm with his current
address .
I f the e-T ender is made by a firm in partnership, it s hall be signed by all the
partners of the firm above their full names and c urrent addres s, or by a pa rtner
holding the po wer of attorney fo r the firm, in which cas e a c ertified copy of the
powe r o f attor ney s hall ac company the E -TENDE R. A c ertified c opy of the
partners hip deed, current address es of all the partners of the firm s hall als o
acc ompany the e-T ender.
I f the e-Tender is made by a limited c ompany or a limited c orporation, it shall be
s igned by a duly authorized pers on holding the po wer of attorney , s hall acc ompany
the e-T ender. Suc h limited c ompany or c orporation may be required to fur nis h
s atis fac tory evidence of its existenc e before the contract is awar ded.
I f the E -TE NDE R is made by a group of firms, the spons oring firm s hall s ubmit
c omplete information pertaining to eac h firms in the group and s tate along with the
bid as to whic h of the firms shall have the respons ibility for e-Tendering and for
c ompletion of the contrac t doc uments and furnis h evidenc e admissible in law in
respect of the authority to s uc h firms on behalf o f the grou p of firms for eT endering and for c ompletion of c ontrac t documents. The full information and
s atis fac tory evidence pertaining to the participation of eac h member of the group of
firms in the e-T ender s hall be fu rnis hed along with the e-T ender.
A ll witness es and sureties s hall be persons of s tatus and probity and their full
names, occ upations and addres s es shall be s tared below their signatures . A ll the
s ignatures in the e-Tender doc ument shall be dated .

IT 14 WITHDRAWAL O F TENDERS
I f, during t he ten der validity period , the T enderer withdra ws his T ender, Tender
s ec urity (E arnest M oney) shall be forfeited and T enderer will be debarred for next
three years to quote in R.M .C .

13

IT 15 INTERP RETATIO NS OF E-TENDER DO CUMENTS


T enderers shall c arefully examine the E -TE NDE R Doc ument and fully inform
themselves as to all the c onditions and matters whic h may in any way affec t the
work or the c ost thereof. If a T enderer fin ds disc repanc ies , or omiss ion from the
s pecific ations or other documents or s hould be in doubt as to their meaning, he
s hould at onc e address quarry to the Addl. City E ngineer, R.M .C . T he res ult of
interpretation o f t he E -TE NDE R will be is sued to all Tenderers as addend um.
IT 16

ERRORS AND DISCREPANCIES IN E-TENDERS


I n c ase of c onflict between the fig ures and words in the rates the rate express ed in
words s hall prevail and apply in s uc h cas es .

IT 17

MODIFICATION OF DOCUMENTS
M odific ation of specific ations and extens ion of the c losing date of the e-T ender, if
required will be made by an addendum. E ac h addendum will be made available
online to all Tenderers . T hes e s hall form a part of e-T ender. T he Tenderer s hall not
add to or amend the text of any of the doc uments except in so far as may be
nec ess ary to c omply with any addendum .
ADDENDA
A ddenda form part of the Contrac t Doc uments , and full c ons ideration s hall be given
to all A ddenda in the preparation of e-T ender. Tenderers shall verify the number of
A ddenda is sued, if any and ac knowledge the receipt of all A ddenda in the E TENDER Failure to so acknowledge may cause the e-T ender to be rejected.
A . T he O wner may
issue
A ddenda
to advis e
T enderers
of
requirements. Suc h a ddenda may modify previous ly is sued A ddenda.

c hanged

B. No addendum may be is sued after the time stated in the notic e inviting eT enders .
IT 18.

TAX A ND DUTIES O N MATERIAL S


A ll c harge on ac count of exc is e duties, C entral / State, s ales tax, work c ontrac t tax
and other duties etc. on materials obtained for the works from a ny source shall be
borne by the c ontractors . No (P) or C or D form s hall be supplied.

IT 19

EVAL UATION O F E-TENDERS


While c omparing e-Tenders, the Rajkot M unic ipal C orporation s hall c onsider fac tors
like pric e offer is workable with the market price, efficienc y and reliability of
c ons truc tion method proposed, c ompliance with the s pec ific ations, relative quality,
work done in past with Rajkot M unicipal Corporation or other Government
O rganizations, litigation issues etc. E valuation criteria specific ally mentioned in the
s pecific ation will als o be taken into c ons ideration in the evaluation o f e-T enders .

IT 20 TIME REQ UIRED FO R COMPL ETION


T he completion period mentioned in this s c hedule is to be reckoned from t he date
of notic e to proceed. T otal c ompletion period is 3 months from the date of iss ue of
notic e to proceed and c ontrac tor should ad here to this completion time.
IT 21 POL ICY FOR TENDER UNDER CO NSIDERATIO N
TENDER s hall be termed to be under consideration from the opening of t he eT ender until suc h time any o fficial annou nc ement or a ward is made.
While e-Tenders are under c ons ideration, Tenderers and their rep res entative or
other interested parties are advised to refrain from c ontac ting by any means any
c orporations pers onnel or representatives on matters related to the e-Tenders
under s tudy . T he C orporations representatives if nec ess ary will obtain clarific ation
on e-Tenders by requesting s uc h information from any or all the T enderers , either
in writing or thr ough pers onal c ontac t, as may be nec ess ary. The T enderer will not

14

be permitted to c hange the s ubs tance of his e-T ender after e-T enders have been
opened. This inc ludes any pos t T ender pric e revis ion. Non-c ompliance with his
provision s hall make the T ender liable fo r rejec tion.
IT 22

PRICES A ND PAYMENTS
T he Tenderer mus t unders tand c learly that the pric es quoted are for the total works
or the part of the total works quoted for and inc lude all c osts due to materials ,
labour, equipment , supervis ion, other s ervices , royalties , taxes etc . and to inc lude
all extra to c over the c ost. No claim for additional payment beyond the pric es
quoted will be entertained a nd the Tenderer will not be entitled s ubs equently to
make any c laim on any ground.

IT 23

PAYMENT TERMS
T he terms of payment are defined in the General Conditions of C ontrac t and
T ec hnic al s pec ific ations. T he Corporation s hall not under any c irc ums tanc es relax
thes e terms of payment and will not consider any alternative payment terms .
T enderers s hould therefore in their o wn interes t note t his provision to avoid
rejec tion of their e-Tenders.

IT 24

AW ARD
A ward of the c ontrac t or the rejec tion or E -TENDE Rs will be made during the
T ender validity period. A s eparate Sc hedule-B (P rice Sc hedule) is given. The
c ontrac tors are reques ted to quote their price offer in % below or above on the
given price in the schedule-B only.

A.

After all c ontract c ontingenc ies are satisfied and the Notice of A ward is iss ued, the
s ucc ess ful T enderer s hall execute the C ontrac t A greement within the time s tated
and shall furnis h the Bo nd as required herein . T he contrac t A greement shall be
exec uted, in form s tipulated by the O wner.

B.

I f the Tenderer rec eiving the Notice of Award fails or refus es to exec ute the
C ontrac t A greement within the s tated time limit or fails or refuses to furnis h the
Bond as required herein . T he O wner may annul his awar d and dec lare the eT ender s ec urity forfeited and will take action as deemed fit.

C.

A c orporation, partnership firm or othe r c ons ortium ac ting as the T enderer and
receiving the awar d s hall furnis h evidence of its exis tence and evidence that the
offic er s igning the contrac t agreement and Bonds for the c orporation, partnership
firm or other c ons ortium acting as the T enderer is duly authorize d to do so.

IT 25 SIGNING OF CO NTRACT
T he s ucc es s ful Tenderer s hall be required to exec ute the c ontrac t agreement within
1 0 days of receipt of intimation to execute the contract, failing which the
C orporation will be entitled annul to the a ward a nd forfeit the Earnes t M oney
Deposit. T he pers on to sign the contrac t doc ument s hall be person as detailed in
A rtic le I T. 13 (s igning of e-Tender documents).
IT 26 DISQ UALIFICA TION
A e-Tender shall be disqualified and will not be taken for c ons ideration if,
(a) T he Tender Sec urity Deposit is not deposited in full and in the man ner as s pec ified
as per A rticle IT . 7 i.e. Earnes t M oney Deposit.
(b) T he e-T ender is in a language other than Englis h or does not contain its Englis h
T ranslation in c as e of other lang uage adopted for e-Tender prepa ration.
(c ) T he e-T ender doc uments are not signed by an authorized person (as per A rtic le IT .
1 3 i.e. s igning o f e-Tender doc uments).
(d) T he general performance data fo r qualification is not s ubmitted fully (as per A rtic le
IT 1 2 i.e. General performanc e Data).

15

(e) T enderer does not agree to payment terms defined as per Article IT . 23 i.e.
payment terms .
A.

A e-Tender may f urther be disqualif ied if ,


(a) P ric e variation is propos ed by the Tenderer on any princ iple other than thos e
provided in the E-T ENDER Documents.
(b) C ompletion sc hedule offered is not c ons istent with the completion s c hedule defined
and s pec ified in e-T ender doc ument.
(c ) T he validity of e-T ender is less than that mentioned in A rtic le IT . 1 1 i.e. e-T ender
validity period.
(d) A ny of the page or pa ges of e-Tender is /are removed o r re placed.
(e) A ny condition whic h e ffec t the cos t.

IT 27 PERFO RMANCE GUA RA NTEE (SECURITY DEPO SIT)


As a c ontract s ec urity the T enderer to whom the award is made shall furnish a
performanc e guarantee (Sec urity depos it) for the amou nt of 5% of the c ontrac t
pric e to guarantee the faithful performanc e, c ompletion and maintenanc e of the
works of the c ontrac t in acc ordanc e with all c onditions and terms s pecified herein
and to t he s atis fac tion of the Engineer-in-c harge and ens uring t he dis c harge of all
obligations aris ing from the exec ution of contrac t in the forms mentioned below:
A fixed depos it rec eipt of any Schedule Bank except C o-operative Bank or
Nationalized Bank duly endo rsed in favour of the Raj kot Municipal Corporation,
Rajkot.
T he performanc e guarantee s hall be delivered to the Corporation wit hin ten (10 )
days of the notic e of awar d and at leas t three (3 ) days before the c ontrac t
agreement is signed unless otherwis e specified by the E ngineer-in-charge.
A lternatively, the c ontrac tor may at his option depos it an amount of 2.5% of the
value of the c ontract pric e within ten days and the balanc e 2.5% to be recovered
in ins tallments through deduc tion @ the rate of 5% from the r unnin g ac c ount bills .
O n due performanc e and completion of the contrac t in all res pec ts, THE
PERFORMA NCE GUA RA NTEE WILL BE RETURNED TO THE CO NTRACTO R
WITHO UT ANY INTEREST A FTER THE DEFECT L IABILITY P ERIOD IS OVER.
IT 28 STA MP DUTY
T he suc cess ful Tenderer s hall have to enter into an agreement o n a non-ju dic ial
s tamp paper of Rs.100 /- as per the form of the agreement approved by the
C orporation. T he c os t of stamp paper and adhes ive stamp shall be born by the
c ontrac tor.
IT 29 BRA ND NA MES
Spec ific reference in the s pec ific ations to any material by manufac turers name, or
c atalogue s hall be constructed as es tablis hing a s tandard or quality and
performanc e an d not as limiting competition and the Tenderer in s uch cas es , may
at his option freely us e only ot her produc t, provided th at it ensures an equal o f
higher quality than the standard mentioned and meets Corporation approval.
IT 30 NON TRANSFERA BLE
E -TE NDE R doc uments are not trans ferable.
IT 31 COST OF e-TENDERING
T he owner will not de fray expens e incurred by T enderers in e-Tendering.
IT 32 EFFECT OF e-TENDER
T he e-T ender for the work s hall remain for a period of 1 2 0 c alendar days from the
date of opening of the e-Tenders for this work and that the Tenderer s hall not be
allowed to with dra w or modify the offer in his own during the period . I f any
T enderer withd ra ws or makes any modification or additions in the terms and

16

c onditions of his own e-T ender, then the Corporation s hall, without preju dic e to any
other right or remedy, be at liberty to reject the e-T ender and forfeit the earnes t
money in full.
IT 33 CHA NGE IN QUANTITY
T he Corporation reserves the right to waive any information in any e-T ender and to
rejec t one or all e-Tenders without as s igning any reasons for s uc h rejec tion and
also to vary the quantities of items or group as s pec ified in the scheduled of pric es
as may be nec ess ary.
IT 34 NEW EQ UIP MENT AND MATERIAL
A ll materials, equipment and s pare parts thereof shall be new, unus ed and
originally c oming from manufac turers plant to the Corporation. The rebuilt or
overhauled equipment/materials will not be allo wed to be us ed on works .
IT 35 RIGHTS RESERVED
T he owner res erves the right to reject any or all e-T enders , to waive any
informality or irregularity in any e-T ender without ass igning any reas on. T he owner
further res erves the right to withhold is suanc e of the notice to proc eed, even after
exec ution of the c ontrac t agreement. No payment will be made to the s ucc essful
T enderer on ac count of s uch withholdi ng. T he owner is not obliged to give reas ons
for a ny s uc h ac tion.
IT 36 A DDITIONA L RIGHTS RESERVED
T he Commiss ioner, Rajkot M unicipal C orporation, reserves right to reduc e the
scope of wo rk & s plit the e-Tender on two or more pa rts wit hout as s igning any
reas on even after t he a war ds of c ontrac t.
IT 37 MOBILIZATIO N A DVANCE
No mobilization advanc e or adva nce on mac hinery will be given.

IT 38 CONDITIO NAL e-TENDERS


T he scope of work is c learly mentioned in the e-Tender doc uments . The c ontractor
s hall have to c arry out the work in ac c ordanc e with the details s pecifications . No
c ondition will be ac cepted. The c onditional e-T ender will liable to be rejec ted.

IT 39 1% CESS & REGISTRATION:


For the welfare o f labour working u nder c ons truc tion I ndus try, the agency shall
have to take the registration with c ompetent authority as per Circ ular
No.C WA /20 04/841 /M -3 dated 30-01-2 006 of Government of Gujarat . Rajkot
M unicipal C orporation will deduc t 1% C ess of the value of work and will depos it the
s ame in Government.
IT 40 PRO FESSIONAL TAX
T he bidder s hall have to pay the Profess ional T ax for c urrent financ ial year impos ed
by Government of Gu jarat, a nd als o the bidder s hall have to produce Enrollment
C ertific ate for the s ame.

Signat ure of contractor.

17

D EC LARATION
I/W e hereby declared that I/We am/are not partner(s) blacklisted or connected with
firm blacklisted in any States, CPWD / MES / Railways or any Governm ent, SemiGovernment or Private bo dy.
At p resent I/W e am/are reg istered as app roved co ntracto r (s ), firm s in
State, CPW D / MES / Railway s.

____

We, the partners / o wner s of this firm , hereby give an un dertakin g that we ar e
jointly and sev erally r esponsible to m eet all the liabilities ever and above the business of this
firm and m ake goo d the abov e finan cial loss sustain ed by the Rajkot Municip al Corporation
as a result of our aban doning the work s entrusted to us.

Date:
Seal and Signature of the Bidder

18

APPLICABILITY O F PRO VIDEN T FUND AND MISC ELLANEO US


PRO VISIO NS AC T 1952
Successful bidder i.e. the agency who se tender is accepted by the RM C shall
have to comply the necessary form alities un der the em ployees provident fund an d
Miscellaneo us Provisions Act, 1952 as Contributory Provident Fun d Scheme is
applicable to labo urer s engaged in construction activity an d shall have to submit
proofs regardin g deduction of provident fun d and other dues an d depositing the same
with government dep artm ent under the act and the scheme regularly on monthly basis
failing which no runn ing / final bill p ayment will be m ade by the RM C to the contractor
in any circumstances.

A certificate to the above effect has to be given by the contractor as under.

Declaration
Of
Depositing Provident Fund contribution
This to certify that we hav e deducted the employees P.F. an d deposited the same
alon g with employers contribution to war ds provident f und on labo ur ch ar ges / wages
paid by us to the labo u rers en gag ed fo r t he w o rk of
with
Provident
Fu n d A uth o rit y un d er o ur Pro v ident Fun d Co d e N o.
We produce herewith the copies of the ch allans for the provident fun d
deduction and contribution deposited as m entioned above.

Date:

Seal and Signature of the Bidder

19
19

BIDDER S FIN ANCIAL CAPAC ITY


Sr.
No. Financial Year

2012-2013

2011-2012

2010-2011

2009-2010

2008-2009

Annual Turno ver


in En gineeri ng
Project Rs.

Net
w orth
Rs
.

Net Ca sh
Rs .

W orki ng
C a pital
Rs .

Note :1)
2)
3)
4)

Figures to be taken from audited balance sh eets. Du ly certified attested true cop y
Copies of the balance sheet to b e attached..
The bidder shall have to provide tha t fo r a period of at least 6 Month s the
bidder ha s ability to sustain negative ca sh balan ce and ho w he proposes to
m eet with the sam e.
Ca sh Plan / Cash flo w S tatement.

20
20

AVAILABLE BID CAPACITY


2008-09

2009-10

2010-11

2011-12

2012-13

Value of work s
executed in Rs.
Crores.
The available bid cap acity will be worked o ut as follo ws.
Available bid capacity = ( A x
N x 2) B, where
A = Max im um of updated total amount of work executed in any on e year of
the last five fin ancial years.
B = The am ount of the existin g commitm ents and ongoing works to be discharge
during tim e interval of N years from the bid due date.
N = Number of years prescribed for completion of the proposed works

21

M ETHO D S TATEMENT AND W O RK PLAN


The Bidder shall have to provide a br ief write up to be en clo sed with the Technical
Bids coverin g his approach and methodolo gy to han dle the project con struction
activities includin g h is details work plan. The brief shall in clude the follo win g aspects.
Sr. No.

C om po nents

1.

Methodolo gy

2.

Con struction equipment availability and plan


of deploym ent.

3.

PERT / Construction chart / Bar chart.

22

SECTION - 2
GENERAL CONDITIONS
OF CONTRACT

23
:: TABLE OF CO NTESTS ::
No.
GC-1
GC-2
GC-3
GC-4
GC-5
GC-6
GC-7
GC-8
GC-9
GC-10
GC-11
GC-12
GC-13
GC-14
GC-15
GC-16
GC-17
GC-18
GC-19
GC-20
GC-21
GC-22
GC-23
GC-24
GC-25
GC-26
GC-27
GC-28
GC-29
GC-30
GC-31
GC-32
GC-33
GC-34
GC-35
GC-36
GC-37
GC-38
GC-39
GC-40
GC-41
GC-42
GC-43
GC-44
GC-45
GC-46
GC-47
GC-48
GC-49
GC-50

Description
Definitions and I nterpretations
Location of s ite and ac c ess ibility
Scope of work
Ruling language
I nterpretation of C ontract Doc ument
C ontrac tor to understand hims elf fully
E rrors in submissions
Suffic iency of E -TE NDE R
Disc repanc ies
P erformanc e Guarantee (Sec urity Depos it)
I nspection of work
Defec t Liability
P ower o f Engineer-I n-C harge to give furthe r ins truc tions.
P rogramme
Sub-letting of work
Sub-Contrac ts for temporary works, etc .
T ime for completion
E xtension of time
C ontrac t Agreement
Liquidated damages
Forfeiture o f Sec urity Deposit
Action of Forfeiture of Sec urity Depos it
No c ompens ation for alteration in or res tric tion in work
I n the event of death of c ontractor
M embers of the owner not individually liable
O wner not bound by pers onal repres entations
C ontrac tor's office at s ite
C ontrac tor's subordinate s taff an d their c onduc t
T ermination of s ub-contrac t by o wner
P ower o f ent ry
C ontrac tor's res ponsibility with the other Contractor and
A gencies .
O ther A genc ies at s ite
Notic es
Rights of various interests
P ric e adjus tments
T erms of Payment
Retention M oney
P ayments due fr om the Contractor
C ontingent Fee
Breac h of C ontract by C ontrac tor
Default of C ontrac tor
Bankruptcy
O wners hip
Dec laration agains t waiver
Laws governing the contract
O ver payment and under payment
Settlement of disputes
Disputes of differences to be refe rred to
A rbitration
T ermination of the Contrac t

24

GC-51
GC-52
GC-53
GC-54
GC-55
GC-56
GC-57
GC-58
GC-59
GC-60
GC-61
GC-62
GC-63
GC-64
GC-65
GC-66
GC-67
GC-68
GC-69
GC-70
GC-71
GC-72
GC-73
GC-74
GC-75
GC-76
GC-77
GC-78
GC-79
GC-80
GC-81
GC-82
GC-83
GC-84
GC-85
GC-86
GC-87
GC-88
GC-89
GC-90
GC-91
GC-92
GC-93
GC-94
GC-95

Spec ial risks


C hange in C ons titution
Sub-c ontrac tual relations
P atents and Royalties
Lien
E xec ution of work
Work in monsoon
Work on Sundays and Holidays
General Conditions for construction work
Drawings to be s upplied by t he O wner
Drawings to be s upplied by t he C ontrac tor
Setting out work
Res pons ibilities of C ontrac tor for c orrec tness of work
M aterials to be s upplied by the O wner
C onditions of iss ue of materials by the O wner
M aterials procured with as sis tanc e of the O wner
M aterials obtained from dis mantling
A rtic le of value of treas ure fou nd during c ons truction
Disc repanc ies between ins truc tions
A lternations in s pec ific ations and des igns and extra work.
Action when no specific ations are iss ued
A bnormal rates
Assis tanc e to E ngineer-In-Charge
T ests for quality of work
Action and c ompens ation in c ase of bad workmans hip
Sus pens ion work
O wner may do part of the work
P ossess ion prior to completion
C ompletion Certific ate
Schedule of Rates
P roc edure for meas urement o f wo rk in progres s
Running ac c ount payments to be regarde d as advances
Notic e for c laim for additional payment
P ayment of Contrac tor's Bill
Final Bill
Rec eipt for payment
C ompletion Certific ate
T axes , Duties, etc .
I nsuranc e
Damage to P roperty
C ontrac tor to I ndemnify O wner
I mplementation of Apprentic e Ac t 1954
Health and Sanitary arrangements for workers
Safety C ode
Accidents

25
GC-01
1 .0

DEFINITIO NS AND INTERP RETA TIO NS :


I n the c ontract (as hereinafter define d) the follo wing wor ds and
expres sions shall, unless repugnant to the s ubjec t or c ontext thereof, have
the follo wing means as s igned to them.

1 .1

T he "O wner / Corporation" s hall mean Rajkot M unic ipal Corporation and
s hall inc lude its M unic ipal C ommiss ioner or other O ffic ers authorized by
the C orporation and also inc lude owner's s ucc essors and ass ignees.

1 .2

T he "C ontractor" s hall mean the person or the pers ons, firm or Company
whos e e-T ender has been acc epted by the O wner and inc ludes the
C ontrac tors legal representative, his suc cessors and permitted as signed.

1 .3
1 .4

DELETED
T he "E ngineer-I n-Charge" s hall mean the person designated as s uch by
the owner from time to time an d s hall inc lude thos e who are expres sly
authorized by the Corporation to ac t for a nd on its behalf for all functions
pertaining to the operation of this c ontract.

1 .5

E ngineer-I n-C harge's Repres entative s hall mean any resident E ngineer or
Ass is tant to the E ngineer-I n-Charge appointed from time to time by the
owner to per form duties s et forth in the E -TE NDE R Doc ument whose
authority s hall be notified in writing to the Contrac tor by the Engineer-I nC harge.

1 .6

"E-TENDER" the offer or propos al of the Tenderer s ubmitted in the


pres cribed form s etting for the pric es for the work to be pe rformed, and
the details thereof.

1 .7

"Contrac t P ric e" s hall mean total money payable to the Contrac tor under
the c ontrac t.

1 .8

"Addenda" shall mean the written or graphic notices iss ued prior to
s ubmis sion of e-T ender whic h modify o r interpret t he c ontrac t documents.

1 .9

"Contrac t T ime" the time s pecified for the completion o f wo rk.

1 .1 0

"Contrac t" s hall mean agreement between t he parties for the exec ution of
works including therein all contract doc uments .

1 .1 1

"Contrac t Doc ument" s hall mean c ollectively the e-Tender documents ,


des igns , drawi ngs , specifications , agreed variations , if any and s uc h other
doc uments constituting the e-Tender and ac ceptance thereof.

1 .1 2

"The Sub-C ontrac tor" shall mean any pers on, firm or c ompany (other than
the Contrac tor) to whom any part of the work has been ent rus ted by the
C ontrac tor with the written consent of the E ngineer-I n-Charge and the
legal repres entative s ucc es s ors and permitted assignee of suc h pers on,
firm or c ompany.

1 .1 3

T he "Spec ific ations" shall mean all directions , the various Tec hnical
Spec ific ations , provisions and requirements attac hed to the c ontrac t which
pertains to the method and manner of per forming the work, to the
quantities and qualities of the wo rk and the materials to be fu rnis hed
under t he c ontrac t for the work and a ny orde r(s ) or ins truc tion(s ) there
under. I t s hall als o mean the lates t Indian Standard I ns titute Spec ification
relative to the partic ular work or part thereo f, so far as they are n ot

26
c ontrary to the E -TE NDE R spec ific ations and in absence of any other
C ountry applied in Indian as a matter of standard engineering practice and
approved in writing by the E ngineer-In-Charge with or witho ut
modific ation.
1 .1 4

T he "Drawings " s hall inc lude maps , plans , tracings, or prints thereof with
any modific ation approved in writing by the Engineer-I n-C harge and as
s uc h other dra wings as may, from time to time, be furnis hed or approved
in writing by the E ngineer-In-Charge in c onnec tion with the work .

1 .1 5

T he "Work" s hall mean the works to be exec uted in acc ordanc e with the
c ontrac t or the part thereof as the cas e may be and s hall inc lude extra,
additional, altered or s ubs tituted wo rks as required for the purpose of the
c ontrac t.
It shall mean the totality of the work by expres s ion or
implication envis aged in the c ontrac t and s hall include all materials ,
equipment and labour require d for or relative or inc idental to or in
c onnec tion with the c ommencement, performanc e and c ompletion of any
work an d / or incorporation in the wo rk.

1 .1 6

T he "Permanent Work" s hall mean works whic h will be inc orporated in and
form part of the work to be handed over to the owner by the Contrac tor on
c ompletion of the c ontrac t.

1 .1 7

T he "T emporary Work" s hall mean all temporary works of every kind
required in or about the execution, c ompletion and maintenance of the
work.

1 .1 8

"Site" s hall mean the land and other places , on, under, in o r through
whic h the permanent works are to be c arried out and any other lands or
plac es provided by the Corporation for the purp ose of the c ontrac t
together with any othe r plac es des ignated in the c ontrac t as forming part
of the s ite.

1 .1 9

T he "C ons truc tion Equipment" s hall mean all appliances / equipment of
whatever nature required in or for exec ution, completion or maintenance
of works or temporary works (as herein be fore defined) but does not
include materials or other things intended to form or forming part of the
permanent work.

1 .2 0

"Notice in writing or written Notice" shall mean a notice written , typed or


in printed form delivered pers onally or s ent by Regis tered P ost to the last
known private or bus ines s address or Registered O ffice of the Contrac tor
and shall be deemed to have been rec eived in the ordinary c ourse of post
it wo uld have been delivered .

1 .2 1

T he "Alteration / variation order" s hall mean an order given in writing by


the E ngineer-I n-C harge to effec t additions or deletions from or alterations
in the work.

1 .2 2

"Final T es t Certific ate" s hall mean the final test c ertific ate iss ued by the
owner within the provisions of t he c ontract.

1 .2 3

T he "Completion C ertific ate" shall mean the c ertific ate to be iss ued by the
E ngineer-I n-C harge when the work has been c ompleted and tes ted to his
s atis fac tion.

27
1 .2 4

T he "Final Certific ate" s hall mean the final c ertificate issued by the
E ngineer-I n-C harge after the pe riod of defec ts liability is over and the
work is finally acc epted by the o wner .

1 .2 5

"Defec ts Liability P eriod" s hall mean the specified period between the iss ue
of C ompletion Certific ate and the is s ue of final certific ate during which the
C ontrac tor is responsible for rec tifying all defects that may appear in the
works.

1 .2 6

"Approved" s hall mean approved in writing including s ubs equent


c onfirmation in writing of previous verbal approval and "Approval" means
approved in writing inc luding as a foresaid.

1 .2 7

"Letter of A cc eptanc e" s hall mean an intimation by a letter to Tenderer


that his e-Tender has been acc epted in acc ordanc e with the provis ions
c ontained therein.

1 .2 8

"O rder" and "I ns truc tions " s hall res pec tively mean any written order or
instruc tion given by the E ngineer-I n-Charge within the s c ope of his powers
in terms of t he contrac t.

1 .2 9

"Running Ac count Bill" s hall mean a bill for the payment of "O n Account"
money to the C ontrac tor during the pro gres s of work on the bas is of wo rk
done and t he s upply of non-peris hable materials to be incorporated in the
work.

1 .3 0

"Sec urity Deposit" s hall mean the depos it to be held by the owner as
s ec urity for the due pe rfo rmanc e of t he c ontrac tual obligations.

1 .3 1

T he "A ppointing A uthority" for the purpose of Arbitration shall be the


M unicipal C ommiss ioner, Rajkot M unicipal C orporation.

1 .3 2 .

"Retention M oney" s hall mean the money retained from R.A .Bills for the
due c ompletion of the "LE T WORS".

1 .3 3

U nless otherwis e s pec ific ally s tated, the masc uline gender s hall include the
feminine and neuter gen ders and vic e-vers a and the s ingular s hall inc lude
the plural and vic e-versa.

GC-02

LOCATION OF SITE AND A CCESSIBILITY :


T he work is to be c arried out in CITY A REA . Non-availability of acc ess
roads s hall in no c as e be the c aus e to condone delay in the exec ution of
the work and no c laim or extra c ompens ation will be paid .

GC-03

SCOPE OF WORK :
T he sc ope of work is defined broadly in the s pecial c onditions of c ontract
and specific ations . T he C ontrac tor shall provide all nec ess ary materials ,
equipment and labour etc . for the exec ution and maintenanc e of the work.
A ll material that go with the wo rk s hall be approved by the E ngineer-I nC harge prior to procurement and us e.
Pow er Supply :
T he Contrac tor shall make his own arra ngement for po wer s upply during
installation.

28
Land f or Cont ract or's Field Of f ice, Godown Etc.:
O wner will not be in a position to provide land required for C ontractor's
field office, godo wn, etc . T he Contractor s hall have to make his own
arrangement for the s ame.
GC-04

RUL ING LA NGUA GE :


T he language acc ording to which the c ontract shall be c ons trued and
interpreted shall be E nglish. A ll entries in the c ontract doc ument and all
c orrespondenc e between the c ontrac tor and the Corporation or the
E ngineer-I n-C harge s hall be in Englis h/Gujarati. A ll dimensions for the
materials s hall be given in metric units only.

GC-05
1.

INTERP RETATIO N O F CONTRA CT DO CUMENT :


T he provision of the General Conditions of Contrac t and Spec ial Conditions
of C ontrac t shall prevail over those of any other documents of the c ontract
unles s specific ally provided othe r wis e, should have there be a ny
disc repanc y, inconsis tenc y, error o r omis s ion in the s everal doc uments
forming the c ontrac t, the matter may be referred to the E ngineer-I nC harge for his instruc tions and dec ision.
T he E ngineer-I n-C harge's
dec is ion in s uc h c ase s hall be final a nd binding to the C ontrac tor.

2.

Works s hown upon the dra win gs but not des cribed in the s pec ific ations or
des c ribed in the s pec ifications without s howing on the dra wi ngs s hall be
taken as desc ribed in the s pec ific ations and sho wn on the dra wings.

3.

T he headings and the marginal notes to the claus e of thes e General


C onditions of C ontrac t or to the s pecifications or to any other part of eT ender doc uments are s olely for the purpos e of giving a c onc is e indication
and not a s ummary of c ontents thereof. T hey s hall never be deemed to
be part thereo f or be us ed in the interpretation or construc tion of the
c ontrac t.

4.

U nless otherwise states s pecifically, in this c ontrac t documents the


s ingular shall inc lude the plural and vice-vers a wherever the c ontext so
requires . Works imparting pers ons s hall inc lude relevant C orporations /
Body of individual / firm o f pa rtners hip.

5.

Notwiths tanding the s ub-division of the documents into separate s ec tion


and volumes every part of eac h shall be supplementary to and
c omplementary of every other part an d s hall be rea d with and into the
c ontext so far as it may be prac ticable to do so.

6.

Where any portion of the General C onditions of Contract is repugnant to or


at variance with any provisions of the Spec ial C onditions of C ontrac t, then,
unles s a different inte ntion appears , the provis ions of the s pec ial
c onditions of c ontrac t s hall be deemed to over ride the provisions of
General C onditions of C ontrac t to the extent of eac h repugnancy of
varianc e.

7.

T he materials , des ign, and workmans hip s hall s atis fy the relevant I SS, and
c odes referred to.
I f additional requirements are s hown in the
s pecific ations, the same s hall be s atis fied over and above I SS and other
c odes.

8.

I f the s pecifications mention that the C ontractor s hall perform c ertain work
or provide c ertain fac ilities , it shall mean that the Contractor shall do s o at
his own cos t.

29

9.

Cont ractor to Collect His Own Inf ormation T he details given in the e-T ender are arranged making nec ess ary
inves tigations for framing an es timate. However , when t he work is being
exec uted, c hanges in s oil conditions are likely to be met with in view of the
formation of s oil, s trata in Rajkot District. I t is, therefore, des irable that
the Contrac tor makes his own inves tigations or additional inves tigations as
may be required fo r c orrectly as s ess ing the c os t of different items of wo rk
and submit his e-T ender acc ordingly. Any c hange in desc ription or
quantity of an item s hall not vitiate the contract or releas e the Contrac tor
from exec uting the work c ompris ed in the contrac t acc ording to the
dra wings and s pec ific ations at the e-Tendered rates .
He is deemed to have kno w the sc ope, nature and magnitude o f the wo rk
and the requirements of materials and labour involved and as to whatever
work he has to complete in acc ordanc e with the c ontrac t. T he Contrac tor
is expec ted to vis it the s ite and surroundings to s atis fy himself as to the
nature o f all existing s tructures , if any, and als o as to the nature a nd the
c onditions of railways , roads , bridges and c ulverts , means of transport and
c ommunic ations whether by land , air or water and as to poss ible
interruptions thereto and t he acc ess and gross from the site, to have
examined and s atisfied hims elf as to the s ites for obtaining sand, s tones ,
bric ks and other materials, the site for dis pos al of s urplus materials, the
available accommodation and make s uch enquiries as may be nec ess ary
for exec uting and completing the work , to have loc al enquiries as to the
s ub-soil, s ubs oil water and variation thereof, s torms, prevailing winds,
c limatic conditions and all other s imilar matters , effec ting work. He is
expected to be familiar with his liability for payment of Government taxes ,
c us toms and exc ise duty and other c harges etc. in c ontrac t with the
exec ution of this c ontrac t.

GC-06

CONTRACTOR TO UNDERSTAND HIMSEL F FULL Y :


T he Contrac tor by e-T endering s hall be deemed to have satisfied hims elf,
as to all considerations and c irc ums tanc es affecting the e-Tender price, as
to the pos s ibility of exec uting the works as s hown and des cribed in the
c ontrac t and to have fixed his pric es ac cording to his own view on these
matters and to have unders tood that no a dditional allowanc es exc ept as
other wis e express ly provided, will after wards be made beyond the c ontract
pric e. The Contractor s hall be res ponsible for any mis unders tanding or
incorrec t information, ho wever, o btained.

GC-07

ERRORS IN SUBMISSIO NS :
T he Contractor s hall be res ponsible for any errors or omiss ions in the
particulars s upplied by him, whet her s uch particulars have been approved
by the E nginee r-I n-Charge or not.

GC-08

SUFFICIENCY OF e-TENDER :
T he Contractor s hall be deemed to have s atis fied hims elf before eT endering as to the c orrectness of the e-T ender rates whic h rates s hall,
exc ept as otherwis e provides for, c over all the C ontrac tor's liabilities and
obligations set forth or implied in the c ontrac t for the pro per exec ution of
the work fo r c omplianc e with requirements of A rtic le GC-19 thereof.

GC-09

DISCREPA NCIES :
T he drawin gs and s pec ific ations are to be c ons idered as mutually
explanatory of eac h other , detailed dra win gs being follo wed in pre ference
to s mall-sc ale drawings and figured dimens ions in preferenc e to sc ale and

30
s pecial conditions in preferenc e to General C onditions.
T he s pec ial
direc tions or dimens ions given in the specifications s hall superc ede all
else.
Should
any disc repancies however , appear o r s hould a ny
mis unders tanding arise as to the meaning and intent of the s aid
s pecific ations or drawings , or as to the dimensions or the quality of the
materials or the due and proper exec ution of the works, or as to the
measurement or quality and valuation of the work executed under this
c ontrac t or as extra there upon, the same shall be explained by the
E ngineer-I n-C harge and his explanation shall be s ubjec t to the final
dec is ion of the M unic ipal Corporation in c ase referenc e be made to it, be
binding upo n the Contrac tor and the Contrac tor shall exec ute the work
acc ording to s uch explanation and without addition o r to deduc tion from
the c ontrac t price and shall also do all s uch works and things nec ess ary for
the proper completion of the works as implied by the dra wings and
s pecific ations, even though s uch wo rks and things are not s pec ially shown
and des cribed in the said s pec ific ations. I n cas es where no partic ular
s pecific ations are given for a ny artic le to be us ed un der t he contrac t, the
relevant specifications of the I ndian Sta ndard I nstitution s hall apply.
GC-10
1.

PERFO RMA NCE GUA RA NTEE (SECURITY DEPO SIT) :


A s um of 5 % of the acc epted value of the e-T ender s hall be depos ited by
the T enderer (hereinafter called the contrac tor when e-T ender is ac c epted)
as s ecurity depos it with the owner for the faith ful per formanc e, c ompletion
and maintenanc e of t he works in ac cordanc e with the contract doc uments
and to the s atis fac tion of the E ngineer-I n-Charge and as s uring the
payment of all obligations arising from the execution of the c ontrac t. T his
s hall be depos ited in one of the forms mentioned belo w :
a.

By a Demand Draft on the Rajkot Branch of a ny Sc heduled Bank exc ept


c o-operative bank.

b.

A Fixed Depos it Receipt of a Sc hedule Bank duly endorsed in favour of the


"RAJKO T MUNICIPAL CORP ORATION", Rajkot.
I rrevoc able and unc onditional Bank Guarantee of E quivalent amount of
any Sc hedule Bank exc ept Co-operative Bank.

c.

d.

2.

T he Contractor may pay 2.5% of the value of works as initial s ecurity


deposit and the balance 2.5% s hall be rec overed in installments through
deductions at the rate of 10 (ten) perc ent of the value of eac h Running
Acc ount Bill till the total s ec urity exec ution exc eeds the acc epted value of
e-T ender because of allotment of furthe r work , furthe r recoveries towards
s ec urity depos it s hall be effected at 10% of the R A Bills to make up the
five perc ent sec urity depos it of the revis ed value of c ontract.
A lternatively, the C ontrac tor may at his option deposit the full amount of 5
perc ent of sec urity deposit within ten days of rec eipt by him of the
notification ac c epting the e-T ender in the form as aforesaid.
I f the C ontrac tor, s ub-contrac tor or their employees s hall break, defac e or
des troy any property belonging to the owner or other agenc y during the
exec ution of the c ontrac t, the s ame shall be made good by the c ontrac tor
at his own expens e and in default thereof, t he E ngineer-I n-C harge may
c aus e the s ame to be made good by other agenc ies and rec over expense
from the C ontrac tor (for which the certific ate of the Engineer-I n-Charge
s hall be final). These expens e c an be rec overed from the s ecurity deposit
if rec overy from ot her sourc es is not poss ible. T he amount as reduced in
s ec urity depos it will be made go od by deduction from the next R A Bill of
the C ontrac tor.

31

GC-11
1.

INSPECTIO N OF WORK :
T he Engineer-I n-C harge s hall have full power and authority to inspect the
work at any time wherever in progress either on the s ite or at the
C ontrac tor's or any other manufac turer's workshop or factories wherever
s ituated and the Contractor s hall afford to E ngineer-I n-Charge every
facility and as sis tanc e to c arry out s uc h ins pec tion, C ontrac tor or his
authorized repres entative shall, at all time during the us ual working hours
and all times when s o notified, remain pres ent to rec eive orders and
instruc tions .
O rders given to C ontrac tor's repres entative s hall be c onsidered to have
the same forc e as if they had been given to the C ontractor hims elf.
C ontrac tor shall give not less than ten (10 ) days notice in writing to the
E ngineer-I n-C harge before c overing up or otherwis e plac ing beyond reach
of inspection and measurement any work in order that the same may be
inspected and measured. I n the event of breach of the above, the s ame
s hall be unc overed at Contractor's expens es for c arrying out s uch
inspection or meas urement.

2.

T he material s hall be dis patc hed from Contrac tor's s tore on site of wo rk
before obtaining approval in writing of the E ngineer-I n-C harge. Contrac tor
s hall provide at all times during the progres s of work and maintenance
period of proper means of access with ladders , gangways , etc. and make
nec ess ary arrangement as direc ted for ins pec tion or meas urement of wo rk
by E ngineer-I n-Charge.

GC-12
1.

DEFECT LIABILITY :
C ontrac tor shall guarantee the work for a period of 06 months from the
date of iss ue of C ompletion Certific ate. A ny damage or defec t that may
aris e or that may remain undis c overed at the time of is s ue of C ompletion
C ertific ate c onnec ted in any way with the e quipment or materials s upplied
by him or in the workmanship s hall be rec tified or replac ed by C ontrac tor
at his own expense as desired by Engineer-I n-C harge or in default
E ngineer-I n-C harge may c ause the s ame to be made good by other
agency and de duc t expens es of whic h the certific ate of Engineer-I nC harge shall be final from any s ums that may then or any time thereafter
bec ome due to Contractor or from his s ec urity depos it or the proc eeds of
s ale thereof or of a su ffic ient portion thereo f.

2.

From the c ommencement to completion of work C ontrac tor shall take full
res pons ibility for the c are of the work including all temporary works and in
c as e any damages , oc cur from any cause whatsoever he s hall at his own
c os t, repair and make good the s ame s o that on c ompletion, wo rk s hall be
in good order and in c onformity, in every respect, with the requirements of
c ontrac t and as per t he ins tructions of the E ngineer-I n-Charge.

3.

I f at any time before the work is taken over , the E ngineer-In-Charge a)

Dec ide that any wo rk done or materials us ed by the C ontrac tor are
defec tive or not in acc ordance with the contrac t or that work or any
portion thereo f is defective or do not ful fill the requirements of c ontract
(all s uc h materials being herein after c alled defec ts in this claus e) he s hall,
as s oon as reasonably prac ticably, give notic e to Contractor in writing of
the s aid defec t specifying partic ulars of the s ame then C ontrac tor s hall at
his own expens e an d with all speed make good the de fec ts s o specified.

32
b)

GC-13

I n c as e Contractor fails to do s o, owner may take, at the c ost of the


C ontrac tor, suc h stops as may in all circ umstances be res ponsible to make
good s uch defec ts.
T he expenditure s o incurred by o wne r will be
rec overed from the amount due to Contrac tor. T he dec is ion of EngineerI n-C harge with re gard to t he amount to be rec overed from C ontrac tor will
be final and binding on the C ontrac tor.
POW ER
OF
ENGINEER-IN-CHA RGE
TO
GIVE
FURTHER
INSTRUCTIONS :
T he Engineer-I n-C harge s hall have the power and autho rity from time to
time and at all times to give furthe r instruc tions and direc tions as may
appear to him nec ess ary or proper for the guidanc e of t he C ontrac tor and
the wo rks and efficient exec ution of the works according to the terms of
the s pec ific ations , and the C ontrac tor s hall rec eive, exec ute, obey a nd be
bound by the s ame, acc ording to the tr ue intent and meaning thereof, as
fully and effec tively as though the same had acc ompanied or had been
mentioned or referred to in the s pec ifications . No work whic h radic ally
c hanges the original nature of the c ontrac t s hall be ordered by the
E ngineer-I n-C harge and in the event of any deviation being ordered, which
in the opinion of the C ontrac tor changes the original nature of the
c ontrac t, he s hall nevertheless c arry it out and any dis agreement as to the
nature o f t he work an d the rate to be paid to thereof s hall be res olved.
T he time of completion of works shall, in the event of any deviations being
ordered res ulting in additional c ost or reduction in c ost over the c ontract
s um, be extended or reduced reasonably by the E ngineer-I n-Charge. T he
E ngineer-I n-C harge's dec ision in the cas e s hall be final and binding.

GC-14

PRO GRAMME :
T he time allowed for exec ution of works s hall be the es sence of the
c ontrac t. T he contrac t period s hall commenc e from the date of notic e of
intimation to proc eed. T he Tenderer at the time of s ubmitting his eT ender shall indic ate in the c ons truc tion s c hedule his programme of
exec ution of work c ommenc ement with the total time s pec ified. T he
C ontrac tor shall provide the Engineer-I n-C harge a detailed programme of
time sc hedule for exec ution of t he works in ac cordance with the
s pecific ations and the c ompletion date. The entire programme to be
finalized by the Contrac tor, has to c onform to the execution period
mentioned along with the Bill of Q uantities in the e-T ender documents .
T he Engineer-I n-C harge upon s c rutiny of s uc h s ubmitted prog ramme by
C ontrac tor, shall examine s uitability of it to the requirement of c ontract
and s ugges t modifications , if foun d nec ess ary.

GC-15

SUB-LETTING OF WORK :
No part of the c ontract nor any s hare o f interest thereon s hall in any
manner or degree be trans ferred, as signed or s ublet by the Contrac tor
direc tly or indirec tly to any pers on, firm or Corporation whos oever exc ept
as provided for in the s uc c eeding s ub-c laus e, without the c ons ent in
writing o f the o wne r.

GC-16

SUB-CO NTRA CTS FO R TEMPO RARY WO RKS ETC. :


T he owner may give written consent to s ub-c ontrac tors for exec ution of
any part of the works at the site, being entered upon the contrac tor
provided each individual contrac t is submitted to the E ngineer-I n-Charge
before bein g entered into and is approved by him. List of s ub-c ontrac tors
to be s upplied .

33

Not-withstanding any s ubletting with suc h approval as aforesaid and


not withs tanding the E ngineer-I n-Charge s hall have rec eived of any s ubc ontrac tors , the C ontrac tor s hall be and shall remain s olely respons ible for
the quality and proper and expeditious exec ution of the works and the
performanc e of all the c onditions of c ontrac t in all res pec ts as if s uch
s ubletting or s ubc ontrac ting had not taken plac e and as if s uch works had
been do ne direc tly by t he Contrac tor.
GC-17
1.

TIME FOR CO MPL ETION :


T he work c overed under this contract s hall be commenc ed from the date
the Contrac tor is s erved with a notic e to proc eed with the work and s hall
be c ompleted before the date as mentioned in the time s chedule of work.
T he time is the essence of the c ontrac t and unless the s ame is extended
as mentioned in C lause GC-18 "Extens ion of Time", the C ontractor s hall
pay liquidated damages for the delay.

2.

T he general time sc hedule for c ons truc tion is given in the e-Tender
doc ument.
C ontrac tor shall prepare a detailed weekly or monthly
c ons truc tion programme in c ons ultation with the E ngineer-I n-C harge s oon
after the agreement and the work s hall be s tric tly exec uted ac cordingly.
T he time for c ons truc tion inc ludes , the time required for testing,
rec tific ations, if any, retes ting and c ompletion of the work in all res pec ts to
the entire s atis fac tion of the Engineer-I n-C harge exc ept the items which
are not c oming in the way to commission the project.

GC-18

GC-19

GC-20

EXTENSIO N O F TIME :
T ime s hall be c ons idered as the es s enc e of the c ontract. If, ho wever, the
failure of the C ontrac tor to c omplete the work as per the stipulated dates
referred to a bove arises from delays on the part of C orporation in
s upplying the materials or equipment, it has undertaken to supply under
the c ontrac t or from delays on the qua ntity of work to be do ne un der the
c ontrac t, or force majeure an appropriate extens ion of time will be given
by the C orporation. T he Contrac tor shall request for s uc h extens ion within
one month of the c aus e of s uch delay and in any c as e before expiry of the
c ontrac t period.
CONTRACT AGREEMENT :
T he s uccessful T enderer s hall enter into and exec ute the c ontract
agreement within 1 0 (ten) days of the notic e of a war d, in t he fo rm shown
in e-Tender doc uments with s uc h modifications as may be necess ary in the
opinion of the C orporation. I t s hall be incumbent on the Contractor to pay
the s tamp duty and the legal c harges for the preparation of the c ontrac t
agreement.
LIQ UIDATED DA MA GES :
I f the C ontrac tor fails to c omplete the work or des ignated part thereof
within t he s tipulated c ompletion date for the work or for the pa rt, he s hall
pay liquidated damages at 0 .1 (zero point one) perc ent of c ontrac t value
for per day of delay s ubject to maximum of 1 0 % of the contrac t value or
as decided by M unicipal C ommiss ioner.
T he Contractor s hall complete one-s ixth quantum of wo rk within one
fourth period, fou r-tenth quant um of work within one-half period and
eight-tenth quant um of work withi n three-fourth period, failing whic h, the

34
C ontrac tor shall be liable to pay liquidated damages an amount as
s pecified above, or as dec ided by M unic ipal Commiss ioner.
T he amount of liquidated damages s hall, however, be s ubjec ted to a
maximum of 1 0 percent of the c ontract value.
GC-21

FORFEITURE OF SECUEITY DEPO SIT :


Whenever any claim agains t the C ontractor for the payment of a s um of
money out of or under the c ontrac t arises , the C orporation s hall be
entitled to rec over s uc h s um by approp riating in part o r whole, the
s ec urity depos it of the Contractor.
In cas e the s ec urity depos it is
insuffic ient, the balanc e recoverable shall be deducted from any sum then
due or whic h at any time thereafter may bec ome due to the C ontractor.
T he Contrac tor shall pay to the owner on demand any balance remaining
due.

GC-22

ACTION O F FO RFEITURE O F SECURITY DEPOSIT :


I n any cas e in whic h under any C laus e or C laus es of the contrac t, the
C ontrac tor shall c ommitted a breac h of any o f the terms contained in this
c ontrac t, the owner s hall have power to adopt any of the follo wing c ours es
as he may deem best s uited to his interest.
a)

T o res cind the c ontrac t (of whic h recession notic e in writing to the
c ontrac tor under the hand o f the o wner s hall be conclusive evidence) in
whic h c ase the sec urity deposit of the C ontrac tor shall s tand forfeited and
be absolutely at the disposal of the o wner.

b)

T o employ labour and to supply materials to carry out the balanc e work
debiting C ontractor with the c ost of labour employed and the c os t of
materials s upplied for which a c ertific ate of the E ngineer-I n-C harge s hall
be final and c onc lusive against the C ontrac tor and 10% of c osts on above
to c over all departmental charges and c rediting him with the value of wo rk
done at the s ame rates as if it has been carried out by the Contrac tor
under the terms of his c ontrac t. T he c ertificate of E ngineer-In-Charge as
to the value of the work done shall be final and c onc lusive against the
C ontrac tor.

c)

T o meas ure up the work of the c ontrac tor and to take suc h part thereof as
s hall be unexecuted out of his hand and give it to another Contrac tor to
c omplete, the same. in this c ase the exc ess expenditure inc urred than
what would have bee n paid to the original C ontractor, if the whole wo rk
had been exec uted by him, s hall be bo rne a nd paid by the o riginal
C ontrac tor and s hall be deduc ted from any money due to him by the
owner unde r the c ontrac t or otherwis e and for the exc ess expenditure, the
c ertific ate of the E ngineer-In-Charge shall be final and conclusive.
I n the event any of the above c ourses being adopted by the o wne r, the
C ontrac tor s hall have no c laims for c ompensation for any loss s us tained by
him by reason of his having purc has ed or proc ured any materials or
entered into any agreements or made any advanc e on acc ount of or with a
view to the execution of the work or the per formance o f the c ontrac t.
I n purc has e the C ontrac tor s hall not be entitled to rec over or be paid a ny
s um for any work actually performed unde r this contrac t unles s the
E ngineer-I n-C harge will c ertify in writing the per formance of s uc h work
and the value payable in res pec t thereof and he s hall only be entitled to be
paid the value s o c ertified.

35

I n the event of the owner putting in forc e the powers as stated in a, b, c,


above ves ted in him under the proc eeding c laus e, he may, if he s o desires ,
take pos session of all or any tools and plant, materials and s tores in or
upon the works or the s ite thereof belonging to the C ontrac tor, or
proc ured by him and inte nded to be us ed for the exec ution of t he work or
any part thereof paying or allowing for the s ame in ac count at the c ontract
rates to be certified by the E ngineer-I n-C harge. The E ngineer-I n-Charge
may give notic e in writing to the Contractor or his repres entative requiring
him to remove s uch tools, plant , materials or s tores from the premis es
within the time s pec ified in the notice and in the event of the Contrac tor
failing to c omply with any s uch notice, the E ngineer-I n-Charge may
remove them at the Contractor's expens es or s ell them by auc tion or
private sale on ac count of the Contractor and his ris ks in all respects
witho ut any furt her notic e as to the date, time or plac e of the s ale and the
c ertific ate of E ngineer-I n-Charge as to the expense of any suc h removal
and the amount of the proc eeds and the expens es of any s uc h sale s hall
be final and conclusive agains t the C ontrac tor.
GC-23

COMPENSA TION FO R ALTERA TIO N IN O R RESTRICTION IN WORK :


I f at any time from the c ommencement of the work , the o wner s hall for
any reasons whats oever not require the whole work or pa rt thereof as
s pecified in the e-Tender to be carried out, the E ngineer-I n-C harge s hall
give notice in writing of the fact to the C ontrac tor, who s hall have no c laim
to any payment or c ompens ation whats oever on ac c ount of any profit or
advantage whic h he might have derived from the exec ution of the work in
full but whic h he did not derive in c ons equenc e of full amount o f the wo rk
not having been carried o ut. He also shall not have any claim for
c ompensation by reas ons of any alterations having been made in original
s pecific ations, drawin gs, des igns and instructions which shall involve any
c urtailment of the work as originally contemplated.
When the C ontrac tor is a partnership firm, the prior a pproval in writing of
the owner s hall be obtained before any change is made in the C ons titution
of the firm. Where the C ontrac tor is an individual or a Hindu Undivided
Family or business c onc ern, suc h approval as afores aid shall, likewise be
obtained before C ontrac tor enters into an agreement with other parties
where u nder, the rec ons tituted firm would have the right to carry out the
work here by u ndertaken by t he C ontrac tor. I n either c as e, if prior
approval as afores aid is not obtained, the c ontract shall be deemed to
have been allotted contravention of subletting clause hereof and the s ame
action may be taken and the same consequence s hall ensure as provided
in the s ubletting c laus e.

GC-24

IN THE EVENT O F DEATH O F THE CO NTRACTO R :


Without prejudice to any of the rights or remedies under the c ontrac t, if
the Contrac tor dies, the owner shall have the option of terminating the
c ontrac t without c ompens ation to the C ontractor.

GC-25

MEMBERS OF THE OW NER NO T INDIVIDUALLY LIABLE :


No offic ial or employee of the owner shall in any way be pers onally bound
or liable for the acts or obligation of the owner un der the c ontract, or
ans werable for any default or omiss ion in the obs ervanc e or per formance
of any acts , matters or things , whic h are herein , c ontained.

36

GC-26

OWNER NO T BOUND BY P ERSONAL REP RESENTATIO NS :


T he Contractor s hall not be entitled to any increas e on the sc hedule of
rates or any ot her rights or claims whats oever by reas on of
representation, promis e or guarantees given or alleged to have been given
to him by any pers on.

GC-27

CONTRACTOR'S O FFICE AT SITE :


T he Contractor s hall provide and maintain an offic e at the s ite for the
acc ommodation of his agent and staff and s uc h office shall remain open at
all reasonable hours to receive information, notic es or other
c ommunic ations.

GC-28
1.

CONTRACTOR'S SUBORDINATE STAFF A ND THEIR CONDUCT :


T he Contrac tor on award of the work s hall name and depute a q ualified
E ngineer having experience of c arrying out work of s imilar nature, whom
equipments , materials , if any, s hall be iss ued and ins tructions for wo rk
given. the Contrac tor shall also provide to the satisfaction of E ngineer-I nC harge sufficient and qualified s taff, c ompetent s ub-agents , foreman and
loading hands inc luding thos e s pec ially qualified by previous experienc e to
s upervis e the type of works compris ed in the contrac t in s uc h manner as
will ens ure work of t he bes t quality and expeditious working. If, in the
opinion of the E ngineer-I n-C harge additional properly qualified s upervis ion
s taff is considered necessary, it s hall be employed by the C ontractor,
witho ut additional charge on ac c ount thereof. The Contractor s hall ens ure
to the s atis fac tion of the Engineer-I n-C harge that sub-c ontractors , if any,
s hall provide c ompetent and effic ient s upervis ion over the work entrus ted
to them.

2.

I f and whe never any of the Contrac tor's or s ub-c ontrac tor's agents , s ubagents , as sistants , foreman or other employees s hall, in the opinion of the
E ngineer-I n-C harge, be guilty o f any mis conduc t or be inc ompetent or
insuffic iently qualified or negligent in the per formanc e of their duties or
that in the opinion of the o wner o r Engineer-I n-C harge, it is undesirable
for adminis trative or any other reas on for person or pers ons to be
employed in the works, the Contrac tor if s o direc ted by the E ngineer-I nC harge, shall at onc e remove s uc h person or persons from employment
thereon. Any person or pers ons so removed shall not again be reemployed in c onnection with the wo rks without the written permis s ion of
the E ngineer-I n-C harge. Any person, s o removed from the works s hall be
immediately replac ed at the expens e of the C ontrac tor by a qualified and
c ompetent s ubs titute. Should the C ontrac tor be required to repatriate any
pers on removed from the works he s hall do s o after approval of EngineerI n-C harge and s hall bear all c os ts in connec tion therewith .

3.

T he Contrac tor shall be respons ible for the proper behavior of all the s taff,
foreman , workmen and othe rs and s hall exerc is e proper c ontrol over them
and in partic ular and without preju dic e to the s aid generality, the
C ontrac tor shall be boun d to prohibit and prevent any employee from
tres pass ing or ac ting in any way detrimental or prejudic ial to the interest
of the c ommunity or of the properties or oc cupiers of land and properties
in the neighbor hood and in the event of s uc h employees s o trespassing,
the Contrac tor shall be responsible therefore and relieve the owner of all
c ons equent c laims , ac tions for damages or injury o r any ot her ground
whatsoever. T he dec is ion of the Engineer-I n-C harge upon any matter
aris ing under this c laim s hall be final .

37
4.

I f and when re quired by the o wner , t he C ontrac tor's pers onnel entering
upon the o wne r's premis es s hall be properly identified by badges of a type
acc eptable to the owner which must be wo rn at all times on o wne r's
premis es.

GC-29

TERMINATIO N OF SUB-CO NTRACT BY OW NER :


I f any s ub-contrac tor engaged upon the works at the site exec ute any
work whic h in the opinion of E ngineer-In-Charge is not ac c ordanc e with
the contrac t doc uments , the owner may by written notic e to the
C ontrac tor reques t him to terminate suc h s ub-contrac t and the C ontrac tor
upon the receipt of s uch notic e s hall terminate suc h s ub-c ontrac ts and the
latter s hall forthwit h leave the works, failing whic h, the owner s hall have
the right to remove s uch s ub-contrac tors from the site.
No action taken by the owner under the above clause shall relieve the
C ontrac tor of his liabilities under the c ontrac t or give ris e to any right to
c ompensation, extens ion o f time or otherwis e.

GC-30

POW ER OF ENTRY :
I f the C ontrac tor s hall not c ommence the work in the manner previously
des c ribed in the c ontract documents or if he s hall at any time, in the
opinion of E ngineer-I n-Charge
i)
ii)
iii)
iv)
v)
vi)

vii)
viii)

Fail to c arry out works in c onformity with the c ontrac t doc uments , or
Fail to c arry out t he wo rks in ac c ordanc e with the time sc hedule, or
Subs tantially s us pend work or the wo rks for a pe riod of s even days
witho ut aut hority from Engineer-I n-C harge, or
Fail to c arry out and exec ute the work to the s atis fac tion of the EngineerI n-C harge, or
Fail to s upply sufficient or s uitable construction plant, temporary wo rks ,
labour, materials or things , or
C ommit breac h of any other provis ions of the c ontract on his part to be
performed or observed or persis ts in any of the above mentioned breac hes
of the c ontrac t for seven days after notice in writing s hall have been given
to the C ontrac tor by the Engineer-I n-C harge requiring s uch breac h to be
remedied, o r
A bandon the work, or
During the continuance of the contract bec omes bankrupt, make any
arrangement or c ompromise with his c reditors , or permit any exec ution to
be levied or go into liquidation whether compulsory or voluntary not being
merely a voluntary liquidation for the purpos e of amalgamation or
rec ons truc tion then i n any suc h c as e.
T he owner shall have the po wer to enter upo n the works and take
pos s ess ion thereof and of the materials , temporary works, c ons tructional
plant and s tores therein a nd to revoke the Contractor's license to use the
s ame and to complete the works by his agents, other Contrac tor or
workmen, to relate the s ame upon any terms to s uch other pers on firm or
C orporation as the owner in his absolute disc retion may think proper to
employ, and fo r the purpose afores aid to use or a uthorize the use of a ny
materials, temporary works , constructional plant, and s tores as afores aid
with making payments or allo wance to the C ontrac tor for the s aid
materials other than s uc h as may be c ertified in writing by the EngineerI n-C harge to be reas onable and without making any payment or allowance
to the C ontrac tor for the use of s aid temporary works , construc tional plant
and stoc k or being liable for loss or damage thereto. If the owner s hall be
reas on of his taking posses sion of the wo rks or of the work being g ot

38
c ompleted by other C ontrac tor inc urred excess expenditure be deduc ted
from any money whic h may be due for the work do ne by the Contrac tor
under the c ontrac t and not paid for. Any defic ienc y s hall forthwith be
made good and paid to the owner by the Contrac tor and the owner s hall
have po wer to sell in suc h manner a nd for suc h pric e as he may think fit
all or any of the c ons tructional plant, materials etc ., c ons ist c ons truc ted by
or belonging to an d to recoup and retain t he said defic ienc y or any part
thereof out of the p roc eeds of the s ale.
GC-31

CONTRACTOR'S RESPO NSIBIL ITY W ITH THE OTHER CONTRA CTOR


AND AGENCIES :
Without repugnanc e to any other c onditions, it s hall be the res ponsibility
of the C ontrac tor executing the work, to work in close co-operation and
c o-ordination with other Contrac tors or their authorize d repres entatives
and the Contractor will put a joint scheme with the c onc urrenc e of other
c ontrac tors or their authorized representatives showing the arrangements
for c arrying his portion of the work to the E ngineer-I n-C harge and get the
approval. T he Engineer-I n-C harge before approving the joint s c heme will
c all the parties c onc erned and modify t he sc heme if required. No c laim
will be entertained on ac c ount of the above. T he Contrac tor shall c onform
in all res pec ts with the provis ions of any s tatutory regulations, ordinanc es
or byla ws of any loc al or duly constituted authorities or public bodies
whic h may be applic able from time to time to works or any temporary
works. The C ontrac tor s s hall keep the owner indemnified agai ns t all
penalties and liabilities of every kind arising out of non-adhe renc e to s uch
s tatutes , ordinanc e, la ws , rules, reg ulations etc .

GC-32

OTHER AGENCIES A T SITE :


T he Contrac tor shall have to execute the work in s uc h place and c ondition
where other a genc ies will als o be engaged for othe r works , s uch as s ite
grading , filling an d leveling, elec tric al and mechanic al engineering works
etc . No claim shall be entertained for works being exec uted in the above
c irc ums tanc es .

GC-33

NOTICES :
A ny notice under this c ontrac t may be s erved on the C ontractor or his duly
authorized repres entative at the job s ite or may be s erved by Registered
P os t direct to the offic ial addres s of the Contractor. P roof of is s ue of any
s uc h notic e c ould be c onc lus ive of the Contractor having been duly
informed o f all c ontents therein.

GC-34

RIGHTS OF VA RIOUS INTERESTS :


T he owner res erves the right to dis tribute the work bet ween more than
one Contractor.
C ontractor s hall c o-operate and afford reas onable
opportunity to other C ontrac tor s for ac cess to the wo rks , for t he c arriage
and storage of materials and execution of their works . Whenever the work
being do ne by department of the o wner or by other Contrac tor employed
by the owner is contingent upon work c overed by this contrac t, the
res pec tive rights of the various interests s hall be determined by the
E ngineer-I n-C harge to secure the c ompletion of various portions of the
work in general harmony .

GC-35

PRICE ADJUSTMENTS :
No adjustment in pric e s hall be allowed and no pric e esc alation will be
allowed .

39
GC-36

TERMS OF PAY MENT :


T he payment of bills shall be made progress ively according to the r ules
and practic es followed by the Corporation. T he progres s ive payment
unles s otherwise provided in the contrac t agreement or subsequently
agreed to by the parties s hall be made generally monthly on submission of
a bill by the C ontrac tor in presc ribed form of a n amount ac c ording to the
value of the wo rk per formed les s the price of materials s upplied by owner
aggregate of previous progress ive payments and as required by Clause
GC-37 (Retention of M oney) herein. All s uch progressive payments s hall
be regarde d as payments by way of a dvance agains t final payment.
P ayment for the wo rk done by the Contrac tor will be bas ed on the
measurement at various s tages of the work , in acc ordanc e with the
c ondition at claus e GC -81 (meas urement of work in p rogress ).

GC-37

RETENTIO N MONEY :
P urs uance to c laus e GC-36 (Terms of P ayment) any on at money due to
the Contrac tor for wo rk done, C orporation will hold as Retention mo ney
five (5 ) percent of the value of work . The retention money will not
normally be due for payment until the completion of the entire work and
till s uc h period the work has been finally ac cepted by the Corporation and
a c ompletion c ertificate issued by the Corporation in pursuant to ClauseGC 79 (Completion Certificate).

GC-38

PAY MENTS DUE FRO M THE CO NTRA CTOR :


A ll c os ts , damages or expens es , for which under the contrac t, Contrac tor
is liable to the Corporation, may be deduc ted by the C orporation fr om any
money due or bec oming due to the Contrac tor under the contrac t or from
any other c ontrac t with the C orporation or may be recovered by ac tion at
law or ot her wis e from the Contractor.

GC-39
i)

ii)

GC-40

CONTINGENT FEE :
T he Contrac tor warrants that he has not employed a person to s olic it or
s ec ure the contrac t upo n any agreement for a c ommiss ion, perc entage,
and br okerage contingent fee. Breac h of this wa rranty s hall give the
C orporation the right to c anc el the c ontrac t or to take any drastic meas ure
as the Corporation may deem fit. The warranty does not apply to
c ommiss ions payable by the Contrac tor to es tablis h c ommercial or selling
agent for t he p urpose of s ec uring bus iness .
No offic er, employer o r agent o f the Corporation s hall be admitted to a ny
s hare or pa rt o f this c ontract or to any bene fit that may ris e there from.
BREACH OF CONTRA CT BY CO NTRACTO R :
I f the C ontrac tor fails to per form the work unde r the c ontrac t with due
diligenc e or shall refus e or neglec t to c omply with ins tructions given to him
in writing by the E ngineer-I n-C harge in accordance with the c ontract, or
s hall c ontravene the provisions of the c ontrac t, the C orporation may give
notic e in writing to the C ontrac tor to make good suc h failure, neglec t, or
c ontravention. Should the Contrac tor fail to c omply with suc h written
notic e within 1 4 (fourteen) days of rec eipt, it shall be lawful for the
C orporation, without pre judic e to any other rights the Corporation may
have under the c ontract, to terminate the contract for all or part of the
works, and make any other arrangements it s hall deem nec es s ary to
c omplete the work outs tanding unde r the c ontract at the time of
termination. I n this event, the performanc e Bond s hall immediately
bec ome due and payable to the Corporation. The value of the work done

40
on the date o f termination a nd not paid fo r s hall be kept as deposit for
adjus tment of exc ess expenditure incurred in getting the remaining wo rk
c ompleted and the Corporation s hall have free us e of any wo rks which the
C ontrac tor may have at the s ite at the time of termination of the contrac t.
GC-41
i)

DEFAUL T OF CONTRACTOR :
T he Corporation may upon written notic e of default to the Contrac tor
terminate the c ontrac t circ umstanc es detailed as under :
a)

I f in the opinion of the Corporation, the Contractor fails to make


c ompletion of works within the time s pecified in the completion sc hedule
or within the period for whic h extens ion has been grante d by the
C orporation to the Contrac tor.

b)

I f in the opinion of the Corporation, the Contrac tor fails to comply with any
of the other provis ions of t his contract.

ii)

I n the event, the Corporation terminates the c ontrac t in whole or in part


as provided in Article GC-50 (Termination of the C ontrac t) the C orporation
res erves the right to p urc has e upon suc h terms and in s uc h manner as it
may be deem appropriate, plant similar to one which is not s upplied by the
C ontrac tor and the C ontrac tor will be liable to the Corporation for a ny
additional c os ts for s uch s imilar plant and / or fo r liquidated damages for
delay until s uc h time as may be required for the final c ompletion of works.

iii)

I f this c ontrac t is terminated as provided in t his paragrap h GC-30 (Power


of E ntry) (1 ) the Corporation i n addition to a ny other rights provided in
this clause, may require the Contrac tor to transfer title and deliver to the
C orporation.
a)
b)

A ny completed wo rks
Suc h partially c ompleted information and c ontrac t rights as the Contrac tor
has specific ally produc ed or ac quired for the performanc e of the c ontrac t
s o terminated.

iv)

I n the event, the C orporation does not terminate the contrac t as provided
in the para graph GC -50 (T ermination of Contrac t) the Contractor s hall
c ontinue performance of the contract, in whic h c ase, he shall be liable to
the Corporation for liquidate d damages for delay until the works are
c ompleted and ac c epted.

GC-42

BANKRUP TCY :
I f the C ontrac tor s hall become bankrupt o r insolvent or has a rec eiving
order made agains t him, or compound with his creditors , or being the
C orporation c ommenc e to be wound u p not being a member volunta ry
windi ng up for the pu rpos e of amalgamation or rec ons truction, or c arry on
its business under a rec eiver for the benefit of his creditors or any of
them, the Corporation s hall be at liberty to either (a) terminate the
c ontrac t forthwith by giving notice in writing to the Contrac tor or to the
rec eiver or liquidator or to any pers on or O rganization in whom the
c ontrac t may bec ome ves ted and to ac t in the manner provided in Article
GC-41 (Default of Contractor) as thou ght the las t mentioned notic e had
been the notic e referred to in s uc h artic le or (b) to give s uc h receiver,
liquidator or other persons in whom the c ontract may become ves ted the
option of c arrying out the c ontract subjec t to his providing a s atis fac tory
guarantee for the due and faithful , per formanc e of the c ontrac t up to an
amount to be agreed . I n the event that the Corporation terminates the

41
c ontrac t in accordanc e with this article, the performanc e bond s hall
immediately become due and payable on demand to C orporation .
GC-43

OWNERSHIP :
Works hand over purs uant to the c ontrac t s hall bec ome the property of
the Corporation from whic hever is the earlier of the following times ,
namely;
a)
b)

When the works are c ompleted purs uant to the contrac t.


When the c ontrac tor has been paid any s um to which he may bec ome
entitled in respect thereof pu rsuant to C laus e GC-36 (T erms of P ayment).

GC-44

DECLARATIO N A GAINST W AIVER :


T he condemnation by the C orporation of a ny breac h or breac hes by the
C ontrac tor or an authorized sub-contractor of any of the s tipulations and
c onditions c ontained in the c ontrac t, s hall in no way pre judic e or affec t or
be c ons trued as a waiver of the Corporation's rights, powers and remedies
under the c ontrac t in res pec t of any breach or breaches.

GC-45

LAW S GOVERNING THE CO NTRA CT :


T his contract s hall be c onstrued acc ording to and s ubjec t to the laws of
I ndia and the State of Gujarat and under the juris dic tion of the Courts of
Gujarat at Rajkot .

GC-46

OVER PAY MENT AND UNDER PAY MENT :


Whenever any claim for the payment of a sum to the C orporation aris es
out of or under this contrac t against the Contractor, the s ame may be
deducted by the C orporation from any s um then d ue or whic h at any time
thereafter may become due to the C ontrac tor unde r this contrac t and
failing that under any other c ontrac t with the Corporation (whic h may be
available with the Corporation), or from his retention money o r he s hall
pay the claim on demand. T he C orporation res erves the right to c arry out
pos t payment audit and technic al examinations of the final bill including all
s upporting vouchers, abs tracts etc . T he C orporation further res erves the
right to enforc e rec overy of any payment when detec ted, not withs tanding
the fac t that the amount of the final bill may be inc luded by one of the
parties as an item of dis pute before an Arbitrator, appointed under Article
GC-49 (Arbitration) of this c ontrac t and notwiths tanding the fac t that the
amount of the final bill figures in the arbitration award. If as a result of
s uc h audit and tec hnic al examinations any over payment is disc overed in
res pec t of any work done by the Contractor or alleged to have bee n done
by him under the contrac t, it s hall be rec overed by the Corporation from
the Contrac tor as pres cribed above. I f any under payment is disc overed
by the C orporation, the amou nt due to the Contrac tor under this c ontract,
may be adjus ted against any amount t hen due o r which may at any time
thereafter bec ome due before payment is made to the Contractor.

GC-47

SETTLEMENT OF DISPUTES :
E xc ept as otherwise specific ally provided in the c ontrac t, all disputes
c onc erning questions of fact arising under the c ontrac t s hall be dec ided by
the Engineer-I n-C harge s ubject to a written a ppeal by the Contrac tor to
the Engineer-I n-C harge and thos e dec is ions s hall be final and binding on
the parties hereto. A ny disputes or differences inc luding those c ons idered
as s uch by only one of the pa rties aris ing out of or in connec tion with this
c ontrac t s hall be to the extent possible settled amic ably between the
parties . If amic able s ettlement c annot be reac hed then all disputed iss ues

42
s hall be settled as provided in A rtic le GC-48 (Disputes or differences to be
referred to) an d A rtic le No.GC -49 (A rbitration).
GC-48

DISPUTES OF DIFFERENCES TO BE REFERRED TO :


I f at any time, any ques tion, disputes or differenc es of any kind
whatsoever shall aris e between the E ngineer-I n-C harge and the contrac tor
upon o r in relation to or in c onnection with this c ontrac t either party may
forth with give to the ot her, notic e in writing o f the exis tenc e of s uch
ques tion, dispute or differe nce as to any decis ion, opinion, instruction,
direc tion, c ertific ate or evaluation of the Engineer-I n-C harge.
T he
ques tion, dis pute or differenc es shall be settled by the Municipal
C ommis sioner, Rajkot M unic ipal Corporation, who shall s tate his decis ion
in writing a nd give notic e of same to the Engineer-I n-C harge and to the
C ontrac tor. Such dec is ion s hall be final and bindin g u pon both parties .
T he contrac t and work on c ontract if not already breac hed or abandoned
s hall proc eed normally unles s and until the same s hall be revis ed (or
uphold) by any arbitration proc eedings as hereinafter provided. Such
dec is ions s hall be final and binding on the E ngineer-I n-Charge and the
C ontrac tor unless the Contrac tor shall require the matter to be referred to
an A rbitration panel as hereinafte r p rovided.

GC-49

ARBITRATION :
I n c ase of any dis pute arising during the c ourse of exec ution, the matter
s hould be referred to M unic ipal Commissioner who will be s ole Arbitrator
whos e dec isions will be final and bin ding to the Contractor.

GC-50
i)

TERMINATIO N OF THE CO NTRACT :


I f the C ontrac tor finds it imprac ticable to c ontinue operation owing to force
majeure reas ons or for any reas ons beyond his control and/or the
C orporation find it imposs ible to c ontinue operation, then prompt
notification in writing s hall be given by t he party affec ted to t he othe r.

ii)

I f the delay or diffic ulties s o c aus ed cannot be expec ted to c ease or


bec ome unavoidable or if operations c annot be res umed within two (2)
months then either party s hall have the right to terminate the c ontract
upon ten (10 ) days written notice to the other. I n the event of s uch
termination of the contract, payment to the Contrac tor will be made as
follows :
a)

T he Contrac tor s hall be paid for all works approved by the Engineer-I nC harge and for any other legitimate expens es due to him.

b)

I f the C orporation terminates the c ontract owing to Forc e M ajeure or due


to any c aus e beyond its control, the C ontrac tor s hall additionally be paid
for a ny work done durin g the s aid two (2 ) mont hs period inc luding a ny
financial c ommitment made for the proper perfo rmanc e of the c ontrac t
and whic h are n ot reas onably de frayed by payments under (a) above.

c)

T he Corporation s hall als o releas e all bonds and guarantees at its disposal
exc ept in cas es where the total amount of payment made to the
C ontrac tor exc eeds the final amount due to him in which cas e the
C ontrac tor s hall refund the excess amount within thirty (3 0) days after the
termination and the Corporation thereafter s hall releas e all bonds and
guarantees . S hould the C ontrac tor fail to refund t he amounts received in
exc ess within the said period s uch amounts s hall be deduc ted from the
bonds or guara ntees provided.

43
iii)

O n termination of t he contrac t for any cause the Contrac tor shall s ee the
orderly sus pension and termination of operations , with d ue consideration
to the interests of the Corporation with res pec t to completion safeguarding
of s toring materials proc ured for the pe rfo rmanc e of the contrac t and the
s alvage and res ale thereof.

GC-51

SPECIAL RISKS :
I f during the c ontrac t, there shall be an outbreak of war (whet her war is
dec lared or not), major e pidemic , earthquake or s imilar occ urrence in any
part of the world beyond the control o f either party to the c ontrac t which
financially or otherwis e materially affec ts the exec ution of the contract, the
C ontrac tor shall unless and until, the contrac t is terminated under the
provisions of this artic le use his bes t endeavors to complete the execution
of the c ontrac t, provided always that the Corporation s hall be entitled at
any item after the ons et of s uch special ris ks, to terminate the c ontract by
giving written notice to the c ontrac tor and upon suc h notic e being given
this contrac t s hall terminate but without prejudic e to the rights of either
party in res pec t of any antec edent breac h thereof.
T he Contrac tor shall not be liable for payment of compens ation for delay
or for failure to per form the c ontrac t for reasons of Forc e M ajeure s uc h as
acts of public enemy, ac ts of Government, fires , floods, cyc lones ,
epidemics, quarantine restrictions , loc kouts, strikes , freight embargoes
and provided that the C ontrac tor shall within 10 (ten) days from the
beginning of s uch delay noti fy the Engineer-I n-C harge in writing, of the
c aus e of delay, the Corporation s hall verify the facts and grant s uch
extens ion as the facts jus tify.

GC-52

CHA NGE IN CONSTITUTIO N :


Where the Contrac tor is a partners hip firm, the prior approval in writing of
the owner s hall be obtained befo re any change is made in the c ons titution
of the firm. Where t he Contractor is an individual or undivided family
bus iness c onc ern suc h approval as afores aid shall likewis e be obtained
before the Contrac tor enters into any partners hip agreement where under
the partners hip firm would have the right to c arry out the wo rks hereby
undertaken by the C ontrac tor. I f prior ap proval as afores aid is not
obtained, the contract shall be deemed to have been assigned in
c ontravention of c ontract.

GC-53

SUB-CO NTRA CTUAL RELATIO NS :


A ll works performed fo r the c ontrac t by a s ub-c ontrac tor shall be purs uant
to an appropriate agreement bet ween t he Contractor and the s ubc ontrac tor, whic h s hall contain provis ion to
a)

b)
c)

P rotect and preserve the rights of t he Corporation a nd the Engineer-I nC harge with res pec t to the works to be per formed under the s ubc ontrac ting party will not prejudic e s uc h rights .
Require that s uch work be performed in ac c ordanc e with the requirements
of c ontract doc uments .
Require un der suc h contrac t to whic h the c ontrac tor is a party, the
s ubmis sion to the C ontractor of applic ation for payment and claims for
additional c os ts , extension of time, damages for delay or other wis e with
res pec t to the sub-contracted portions of the work in suffic ient time, t hat
the Contrac tor may apply fo r payment c omply in acc ordanc e with the
c ontrac t doc uments for like c laims by the C ontrac tor upon the C orporation.

44
d)

e)

Waive all rights the c ontrac ting parties may have agains t one a nother for
damages c aus ed by fire or other perils covered by the property ins urance
exc ept s uc h rights as they may have to the proc eeds of s uch ins urance
held by t he Corporation as trustee and,
O bligate each sub-contractor s pec ifically to c ons ent to the provis ions of
this Article.

GC-54
1.

PATENTS A ND ROYALTIES :
C ontrac tor, if licensed under any patent c overing eq uipment, mac hinery,
materials or c omposition of matter to be us ed or s upplied or methods and
proc ess to be prac tic ed or employed in the performanc e of this c ontrac t
agrees to pay all royalties and lic ens e fees , which may be due with res pect
thereto. I f any equipment, mac hinery, materials , composition matters , to
be used or supplied or methods prac tic ed or employed in the performance
of this contrac t, is c overed by a patent under whic h C ontrac tor is not
licensed, then the C ontrac tor before s upplying / using the equipment,
mac hinery, materials , compositions , methods of proc ess shall obtain s uch
license and pay s uch royalties and lic ens e fees as may be nec ess ary for
performanc e of this c ontrac t. I n the event C ontrac tor fails to pay s uch
royalty or to obtain any suc h license, any s uit for infringement of s uch
patents which is brought agains t the Contractor or the owner as a result of
s uc h failure will be defended by the C ontractor at his own expens es and
the Contrac tor will pay any damages and c os ts awarded in s uch suit. T he
C ontrac tor shall promptly notify the owner if the Contrac tor has ac quired
knowled ge of any plant under which a s uit for infringement c ould be
reas onably brought because of the us e by the owner of any equipment
mac hinery, materials , proc ess methods to be supplied in hereunder.
C ontrac tor agrees to and does hereby grant to o wner together with the
right to extend the s ame to any of the subsidiaries of the owner an
irrevoc able royalty fee lic ens e to us e in any C ountry , any invention made
by the C ontrac tor or his employees in or as a res ult of the performanc e of
work under contrac t.

2.

With res pec t to any s ub-contract entered into by Contractor purs uant to
the provis ions of the relevant c laus e hereof, t he Contractor s hall obtain
from the s ub-c ontrac tor an unders tanding to provide the o wner with the
s ame patent protection that c ontracts is required to provide under the
provisions of the c laus e.

3.

T he Contrac tor shall indemnify and s ave harmless the owner from any loss
on acc ount of claims agains t owner for the c ontributory in frin gement of
patent rights aris ing out o f a nd bas ed u pon t he c laim that the use by the
C orporation of the proc es s included in the design prepared by the
C ontrac tor and us ed in t he ope ration o f the plant infri nges on a ny pate nt
rights.

GC-55

LIEN :
I f, at any time, t here should be evidence of any lien o r c laim for which
owner might have bec ome liable and which is c hargeable to the
C ontrac tor, the owner s hall have the right to retain out of any payment
then due or thereafter to bec ome due an amount su ffic ient to c ompletely
indemnify the o wner agains t suc h lien or c laim or if s uc h lien or c laim be
valid the o wner may pay an d dis charge the s ame and de duc t the amou nt
as paid from any money whic h may be due or bec ome due and payable to
the Contractor.
If any lien or c laims remaining unsettled after all
payments are made, the Contractor s hall refund or pay to the owner all

45
money that the latter may be c ompelled to pay in disc harging s uch lien or
c laim inc luding all c os ts and reas onable expens es .
GC-56

EXECUTIO N OF W ORK :
T he whole work s hall be c arried out in s tric t c onformity with the provis ions
of the contrac t doc ument, detailed drawings, specifications and the
instruc tions of the Engineer-I n-C harge from time to time. T he Contrac tor
s hall ensure that the whole work is executed in the mos t s ubs tantial, and
proper man ner with bes t workmans hip us ing materials of bes t quality in
s tric t accordance with t he s pec ific ations to the entire s atis fac tion of the
E ngineer-I n-C harge.

GC-57

WORK IN MO NSO ON :
When the work c ontinues in mons oon if require d, t he Contractor s hall
maintain minimum labour forc e required for the work and plan and
exec ute the c ons truc tion and erec tion work acc ording to the prescribed
schedule. No extra rate will be c ons idered for suc h work in mons oon.
During monsoon and entire c ons truc tion period, the C ontrac tor shall keep
the s ite free from water at his o wn c os t.

GC-58

WORK ON SUNDAYS AND HOLIDA YS :


No work except c uring shall be c arried out on Sunday and holidays .
However , if the exigenc ies of the work need c ontinuation of work on
Sundays and Holidays , written permiss ion of the E ngineer-I n-C harge s hall
be obtained in a dvanc e.

GC-59

GENERAL CONDITIO NS FO R CONSTRUCTIO N WORK :


Working hours shall be eight every day. T he over time work in two s hifts
c ould be c arried out with the written permis sion of the E ngineer-I n-Charge
but no c ompensation shall be paid for the s ame. T he rate quoted s hall
include this . T he Contractor s hall plan his work in s uc h a way that his
labourers do not remain idle. T he owner will not be res ponsible for idle
labour of the Contractor. The C ontrac tor s hall s ubmit to the owner
progres s report every week. The details and proforma of the report will be
as per mutual a greement.

GC-60

DRAWINGS TO BE SUPP LIED BY THE OW NER :


T he drawings attac hed with the e-T ender doc uments shall be for general
guidanc e of the C ontrac tor to enable him to vis ualize the type of work
c ontemplated and sc ope of work involved.
Detail working dra wings
acc ording to whic h the work is to be done s hall be prepared by the
C ontrac tor for exec uting the work .

GC-61

DRAWINGS TO BE SUPP LIED BY THE CO NTRA CTOR:


Where dra wings, data are to be furnis hed by t he Contrac tor they s hall be
as enumerated in special c onditions of c ontrac t and s hall be furnis hed
within the s pec ified time. Where ap proval of dra win gs has been s pec ified
it s hall be C ontrac tor's res ponsibility to have thes e drawings got approved
before any work is taken up with regard to the s ame. Any c hanges
bec oming nec ess ary in thos e drawings during the exec ution of the wo rk
s hall have to be c arried out by the Contractor at no extra c os t. A ll final
dra wings s hall bear the c ertification stamp as indicated below d uly signed
by both the Contractor an d E ngineer-In-Charge.

46

C ertified
true
for .P ro ject
No ..

A greement

Signed .
Cont ractor
Engineer-In-Charge
Drawings will be approved within three (3 weeks of the rec eipt of the same by the
E ngineer-I n-C harge.

GC-62

SETTING O UT WORK :
T he Contractor s hall set out the work on t he s ite handed over by the
E ngineer-I n-C harge and shall be respons ible for the c orrec tness of the
s ame. T he work s hall be carried out to the entire satisfaction of EngineerI n-C harge. The approval thereof or pa rtaking by E ngineer-In-Charge or
s etting out work s hall not relieve C ontrac tor of any of his respons ibilities .
T he Contractor s hall provide at his own c os t all necessary level pos ts ,
pegs , bamboos , flags , ranging rods, strings and other materials and
labourers required for proper setting out of the work . The C ontractor s hall
provide fix and be res ponsible for the maintenanc e of all s takes ,
templates, level markets , profiles and s imilar other things and shall take
all nec essary prec autions to prevent their removal or dis turbanc e and s hall
be respons ible for the consequences for s uch removal or dis turbanc e. T he
C ontrac tor shall also be res ponsible for the maintenanc e of all exis ting
s urvey marks , boundary marks , and dis tance marks and centerline marks
either exis ting or fac e lines and c ros s lines shall be marked by small
mas onry pillars . Eac h pillar s hall have distance mark at the center for
s etting up the theodolite. T he work shall not be s tarted unless the s etting
out is c hoked and approved by E ngineer-I n-Charge in writing but s uch
approval s hall not relieve the C ontrac tor of his respons ibilities about the
c orrectnes s of s etting out. The C ontrac tor s hall provide all materials ,
labour and other facilities necess ary for c hec king at his own c ost. Pillars
bearing geodetic marks on s ite s hall be protec ted by the C ontractor. On
c ompletion of the work, the C ontractor s hall s ubmit the geodetic
doc uments acc ording to whic h the work has been c arried o ut.

GC-63

RESPO NSIBIL ITIES OF CO NTRA CTO R FO R CORRECTNESS OF THE


WORK :
T he Contractor s hall be entirely and exclusively res ponsible for the
c orrectnes s of every part of the work an d s hall rec tify c ompletely any
errors therein at his own cos t when so ins truc ted by Engineer-I n-C harge.
I f any error has c rept in the work d ue to non-observanc e of this clause,
the Contrac tor will be res ponsible for the error and bea r the c os t of
c orrective work.

1.

Materials t o be supplied by t he Contractor:


C ontrac tor shall proc ure and provide all the material required for the
exec ution and maintenance of work inc luding M S rods; all tools, tackles ,
c ons truc tion plant and equipment except, the materials to be s upplied by
the owner detailed in t he contract doc uments . O wner, s hall make
rec ommendations for proc urement of materials to the res pec tive
authorities if des ired by the Contractor but as sumes no res ponsibility of
any nature. O wner shall insis t for proc urement of materials with I SI
marks s upplied by reputed firms of the DGS & D lis t.

47
2.

I f ho wever, the E ngineer-I n-Charge feels that the work is likely to be


delayed due to Contractor's inability to proc ure materials , the E ngineer-I nC harge shall have the right to proc ure materials, from the market and the
C ontrac tor will acc ept these materials at the rates dec ided by E ngineer-I nC harge.

GC-64
1.

MATERIAL S TO BE SUPP LIED BY THE OW NER :


I f the c ontrac t provided c ertain materials or s tores to be s upplied by the
owner, s uc h materials and s tores trans ported by the C ontrac tor at his c ost
from owner's s tores or Railway Station. T he c os t from C ontrac tor for the
value of materials s upplied by the o wner will be rec overed from the
R.A .Bill on the basis of ac tual c ons umption of materials in the wo rk
c overed and for whic h R A Bill has been prepared. A fter c ompletion of the
work, the Contrac tor has to account for the full quantity of materials
s upplied to him.

2.

T he value of s tore materials supplied by o wner to the C ontractor s hall be


c harged at rates s hown in the c ontrac t document and in c ase any other
material not lis ted in the sc hedule of materials is supplied by the owner,
the same shall be c harged at c ost pric e including c arting and other
expens es incurred in proc uring the same. All materials so supplied s hall
remain the pr operty o f the o wne r an d s hall not be removed from the s ite
on any acc ount. A ny material remaining unus ed at the time of c ompletion
of work or termination of contracts shall be returned to owner's s tore or
any other plac e as direc ted by the Engineer-I n-C harge in perfectly good
c ondition at Contractor's c os t. When materials are supplied free of c os t for
use in work and s urplus and unac counted balance thereof are not returned
to the owner, recovery in res pec t of suc h balance will be effec ted at double
the applicable iss ue rate of the material or the market rates whichever is
higher.

GC-65

CONDITIO NS OF ISSUE OF MA TERIALS BY THE OW NER: (N.A.)


T he materials s pec ified to be iss ued by the owner to the C ontractor s hall
be issued by the owner at his store and all expens es for it carting s ite s hall
be borne by the C ontrac tor will be issued during working hours and as per
rules of owner from time to time.
C ontrac tor shall bear all expens es for s torage and s afe c us tody at site of
materials issued to him be fore us e in work.
M aterial shall be is sued by the o wner in s tandard / non-s tandard s izes as
obtained from man ufac turer .
C ontrac tor shall construct suitable godowns at s ite for s toring the
materials to protec t the s ame from damage due to rain, dampnes s , fire,
theft etc .
T he Contractor s hould take the delivery of the materials iss ued by the
owner after satis fying hims elf that they are in good condition. O nce the
materials are issued, it will be the respons ibility of the C ontrac tor to keep
them in good c ondition and in s afe c us tody. I f the materials get damaged
or if they are stolen, it shall be the res ponsibility of the Contrac tor to
replace them at his c ost acc ording to the ins truc tions of the E ngineer-I nC harge.
For delay in s upply or for non-s upply of materials to be s upplied by the
owner, o n acc ount of natural c alamities , ac t of enemies , other difficulties

48
beyond the control of the owner , the o wner c arries no respons ibilities . In
no c as e the Contractor s hall be entitled to c laim any c ompens ation for loss
s uffered by him on this ac count.
None of the materials issued to the contrac tor, s hall be us ed by the
C ontrac tor for manufac turing items whic h c an be obtained from the
manufac turer's . T he materials issued by the owner s hall be us ed for the
work only and no other purpose.
C ontrac tor shall be required to exec ute indemnity bond in the prescribed
form for the safe c ustody and ac c ount of materials iss ued by the owner .
C ontrac tor shall furnish s uffic iently in advanc e a s tatement of his
requirements of quantities of materials to be supplied by the owner and
the time when the s ame will be required for the work , so as to enable
E ngineer-I n-C harge to make arrangements to proc ure and s upply the
materials.
A daily acc ount of materials iss ued by the owner shall be maintained by
the c ontrac tor showing receipt, consumption and balanc e on hand in the
form laid down by Engineer-I n-C harge with all c onnected paper and s hall
be al ways available for ins pec tion in the site office.
C ontrac tor shall s ee that only the required qua ntities of materials are got
issued and no more. T he C ontrac tor shall be respons ible to return the
s urplus materials at o wner's s tore at his own c ost.
GC-66

MATERIAL S P RO CURED WITH ASSISTA NCE O F THE OW NER :


Notwiths tanding anything contained to the contrary in any of the c laus es
of this c ontrac t, where any materials for the exec ution o f the c ontract are
proc ured with the as s is tanc e of the o wner either by is s ue from o wne r's
s toc k or purc has e made under orders or permits or lic ens es iss ued
materials as trustees for owner, and us e s uch materials not disposed them
off with out the permis sion of owner and unservic eable materials that may
be left with him after completion of the c ontract or at its termination for
any reason whats oever on his being paid or credited s uc h price as
E ngineer-I n-C harge s hall determine having due regard to the conditions of
the materials . T he pric e allowed to Contractor s hall not exceed the
amount charged to him exc luding the s torage of breac h of the afores aid
c ondition, the Contrac tor shall in terms of lic ens e or permits and/or for
c riminal breac h of trus t be liable to compensate o wner at double the rate
or any higher rates. In the event of thes e materials at that time having
higher rate or not being available in the market then any other rate to be
determined by the E ngineer-In-Charge at his dec is ion s hall be final and
c onc lus ive.

GC-67

MATERIAL S O BTAINED FROM DISMA NTLING :


I f the C ontrac tor, in the cours e of execution of work, is c alled upon to
dismantle any part of work for reas ons other than o n acc ount of bad or
imperfec t work , the materials obtained from dis mantling will be property
of the o wne r and will be dis pos ed off as per ins truc tions of E ngineer-I nC harge in the bes t interes t of the owner .

GC-68

ARTICL E OF VAL UE OF TREASURE FOUND DURING CONSTRUCTION :


A ll gold, silver and other minerals of any desc ription and all prec ious
s tones , coins, treasures , relics , antiques and other similar things which

49
s hall be found in, under or upo n s ite s hall be the property of the owner
and the Contractor s hall properly p res erve the same to the s atis fac tion of
the E ngineer-I n-C harge and s hall hand over the s ame to the o wner.
GC-69

DISCREPA NCIES BETWEEN INSTRUCTIONS:


I f there is any discrepancy between various stipulations of the c ontract
doc uments or instruc tions to the C ontrac tor or his authorized
representative or if any doubt a rises as to the meaning of s uch s tipulation
or instructions , the C ontrac tor shall immediately refer in writing to the
E ngineer-I n-C harge and s hall han d over the same to the o wner.

GC-70

ALTERATIONS IN SP ECIFICATIO NS & DESIGNS & EXTRA W ORK :


T he Arc hitect / Engineer-I n-C harge shall have power to make any
alterations in, omission from, addition to s ubs titution for, the s c hedule of
rates , the original specifications , drawings , designs and ins truc tions that
may appear to him to be neces sary or advis able during the p rogres s of
work and the C ontrac tor s hall be bound to carry out s uc h altered / extra /
new items of work in acc ordanc e with any ins truc tions which may be given
to him in writing s igned by Engineer-I n-C harge and s uch alteration
omissions, additions or s ubs titutions , s hall not invalidate contrac t and any
altered, additional or s ubs tituted work shall be carried out by the
C ontrac tor on the same conditions of c ontrac t. The time of c ompletion
may be extended by Arc hitect as may be c ons idered jus t and reas onable
by him. T he rates for suc h additional, altered or substitute wo rk s hall be
worked out as under :

a)

I f the rates fo r additional , altered or s ubs titutes work are s pec ified in the
c ontrac t for work , the C ontractor is bound to carry out suc h work at the
s ame rates as s pecified in the contract.

b)

I f the rates for additional, altered or s ubs tituted work are not s pec ific ally
provided in the c ontract for the work, the rates will be derived from the
rates of s imilar items of work in the c ontract work. T he opinion of
E ngineer-I n-C harge as to whethe r the rates c an be reas onably s o derived
the items of contract will be final and bin ding to the C ontrac tors .

c)

I f the rates of altered, additional or substitute work c annot be determined


as s pec ified in (a) or (b ) above , the rate shall be paid as per S.O .R. of
GWSSB.

d)

I f the rates of altered, additional or substitute work c annot be determined


as s pec ified in (a) or (b ) or (c) above , the C ontrac tor s hall within seven
days of the rec eipt of order to c arry out the work inform the A rc hitec t /
E ngineer-I n-C harge of the rate whic h he intends to c harge for s uc h work
s upported by rate analys is and the A rchitec t / Engineer-I n-C harge will
determine the rate o n the bas is of prevailing market rates of materials ,
labour c os t at sc hedule of labour plus 1 5% there on as C ontrac tor's
s upervis ion overheads and profit. T he opinion of Arc hitect / Engineer-I nC harge as to the market rates of materials and the quantity of labour
involved per unit o f meas urement will be fin al and bindin g on Contractor.
But under no c irc umstanc es , the Contractor s uspends work o r the plea of
non s ettlement of items falling unde r this c laus e.

50
GC-71

ACTION W HEN NO SPECIFICA ITO NS ARE ISSUED :


I n c ase of any class of work for which no s pec ific ations is s upplied by the
owner in the e-T ender doc uments , s uch work shall be c arried out in
acc ordance with relevant latest I SS and if I SS do not cover the same, the
work s hall be c arried out as per General Tec hnic al Specification for
building wo rk; a nd i f not c overed in then it is to be with s tandard
E ngineering Practic e s ubject to the app roval of Engineer-I n-C harge.

GC-72

ABNORMA L RATES :
C ontrac tor is expec ted to quote rate for eac h item after c areful analys is of
c os t involved for the pe rformance of the c ompleted item c ons idering all
s pecific ations and c onditions of c ontrac t.

GC-73

ASSISTANCE TO ENGINEER-IN-CHARGE:
C ontrac tor shall make available to E ngineer-In-Charge free of c os t all
nec ess ary ins truments and ass is tance in c hec king of any work made by
the C ontrac tor setting out for taking measurement of work etc .

GC-74

TESTS FOR Q UAL ITY OF W ORK :

1.

A ll workmans hip s hall be of the bes t kind des cribed in the c ontract
doc uments and in ac c ordanc e with t he ins truc tions of Engineer-I n-Charge
and shall be s ubjec ted from time to time to s uc h tes ts at Contractor's c ost
as the Engineer-I n-C harge may direc t at the plac e of manufac ture of
fabrication or on the s ite or at any suc h plac e. Contrac tor shall provide
ass is tance, ins truments, labour and materials as are normally required for
examining, measuring and testing of any work of workmans hip as may be
s elec ted and required by E ngineer-I n-C harge.

2.

A ll tests nec ess ary in connec tion with the exec ution of wo rk as dec ided by
E ngineer-I n-C harge s hall be c arried out at an approved laboratory at
C ontrac tor's c ost.

3.

C ontrac tor shall furnis h the Engineer-I n-C harge for approval when
reques ted or if required by the s pec ific ation, adequate s amples of all
materials and finis hed goods to be used in wo rk s uffic iently in advanc e to
permit tes ts and examination thereof. All materials furnis hed and finis hed
goods applied in work shall be exac tly as per the a pproved s amples .

GC-75

ACTION A ND CO MP ENSATION IN CA SE OF BA D W ORKMANSHIP :


I f it s hall appear to the E ngineer-In-Charge that any wo rk has been
exec uted with materials of inferior des c ription, or quality or are unsound
or with uns ound, imperfect or uns killed workmans hip or other wise not in
acc ordance with the c ontrac t, the C ontrac tor s hall, on demand in writing
from E ngineer-In-Charge or his authorized repres entative s pec ifying the
work, materials or articles c omplained of, not withstanding t hat the s ame
may have been inadvertently pass ed, c ertified and paid for, forthwith
rec tify or remove and rec ons truc t the work , s o s pec ified. I n the event of
failure to do s o within a period to be s pec ified by the Engineer-I n-Charge
in his afores aid demand, Contrac tor shall be liable to pay compens ation at
the rate o f hal f a pe rcent of t he es timated c ost of work for every wo rk
limited to a maximum of ten (1 0%) percent of the value of work while his
failure to do so continues and in the c as e of any s uc h failure, the
E ngineer-I n-C harge may on expiry of the notic e period rectify and remove
and re-exec ute the work or remove and replac e with others at the risk and
c os t of the Contrac tor. T he dec ision of the E ngineer-I n-Charge as to any
ques tion arising under this c laus e s hall be final and conclusive.

51

GC-76

SUSPENSION WO RK :
C ontrac tor shall, if orde red in writing by Engineer-I n-C harge or his
representative temporarily s us pended the wo rk or a ny part t hereof for
s uc h time (not exceeding one month) as ordered and s hall not after
rec eiving s uch written notic e proc eed with the work u ntil he s hall have
rec eived a written order to proc eed therewith. The C ontractor s hall not be
entitled to c laim c ompens ation for any loss or damage sustained by him by
reas on of temporary sus pension of work as afores aid. An extens ion of
time for completion of work will be granted to the Contrac tor
c orresponding to the delay caused by s uch s us pension of work if he
applies for the same provided the s us pens ion was not c ons equent upon
any defa ult or failure on the part of the Contrac tor.

GC-77

OWNER MAY DO PART OF THE WORK :


When the Contractor fails to comply with any instructions given in
acc ordance with the provisions of this c ontract, the o wner has the right to
c arry out s uc h parts of work as the o wner may designate whether by
purc has ing materials and engaging labour o r by the agenc y of another
C ontrac tor. I n suc h c as e the owner s hall deduc t from the amount which
other wis e might bec ome due to C ontrac tor, the cos t of s uch work and
materials with then (1 0) perc ent added to cover all departmental c harges
and should the total amount thereof exceed the amount due to c ontract,
C ontrac tor s hall pay the differenc e to o wner .

GC-78

POSSESSION PRIOR TO CO MPLETIO N :


T he Engineer-I n-C harge s hall have the right to take pos session of or to
use any c ompleted or partly c ompleted work or part of work. Such
pos s ess ion or use shall not be deemed to be an acc eptanc e of any wo rk
c ompleted in accordance with the c ontact. If s uc h prior poss es sion or use
by E ngineer-I n-Charge delays the proc ess of wo rk, equitable adjus tment
in the time of c ompletion will be made and the contrac t s hall be deemed to
be modified ac c ordingly.

GC-79

COMPL ETION CERTIFICATE :


As s oon as the work has been c ompleted in acc ordance with c ontact
(exc ept in minor res pects that do not effec t their us e for the purpose for
whic h they are intended an d exc ept for maintenance thereof) as per
General C onditions of C ontract the Engineer-I n-C harge s hall issue a
c ertific ate (hereinafter c alled completion c ertificate) in whic h s hall certify
the date on which work has been c ompleted and has pass ed the said tests
and owner shall be deemed to have taken over work on the date so
c ertified. I f wo rk has been divided in various groups in c ontract, owner
s hall be entitled to take over any group or groups before the other or
others and there upon the Engineer-I n-C harge will iss ue a c ompletion
c ertific ate, whic h will, ho wever, be for s uch group or grou ps s o taken over .
I n order that C ontrac tor c ould get a c ompletion c ertificate, he s hall make
good will all s peed any defec t arising from the defective materials s upplied
by C ontrac tor of workmans hip or any act or omis sion of C ontrac tor that
may have been discovered or developed after the work o r groups of works
has been taken over. T he period allowed for carrying out s uc h work will
be normally, one month . I f any defec t be not remedied within the time
s pecified, owner may proc eed to do work at C ontractor's (Agenc y, or Firm)
risk and expenses and deduc t from the final bill s uc h amount as may be
dec ided by o wner . If by reas on of any default on the part of the
C ontrac tor, a c ompletion certific ate has not been issued in res pec t of every

52
portion of work within one month after t he date fixed by c ontract for
c ompletion of work, o wner s hall be at liberty to use work or any portion
thereof in res pec t of whic h a completion c ertificate has been iss ued,
provided that work or t he portion t hereof so us ed as aforesaid s hall be
affor ded reasonable opportunity for c ompletion of that work o r the portion
thereof so used as afores aid shall be afforded reasonable opportunity for
c ompletion of that work for the is sue of c ompletion certific ate.
GC-80
1.

SCHEDULE OF RATES :
T he rates quoted by the C ontrac tor shall remain firm till the completion of
the work and s hall not be subjec t to es c alation. Schedule of rates s hall be
deemed to inc lude an d c over all c osts , expenses and liabilities of every
des c ription and ris ks or every kind to be taken in exec uting, c ompleting
and handing over the work to o wner by C ontrac tor. The c ontractor s hall
be deemed to have known the nature, s cope, magnitude and the extent of
work and materials required though contrac t documents may not fully and
prec isely furnis h them. He s hall make suc h provision in the Sc hedule of
Rates as he may consider nec essary to c over the c ost of s uc h items of
work and materials as may be reas onable and nec es s ary to complete the
work. T he opinion of Engineer-I n-C harge as to the item of work which are
nec ess ary and reasonable for c ompletion of the work s hall be final and
binding on Contrac tor although the same may be not s hown on dra wings
or desc ribed s pec ifically in c ontract doc uments .

2.

T he Sc hedule of Rates shall be deemed to include and cover the cos t of all
c ons truc tional plant, temporary work , materials , labour and all other
matters in connec tion with each item in Schedule of Rates and the
exec ution of work or any portion thereo f finis hed c omplete in every
res pec t and maintained as s hown or des cribed in the c ontrac t document or
as may be ordered in writing duri ng t he continuanc e o f the c ontract.

3.

T he Sc hedule of Rates shall be deemed to include and cover the cos t of all
royalties and fees for the artic les and proc ess es, protec ted by letters
patent or other wis e incorporated in or used in connec tion with work , also
all royalties , rents and other payments in connec tion with obtaining
material of whats oever kind for work and s hall inc lude an indemnity to
owner whic h Contrac tor hereby gives against all ac tion, proceedings ,
c laims, damages, cos ts and expens es aris ing from the incorporation in or
use on the works of any s uch articles , proc ess es or materials. O ther
M unicipal or local Board c harges if levied on material, equipment or
mac hineries to be brought to s ite for use on work s hall be borne by the
C ontrac tor.

4.

No exemption or red uction of c ustom duties , exc is e duties , s ales tax or


any other taxes or c harges of the C entral or State Government or of any
Loc al Body whats oever will be granted or obtained and all s uc h expens es
s hall be deemed to have been inc luded in and c overed by Sc hedule of
Rates. C ontractor s hall als o obtain and pay for all permits or other
privileges nec essary to c omplete the work.

5.

T he Sc hedule of Rates s hall be deemed to inc lude and c over risk on


acc ount of delay and inte rfere nc e with C ontrac tor's c onduct of work which
may occ ur from any c aus e including orders of owner in the exerc is e of his
powe rs and on acc ount of extens ion of time gra nted due to various
reas ons .

53
6.

For work under u nit rate bas is, no alteration will be allowed in the
Schedule of Rates by reas ons of wo rk or any part of them being modified,
altered, extended, diminis hed or omitted.

GC-81
1.

PRO CEDURE FOR MEASUREMENT OF WORK IN PROGRESS:


A ll meas urements shall be in metric sys tem. All the work in progress will
be jointly measured by the repres entative of E ngineer-I n-C harge and
C ontrac tor's authorized agent. Suc h meas urements will be got recorded in
the M easurement Book by the E ngineer-I n-Charge or his authorized
representative and s igned by the Contractor or his authorized agent in
token of ac c eptanc e. If the Contrac tor or his authorized agent fails to be
pres ent whenever required by the E ngineer-In-Charge for taking meas ures
for every reas ons whats oever, the meas urement will be taken by the
E ngineer-I n-C harge or his authorized representative not withstanding the
abs enc e of Contractor and thes e measurements will be deemed to be
c orrect and binding on the C ontractor.

2.

C ontrac tor will submit a bill in approved proforma in quadru plic ate to the
E ngineer-I n-C harge of the
work giving abs trac t and detailed
measurements of various items exec uted during a month as mutually
agreed. T he E ngineer-I n-Charge s hall verify the bill and the claim, as far
as admiss ible, adjusted if poss ible, within 10 days of pres entation of the
bills .

GC-82
1.

RUNNING ACCOUNT PAYMENTS TO BE REGARDED A S A DVA NCES :


A ll running ac c ount payments s hall be regarded as payments by way of
advanc e agains t the final payment only and not as payment fo r wo rk
actually done and completed and s hall not preclude the requiring of bad,
uns ound and imperfec t or unskilled work to be removed and taken a way
and rec ons truc ted or rejected or to be considered as an admiss ion of the
due per formanc e o f c ontract or any part thereof.

2.

Five (5 ) percent o f the gros s R A Bill amount shall be retained from each
bill as retention amount and the s ame will be paid with the final bill.

GC-83

NOTICE FO R CLAIM FO R A DDITIONAL PAY MENT :


I f the Contrac tor c ons iders that he is entitled to extra payment or
c ompensation or any c laim whats oever in res pec t of work , he s hall
forth with give n otice in writing to the E ngineer-I n-Charge about his extra
payment and / o r c ompens ation. Such notic e s hall be given to the
E ngineer-I n-C harge within ten (1 0) days from the happening of any eve nt
upon whic h Contractor basis suc h c laims and s uc h notic e shall c ontain full
particulars of the nature of s uch claim with full details and amou nt
c laimed. Failure on the part of the C ontractor to put forward any c laim
with the neces sary partic ulars as above, within the time above s pec ified
s hall be an abs olute waiver thereof. No omis sion by owner to reject any
s uc h claim and no delay in dealing there with s hall waiver by owner or a ny
rights in res pec t thereof.

GC-84
1.

PAY MENT OF CO NTRACTO R'S BIL L :


T he price to be paid by the owner to C ontrac tor for the work to be done
and for t he per formanc e of all the obligations undertaken by the
C ontrac tor under contract s hall be bas ed on the c ontract pric e and
payment to be made ac cordingly for the work ac tually exec uted and
approved by the E ngineer-In-Charge.

54
2.

No payment s hall be made for work cos ting less than Rs .1 ,00 ,00 0/- till the
work is completed and a certific ate of completion given. But in c as e of
work estimated to cos t more than Rs .1 ,00 ,000 /-.
C ontrac tor on
s ubmitting the bill thereof will be entitled to rec eive a monthly payment
proportionate to the part thereo f, approved and pas sed by Engineer-I nC harge, whos e c ertificate of s uch approval and pas sing of the s um so
payable shall be final and c onc lus ive agains t contractor. This payment
s hall be made after nec ess ary deductions as stipulated els ewhere in the
c ontrac t doc uments for materials , s ecurity depos it etc . T he payment s hall
be released to the C ontractor within one (1) month of s ubmis s ion of the
bill duly pre-occ upied on proper revenue stamp.
P ayment due to
C ontrac tor s hall be made by the owner by cros sed A ccount P ayee C heque
in I ndian c urrenc y for war ding the same to the registered office of the
C ontrac tor. O wner s hall not be respons ible if the c heque is mis laid of
mis appropriated by u nauthorized persons.

GC-85

FINAL BIL L :
T he final bill s hall be s ubmitted by C ontrac tor within one (1) mont h of the
date of physic al c ompletion of work, other wis e the E ngineer-I n-C harge's
c ertific ate of the meas urement and of total amou nt payable for work s hall
be final and binding on all parties .

GC-86

RECEIPT FOR PAY MENT :


Rec eipt for payment made on acc ount of wo rk when executed by a firm
mus t be s igned by a pers on holding P ower of Attorney in this res pec t on
behalf of C ontrac tor exc ept when des c ribed in the e-Tender as a limited
c ompany in whic h c ase the rec eipt must be signed in the name of the
C ompany by one of its princ ipal officers or by s ome pers on having
authority to give effec tual rec eipt for the C ompany.

GC-87
1.

COMPL ETION CERTIFICATE :


When the C ontrac tor fulfils his obligation as per terms of contrac t, he s hall
be eligible to apply for C ompletion Certific ate. C ontrac tor may apply for
s eparate C ompletion C ertific ate in respect of each suc h portion of work by
s ubmitting the c ompletion doc uments along with s uc h application for
C ompletion Certific ate.
T he Engineer-I n-C harge s hall normally iss ue to C ontractor the C ompletion
C ertific ate within one (1) month after receiving an applic ation thereof from
C ontrac tor after verifying, from the completion documents and satisfying
hims elf that work has been c ompleted in accordanc e with and as set out in
the construction and erec tion drawings and the c ontrac t documents .
C ontrac tor after obtaining the C ompletion Certific ate is eligible to pres ent
the final bill for work exec uted by him u nder the terms of contrac t.

2.

Within one month of c ompletion of work in all res pec ts C ontrac tor s hall be
furnished with a c ertificate by the E ngineer-I n-Charge of suc h c ompletion
but no c ertific ate s hall be given nor s hall work be deemed to have been
exec uted until all (i) s caffolding, surplus materials and rubbish is c leaned
off s ite completely, (ii) until work s hall have been meas ured by the
E ngineer-I n-C harge whos e meas urement s hall be binding and c onc lus ive
and, (iii) until all the temporary works, labour and s taff colonies etc .
c ons truc ted are removed and the work site cleaned to the s atis fac tion of
the Engineer-I n-C harge.
I f C ontrac tor s hall fail to c omply with the
requirements as aforesaid or before date fixed for the completion of work,
the Engineer-I n-C harge may at the expense of Contrac tor remove s uch

55
scaffolding, surplus materials and rubbis h and dis pos e off the s ame as he
thinks fit.

3.

T he followin g documents will form the c ompletion doc uments :a) T ec hnic al documents acc ording to whic h the wo rk has bee n c arried o ut.
b)

T hree s ets of c ons truc tion drawings showin g therein the modi fic ations and
c orrections made during the cours e of execution signed by the EngineerI n-C harge.

c)

C ompletion Certific ate for "E mbedded" or "C overed" up wo rk.

d)
e)

C ertific ate of final levels as s et out for va rious works.


C ertific ate of test perfo rmed for various work.

f)

M aterial appropriation s tatement for the materials iss ued by owner for
work and lis t of s urplus materials returned to owner's store duly supported
by neces sary doc uments .

4.

U pon expiry o f the period of defec t liability and sub jec t to Engineer-I nC harge being s atis fied that work has been duly maintained by Contrac tor
during the defec t liability period of fixed originally or as extended
s ubs equently and that Contrac tor has in all res pec ts made up any
s ubs idence and performed all his obligations under c ontract, the EngineerI n-C harge (without prejudic e to the rights of o wner in any way ) give final
c ertific ate to that effect. The C ontrac tor s hall not be c ons idered to have
fulfilled the whole of his obligation until final certific ate shall have been
given by the E ngineer-In-Charge.

5.

Final Certif icate only evidence of completion:


E xc ept the final c ertific ate, no other certific ate of payment agains t a
c ertific ate or on general ac c ount s hall be taken to be an admiss ion by
owner of the due performanc e of contract or any part thereof of occ upancy
or validity or a ny c laim by the C ontractor.

GC-88
1.

TAXES, DUTIES, ETC. :


C ontrac tor agrees to and does hereby acc ept full and exc lus ive liability for
the payment of any a nd all taxes including Sales T ax, Duties , etc., now or
hereinafter impos ed, increas ed or modified from time to time in res pec t of
work and materials and all contributions and taxes for unemployment,
c ompensation, ins uranc e and old age pens ion or annuities now or
hereinafter impos ed by the C entral or State Government authorities with
res pec t to or c overed by the wages , salaries or other c ompensation paid to
the pers ons employed by Contrac tor.
I f the C ontrac tor is not liable to Sales T ax ass ess ment, a certific ate to that
effec t from the Competent A uthority s hall be produc ed without whic h final
payment to the C ontractor s hall not be made No.P , 'C ' and 'D' Form s hall
be s upplied by the owne r, and t he C ontrac tor shall be required to pay full
tax as applicable.

2.

C ontrac tor shall be res pons ible for c omplianc e with all obligations and
res trictions impos ed by the labour law or any other law a ffec ting
employer-employee relations hip.

56
3.

C ontrac tor further ag rees to comply and to s ec ure the complianc e of all
s ub contrac tors with applic able Central, State, M unicipal and loc al laws
and reg ulations and re quirement. C ontrac tor als o agrees to defe nd,
indemnify the hold harmless the owner from any liability or penalty which
may be impos ed by Central, State or loc al authority by reas ons of any
violation by C ontrac tor or s ub Contractor of s uch laws , regulations or
requirements and als o from all claims , suits or proc eedings that may be
brought agains t owner arising under , growing o ut of or by reasons or work
provided for by this Contract by third parties or by Central or State
Government autho rity or any administrative Sub-Divis ion thereof.
T he Sales T ax on work contract will be bor ne by C ontractor.

GC-89

INSURA NCE :
C ontrac tor shall at his own expens es carry and maintain the reputable
I ns uranc e C ompanies to the s atis fac tion of o wner as follows :

1.

C ontrac tor agrees to and us es hereby acc ept full and exc lus ive liability for
c ompliance with all obligations impos ed by the Employer's State Ins urance
Act, 194 8 and Contractor further agrees to defend, indemnify and hold
owner hard nes s from any liability or penalty whic h may be impos ed by the
C entral or State Government or loc al authority by reasons of any assorted
violation by Contrac tor or Sub-C ontrac tor or the E mployees State
I ns uranc e Act, 19 48 and als o from all claims , s uits or proceedings that
may be brought agains t owne r aris ing under, g rowing out of or by reas ons
of the work provided for by this c ontrac t whether brou ght by employees of
C ontrac tor by third parties or by Central or State Government authority or
any adminis trative Sub-divis ion thereof.
C ontrac tor agrees to fill in with t he E mployees State Ins urance
C orporation, the declaration form and all fo rms whic h may be required in
res pec t of Contrac tor's or s ub-Contrac tor's employees whose aggregate
remuneration is Rs.4 00/- p.m. or les s and who are employed in wo rk
provided for or thos e c overed by E SI from time to time under the
agreement. T he C ontrac tor s hall deduc t and s ec ure the agreement of the
s ub-Contrac tor to deduc t the employees c ontribution as per the first
schedule of the E mployees State I nsuranc e Act from wages . C ontrac tor
s hall remit and s ecure the agreement of sub-contractor to remit to the
State Bank of I ndian Employees State I nsuranc e Acc ounts , the employee's
c ontribution as required by the Ac t. Contrac tor agrees to maintain all
c ards and rec ords as required under the Act in respect of employees and
payments and C ontrac tor shall s ec ure the agreements of the s ub
c ontrac tors to maintain in s uc h rec ords, any expenses inc urred for the
c ontributions, making c ontributions or maintaining rec ords s hall be to
C ontrac tors or sub-contractors own ac c ount. o wner s hall retain suc h s um
as may be nec ess ary from the c ontrac t value until Contractor s hall furnish
s atis fac tory proof that all contribution as required by the Employees State
I ns uranc e Act, 19 48 have been paid .

2.

Workm an's com pensation and employees liability insurance:


I ns uranc e s hall be effec ted for all C ontrac tors employees engaged in the
performanc e of this c ontrac t. I f any part of work is s ublet, Contrac tor
s hall require the s ub-Contrac tor to provide workman's c ompens ation and
employer's liability ins urance, which may be required by o wner.

3.

O ther I nsuranc e required un der law of regulations or by o wner C ontrac tor


s hall als o c arry and maintain any and all othe r insuranc e whic h may be

57
required un der any law or reg ulation from time to time. He shall also
c arry and maintain any ot her i ns urance, which may be re quired by o wner.
GC-90
1.

DAMAGE TO P ROPERTY :
C ontrac tor shall be res pons ible for making good to the s atis fac tion of
owner any loss of and any damage to all s truc tures and properties
belonging to o wner o r being executed or proc ured o r being procured by
owner o r o f othe r age nc ies within the premis es of all work o f owner , if
s uc h loss or damage is due to fault and / or the negligenc e of willful ac t or
omission of C ontrac tor, his employees , agent, repres entatives or s ubC ontrac tor s .

2.

C ontrac tor shall indemnify and keep owner ha rmless of all c laims for
damage to properties other than prope rty aris ing under by reas ons of this
agreement, suc h c laims res ult from the fault and / or negligenc e or willful
act or omission of C ontrac tor, his employees , agents repres entative or
s ub-contrac tor.

GC-91
1.

CONTRACTOR TO INDEMNIFY OW NER :


T he Contrac tor shall indemnify and keep indemnified the owner and eve ry
member, offic er and employee of owner from and agains t all actions ,
c laims, demands and liabilities whats oever under the in respect of the
breach of any of the above c lauses and / or agains t any claim, ac tion or
demand by any workman / employee of t he C ontrac tor or any s ubc ontrac tor under any la ws , rules or regulations having forc e of la ws ,
including but not limited to c laims agains t the owner under the workman
c ompensation Act, 1923, the Employee's P rovident Funds A c t, 1952 and /
or the c ontrac t labour (Abolition and Reg ulations) A ct, 1970.

2.

PAYMENTS OF CLAIMS A ND DAM AGE S : If owner has to pay any money in


res pec t of s uc h c laims or demands afores aid, the amount s o paid a nd the
c os t inc urred by the owner shall be c harged to and paid by Contrac tor
witho ut any dispute not wit hs tanding the s ame may have been paid
witho ut the consent or authority of t he C ontrac tor.

3.

I n every c as e in which by virtue of any provision applicable in the


workman's Compens ation Ac t, 19 23 or any other Act, owner be obliged to
pay compens ation to workmen employed by Contractor the amount of
c ompensation s o paid, and without p rejudic e to the rights of owner under
Sec tion-(12 ) Sub-s ec tion-(2 ) of the said Act, owner s hall be at liberty to
rec over suc h amount from any surplus due to o n to bec ome due to the
C ontrac tor or from t he s ec urity depos it. O wner will not be bou nd to
c ontes t any claim made under Section-(12 ) Sub-s ection-(2) of the s aid act
exc ept on written reques t of Contrac tor and giving full sec urity for all c osts
c ons equent upon the c ontes ting of s uch claim.
T he Contrac tor s hall protec t adjoining s ites against struc tural, dec orative
and other damages that c ould be cas ed to adjoining premis es by the
exec ution of thes e works and make good at his c os t, any suc h damage, so
c aus ed.

GC-92

IMP LEMENTA TIO N OF APP RENTICE ACT 1954 :


C ontrac tor s hall c omply with the provis ions of the apprentice Ac t 19 54 and
the orders iss ued there under from time to time. I f he fails to do s o, it will
be a breac h of c ontrac t.

58

GC-93

HEALTH A ND SA NITARY ARRA NGEMENTS FOR WORKERS:


C ontrac tor shall c omply with all the rules and regulations o f the local
Sanitary A uthorities or as framed by owner from time to time for the
protection of health and provide sanitary arrangements of all labour
direc tly or indirec tly employed on the wo rk of this c ontrac t.

GC-94

SAFETY CO DE :
General :
C ontrac tor shall adhere to s afe construc tion prac tic e and guard against
hazardous and uns afe working c onditions and s hall c omply with o wne r's
rules as set forth herein.

1.0
1 .1

First Aid and Indust rial Inj uries :


C ontrac tor s hall maintain Firs t-Aid facilities for its employees and thos e of
his s ub-contrac tors .

1 .2

C ontrac tor s hall make outside arrangements for ambulanc e s ervice and for
the treatment of indus trial injuries. Name of those providing these
s ervices s hall be furnis hed to E ngineer-I n-Charge prior to s tart of
c ons truc tion, and their telephone numbers shall be prominently pos ted in
C ontrac tor's field offic e.

1 .3

A ll injuries s hall be reported promptly to E ngineer-I n-Charge and a c opy of


C ontrac tor's report covering eac h personal injury requiring the attention of
a physic ian shall be furnis hed to owner.

2.0
2 .1

General Rules :
C arrying and striking, matc hes , lighters ins ide the project area and
s moking within the job s ite is strictly prohibited. V iolators of s moking rules
s hall be dis charged immediately. Within the operation area, no hot wo rk
s hall be permitted, without valid gas , s afety, fire permits . T he Contrac tor
s hall als o be held liable and res pons ible for all laps es of his s ub-Contrac tor
s / employees in this regard.

3.0
3 .1

Cont ractor's Barricades :


C ontrac tor shall erec t and maintain barric ades without any extra c ost,
required in connec tion with his operation to g uard o r pr otect during the
entire phas e o f the operation of this contrac t for i)
E xc avation
ii)
Hoisting areas
iii)
A reas adjudged ha zardous by Contractor's OR O wner's ins pec tors .
iv)
O wner's existing property liable to be damaged by C ontrac tor's
operations , in the o pinion of E nginee r-I n-C harge / Site Engineer.

3 .2

C ontrac tor's employees and those of his sub-c ontractors shall bec ome
acquainted with owner's barric ading practic es and s hall respect the
provisions thereof.

3 .3

Barricades and hazardous areas adjac ent to but not located in normal
routes of t ravel shall be marked by red lantern at night .

4.0
4.1

Scaf folding :
Suitable sc affolding s hall be provided fo r workman for all works that
c annot
safely
be
done
from
ladde rs .
When a ladder is used, an extra mazdoor s hall be engaged fo r holding the
ladder and if t he ladder is us ed for c arrying materials as well s uitable

59
footholds and handholds shall be provided on the ladder and the s ame
s hall be given an inc lination not s teeper that 1 in 4 (1 horizontal and 4
vertical).
4 .2

Scaffolding or s taging, more than 3 .6 M . (1 2') above the ground o r floor,


s wing or s uspended from an overhead support or erected with stationary
s upport shall have a guard rail properly attac hed, bolted, brac ed and
other wis e fixed at least 1.0 M (3') high above the floor or platfo rm or
scaffolding or s taging and exten ding along t he entire length o f the outs ide
ends thereof with only suc h openings as may be necessary for the delivery
of materials. Such sc affolding or s taging s hall be s o fastened as to
prevent it from s waying from the building or s truc ture.

4 .3

Working platfo rms , gang ways, and s tairways s hould be s o c ons truc ted
that they s hould not s ag unduly or inadequately and if t he height of the
platform or the gang way o f the s tairway is more than 3.6 (12') above
ground level or floor level, they should be c losely boarded, s hould have
adequate widt h an d s hould be s uitably fastened as des cribed in 4 .2 above.

4 .4

E very opening in the floor of a building or in a working platfo rm be


provided with s uitable means to prevent the fail of persons or materials by
providing s uitable fenc ing or railing whose minimum height s hall be 1.0 M
(3'.0 ").

4 .5

Safe means of ac c ess shall be provided to all working platforms and other
working places . E very ladder s hall be sec urely fixed. No portable single
ladder s hall be over 9 .0 M . (30 ') in length while the width bet ween the
s ide rails in rung ladder s hall in no cas e be les s than 30 cms (1 2 inc hes )
for ladder up to and inc luding 3 .0 M . (10 '), in longer ladders this width
would be increased at leas t 6 mm (1 /4") for each addition 30 c.m. (1.0 ) of
length. Uniform s tep spacing s hall not exc eed 30 c ms. (12"). Adequate
prec aution s hall be taken to prevent danger from elec tric al equipment. No
materials on any of the s ide of wo rk s hall be so stac ked or placed as to
c aus e danger or inconvenience to any person or public . T he Contrac tor
s hall als o provide all nec ess ary all nec ess ary fenc ing and lights to protect
the workers and s taff from ac c idents , and s hall be bound to bear the
expens es of defenc e of every s uit ac tion or other proceedings at la w t hat
may be bro ught by a ny pers ons for in jury sus tained owning to ne glec t of
the above precautions and to pay damages and c os ts whic h may be
awar ded in any s uch s uit or action or proc eedings to any s uch pers on, or
whic h, may be with the c ons ent of t he Contrac tor be paid to c ompromise
any c laim by any s uc h person.

5.0
5 .1

Excavation :
A ll trenc hes 1 .2 M (4') or more in depth , s hall at all time be supplied with
at leas t one ladder .

5 .2

Ladder s hall be extended bottom o f the trenc h to at least 3" above the
s urface of the ground. T he side of the trenc h whic h are 1 .5 M (5') or more
in depth s hall be s topped bac k to give suitable s lope, or sec urely held by
timber brac ing, s o as to avoid the danger of s ides to c ollapse. T he
exc avated materials s hall not be placed within 1.5 M (5 ') of the trenc h of
half of the trenc h depth whic hever is more. C utting s hall be done from top
to bottom. Under no c ircums tanc es, undermining o r unde r c utting be
done.

60

6.0
6 .1

Demolition :
Before any demolition wo rk is c ommenc ed and als o during the prog res s of
the work all roads and o pen area a djac ent to the wo rk s ite s hall either be
c los ed or s uitably protected.

6 .2

No elec tric c able or apparatus whic h is liable to be a s ourc e of danger s hall


remain elec tricity c harged.

6 .3

A ll prac tic al steps shall be taken to prevent danger to pers ons employed
from ris k of fire or explosion o f flooding. No floor or other part of the
building shall be s o over loaded with debris or materials as to render it
uns afe.

7.0
7 .1

Saf ety Equipm ent :


A ll nec ess ary pers onal s afety equipment as c ons idered nec ess ary by the
E ngineer-I n-C harge s hould be made available for the us e of pe rs ons
employed on the s ite and maintained in a c ondition s uitable for immediate
use, and t he C ontrac tor s hould take adequate steps to ens ure proper use
of eq uipment by thos e concerned.

7 .2

Workers employed on mixing as phaltic materials, c ement and line mortars


s hall be provided with protec tive foot wear a nd protec tive gloves .

8.0
8 .1

Risky P lace :
When the work is done near any place where the re is a ris k of dro wning,
all nec essary s afety equipment shall be provided and kept ready for use
and all nec ess ary steps taken for prompt resc ue of any pers on in danger
and adequate provision s hould be made for prompt firs t-aid treatment of
all injuries likely to be sus tained during t he course of the work .

9.0
9 .1

Hoisting Equipment :
U se of hois ting mac hines and tac kles including their attac hments , and
s torage and s upports s hall c onform to the follo wing s tandards or
c onditions .
T hes e s hall be of good mechanic al c ons truction, sound material and
adequate s trength and free from patent defec t and s hall be kept in good
c ondition and in good workin g o rder .
E very rope us ed in hois ting or lo wering materials or as a means of
s us pens ion shall be of durable quality and adeq uate s trength an d free
from patent de fec ts.
E very c rane driver or hois ting applianc e operator s hall be properly
qualified and no pers on u nder t he age of 2 1 years s hould be in-charge of
any hois ting machine inc luding any s caffolding.
I n c ase of every hois ting machine and of every c hain ring hook, s hac kle,
s wivel and pulley block us ed in hois ting or lowering or as means of
s us pens ion, the s afe working load s hall be as certained by adequate
means . E very hoisting mac hine and all gear referred to a bove s hall be
plainly marked with the s afe workin g load and the conditions under which
it is applic able shall be c learly indic ated. No part of any machine or any
gear referred to above in this paragraph s hall be loaded beyond the s afe
working load except for the purpose of tes ting.
I n c ase of departmental mac hine, the s afe work load s hall be notified by
the Engineer-I n-C harge, as regards Contractor s mac hine, the Contrac tor
s hall, notify, the s afety working load o f the mac hine to the Engineer-I nC harge. Whenever the Contractor brings any mac hinery to s ite of work he
s hould get it verified by the E ngineer-I n-Charge c onc erned.

9 .2

9 .3

9 .4

9 .5

9 .6

61

10.0

Electrical Equipm ent :


M otors , gears , transmiss ion, electric wiring and other dangerous parts of
hois ting applianc es s hall be provided with e ffic ient safeguards , hois ting
applianc es should be provided with suc h means when will red uce to the
minimum the risk of acc idental desc ent of the load, ade quate p rec autions
s hall be taken to reduc e to the minimum the ris k of any part or a
s us pended load bec oming acc identally displaced. When workers are
employed on elec tric al ins tallations whic h are already energized, ins ulating
mats , wearing apparel s uch as gloves , and booths as may be nec ess ary
s hall be provided. T he workers s hall not wear any rings , watches and
c arry keys or other materials which are good c onductors of electricity.

11.0

Maintenance of Saf ety Devices :


A ll scaffolds , ladders and other s afety devices as mentioned or described
herein s hall be maintained in s ound c ondition and no s c affold, ladder or
equipment shall be altered or removed while it is in use. Adequate
was hing fac ilities s hould be p rovided at or near place of work.

12.0

Display of Saf ety Instructions :


T he safety provis ions should be brought to the notic e of all concerned by
display on a Notic e Board at a prominent place at the work s pot. T he
pers ons res ponsible for c omplianc e of the s afety c ode shall be named
therein by the C ontrac tor.

13.0

Enf orcement of Saf ety Regulations :


T o ens ure effec tive enforcement o f the rules and regulations relating to
s afety prec autions , the arrangement made by the Contrac tor shall be open
to ins pec tion by the Welfare O ffic er, Engineer-I n-C harge or Safety
E ngineer of the owner or their repres entatives .

14.0
1 4.1

No Exemption :
Notwiths tanding the above c laus e 1 .0 to 13.0 there is nothing to exempt
the Contrac tor from the operations of any other Ac t or Rules in forc e in the
Republic of I ndia.
I n addition to the above, the C ontrac tor s hall abide by the s afety c ode
provisions as per C .P .W.D. s afety code framed from time to time.

1 4.2

GC-95

ACCIDENTS :
I t s hall be Contractor's respons ibility to protect agains t acc idents on the
works. He shall indemnify the o wner a gainst any claim for damage or for
injury to pe rson or prope rty res ulting from, and in the c ours e of work and
also under the provis ions of the workman's c ompensation Ac t. On the
occ urrence of an acc ident arising out of the works whic h res ults in death
or whic h is so s erious as to be likely to res ult in death, the C ontractor s hall
within t wenty-fou r ho urs of s uch ac cident, report in writing to the
E ngineer-I n-C harge, the fac ts s tating clearly and in sufficient details the
c irc ums tanc es of suc h acc ident and the subsequent action. All other
acc idents on the works involving inju ries to person or damage to prope rty
other than that of the Contrac tor s hall be promptly reported to the
E ngineer-I n-C harge, s tating clearly and in suffic ient details the fac ts and
c irc ums tanc es of the acc idents and the action taken. In all c as es, the
C ontrac tor shall indemnity the owner against all loss or damage res ulting
direc tly or indirec tly from the C ontractor's failure to report in the manner
aforesaid. This inc ludes penalties or fines, if any, payable by the owne r as
a c ons equenc e of failure to give notic e under the Workman's

62
C ompensation Ac t, or failure to c onform to the provis ions of the said ac t in
regard to s uch ac c idents .
I n the event of an acc ident in res pec t of which compens ation may bec ome
payable under t he Workman's C ompens ation Act VIII of 1923 including all
modific ation thereof, the E ngineer-I n-C harge may retain out of money due
and payable to the C ontractor s uch sum of sums of money as may in the
opinion of Engineer-I n-C harge be sufficient to meet s uc h liability. On
rec eipt of award from the Labour C ommiss ioner in regard to quantum of
c ompensation, the difference in amount will be ad justed.

Addl.A .E.
R. M.C.

Dy.Ex.Engineer

R.M.C.

Addl. City Enginee r

R.M.C.

Signat ure of Contract or.

63

PART-II
SECTION - 3
TECHNICAL
SPECIFICATIONS

64

TEC HN ICAL S PECIFICATIO NS


CO NTENTS
SR
NO
A

PARTICULARS
GENERAL
1 Scope of Contract
2 Tender Price
3 Completion Schedule
4 Gener al Technical Guideline

SPEC IFICATIO N O F MATERIAL

DETAILED TEC HNIC AL SPEC IFIC ATIO N

ADDITIO NAL CO NDITIO NS

65

:: TECHNICAL S PECIFICATION ::
(A) GENER AL
1.

SCO PE OF CONTRA CT :
The work entitled comprise of CEMENT CO NCRETE RO AD WO RK
INSID E PED AK INSTI TUTE IN W ARD NO.6
complete as per
specifications.

2.

TENDER P RI CE :
The rates quoted in the bill of quantities shall cover everything necessary
for the due and com plete execution of the work according to the dra wings
and other condition and stipulations of the contract including specifications
of the evident, intend and meaning of all or either of them or according to
custom ary usage and for periodical and final inspection and test and proof
of the wo rk in every respect and for measuring, num bering or weighing
the same, including setting out and laying or fixing in position and the
provision of all m aterials, power, tools, rammers, labour, tackle, platforms
with im pervious lapped joints for scaffolding, ranging roads, straight
edged, cantering and boxing, wedges, moulds, templates, posts, straight
rods, straight edged, cantering and boxing, wedges, moulds, templates,
posts, straight rails, boning staves strutting, barriers, fencing lighting
pumping apparatus, temporary arrangement for passage of traffic a ccess
to premises and continuance to drainage water supply and lighting (if
interrupted by contractors work) temporary sheds, painting, varnishing,
polishing establishm ent for efficient supervision and stating arrangements
for the efficient protective of life and property and all requisite plant and
machinery of every kind.
The contractor shall keep every portion of the work clear of accumula tion
from time to time and shall leave every portion of the work clean, clear,
perfect and at the conclusion of whole, providing at their o wn cost all such
material implement, appliances and labour as the Engineer in charge m ay
require to prove if it to be so.

3.

COMPLETION SCHED ULE :


The contract period shall be 3 mont hs from the date of notice to proceed.
The Contraction shall submit his completion schedule and the program of
works together with this tender in conformity with completion schedule
given in the documents.

4.
4.1

GENERAL TECHNI CAL GUID ELI NE :


All the items occurring in the wo rk and as found necessary during actual
execution shall be carried out in the best workman like manner as per
specifications and the wri tten order of the Engineer in charge

4.2

Extra Claim in respect of extra work shall be allowed only if such work is
ordered to be carried out in writing by the Engineer in charge

4.3

The contractor shall engage a qualified Engineer for the Execution of wo rk


who will remain present for all the time on site and will receive

66
instructions and orders from the Engineer in charge or his authorized
representative. The instruction and orders given to the contractor
representative on site shall be considered as it given to the contractor
himself.
4.4

The work orde r book as prescribed shall be m aintained on the site of the
work by the contactor and the contractor shall sign the orders given by
the inspecting offers and shall carry out them properly.

4.5

Quantities specified in the tender may very at the time of actual execution
and the contractor shall have no claim for com pensation on account of
such variation

4.6

Unexcavated lengths shall be left wherever required and so directed by


the Engineer in charge during the currency of the contract and shall be
tackled. If required, before completion of work.

4.7

Diversion of road, if necessary, shall be provided and maintained during


the currency of the contract by the contractor at his cost.

4.8

Figured Dimensions of drawing shall supersede measurements by scale,


special dimensions or directions in the specifications shall supersede all
other dimensions.

4.9

The contracto r shall be responsible to take regular level on the approved


alignment before actually level on the approved alignment before actually
starting the work The levels shall be commence to the G.T.S. levels and
shall be got approved from the Engineer in charge

4.10

If the arrangement of temporary drainage is required to be made during


any work of this Contract, this shall be made by the Contractor wi thout
claiming any extra cost.

-x-x-x-

67

(B)

SPECIFICA TIONS OF MATER IA LS

1.

Material:

M-1

Water:
Water shall not be salty or brackish and shall be clean, reasonably clear
and free from objectionable quantities of silt and traces of oil and injurious
alkalis, salts, organic matter and other deleterious material which will
either weaken the m ortar of con crete o r cause efflorescence or atta ck the
steel in RCC container for transport, storage and handling of water shall
be clean. Water shall conform to the standards specified in I.S. 456 Latest edition.
If required by the engineer-in-charge, it shall be tested by comparison
with distilled wa ter. Com parison shall be m ade by means of standard
cem ent tests for soundness, change in time of setting and mortar strength
as specified in I.S. 269 (Latest edition). Any indication of unsoundness,
change in time of setting by 30 minutes or more or decrease of more than
10 per cint in strength of mortar prepared with wa ter sample when
com pared wi th the results obtained with mortar p repared with distilled
water shall be sufficient cause for rejection of water under test.
Water for curing mortar, concrete or m asonry should not be too acidic or
too alkaline. It shall be free of elements whi ch significantly affect the
hydration reaction or otherwise interfere with the hardening of mortar or
concrete during cu ring or those which produce obje ctionable stains or
other unsightly deposits on concrete or mortar surface.
Hard and bitter water shall not be used for curing.
Potable water will generally found suitable for curing mortar of concrete.

M-2

Lime:
Lime shall be hydraulic lime as per I S 712 - Latest Edition. Necessary
tests shall be carried out as per I S 6932 9 (Parts I to X) Latest edition.
The following field tests for limes are to be carried out:
i)

A very rough idea can be form ed about the type of lime by its visual
examination i.e. fat lim e bears pure whi te colour, lim e in form of
porous lumps of dirty white colour indicates quick lim e and solid
lum ps are the unburnt lime stone.

ii)

Acid tests for determ ining the carbonate content in lime, lime
Excessive amount of impurities and rough determ ination of lim e.

Storage shall comply with I S 712 - Latest Edition. The slaked lime, it
stored, shall be kept in a weather proof and dam p-proof shed with
impervious floor and sides to protect it against rain, moisture, and
weather and extraneous materials mixing with i t. All lime that has been
dam aged in any way shall be and all rejected m aterials shall be removed
from site of work.

68

Field testing shall be done according to I S 269 (latest edition) to show


the acceptability of materials.
M-3

Cement:
Cement shall be ordinary portland cement as per IS 269 or I S 455 or IS
1489 (P-I) or (P-II) or IS 8041 or IS 8043, IS 8812 or IS 12330, IS 12269
(All Latest edition).

M-4

White Ceme nt:


The white cement shall conform to I S 8042-E Latest edition.

M-5

Colored Cement :
Color cement shall be with white or grey portland cement as specified in
the item of the work.
The pigments used for colored cement shall be of approved quality and
shall not exceed 10% of cement used in the mix. The mixture of pigment
and cement shall be properly ground to have a uniform color and shade.
The pigments shall have such properties as to provide for durability under
exposure to sunlight and weather.
The pigment shall have the property such that it is neither affected by the
cem ent nor detrimental to it.

M-6

Sand:
Sand shall be natural sand, clean well graded, hard strong, du rable and
gritty parti cles free from injurious amounts of dust, clay, kankar nodules,
soft or flaky particles Shale, alkali, salts organic matter, loam, m ica or
other deleterious substances and shall be got approved from the
engineer-in-charge. The sand shall not contain m ore than 8 percent of silt
as determ ined by field test. If necessary, the sand shall be washed to
make it clean.
Coarse Sa nd:
The fitness m odules of coarse sand shall not be less than 2.5 and shall not
exceed 3.0. The sieve analysis of coarse shall be as under:
----------------------------------------------------------------------------------I .S. Sieve
Des ignation

P erc entage by weig ht


pas sing sieve

I S Sieve percentage
Des ignation

by weight
perc entage pas s ing s ieve.

----------------------------------------------------------------------------------4 .7 5 mm
2 .3 6 mm
1 .1 8 mm

1 00
9 0 to 10 0
7 0-100

6 00 M ic ron
3 00 M ic ron
1 50 M ic ron

3 0-100
5 -7 0
0 -5 0

-----------------------------------------------------------------------------------

69

Fine Sa nd:
The fineness modules shall not exceed 1.0 The sieve analysis of fine sand
shall be as under:
----------------------------------------------------------------------------------I .S. Sieve
Des ignation

P erc entage by weig ht


pas sing sieve

I S Sieve percentage
Des ignation

by weight
perc entage pas s ing s ieve.

----------------------------------------------------------------------------------4 .7 5 mm
2 .3 6 mm
1 .1 8 mm

1 00
1 00
7 5-100

6 00 M ic ron
3 00 M ic ron
1 50 M ic ron

4 0-85
5 -5 0
0 -1 0

----------------------------------------------------------------------------------M-7

Stone Dust:
This shall be obtained from crushing hard black trap or equivalent. It shall
not contain more than 8% of silt as determ ined by field test with
measuring cylinder. The m ethod of determ ining silt contents by fields test
is given as under:
A sample of stone dust to be tested shall be placed without drying in 200
mm measuring cylinder. The quantity if the sam ple shall be such that it
fills the cylinder upto 100 mm mark, the clean water shall be added upto
150 mm mark. The mixture shall be stirred vigorously and content
allowed to settle for 3 hours.
The height of silt visible as settled layer above the stone dust shall be
expressed as percentage of the height of the stone dust below. The stone
containing more than 8% silt shall be washed so as to bring the content
within the allo wable lim it.
The fitness nodules of stone dust shall not be less than 1.80

M-8

Stone Grit:
Gri t shall consist of crushed or broken stone and be hard, strong dense
durable clean of proper gradation and free from skin or coating likely to
prevent proper adhesion of mortar. Grit shall generally be cubical in shape
and as far as possible flaky elongated pieces shall be avoided. It shall
generally com ply with the provisions of IS 383 (Latest Edition). Unless
special stone of particular quarries is mentioned, grit shall be obtained
from the best black trap or equivalent hard stone as approved by the
engineer-in-charge. The grit shall have no deleterious reaction with
cem ent.
The grit shall conform to the following gradation as per sieve analysis:
----------------------------------------------------------------------------------I .S. Sieve
Des ignation

P erc entage pas sing


through sieve

I S Sieve
Des ignation

perc entage pas sing thro ugh sieve

----------------------------------------------------------------------------------1 2.50 mm
1 0.00 mm

1 00%
8 5-100%

4 .7 5 mm
2 .3 6 mm

0 -2 0%
0 -2 5%

-----------------------------------------------------------------------------------

70
The crushing strength will be such as to allow the concrete in which it
used to build up the specified strength of concrete.
The necessary tests for grit shall be carried out as per the requirements of
I S 2386 (Part I to VIII) Latest edition as per instruction of engineer-incharge. The necessity of test will be decided by the engineer-in-charge.
M-9

Cinder:
Cinder is well bu rnt furnace residue whi ch has been fused or sintered into
lum ps of varying sizes.
Cinder aggregates shall be well burn t furna ces residue obtained from
furnace using coal fuel only. It shall be sound clean and free from clay,
dirt, ash or other deleterious matter.
The average grading for cinder aggregate shall be as mentioned below:
----------------------------------------------------------------------------------I .S. Sieve
Des ignation

P erc entage pas sing

I S Sieve
Designation

perc entage pas sing

----------------------------------------------------------------------------------2 0 mm
1 0 mm

1 00%
86

4 .7 5 mm
2 .3 6 mm

70
52

----------------------------------------------------------------------------------M-10 Lime Mortar:


Lime: Lim e shall conform to specification M-2. W ater: Water shall
conform to specification M -1. Sand: Sand shall conform to specification
M-6.
Proportion of M ix:
Mortar shall consist of such proportions of slaked lim e and sand as m ay be
specified in item. the slaked lime and sand shall be measured by volume.
Pre paration of Morta r:
Lime m ortar shall be prepared by process as per IS 1625 Latest edition.
Power dri ve mill shall be used for preparation of lime mortar. The slaked
lime shall be placed in the mill in an even layer and ground for 180
revolutions with a sufficient water. W ater shall be added as required
during griding (ca re being taken not to add m ore water) that will bring the
mixed material to a consistency of stiff paste. Thoroughly wetted sand
shall then be added evenly and the mixture ground for another 180
revolutions.
Storage:
Mortar shall always be kept dam p, protected from sun and rain till used
up, covering it by ta rpaulin or open sheds.
All mortar shall be used as soon as possible after grinding. It should be
used on the day on which i t prepared. But in no case, m ortar made earlier
than 36 hours shall be permitted for use.

71
M-11 Cement M ort ar:
Water shall conform to specification M -1. Cement: Cement shall conform
to specifications M-3. Sand: Sand shall conform to M -6.
Proportion of M ix:
Cement and sand shall be mixed to specified proportion, sand being
measured by measuring boxes. The proportion of cem ent will be by
volume on the basis of 50 kg/Bag of cem ent being equal to 0.342 Cu.M.
The mortar m ay be hand mixed as directed.
Proportion of M ortar:
In hand mixed mortar, cement and sand in the specifications shall be
thoroughly m ixed dry on a clean im pervious platform by turning over at
least 3 times or m ore till a homogeneous mixture of uniform color is
obtained. mixing platform shall be so arranged that no dele terious
extraneous m aterial shall get mixed wi th mortar or mortar shall flow out.
While mixing, the water shall be gradually added and thoroughly mixed to
form a still plastic mass of uniform color so that each particle of sand shall
be com pletely covered wi th a film of wet cem ent. the water cem ent ratio
shall be adopted as directed.
The mortar so prepared shall be used within 30 minutes of adding water.
Only such quantity of mortar shall be prepared as can used within 30
minutes.
M-12 Stone Coa rse A ggregate for Nom ina l M ix Concrete.
Coarse aggregate shall be of machine crushed stone of black trap or
equivalent and be hard, strong, dense, durable clean and free from skin
and coating likely to prevent proper adhesion of mortar.
The aggregate shall generally be cubical in shape. Unless special stones of
particular quarries are mentioned, aggregates shall be machine crushed
from the best black trap or equivalent hard tone as approved. Aggregate
shall have no deleterious reaction with cement. The size of the coarse
aggregate for plain cement concrete and ordinary reinforced cement
concrete shall generally be as per the table given below, however, in case
of reinforced cement concrete the maximum lim it may be restricted to 6
mm, less than the minimum lateral clear distance between bars of 6 mm
less than the cover whi chever is smaller.
IS
Sieve
des ignation

Perc entage pass ing for s ingle I S Sieve


sized aggregates of nominal des igsize
nation
40 mm
20 mm
16 mm

Percentage pass ing for


single sized aggregates of
nominal s ize
40 mm 20 mm 1 6 mm

80 mm

--

--

--

--

--

--

63
40
20
16

100
85-100
0-2 0

-100
85-100

--100
8-1 00

0.5
----

-0.2 0
0.5 0
--

0 .30
0 .5
---

mm
mm
mm
mm

12 .5
mm
10 mm
4.7 5 mm
2.3 5 mm
--

72

Note:
This percentage may be the engineer-in-charge when considered
necessary for obtaining better density and strength of concrete.
The grading test shall be taken in the beginning and at the change of
source of materials. The necessary tests indicated in IS 383 Latest edition
and IS 456 Latest edition shall have to be carried out to ensure the
acceptability. The aggregates shall be stored separately and handled in
such a manner as to prevent the intermixing of different aggregates. If
the aggregates are covered with dust, they shall be washed with wa ter to
make them clean.
M-13 Bla ck Tra p or Equiva lent Ha rd Stone Coarse:
Aggregate for D esign Mix concrete:
Coarse aggregate shall be of machine crushed stone of black trap or
equivalent hard stone and be hard strong, dense, durable, clean and free
from skin and coating likely to prevent proper adhesion of mortar.
The aggregates shall generally be cubical in shape. Unless special stones
of particular quarries are mentioned, aggregates shall be m achine crushed
from the best, black trap or equivalent hard stones as approved.
Aggregate shall have no deleterious reaction with cement.
The necessary tests indicated in IS 383 Latest edition and IS 456 Latest
edition shall have to carried out to ensure the acceptability of the
material.
If aggregate is covered with dust, it shall be washed with wate r to m ake it
clean.
M-14 Brick Bats A ggregate :
Bri ck bat aggregate shall be broken from well burnt or slightly over burnt
and dense bricks. It shall be homogeneous in texture, roughly cubi cal in
shape, clean and free from dirt of any other foreign material. The brick
bats shall be of 40 mm to 50 mm size unless otherwise specified in the
item . The under burnt of over brunt bri ck bats shall not be allowed.
The brick bats shall be measured by suitable boxes as directed.
M-15 Bricks:
The bricks shall be hard or machine moulded and made from suitable soils
and burnt. They shall be free from cracks and flaws and nodules of free
lime. They shall have sm ooth rectangular faces wi th sharp corners and
shall be of uniform colors.
The bricks shall be moulded with a frog of 100 mm x 40 mm and 10 mm
to 20 mm deep on one of it's flat sides. The bricks shall not break when
thro wn on the ground from a height of 600 mm.
The size of modular bricks shall be 190 mm x 90 mm .

73
The size of the conventional bricks shall be as under:
(9" x 4.3/8" x 2,3/4") 225 x 110 x 75 mm
Only bricks of one standard size shall be used in one work. The following
tolerances shall be perm itted in the conventional size adopted in a
particular wo rk.
Length 1/8" (3mm ) width : 1/16" (1.5mm )
Height: 1/16" (1.5 mm)
The crushing strength of the bri ck shall not be less than 35 kg/sq.cm . The
average water absorption shall not be more than 20 percent by weight.
Necessary tests for crushing strength and water absorption etc., shall be
carried out as per IS: 3495 (Part I to IV) - latest edition.
M-16 Stone:
The stone shall be of the specified variety such as granite / trap stone /
quarzite or any other type of good hard stones. The stones shall be
obtained only from the approved quarry and shall be hard, sound, durable
and free from defects like cavities cracks, sand holes flaws, injurious
reins, patches of loose or soft m aterials etc. and weathered po rtion and
other stru ctu ral defects or imperfection tending to affected their
soundness and strength. The stone with round surface shall not be used.
The percentage of water absorption shall not be more than 5% dry or wet.
When tested in accordance wi th I.S.1124 - Latest edition. The minimum
crushing strength of the stone be 200 kg/sq.cm unless otherwise
specified.
The samples of the stone to be used shall be got approved before the
work is started.
The khanki facing stone shall be dressed by chisel as specified in the item
for khanki facing in required shape and size. The face of the stone shall be
so dressed that the bushing on the exposed face shall not project by more
than 40 mm from the general wall surface and on face to be plastered it
shall not project by more than 19 mm nor shall it have depressions more
than 10 mm from the average wall surface.

M-17 Laterite Stone


Laterite stone shall be obtained from the approved quarry. It shall be
com pacted, in texture, sound, durable and free from soft patchs. Its shall
have m inimum crushing strength of 10 Kg/sq.cm in its dry condition. It
shall not absorb water more than 20 % of its own weight, when imm ersed
for 24 hours in wate r After quarrying, the stone shall be allowed to
weather for some time before using in work. '
The stone shall be dressed into regular rectangular blocks so that all faces
are free from waviness and unevenness, and the edges true and square.
Those types of stone in whi ch whi te cly occurs should not be used.
Special corner stones shall be provided where so directed.

74

M-18 Mild St ee l Ba rs:


Mild steel bars reinforcement for RCC work shall confirm to IS 432 (PartII) Latest edition and shall be of tested quality. It shall also comply with
relevant part of IS 456 Latest edition.
All the reinforcement shall be clean and free from dirt, paint, grease, mill
scale or loose or thick rust at the tim e of placing.
For the purpose of payment, the bar shall be measured correct upto 10
mm length and weight payable worked out at the rate specified below:
1
2
3
4
5
6
7

6 mm
8 mm
1 0 mm
1 2 mm
1 4 mm
1 6 mm
1 8 mm

0.2 2
0.3 9
0.6 2
0.8 9
1.2 1
1.5 8
2.0 0

Kg/Rmt
Kg/Rmt
Kg/Rmt
Kg/Rmt
Kg/Rmt
Kg/Rmt
Kg/Rmt

8
9
10
11
12
13
14

20
22
25
28
32
36
40

mm
mm
mm
mm
mm
mm
mm

2.4 7
2.9 8
3.8 5
4.8 3
6.3 1
7.9 9
9.8 6

Kg/Rmt
Kg/Rmt
Kg/Rmt
Kg/Rmt
Kg/Rmt
Kg/Rmt
Kg/Rmt

M-19 High Y ield St re ngt h Stee l D eformed Bars:


High yield strength steel deformed bars shall be either cole twisted other
rolled and shall conform to IS 1786 Latest edition and IS 1139 Latest
edition respectively.
Other provisions and requirements shall conform to specification No.M-18
for Mild Steel Bars.
M-20 High Tensile Steel Wires:
The high tensile wires for use in prestressed concrete wo rk shall conform
to IS 2090 Latest edition.
The tensile strength of the high tensile steel bars shall be as specified in
the item. In absence of the given strength the m inimum strength shall be
taken as per part 6-1 of the IS 1785 Latest edition. Testing shall be done
as per I S requirements.
The high tensile shall be free from loose m ill scale, rust, oil grease, or any
other harmful matter. Cleaning of steel bars may be carried out
immersion in solvent solution, wi re brushing or passing through a
pressure box containing carborundum.
The high tensile wi re shall be obtained from manufacturer in coil having
diameter not less than 350 times the diameter of wi re itself, so that wi re
springs back straight on being uncoiled.
M-20(A)
Pla in Carbon Drawn Steel W ires:
The plain carbon drawn steel wires for use in precast concrete work shall
be conform to IS 1785 (Part-II) Latest edition.
The tensile strength of the P C steel bars shall be as specified in the item.
In absence of the given strength, the m inimum strength shall be taken as
per IS:1785 Latest edition. Testing shall be done as per IS requirements.

75

The P C steel bars shall be free from loose mill scale, rust, oil grease, or
any other harmful matter. Cleaning of steel bars may be carried out
immersion in solvent solution, wi re brushing or passing through a
pressure box containing carborandum.
M-21 Mild St ee l Binding Wire:
The mild steel wi re shall be of 1.63 mm, 22 mm (16 or 18 gauge)
diameter and shall conform to I S 280 Latest edition.
The use of black wire will be permitted to binding reinforcem ent bars. It
shall be free rust, oil paint, grease, loose mill scale or any other
undesirable coating which may prevent adhesion of cement mortar.
M-22 Structura l Stee l:
All stru ctu ral steel shall confirm to IS 226 Latest edition. The steel shall be
free from the defects mentioned in IS 226 Latest edition and shall have a
smooth finish. the material shall be free from loose mill scale, rust pits or
other defects affecting the strength and durability. River bars shall
conform to IS 1148 Latest edition.
When the steel is supplied by the contractor, test certificate of the
manufacturer shall be obtained according to IS 226 Latest edition and
other relevant Indian Standards.
M-23 Galv anize d I ron Sheets :
The galvanized iron sheets shall be plain or corrugated sheets of guages
as specified in item . The G.I. Sheets shall conform to I.S.latest edition.
The sheets shall be undam aged in carriage and handling either by rubbing
off of zinc coating or otherwise. They shall have clean and bright surface
and shall be free from bends, holes, rust or white po wdery deposit.
The length and width G.I. sheet shall be as directed as per site condition.
M-23-A : G.I. Va lleys gutter, ridges :
The G.I. ridges and hips shall be of plain galvanized sheets Class-3 of the
thickness as specified in item . These shall be 600 mm in and wid th and
properly bent up to shape without damage to the sheets an in process of
bending.
Valleys gutters and flashings shall also be of galvanized sheets of
thickness as specified in item . Valleys shall be 900 mm. wide overall and
flashing shall be 380 mm. wide overall. They shall be bent to the required
shape without damage to the sheet in the process of bending.
M-24. Asbestos Ceme nt She ets :
Asbestos cem ent sheets plain, corrugated or semi-corrugated shall conform shall conform to I.S. latest edition. The thickness of the sheets
shall be as specified in The item. the sheets shall be free from all defects
such as cracks, holes, deformities, edges or otherwise dam aged.

76

Ridge & Hips :


Ridge and hips shall, be of same thickness as that of A.C. sheets. The
types of ridges shall be suitable for the type of sheets and location.
Other accessories to be used in roof such as flashing pieces eaves filler
pieces, valley gutters, north light and ventilator curves, barge boards etc.
shall be of standard m anufacture and shall be suitable for the type of
sheets and location.
M-25. Ma nglore Pattern Roof Tile s :
25.1. The mangalore pattern tiles shall conform to I.S. latest edition for Class
AA o r class A type as specified in item. Sample of the tiles to be provided
shall be got approved from the Engineer-in-charge. Ne cessary tests shall
be carried out as directed.
M-26 Shuttering:
The shuttering shall be either of wooden planking of 30 mm minimum
thickness with or without sheet lining or of steel plates stiffened by steel
angles. The shuttering shall be supported on battens and beam s and
props of vertical bullies properly cross braced together so as to make the
centering rigid. In places of bullies props, brick pillar of adequate section
built in mud mortar may be used.
The form work shall be sufficiently strong and shall have cam ber, so that
it assumes corre ct shape after deposition of the concrete and shall be able
to resist forces caused by vib ration of live load of men working over it and
other incidental load associated wi th it. The shuttering shall have smooth
and even surface. Its joints shall not permit leakage of cement grout.
If at any stage of work du ring or after placing concrete in the stru ctu re,
the form work sags or bulges out beyond the required shape of the
structure, the concrete and adequately rigid form work. The complete
form work shall be got inspected by and got approved from the engineerin-charge before the reinforcement bars are placed in position.
The props shall consist of bullies having 100 mm minim um dia.
measurement at mid length and 80 mm at thin end and shall be placed as
per design requirem ent. These shall rest squarely on wooden sole plates
40 mm thick and m inimum bearing area of 0-10 sq.m laid on sufficiently
hard base.
Double wedges shall further be provided between the sole pite and the
wooden props so as to facilitate tightening and easing of shuttering
without jerking the concrete.
The timber used in shuttering shall not be so dry as too absorbed water
from concrete and swell or bulge nor so green or wet as the shrink after
erection. The tim ber shall be properly sawn and planned on the sides and
the surface com ing in contact wi th con crete. Wooden form work with
metal sheet lining or side plates stiffened by steel angles shall be
permitted.

77
As far as pra cticable, clam ps shall be used to hold the forms together and
use of nails and spikes avoided.
The surface of timber shuttering that would come in contact with concrete
shall be well wetted and coated with soap solution before the concreting is
done. Alternatively, coat of ra w linseed oil or oil of approved manufacturer
may be applied in place of soap solution. In case of steel shuttering either
soap solution or raw linseed oil shall be applied after thoroughly cleaning
the surface. Under no circumstances, black or brunt oil shall be perm itted.
The shuttering for beams and slabs shall have camber of 4 mm per meter
(1 in 250) or as directed by the engineer-in-charge, so as to offset the
subsequent deflection for cantilevers, the cam ber of free end shall be 1/50
of the projected or as directed by the engineer-in-charge.
M-27. Ex pansion joints - Premoulded f ille r:
The item provides for expansion joints in R.C.C. fram e structu res for
internal joints, as well as exposed joints, with the use of prem oulded
bituminous joint filler.
Premoulded bituminous joint filler, i.e. performed strip of expansion
joint filler shall not got deformed or broken by twisting, bending or
other handling when exposed to atmospheric condition. Pieces of joint
filler that have been damaged shall be rejected.
Thickness of the pre-moulded joint filler shall be 25 mm. unless otherwise
specified.
Premoulded bituminous joint filler shall conform to I.S. Latest edition.
M-28. Expansion joints Coppe r strips & hold fasts :
The item provide for expansion joints in R.C.C. frame structu re for
internal joint as well as for exposed joints wi th the use of necessary
copper strip and holdfasts.
Copper sheet shall be of 1.25 mm thick and of 1.25 mm width and the "U"
shape in the middle.
Copper strip shall have holdfast of 3 mm diameter copper rod fixed to the
plate soldered on strip at intervals of about 30 cm or as shown in the
dra wing o r as directed. The width of each flange (horizontal side) of the
copper plate to be emvidded in the concrete work shall be 25 mm. depth
of "U" to be provided in the expansion joint, in the copper plate shall be of
25 mm.

M-29. Tea k wood :


The teak wood shall be of good quality as required for the item to be
executed. When the kind of wood is not specifically m entioned, good
Indian teak wood as approved shall be used.

78

Teak wood shall generally be free from large, loose, dead of cluster knots
flaws, shakes, warps, twists, bends; or any other defects. It shall
generally be uniform in substance and of straight fibres as far as possible.
It shall be free from rot, decay, harmful fungi and other defects of harmful
nature, which wi ll affect the strength, du rability or its usefulness for the
purpose for whi ch i t is required. The colour shall be uniform as far as
possible . Any effort like paining, using any adhesive resinous materials
made to hide the defects shall render the pieces liable to rejection by the
Engineer-in-Charge.
All scantlings, planks etc. shall be sawn in straight lines and planes in the
direction of grains and of uniform thickness.
The tolerances in the dimensions shall be allowed at the rate of 1.5 mm,
per face to be planed.
First class te ak wood :
First class teak wood shall have no individual hard and sound knots,
more than 6 sq.cm. in size and the aggregate area of such knots shall
hot be than 1 % of area of piece, the timber shall be closed grained.
Second Class Teak Wood :
No individual hard and sound knots shall be more than 15 sq.cm. in size
and aggregates area of such - knots shall not exceed 2 % of the area of
piece.
M-29. A Non-teak wood :
The non-teak wood shall be chem ically treated, seasoned as per I.S.
Specification and of good quality. The type of, wood shall be got approved
before collecting the same an site. Fabrication of wooden members shall
be started only after approval.
For this purpose wood of Bio, Kalai, Sires, Saded, Behda, Jamun, Sisoo
will be used for door where as only Kalai, Halda, Sires, Kalam etc. will be
permitted far shutters after proper seasoning and chem ical treatment,
The non-teak wood shall be free from large, loose dead of cluster knots,
flows, shakes, warps, bends or any other defects. It shall be uniform in
substance and of straight fibres as far as possible. It shall be free from
rots, decay, harm ful fungi and other defects of nature whi ch will effect the
straight durability o r its -usefulness for the purpose for whi ch it is required.
The colour of wood shall-be uniform as far as possible. The scantalings
planks etc. shall be saw in straight lines and planes in the direction of
grain and of uniform thickness. The departm ent will use the Agency to
produce certifi cate from Forest Department in event of Dispute and the
decision of the Department shall be final and binding to the contractor:
The tolerance in the dimension shall be allowed at 1.5 mm . per face to be
planed.

79

M-30. Wooden f lush door shutte rs (solid core) :


The solid core type flush door shutters shall be of decorative or nondecorative type as specified in the drawing. The size and thickness of the
shutter shall be as specified in drawings or as directed. The timber
species for core shall be used as per I.S. Latest edition. The timber shall
be free from decay and insect attack. Knots and knot holes less than half
the width of cross-section of the m embers in which they occur may be
permitted. Pitch pockets, pitch streaks and harmless pin holes shall be
permissible except in the exposed edges of the care members. The
commercial plywood, cross-bands shall conform to I.S: latest edition.
The face panel of the shutters shall be formed by gluing by the hot press
process on both faces of the care with either, plywood or cross-bands
and face veneers. The lipping, rebating, opening of gla zing; venetian etc.
shall be provided if specified in the drawing.
All edges of the door shutters shall be square. The shutters shall be free
from twist of wa rp in its plant Both faces of the shutters shall be sand
papered to sm ooth even texture.
The shutters shall be tested for
(1)
(2)
(3)

End immersion te st : The test shall be carried out as per I.S.


latest edition. There shall be no delaminatian at the end of the test.
Knife test : The face panel when tested in accordance with I.S.
latest edition shall pass the test.
Glue a dhesion test : The flush door shall be tested for glue
adhesive test in accordance with I.S.: latest edition. The shutters
shall be considered to have passed the test if no delamination
occu rs in the glue lines in the plywood and if no single
delamination more than 80 mm in length and more than 3 mm in
depth has occured in the assembly glue lines between the plywood
face and the style and rail. Delam ination at the corner shall be
measured continously around the corner. Delamination at the
knots, knot holes and other permissible wood defects shall not be
considered in assessing the sample.

The tolerance in size of solid care type flush door shall be as under:
In Nom inal thickness 1.2 mm in Nom inal height 3 mm.
The thickness of the shutter shall be uniform throughout with a
permissible variation of not m ore than 0:8 mm: when measured at any
two points.

80
M-31. Aluminum doors, windows, ve ntilators :
Aluminum alloy used in the manufacture of extruded window sections
shall conform to I.S. designation HEA-WP of LS. : latest edition and also
to I.S. Designation WVG-.WP of I.S. latest edition. The section shall be as
specified in the dra wing and design. The fabrication shall be done as
directed.
The hinges shall be cast or extruded alum inum hinges of same type as in
window bu t of larger size.
The hinges shall normally be of 50 mm. projecting type. Non-projecting
type of hinges m ay also be u sed if directed. The handles of door shall be
of specified design. A suitable lock for the door operable from outside or
inside shall be provided. In double, shutter door, the first closing shutter
shall have concealed aluminum allo y bolt at top and bottom ,
M-32. Rolling Shutters.
The rolling shutters shall conform to I.S. latest edition. Rolling shutters
shall be supplied of specified type wi th accessories. The size of the rolling
shutters shill be specified in the drawings. The shutters shall be constructed wi th interlo cking lath sections formed from cold rolled steel strips
not less than 0.9 aim. thick and 80 mm. wide for shutters upto 3.5 mm,
width not less than 1.25 mm, thick and 80 mm. wide for shutter 3.5 mm
in width and above unless otherwise specified,
Hood covers shall be of mild steel deep channel section and of rolled
pressed or build up (fabricated) jointless construction. The thickness of
sheet used shall not be less than 3.5 mm.
Hood covers shall be m ade of M S Sheets not less than 0.90 mm. thick.
For shutters having width 3.5 M eter and above, the thickness of M.S.
sheet for the hood cover shall be not less than 1.25 mm.
The spring shall be of , best quality and shall be manufactured from tested
high tensile spring steel wi re or strip of adequate strength to balance the
shutters in all position. The spiting pipe shaft etc, shall be supported on
strong M.S. or m alleable C.I. brackets. The brackets shall be fixed on or
under the lintel as specified with rawl plugs and scre ws bolts etc.
The rolling shutters shall be of self rolling upto 8 Sq. m. clear area wi thout
ball bearing and up to 12 Sq. rn. clear area with ball bearing. If the rolling
shutters are of larger, than gear operated type shutters shall be used
The locking arrangement shall be provided at the bottom of shutter at
both ends. The shutters shall be opened from outside,
The shutters completed wi th door suspension shafts,
arrangements, pulling hooks handles and other accessories.

looking

81

M-33. Collapsible Steel Gate :


The collapsible steel gate shall be in one or two leaves and size as per
approved drawings or as specified. The gate shall be fabricated from best
quality mild steel channels, flates etc. Ei ther steel pulleys or ball bearings shall be provided in every doubly channel, Unless otherwise
specified the particulars of collapsible gate shall be as under :
(a) Pickets : These shall be of 20 mm. M.S. channels of heavy sections
unless otherwise shows on drawings. The distance center to center of
pickets shall be 12 cms with an opening of 10 Cms.
(b) Pivoted M .& flats shall be 20 mm x 6 mm.
(c) Top and bottom guides shall be from tee or flat iron of approved size.
(d) The fittings like stoppers, fixing hold fasts, locking cleats brass handles
and cast iron rollers shall be of approved design and size.
M-34. We lded Stee l Wire Fa bric
Welded steel wi re fabri c for general purpose shall be manufactured from
cold drawn steel wire "as drawn" o r galvanized steel conforming to LS.
Latest edition wi th longitudinal and transverse wi re securely connected at
every intersection by a process of electri cal resistance welding and
conforming to I.S. latest edition. It shall be fabricated and finished in
workmanlike manner and shall be free from injurious defects and shall be
rust proof. The type of m esh shall be oblong or square as directed. The
mesh sizes and size of wi re for square as well as oblong welded steel wi re
fabric shall be as directed. The steel wi re fabric in panels shall be in one
whole piece in each panel as far as stock sizes permit.

M-35. Ex pande d Meta l, Sheet s :


The expanded metal sheets shall be free from flaws, joints, b roken
strands, laminations and other harmful surface defects. Expanded metal
steel sheet shall conform to I.S. latest edition, except that blank sheets
heed not be with guaranteed mechanical properties. The seze of the size
of the diamodd mesh of expanded metal and dim ensions of strands (width
and thickness) shall be as specified. The tolerance on nominal weight of
expanded metal sheets shall be of 10 percent.
Expanded metal in panels shall be in one whole piece in each panel as far
as stocks sizes permit. the expanded metal sheets shall be coated with
suitable protective coating to prevent corrosion,
M-36. Mild St ee l W ire (Wire Gauze Jali) :
Mild steel wi re may be galvanized, as indicated. A11 finished steel wi re
shall be well cleanly dra wn to the dimensions, and size of wire as specified
in item . The wi re shall be sound, free from splits, surface flaws, rough

82
jagged-and imperfect edges and other harm ful surface defect and shall
conform to I.S. latest edition.
M-37. Ply wood
The plywood for general purpose shall conform I.S. latest edition.
Plywood is m ade by cementing together thin boards or sheets of wood
into panels. There are alwa ys an odd num ber of layers, 3, 5, 7, 9 ply etc.
The plies are placed so that grain of each layer is at right angle to the
grain in the adjacent layer.
The chief advantages of plywood over a single board of the same
thickness is the more uniform strength of the plywood, along the length
and wid th of the plywood and greater ,resistance, to cracking and splitting
with change in m oisture content.
Usually synthetic resins are used for gluing, phenolic resions are usually
cured in a hot press whi ch compresses and simultaneously heats the plies
between hot plates whi ch maintain a temperature of 90 degree C to 140
degree and a pressure of 11 to 14 Kg/Sq. Cm. on the wood. The time of
heating may be anything from 2 to 60 minutes depending upon thickness.
When water glue are used the wood absorbs so much water that the
finished plywood must be dried carefully When synthetic resigs are used
as adhesive the finished plywood m ust be exposed to an atmosphere of
controlled humidity until the proper amount of m oisture has been
absorbed.
According to I.S. Latest edition, the plywood far general purpose shall be
of the grades namely BWR; WWR and CWR, depending upon the
adhesives used for bonding the veneers, and it will be further classified
into six type namely AA, AB, AC, BB, BC and CC, based on the quality of
the two fa ces, each face being moisture content not less than 8 percent
and riot more than 16 percent.
37.8. Thickness of plywood boards
Boa rd
3 ply

Thickness
3 mm
4 mm
5 mm
6 mm

Boa rd
3 ply

Thickness
5 mm
6 mm
8 mm
9 mm

B oa rd
3 ply

Thickness
9 mm
13 mm
16 mm
13 mm

B oa rd
3 ply

Thickness
16 mm
19 mm
19 mm
25 mm

M-38 Gla ss :
All glass shall be of the bet quality, from specks, bubbles, smokes, veins,
air, holes blisters, and other defects. The kind of glass to be used shall be
as mentioned in the item or specification or in the special provisions or as
shown in detailed dra wings. Thickness of glass panes shall be uniform.
The specifications for different kinds shall be as under:

83

Sheet Gla ss:


In absence of any specified thickness or weight in the item or detailed
specifications of the item of work, sheet glass shall be weighing 7.5
Kg/Sq. m. for panes upto 600 mmx500 mm.
For panes larger than 600 mm.x600 mm . and upto 800 mm.x800 mm.
the glass weighing not less than 8.75 Kg Sq. m. shall be used. For bigger
panes upto 900 mm:x900 mm. glass weighing not less than 8.75 Kg/Sq.
m. shall be used. For bigger panes upto 900 mm.x900 mm. glass
weighing not less than 11.25 Kg/Sq. M. shall be used
Sheet glass shall be patent flattened glass of best quality and of glazing
and framing purposes shall conform to I.S. latest edition. Sheet glass of
the specked colour used, if so shown on detailed dra wings or so specified.
For important buildings and for panes with any dim ension over 900 mm.
plate glass of specified thickness shall be used.
Plate Gla ss :When plate glass is specked, it shall be "Polished patent plate glass" of
best quality. It shall have both the surface ground late and parallel and
polished to obtain clear undisturbed vision and reflection. The plate glass
shall be of the thickness mentioned in the item or as shown i n the detailed
dra wing o r as specified. In absence of any specified thickness, the,
thickness of pla te glass to be supplied shall be 6 mm. and a tolerance of
0.20 m rn. shall be adm issible.
Obscured Glass:
This type of glass transmits light so that vision is partially or almost
com pletely obscured. Glass shall be plain rolled, figured, ribbed or fluted,
or frosted glass as may be specked as required. The thickness and type of
glass shall be as per details on drawings or as specified or as directed.
Wired Gla ss :
Glass shall be with wi re netting embedded in a sheet of plate glass.
Electri cally welded 13 mm. Georgian square mesh shall be used.
Thickness of glass shall not be less than 6 mm. W ired glass shall be of
type and thickness as specified.
M-39 A cry lic Sheets :
Acrylic sheet shall be of thickness as specified in the item and of an
specked shape size as the case maybe. Panels may be flat or curved. It
should be light in weight. It shall be colourless or coloured or opaque as
specified in the item. Colourless sheet shall be as transparent as the
finest optical glass. Its light transmission rate shall be about 95%.
Transparency shall not be affected for the sheets thickness of it shall be
extrem ely resistant to sunlight, weather and temperatures.
It shall not show any significant yello wing or change in physi cal
properties or loss of light transm ission over a longer period of use. The
sheet shall be impact resistant also. Sheets should be of such quality
that they can be cut, bent and jointed, as desired. Solution or the joints
shall be used as per the requirem ent of manufacturer.

84

M-40. Pa rticle board :


The particle boards used for face panels shall of best quality free from any
defects. The particle boards shall be made wi th phenolam aldehyde
adhesive. The particle boards shall conform to IS latest edition "Specification for wood parti cle board for general purpose" The si ze and the
thickness shall be as indicated.

M-41. Ex pa nde d polystyre ne or tame d styrope r slabs


The expanded polystyrene ceiling boards and tiles shall be of approved
make and shall be of size, thickness finish and colour as indicated. It shall
be of high density and suitable for use as insulation material. The
insulating material shall be like slab of Thermo Cole etc.
M-42. Re sign bonded fibe r glass :
The resign bonded fiber glass tiles or rolls shall be of approved make and
shall be followed.
For test of Mineral wool therm al insulation Blanker IS. : latest edition shall
be of sizes, thickness and finish as indicated.
Insulation wood blanket shall be with the following coverings on one or
both side as indicated.
(1)
Bituminised hessain Kraft paper for use in position where moisture
has to be excluded.
(2)
Hessian cloth or Kraft paper, for keeping out dust
(3)
G. I. wi re netting, suitable for surfaces to be plastered over.
M- 43. F ixt ures a nd fastenings
Genera l
The fixtures and fastenings, that is butt, hinges, tee and strap hinges
sliding door bolts tower bolts, door latch, bath-room latch, handless door
stoppers, casement window fasteners, casement staysand ventilators
catch shall be made of the metal as specked in the item or its
specification.
They shall be of iron, brass, aluminum , chromium plated iron, chromium
plated brass, copper oxidized iron, copper oxidized brass or anodized
aluminum as specified.
The fixtures shall be heavy, medium or light type. The fixtures and
fastenings shall be smooth finis hed and shall be such as will ensure ease
of operations.
The sample of fixture and fastenings shall be got approved as regards,
quality and shape before providing them in position.
Brass and anodized aluminum fixtures and fastening shall be bright
finished.

85

Holdfa sts :
Holdfasts shall be m ade from mild steel flat 30 cm. length and one of the
holdfasts shall be bent at right angle and two nos. of 6 mm- diameter
holes, shall be made in it for fixing it to the fram e with screws. At the
other end, the holdfast shall be forked and bent at right angles in opposite
directions
Butt hinges:
Railway standard heavy type butt hinges shall be used when so specified.
Tee and strap hinges shall be manufactured from M.S. Sheet
Siding door-bolts (Aldrops):
The aldrops as specified in the item shall be used and shall be tot
approved.
Tower bolts (Ba rrel Type):
Tower bolts as specified in the item shall be used and shall be got
approved.
Door Latch
The size of door latch shall be taken as the length of latch.
Bat hroom Latch
Bathroom latch shall be similar to to wer bolt.
Handle
The size of the handles shall be determined by the inside grip length of
the handles. Handles shall have a base plate of length 50 mm . m ore than
the size of the handle.
Door Stoppers
Door Stoppers shall be either floor door stopper type or door catch type.
Floor stopper shall be of overall size as specified and shall have a rubber
cushion.
Door Catch
Door catch shall be fled at a height of about 900 mm. from the floor level
such that one part of the catch is fitted on the inside of the shutter and
the other part is fixed in the wall with necessary wooden plug
arrangements for appropriate fixity. The catch shall be fixed 20 mm.
inside the face of the door for easy operation of catch.

86
Wooden D oor Stop with hinges
Wooden door stop of size 100 mm X 60 mm.X 40 mm . shall be fixed on
the door frame with a hinge of 75 mm . size and at a height of 900 mm.
from the floor level. The wooden door stop shall be provided with 3 coats
of approved oil paint.
Casement window Fa ste ne r
Casement windo w fastener for single leaf windo w shutter shall be left or
right handed as directed.
Casement st ays (Straight Peg St ay) :
The stays shall be made from a channel section having th ree holes at
appropriate position so that the window can be opened either fully or
partially as directed. Size of the stay shall be 250 mm to 300mm as
directed.
Ventilator Catch
The pattern and, shape of the catch shall be as approved.
Piv ot
The base and socket plate shall be made from minimum 3 mm. thick
plate, and projected pivot shall not be less than 12 mm. diameter and 12
mm. length and shall be firm ly riveted to the base plate in case of iron
and in single piece in the case of brass pivot.
M-44. Pa int s :
Oil paints shall be of the specified colour arid shade, and as approved. The
ready mixed paints shall only be used. However, if ready mixed paint of
specified shade or tint is not available while ready mixed paint with
approved stained will be allo wed. In such a case, the contractor shall
ensure that the shade of the paint so allowed shall be uniform .
All the paints shall meet with the following general requirements
(i)

Paint shall not show excessive setting in d freshly opened full can and
shall easily be redispresed wi th a paddle to a sm ooth homogeneous state.
The paint shall show no cu rdling, livering, caking or colour separation and
shall be free from lumps and skins.
(ii) The paints as received shall brush easily, Possess good leveling properties
and show no running or sagging tendencies.
(iii) The paint shall not skin within 48 hou r in a three quatereds filled closed
container.
(iv) The paint shall dry to d smooth uniform finish free from roughness, grift,
unevenness and other imperfections:

87
Enamel P aint s:
The enamel paint shall satisfy in general requirements in specification of
oil paints: Enamel paint shall conform to IS : latest edition.
M-45 Fre nch Polish
The French polish of required tint and shade shall be prepared with the
below mentioned ingredients and other necessary materials
(i) Denatured spirit of approved quality (ii) Chandras (iii) Pigment.
The French polish so prepared shall conform to IS: Latest edition.
M-46 Marble chips for marble mosa ic t errazzo :
The marble chips shall be of approved quality and shades: It shall be
hard, sound, dense and homogeneous in texture wi th crystalline and
coarse grains. !t shall be uniform in colour and free from stains, cracks,
decay and weathering.
The size of various colour of marble chips ranging from the smallest upto
20 mm. shall be used whe re the thickness of top wearing layer is 6 mm.
size. The marble chips of approved quality and colours only as per grading
as decided by the Engineer-in-charge shall be used for marble mosaic tiles
or works.
The marble chips shall be machine crushed. They shall be free from
foreign matter, dust etc, except as above, the chips shall conform to IS
latest edition.
M-47. Flooring Tiles :
(A). Plain Ceme nt tile s
The plain cement tiles shall be of general purpose type. These are the tiles
in the manufacture of whi ch no pigments are used. Cement used in the
manufacture of tiles shall be as per Indian Standards.
The tiles shall be manufactured from a mixture of cement and natural
aggregates by pressure process. During manufacture, the tiles shall be
subjected to pressure of not less than 140 Kg/Sq. Cm. The proportion of
cem ent to aggregate in the backing of the tiles shall be-not less than 1:3
by weight. the wearing face though the tiles are of plain cement, shall be
provided with stone chips of 1 to 2 mm. size. The proportions of cement
to aggregate in the wearing layer of the tiles shall be three parts of
cem ent to one parts chips by weight. The minim um thickness of wearing
layer shall be 3 mm. The colour and texture of wearing layer shall be
uniform throughout its face and thickness. O n removal from mould, the
tiles kept in moist condition continuously at least for seven days and
subsequently, if necessary, for such long periods would ensure their
conform ity to requi rements of IS. Latest edition regarding strength
resistance to wear and water absorption.

88

The wearing face of the tiles shall be plane, free from projections,
depressions and cracks and shall be reasonably parallel to the back face of
the tile. All angles shall be right angle and all edges shall be sharp and
true.
The size of tiles shall generally be square shape 24.85 Cm. x 24.85 Cm:
or 25 Cm. x 25 Cm. The thickness of tiles shall be 20 mm.
Tolerance of length and breadth shall be plus or minus one m illimeter.
Tolerance on thickness plus 5 mm.
The tiles shall satisfy the tests as regards transverse strength, resistance
to wear and water absorption as per I.S. : Latest edition.
(B) Pla in Coloured Tiles:
These tiles shall have the same specification as for plain cement tiles as
per (A) above expect that they shall have a plain wearing surface wherein
pigments are used. They shall conform to I.S. Latest edition.
The pigments used for colouring cement shall not exceed 10 percent by
weight of cem ent used in the mix. The pigments, synthetic or otherwise,
used for colouring tiles shall have perm anent colour and shall not contain
materials detrimental to concrete.
The colour of the tiles shall be specified in the item or as directed.
(C) Ma rble Mosaic Tiles:
The tiles same specification as per plain cement tiles except the
requirements as stated below:
The marble m osaic tiles shall conform to I.S. latest edition. The wearing
face of the tiles shall be mechanically ground and filled. The wearing face
of tiles shall be free from projections, depressions and cracks and shall be
reasonably parallel to the back face of the tiles. All angles shall be right
angles and all edges shall be sharp and true.
Chips used in the tiles be from smalle st upto 20 mm. size. The minimum
thickness of wearing layer of tiles shall be 6 mm. For pattern of chips to
be had on the wearing face, a few sam ples with or without thei r full size
photographs as directed shall be presented to the Engineer-in-charge for
approval.
Any parti cular sam ples, if found suitable shall be approved by the
Engineer- in-charge, or he may ask for a few more samples to be
presented. The sam ples shall have to be made by the contractor till a
suitable sample is finally approved for use in the work. The Contractor,
shall ensure that the tiles-supplied for the work shall be in conformity
with the approved sam ple only, in terms of its dimensions thickness of

89
backing layer and wearing surface, materials, ingredients, colour. shade
chips, distribution etc. required.
The tiles shall be prepared for cement conforming to Indian Standards or
coloured portland cement generally depending upon the colour of tiles to
be or as directed.
(D) Chequered Tile s : `
Chequered tiles shall be plain cement tiles or m arble mosaic tiles. The
former shall have the same specification as per (A) above and the latter
as per marble mosaic tiles as per (C) except as mentioned below
The tiles shall be of nominal size of 250 mm. X 250 mm. if specified. The
centre to centre distance of chequer shall not be less than 25 mm . and
not more than 50 mm. The overall thickness of the tiles shall be 22 mm.
The grooves in the chequers shall be uniform and straight. The depth of
the grooves shall not be less than 3 mm. The chequered tiles shall be
plain, coloured or mosaic as specified. The thickness of the upper layer
measured form the top of the chequers shall not be less than 6 mm. The
tiles shall be given the first grinding with m achine before delivery to site.
Tiles shall conform to relevant IS: latest edition.
(E) Chequered Tiles F or Sta ir Ca ses :
The requirem ents of these tiles shall be the sam e as chequered tiles as
per (D) above except in following respects :
(1) The length of a tile including note shall be 330 mm : (2) The
minimum thickness shall be 28 mm : (3) The nosing shall have also the
sam e wearing layer as at the top: (4) The nosing edge shall be rounded.
(5) The front portion of the tiles for minimum length of 75 mm. from and
including the nosing shall have grooves running parallel to nosing and at
centers not exceeding 25 mm. Beyond that the tiles shall have normal
chequer pattern.
M-48. Rough Kota h St one :
The kotah stones shall be hard, even, sound and regular in shape and
generally uniform in colour, The colour of the stone shall generally be
green. Bro wn coloured shall not be use. They shall be without any soft
veins, cranks or flaws.
The size of the stones to be used for flooring shall be of siz e 600 mm. X
600 mm. abd / or size 600 mm. X 450mm as directed. However smaller
sizes will be allo wed to be used to the extent of maintaining required
pattern. Thickness shall be as specified.
Tolerance of minus 30 mm. on accounts of chisel dressing of edges shall
be permitted for length as well as breadth. Tolerance in thi ckness shall be
+ 3 mm.

90

The edges of stones shall be truly chiselled and table rubbed wi th coarse
sand before paving. All angles and edges of the stone of shall be true,
square and free from chipping and the surface shall be true and plain.
When machine cut edges are specified, the exposed and the edges at
joints shall be machine cut. The thickness of the exposed machine cut
edges shall be uniform.
M-49. Polished Kot ah St ones :
Polished kot4h stone shall have the same specification as per rough kotah
stone except as mentioned below:
The stones shall have machine polished surface. W hen brought an site,
the stones shall be single polished or double polished depending upon its
use. The stones for paving shall generally be single polished. The stones
to be used for dedo, skiri thing sink, veneering, sills, steps, etc, whe re
machine polishing after the stone are fixed in situ is not possible shall be
double polished.
M-50. Dholpur Stone St ab :
Dholpur stone slab shall be of best quality as approved by the Engineerin-charge: The stone slab shall be without any veins, cra cks, and flaws.
The stone slab be even, sound and durable regular in shape and of
uniform colour.
The size of the stone shall be as specified in the item or detailed drawing
of as approved by the Engineer-in-charge. The thickness of the stone
shall be as specified in the item of work wi th the permissible tolerance of
plus or minus 2 mm. the provisions in respect of polishing as for polished
kotah stone shall apply to polished Dholpur stone also. All angle s and
edges of the face of the stone slab shall be fine chiselled or polished as
specified in the item of work and ai6 the four edges shall be machine
out. All angles and edges of the stone slab shall be true and plane.
The sample of stone shall be got approved by the Engineer-in-charge for
a particular work. It shall be ensured that the stones to be used in a
particular wo rk shall not differ m uch in shade or tint from the approved
sam ple.
M-51. Marble Slab :
Marble slab shall be white or of other and of best quality as approved by
the Engineer-in-charge.
Slabs shall be hard close, uniform and hom ogeneous in texture. They
shall have even crystalline grain and f ree from defects and cra cks. the
surface shall be machine polished to an even and perfect plane surface
and edges machine cut true and square. The rar face shall be rough to
provide key for the mortar.

91
Marble slabs with nature veins, if selected shall have to be laid as per the
pattern given by the Engineer-in-charge. Size of the slab minim um 460
mm. X 450 mm: and preferably 600 min. X 600 mm. However sm aller
sizes will be allo wed to be used to the extent of maintaining required
pattern.
The slab shall not be thinner than the specified thickness at its thinnest
part. A fe w specimen of finished slab to be used shall be deposited by
the Contractor in the office for reference.
Except as above, the marble slabs shall conform to IS: Latest edition.
M-52. Gra nit e Stone sla b :
Granite shall be of approved colour and quality. The stone shall be hard,
even sound and regular in shape and generally uniform in colour. It shall
be without any soft veins, cracks of flaws.
The thickness of the stone shall be as specified in item.
All exposed faces shall be double polished tender truly smooth and even
reflecting surface. The exposed edges and corners shall be rounded off as
directed. The exposed edges shall be machine cut and shall have uniform
thickness.
M-53. PV C F looring
PVC sheet for PVC, floor covering shall be of homogenous flexible type,
conforming to I.S. Latest edition. The PVC covering shall neither develop
any toxic effect while put to use for shall give off any disagreeable odour.
Thickness of flexible type covering Ales shall be as specified in the
description of the item.
The flexible shall be backed with hessian or other woven fabri c. The
following toleran ces shall be applicable on the nominal dimensions of the
folls or tiles :
(a) Thickness 15 mm.
(b) Lengh of Width :
1 . 3 00 rnm. s quare tiles 0 .20 mm
2 . 600 mm. Square tiles 0.4 0 mm.

3 . 90 0 mm, s quare tiles 0.6 0 mm,


4 . Sheets and roll 0.1 0 perc ent.

A dhesive:
The adhesive for PVC flooring shall be of the type and m ake , recommended
by the manufactures of PVC sheets/tiles.
M-54 Facing Tiles
The facing tiles (burnt cla y facing bri cks) shall be free from cracks and
nodules of free lime. They shall be thoroughly burnt and shall have plane
rectangular faces with parallel sides and sharps straight right angled faces..
The texture of the finished surface that will be exposed when in place shall
conform to an approved sample consisting not le ss than four stretch bricks
each representing the texture desired. The facing tiles shall have a

92
pleasing appearance sufficient resistance to penetration by rain and greater
durability than comm on bricks. The tiles shall conform to I.S.Latest edition.
I
The standard size of facing brick tiles shall be 19 x 9 x 4 cms. The facing
brick tiles shall be provided wi th frog whi ch shall conform to IS: Latest
edition.
The permissible tolerance in dimensions specified above shall be as follows
:
Size
Tolerance for
1st class brick 2nd class brick
19
6 mm 10 mm
9
3 mm 7 mm
4
1.5 mm 3 mm
The tolerance for distortion or warpage of face or edges of individual
brick form a plane surface and from a straight line respectively shall be
as follows:
Ficing dimensions
Permissible tolerance
M ax. below 19 cm s
Max 2.5 mm
--do-- above 19 mm
Max 3.0 mm

The average com pressive strength obtained as a sample of five tiles when
tested in accordance with the) procedure laid as per IS: Latest edition
shall be not less than 175 Kg/Sq. Cm. The average compressive strength
of any individual bricks shall be not less than 160 Kg/Sq. Cm.
The average water absorption for five bricks tiles shall not exceed 12
percent of average weight of bri ck before testing. The absorption for each
individual bricks shall not exceed 25 percent.
The brick tiles when tested in accordance wi th IS: Latest edition, the rate
of efflorescence shall not be more than "Slightly effloresced'
M-55. White gla ze d t iles
The tiles shall be of best quaky as approved by the Engineer- in-charge.
They shall be foat and true to shape. They shall be free from cracks,
crazing spots, chipped edges and corners. The glazing shall be of uniform
shade.
Variation f rom the stated sizes, other than the thi ckness of tile shall be
plus or minus 1.5 mm . The thi ckness of ti le shall be 6 mm . Except as
above the tiles shall confo rm to I.S. La test edi tion.
M-56. Ga lva nized Iron Pipes and F itt ings:
Galvan ized iron pipe shall be of the medium type and of requi red
diameter and shall com ply with IS: latest edition. The specif ied
diameter of the pipes shall refer to the inside diam eter of the bore.
Clamps, scre w a nd all gal vanized i ron fittings shall be of the standard
'R' or equi valent make.

93
M-57. Bib cock and stop cock:
A bib cock is a dra w off tap wi th a horizontal in let and free outlet. A
stop co ck is a valve wi th a suitable means of co nnection for insertion in
a pipeline for con trolling o r s topping the flow.
They shall be of screw do wn type and or brass ch rom ium plated and of
diameter as specified in the descrip tion of the item . They shall confo rm
to IS: latest edition and they shall be of best Indian make. They shall
be polished brig ht.
The m inimum finished weig ht of bib cock and stop co ck shall be as
given belo w:
Diameter
8 mm
10 mm

Bib co ck
0.25 kg
0.30 kg

Stop co ck
0.25 kg
0.35 kg

Diam eter
15 mm
20 mm

Bib co ck
0.40 kg
0.75 kg

Stop cock
0.40 kg
0.75 kg

M-58. Gun m et al wheel va lve :


The gun metal wheel val ve shall be of approved quali ty. These shall be
of gun metal fitted with wheel and shall be of gate valve opening full
way and of the size as specified. These shall conform to IS: latest
edition.
M-59. W hit e glaze d porce lain wash basin:
Wash basin shall be of whi te porcelain firs t quali ty best Indian make
and it shall conform to IS: latest edition. The size of the wash basin
shall be as specified in the i tem. Wash basin shall be of one piece
constru ction wi th continued ove r flow arrangem ents. All internal angles
shall be designed so as to facilita te cleaning. W ash basin shall have
single tap hole or two holes as specified. Each basin shall have a
ci rcula r waste hole whi ch is either revated o r beveled internall y with 65
mm diameter at top and 10 m m depth to suit the waste fitting. The
necessary stud slo t to recei ve the b racket on the under side of the
basin shall be provided. Basin shall have an internal soap holder recess
whi ch shall fu lly drain into the bowl .
White glazed pedestal of the quality and color as that of the basin shall
be pro vided whe re spe cified in the i tem. It shall be completely recessed
at the back fo r reception of supply and wash pipe. It shall be capable of
supporting the basin rigid ly and adequately and shall be so designed as
to make the height from the floor to top of the rim of basin 750 mm to
800 mm as directed.
M-60. Europea n ty pe wat er closet wit h low le vel flushing:
The Eu ropean type water closet shall be whi te glazed porcelain fi rst
quality and shall be of wash down type confo rm ing to IS: latest edi tion.
'S' trap shal l be pro vided as required wi th water seal no t than 50 mm.
The solid plasti c seal and cover shall be of best Indian make conforming
to IS: latest edition. They shall be made of moulded synthetic materials
whi ch shall be tough and hard with hig h resistance to solven ts and shall

94
be free from blisters and surface defects and shall have chromium
plated brass h inges and rubber buffer of suitable size.
M-61. Orissa ty pe water closet:
The specifi ca tion of Orissa type whi te glazed wate r closet of fi rst quali ty
shall confo rm to IS: latest edition and relevant spe cifi cation of Indian
type wa ter closet except that pan will be wi th the integral squatting pan
of size 580 x 440 m m wi th raised footrest.
M-62. India n ty pe wate r closet:
The Indian type whi te glazed wa ter closet of fi rs t quali ty shall be of size
as specified in the i tem and conforming to I S: latest edi tion. Each pan
shall have in teg ral flushing. It shall also ha ve an inle t at back o r front
for connecting fl ush pipe as directed. The inside of the bottom of the
pan shall have sufficient slope from the front to wa rds the ou tlet and
surface shall be unifo rm and smooth. Pan shall be pro vided with 100
mm. diameter "P" or "S" trap with approximately 50 mm, Water seal and
50 mm . diameter vent horn.
M-62 A Foot Rests
A pair of white glazed ear-then ware rectangular foot of minimum size 250
mm . x 130 mm x 20 min shall be provided with the water closet.
M-63 Gla zed Earthen Ware Sink
The glazed earthen ware sink shall be of specified size, colour and quality.
The sink shall conform to I. S. latest edition. The brackets for sinks shall
conform to IS: latest edition.
The pipes shall conform to I.S. latest edition for steel and lead pipes
respectively. 32 min. brass waste coupling of standard pattern with brass
chain and rubber plug shall he provided with sink.
M-64. Glaze d e art he n-ware Lipped ty pe fla t back urinal / corner type
urinal.
The lipped type shall be flat. back or corner type as specifie d in the item
and shall conform to IS: Latest edition. It shall be of best Indian make and
size as specified arid approved by the Engineer-in-charge. The flat back or
corner type urinal m ust be of 1st quality free from any defects, cracks etc.
M. 65. Low level e namel flushing tank
The lo w level enamel flushing tank shall be of 15 litres capacity. It shall
conform to IS: latest edition. The flushing cistern shall be of best quality
and free from any defects. The flushing tank shall have outle t 32 mm.
diameter. The outlet shall he connected with WC. Pan by lead pipe or PVC
pipe as specified. The flushing cistern shall be provided with inlet and outlet
for fixing G.I. inlet pipes and overflow pipes The flushing cistern shall be
provided with ch rom ium plated handle for flushing. The flushing tank shall
be provided with bracket of cast iron so that it can be fixed on wall at
specified height. The, brackets shall conform to I.S. latest edition.

95
M-66. Cast iron flushing cistern.
The cast iron flushing cistern shall be of 15 litres capacity. It conform to IS.
latest edition, The flushing cistern shall be of best quality free from any
defects, The flushin g cistern shall have outlet of 32 mm. diameter. The lead
pipe shall conform IS: latest edition. For fixing G.I. inle t pipes and overflow
pipe 20 mm dia inlet and outlet shall he got provided. The flushing, cistern
shall be provided with galvanized iron chain and pull of sufficient length and
shall be got approved from the engineer-in-charge. The cast iron flushing
cistern shall be painted with one coat of anti-corrosive paint and two coats
of paints. The flushing cistern shall be fixed on two C.I. brackets. The C.I.
bracket shall conform to IS: latest edition.
M-67 Flush Cock
Half turn flush cock (Heavy weight) shall be of gun metal chromium plated
of diameter as specifie d in the description of the item. The flush cock shall
conform to relevant Indian Standard.
M-68 Cast iron pipes and fittings.
All soil, water, vent and antisyphonage pipe and fitting shall conform to IS:
latest edition. The pipe shall have spigot and socket ends with head on
spigot end. The pipes and fittings shall be true to shape, smooth, cylindrical
their inner and outer surfaces being as nearly as practicable concentric.
They shall be sound and nicely cast and shall be free from cracks, laps
pinholes or other imperfection and shall be neatly dressed and carefully
settled.
The end of pipes and fittings shall be, reasonable square to their axis.
The sand cast iron pipes shall be of the diameter as specified in the
description and shall be in lengths of 1.5 M , 1.8 M. and 2 M. including
socket ends of the pipe unless shorter lengths are either specified or
required at junctions etc. The pipes and fittings shall he supplie d. without
ears unless specified or directed otherwise.

Tole ra nces
The standard weights and thickness of pipes shall be as shown in the
following table:
Sr
No

Nom inal
dia. of bore

Thickness

75 mm

5.0 mm

100 mm

5.0 mm

O verall

Weight of
pipe
1.5
m 1.8
m
long
long
12.83 kg
16.52 kg

Excluding
ears
2 m long
18.37 kg

18.14 kg

24.15 kg

21.67 kg

96
A tolerance upto minus 15 percent in thickness and 20 mm in length will
be allowed. For fittings tolerance in lengths shall be plus 25 mm and
minus 10 mm.
The thickness of fittings and their socket and spigot dimensions shall
conform to the thickness and dimensions specified for the corresponding
sizes of straight pipes. The tolerance in weights and thickness shall be the
sam e as for straight pipes.
M-69. Na hni Tra p:
Nahni trap shall be of cast iron and shall be sound and free from porosity
or other defects which affect serviceability. The thi ckness of the base
metal shall not be less than 6.5 mm. The surface shall be smooth and free
from craze, chips and other flaws or any other kind of defect whi ch affect
serviceability. The size of nahni trap shall be as specified and shall be of
self cleaning design.
The nahni trap shall be of quality approved by the engineer-in-charge and
shall generally conform to the relevant Indian Standard.
The nahni provided shall be wi th deep seal, minim um 50 mm except at
places where trap with deep seal cannot be accomm odated. The cover
shall be cast iron perforated cover shall be provided on the trap of
appropriate size.
M-70. Gully Trap:
The gully trap shall conform to IS: latest edition. It shall be sound, free
from defects such as fire cracks or hair cracks. The glaze of the traps shall
be free from crazing. They shall give a sharp clear note when struck with
light hammer. There shall be no broken blisters.
The size of the gully trap shall be as specified in the item.
Each gull y trap shall have one C.I. grating of square size correspodning to
the dimensions, of inlet of gully trap. It will also have a water tight C.I.
cover with frame inside dimension 300 mm x 300 mm. The cover with
frame inside dimensio ns 300 mm x 300 mm the cover weighing not less
than 4.53 kg and the frame not less than 2.72 kg. The grating cover and
frame shall be of sound and good casting and shall have truly square
machined seating faces.
M-71. Gla ze d st one ware pipe and fitt ings:
The pipes and fittings shall be of best quality as approved by engineer-incharge. The pipe shall be of best quality m anufactured from stoneware of
fire clay, salt glazed thoroughly bu rnt through the whole thi ckness, of a
close even texture, free from air blows, fire blisters, cracks and other
imperfections, which affect the serviceability. The inner and outer surfaces
shall be smooth and pefectly glazed. the pipe shall be capable to
withstand presures of 1.5 m lead without showing sign of leakage. The
thickness of the wall shall not be less than 1/12th of the internal dia. the
depth of socket not be less than 38 mm. The socket shall be sufficiently
large to allow a joint of 6 mm around the pipe.

97

The pipes shall generally conform to relevant IS latest edition.


M-72. Wa ll Peg Ra il:
The aluminum wall peg rail shall have three aluminum pegs of approved
quality and size. It shall be fixed on teak wood plank of size 450 mm x 20
mm. The teakwood shall be french polished or oil painted as specified.
M-73. G.I. W ater Spot :
The G.I. pipes of 40 mm dia shall be of m edium quality and specials shall
be of 'R' brand or equivalent of the best approved quality.
The pipe shall have length as required for the thi ckness of wall in which it
is fixed, and at outside end tee and bend cut at half the length shall be
provided and at other end, coupling shall be provided to have better
fixing. The water spout shall be provided as per detaile d drawing or as
directed.
M-74. Asbestos Ceme nt Pipe (A.C. P ipe )
The asbestos cement pipe of diameter as specified in the description of
the item shall conform to I.S. latest edition. Special like bends, shoes,
cowls etc. shall conform to relevant Indian Standards. The interior of pipe
shall have a smooth finish, regular, surface and regular internal diameter.
The tolerance in all dim ension shall be as per IS: latest edition.
M-75. Crydon Ball va lve
Ball valve of screwed type including polythene flo at and necessary level
etc. shall be of the size as m entioned in the description of item and shall
conform to IS: latest edition.
M-76. Bit umen Fe lt For Water Proof ing And Damp Proof ing
Bitumen felt shall be on the fiber bases and shall be of type 2, self
finished felt grade-2 and shall conform to IS: latest edition.
M-77. Se lected Ea rth
The selected earth shall be that obtained from excavated material or shall
have to be brought from outside as indicated in the item. If item does not
indicate anything the selected earth shall have to be brought from
outside.
The selected earth shall be good -yellow soil and shall begot approved
from the Engineer-in-charge. In no case black cotton soil or similar
expensive and shrinkable soil shall be used. It shall be clean and free from
all rubbish and perishable materials, stones or brick bats. The clods shall
be broken to a size of 50 mm. or less. Contractor shall m ake his own
arrangement at his own cost for land for borro wing selected earth. The
stacking of m aterial shall be done as directed by the Engineer-in-charge in
such a way as not to interfere with any constructional activities and in
proper stacks.

98

When excavated material is to be used, only selected stuff got approved


from the Engineer-in-charge shall be used. It shall lie stacked separately
and shall comply with all the requirem ents of selected earth mentioned
above.

M-78. Barbe d W ire.


The barbed wi re shall be of galvanized steel and it shall generally conform
to IS: latest edition. The barbed wire shall be of type-I whose nominal
diameter for line wi re shall be 2.5 mm and point wi re 2.24 mm. The
nom inal distance between two barbs shall be 75 mm , unless otherwise
specified in the item. The barbed wi re shall be formed by twisting together
two line wi res, one containing the barbs. The size of the line and point
wires and barb spacing shall be as specified above. The perm issible
deviation from the nom inal diameter of the line wi re and point wi re shall
not exceed 0.08 mm .
The barbs shall carry four points and shall be formed by twisting two point
wires, each two turns, lightly round one line wire, making altogether four
com plete turns. The barbs shall be so finished that the tour points are set
and locked at right angles to each other. The barbs shall have a length of
not less than 13 mm . and not more than 18 mm . The point shall be sharp
and cut at an angle not greater than 35 degree of the axis of the wi re
form ing the barbs.
The line and point wi res shall be circular section, free from scale and other
defects and shall be uniformly galvanized. The line wi re shall be in
continuous length and shall not contain any welds other than those in the
rod before it is dra wn. The distance between two successive splices shall
not be less than 15 meters.
The lengths per 100 Kg. of bar-bed wire IS: type I shall be as under :
Nom inal 1000 meters. Minimum 934 Meter. M aximum 1066 Meter.

-x-x-x-x-x-

99

(C)

D ETAILED TECHNICAL S PECIFICATIONS

Item No.1:
1.0.0 (A) Ex cavat ion for foundation upto 0. 0 M to 1. 50 de pt h including
sorting out and sta cking of useful mate ria ls a nd disposing of t he
exca vated st uff within t he city limit as directed in soft murrum,
ha rd murrum
1.0
1.1

Genera l
Any soil whi ch generally yields to the application of pickaxes and
shovels, phawaras rakes or any such ordinary excavating , im plement or
organic soil, gravel, slit., sand turf loan, clay, peat etc. fall under this
category.

2.0
2.1

Clea ning t he sit e.


The site on whi ch the structu re is to be built shall be cleared, and all
obstructions, loose stone, materials and rubbish of all kind, bush, wood
and trees shall be rem oval as directed. The materials so obtained shall
be property of the Government and shall be conveyed and stacked as
directed within 50 m . lead. The roots of the tree com ing in the sides shall
be cut and coated with an asphalt.

2.2.

The rate of side clearance is deemed to be included in the rate of earth


work for whi ch no extra wi ll be paid.

3.0.

Sett ing out


After clearing the site, the centre lines will be given by the Engineer in
charge. The contracto r shall assume full responsibility for alignm ent,
elevation and dimension and of each and all parts of the work.
Contractor shall supply labours, materials, etc. required for setting out
the reference marks and bench marks and shall maintain them as long
as required and directed.

4.0

Excavation
The excavation in foundation shall be carried out in true line and level
and shall have the width and depth as shown in the drawings or as
directed. The contractor shall do the necessary shoring and shutting or
providing necessary slopes to a safe angle, at his o wn cost:. The
payment for such precautionary measures shall be paid separately if not
specified. The bottom of the excavated area shall be leveled both
longitudinally and transferely as directed by removing and watering as
required. No earth filling will be allo wed for brining it to level, if by
mistake or any other reason excavation is made deeper or wider than
that shown on the plan or directed. The extra depth or width shall be
made up with con crete of sam e proportion as specified for the foundation
concrete at the cost of the contra ctor. The excavation upto 1.5 m . depth
shall be m easured under this item.

5.0

Disposal of t he excavate d stuff

100
5.1

5.2

The excavated stuff of the selected type


trenches and plinth or leveling the ground
and watering etc.
The balance of the. excavated quantity
contractor from the site of work to a place
and all lift.

shall be used in filling the


in layers including ramming
shall be rem oved by the
as directed wi thin RMC lim it

6.0

Mode of mea surements & payment

6.1

The rate shall be for a unit of one cubic metre.

Item No.2:
5.1.6. Providing a nd la ying in foundat ion a nd plint h/under floods lime
concrete wit h hard broken aggregate of 4 to 9 cm nominal size a nd 50%
mortar comprising of 1 Lime putty : 2 fine sand a nd curing complete
excluding cost of form work.
1.0. Mate ria ls:
1.1. W ater shall conform to M-l. Sand shall conform to M -6. Lim e shall conform
to M -2. Graded aggregated 4 to 9 cm nominal size shall conform to M-l2.
2.0. Workma nship:
2.1. General
2.1.1. Before starling the concrete the bed of the foundations trenches shall be
cleared of all loose materials and watered and ramm ed as directed.

2.2. Proport ion of Mix :


2.2.1. The proportion of lime, sand and aggregate shall be specified in the item
of the work and shall be measured by volume.
2.2.2. The lime mortar shall consist of proportion of 1 Lime putty : 2 sand
volume. The lim e mortar shall be prepared by wet p rocess Powe r dri ven mill
shall be used for preparation of lim e m ortar. The slaked lime shall be placed in
the Mill in even layers and ground for 180 revolutions with sufficient wate r. The
water shall be added as required during g rinding (and care shall be taken not to
add more water) so that it will b ring the m ixed m aterials to a consistency of stiff
paste, throughly wetted sand shall then be added evenly and the mixture ground
for another 180 revolutions.
2.2.3. Lim e mortar shall be kept damp, protected from sun and rain till used-up,
covering it by tarpauline or open sheds.
2.2.4. All the lime mortar shall be used as soon as possible after grinding. It
should be used on the day of which it is prepared but in no case mortar made
earlier than 36 hours shall be permitted for use.
2.3. M ixing : 2.3. 1. The concrete shall be mixed in mechanical m ix er. Mixing
shall be continued until there is uniform distribution of the m aterial and the

101
mass is uniform in colour and consistency but in no case mixing shall be done for
less than 2 to 3 minutes.
2.4. Laying & Compact ing: 2. 4. 1. The concrete shall always be used while
quite fresh. It shall be laid (not thrown) in layers not exceeding 150 mm: in
thickness and shall be well and quickly_ rammed with wooden or iron rammers,
till the required compaction is achieved. The concrete laid shall not be of too
fluid consistency. After i t has been mixed no more wate r shall be added, but the
surface during and after com paction shall be kept damp. In laying consecutive
layers, the layer east shall be well watered and m ade rough before the upper
layer is laid. The concrete shall be kept continuously wet for period of 7 days
from the date of placing or until it is built over whicheve r is more.
2.5. Mode of measureme nt and payme nt:
2.5.1. The concrete wo rk shall be measured in length, breadth and depth as
specified on drawing or as directed, correct upto nearest centimetre and cubical
content shall be worked out nearest upto two places or decimals.
2.5.2. The rate shall be for a unit of one cubic metre.
5.1.8. Providing and laying in foundation and plinth/under floors lime concrete
with graded bricks aggregate 40 mm. nominal size and 40% mortar comprising
of 1 Lime Putty : 9 find sand and curing complete excluding cost of form work.
1.0. Mate ria ls :
1.1. Water shall conform to M -1. Lime mortar shall conform to M -10. Brick bats
aggregates 40 mm. nominal size shall con form to M -14.
2.0. Workma nship :
2.1. The relevant specifications of item No. 5.1.6. Shall be followed except that
brick aggregate shall be used instead of graded stone aggregate.
3.0. Mode of measureme nt and payme nt:
3.1. The concrete work shall be measured in length, breadth and depth as
specified in drawing or as directed, correct upto largest centimetre and cubical
content shall be worked out upto two places of decim als.
3 2. The rate shall be for a unit of one cubic m etre.
Item No.3
3.0
Providing a nd laying cement concret e 1:2:4 (1 cement: 2 coarse
sand: 4 gra ded stone-a ggregate 20 mm nominal size) and curing
complete excluding the cost pf form work in foundat ion a nd
plinth,
1.0.
1.1

Materials
Water shall conform to M-1. Cement shall conform shall conform to M-3.
Sand shall conform to M -6. Stones aggregate 20 mm . nom inal size shall
conform to M -12.

102

2.0
2.1

Workmanship
Genera l

2.1.1 Before starting concrete the bed of foundation trenches shall be cleared of
all loose materials, leveled, watered and rammed as directed.
2.2

Proportion of M ix

2.2.1 The proportion of cement, sand and coarse aggregate shall be one part of
cem ent, 2 parts of sand and 4 parts of stone aggregate; and shall be
measured by volume.
2.3.

Mixing

2.3.1. The concrete shall he mixed in a mechanical m ix er at the site of work.


Hand mixing may ho wever be allo wed for sm aller quantity of work if
approved by the Engineer-in-charge. When hand m ixing is permitted by
the Engineer-in-charge in case of break-down of machineries and in the
interest of the work, it shall be carried out on a water tight platform and
care shall be taken to ensure that mixing is continued until the m ass is
uniform in colour and consistency. However in such cases 10% more
cem ent than otherwise required shall have to be used without any extra
cost. The mixing in mechanical m ixer shall be done for a period 1. 1/2 to 2
minutes. The quantity of water shall be just sufficient to produce a. dense
concrete of required workability for the purpose.
2.4

Tra nsport ing & pla cing t he concrete.

2.4.1 The concrete shall, be handed from the place of m ix ing to the final
position in not m ore than 15 minute by the method as directed and shall
be placed into its final position, com pacted and finished wi thin 30 m inutes
of m ixing with wate r i.e. before the setting commences. .
2.4.2 The concrete shall be laid in layers of 15 cms to 20 cms.
2.5. Compa cting:
2.5.1 The concrete shall be rammed with heavy i ron ramm ers and rapidly to get
the required com paction and to allow all the interstices to be filled with
mortar.
2.6.

Curing

2.6.1 After the final set, the concrete shall be kept continuously wet if required
by ponding for a period of not less then 7 days from the date of
placem ent.
2.7.

Mode of mea surements and payme nt:

2.7.1 The concrete shall he measured for its length, breadth, and depth, limiting
dimensions to those specified on plan or as directed.
,
2.7.2 The rate shall be for a unit of one cubic metre.

103

Item No.4
Rem oval of excavated stuf f and laying w it hin RMC lim it as direct ed by
engineer-in-charge.
Dis pos al of exc avate d materi als is s ub jec t to t he followi ng.
U ns uitable materials obtai ned from c learanc e, site and exc avatio n s hall be
disposed o ff within RM C limit as directe d.
T he rate shall be fo r a unit o f one c ubic metre.

Addl.A .E.
R. M.C.

Dy.Ex.Engineer

R.M.C.

Addl. City Enginee r

R.M.C.

Signat ure of Contract or.

104

(D) ADDITIONAL CONDITIONS


1.

The contracto r shall have to provide his own level instrum ent for this
work.

2.

Providing and fixing of precast RCC slab and column shall have to be
carried out in line and level.

3.

Work is required to be carried out in residential / outside area where all


the services like water supply, sullage water pipeline, telephone / electric
cable are existing. Under the ci rcumstances, prior to sta rting the wo rk
agency shall have to excavate the trenches m anually for upto 1 mt depth.
During the course of execution, all the services shall have to be
maintained by the agency and any damage to any services or property,
the agency shall have to get it repair at their cost.

4.

For excavation of trench, use of JCB machine wil l not be perm itted directly
on the top surface of the road. After excavation upto minimum 1.00 mt.
depth from road surface or existing ground level, sam e shall have to be
carried out m anually or by using Breaker and after locating underground
services like; water supply pipeline, water connection lines, pipe gutters,
telephone cables, electric cables etc., and thereafter upon taking the prior
approval of the Engineer-In-Charge, the excavation can be carried out by
using JCB machine.

5.

Rajkot Municipal Corporation shall recommend to the competent authority


to give Controlled Blasting License to the contractor for carrying out
excavation in hard rock. In case of blasting license not perm issible from
the competent authority in some places then excavation is to be done by
using wedges and hammers, chiseling, breakers, pneum atic tools, etc.
Also in case where blasting license is permitted but even then if there is
no possibility of carrying out the blasting for whatsoever reason, the
excavation is to be done by using Wedges and hammers, chiseling,
breakers, pneumatic tools etc. No extra payment shall be made for
excavation to be carried out in any of the above m entioned both the
situations.
Excavation in soft rock and hard rock shall have to be carried out only by
Chiseling, Breaker (pneumatic tools) etc., as far as possible. If excavation
is not possible in terms of above and if excavation is required to be carried
out wi th the help of blasting then the same shall have to be carried out
only after taking prior approval and necessary license for blasting from the
com petent authority.

6.

7.

In case of excavation not possible manually or by chiseling in certain


place(s) as well as if blasting is also not possible due to various reasons
i.e. to avoid damage to nearby water pipeline, pipe gutter, telephone
cables / Duct, Raw houses / week buildings / narro w street etc., then the
excavation by blasting will not be permitted. Under these circumstances,
excavation shall have to be carried out only by Breaker (pneumatic tools)
as per the instructions of the Engineer-In-Charge. No extra payment will
be made for such type of excavation done by using Breaker. The rate for

105
excavation shall be paid as per the rate of related item mentioned in
Schedule-B.
8.

The safety of the trenches is the prime important factor. Along the
trenches on both the side, a hum p of excavated stuff of minim um height 3
to 5 ft shall have to be provided till the work is got completed. However,
where there is no defined road, in such area, the fencing/ lighting etc.,
requires to be provided as per clause 1.1.15. Sign Board shall have to be
provided at required locations, so that there will not be any fatal accident.

9.

Regarding the width of excavation, as (a) it is difficult to carry out the


verti cal trench excavation, (b) possibility of sliding the soil, and (c)
uneven excavation trench width in case of blasting. In this connection, for
every 1.5 mt lift if there is less width upto 5 cm at the bottom then the
top width of excavated trench, it shall be considered as per the specified
trench width or actual tren ch width carried out at the ground level by the
contractor whi chever is less. If excavation is carried out more than the
specified width then the paym ent will be m ade only for the specified width
of excavation.

10.

After entering into an agreement, the agency shall have to finalize the
agency for supply of the material like Precast RCC slab and colum n and
the name of manufacturer / supplier should immediately be informed to
Rajkot Municipal Corporation so that Rajkot M unicipal Corporation can also
expedite the manufacturer / supplier for the material. If necessary, Rajkot
Municipal Corporation will visit and inspect the facto ry. During the
inspection, if Rajkot Municipal Corporation is not satisfied then the
contractor shall have to procure the material from other manufacturer(s).

11.

While the work in p rogress, there is possibility of change in location line


according to the site conditions. Under these circumstances, the
contractor shall have to carry out the work acco rdingly, for whi ch, no
extra payment shall be made in such situations. Over and above, the
decision of Engineer-in-charge for change in drainage line routes shall be
final and binding to the contractor.
The quantity of various items mentioned in the schedule-B is liable to
increase or decrease. Under the circum stances, the contractor shall have
to carry out the wo rk accordingly. Rajkot M unicipal Corporation will not
entertain any dispute in this regard.
In case of any ambiguity found in inspections / dra wings etc, the decision
of engineer-in-charge shall be final and binding to the contractor.

12.

13.

14.

Rates quoted in Bill of Quantities to cover everything necessary for


com plete Execution of work :
The rates quoted will be held to cover everything necessary of the due
and complete execution of the work according to the drawings and the
several conditions and the stipulations of the contract, including
specification, or the evident in tent and meaning of all or either of them or
according to custom ary usage and for the periodical and final inspection
and test and proof of the wo rk in every respect and for m easuring,

106
numbering or weighing the same including setting out and laying or fixing
in position and the provision of all materials,
Power, tool rammers, beaters, labour, tackle platform s with im pervious
lapped joints for scaffold ing ranging rods, straight edges, centering and
boxes, wedges, moulds, templates, post straight rails, boning-staves,
measuring rods, page boards, shores, barriers, fencing, lighting, pumping
apparatus, temporary arrangements of passage of traffic, access to
premises and continuance of drainage, water supply and lighting (if
interrupted b y the wo rk) lard tem porary sheds and buildings nahanis
roofed in or otherwise haulage, painting, varnishing, polishing,
establishments for efficient supervision and watching arrangements for
the efficient protection of life and property and all requisite plant,
implements and appliances every kind, except only such matter and
things as it may be distinctly s tated here in are to be supplied by the
contractors. A rate for anyone description of wo rk is to be held to include
such items of other classes of and for these on separate specific charge
will be admitted. The contra ctors shall keep every portion of the wo rk
clear of accumulation from time to time and shall leave every portion of
the wo rk clean, clear, perfect and at the conclusion of whole, providing at
their o wn cost all such material implement appliances and labour as the
Engineer may require to prove if it is to be so.
15.

The contracto rs are particula rly di rected to observe from the Arti cles of
Agreement and the specifications, what is to be included in their rates for
the several portions of the work and also under what conditions payments
are to be made.

1 6.

T he cos t of all tes ts required to be c arried out for concrete / material tes ting will
be borne by the c ontractor. No extra payment will be made from Rajkot M unicipal
C orporation. I f the quality of work is going to be s uffered then the whole
res pons ibility will rest on the c ontrac tor.

1 7.

T he contrac tor s hall have to avail P F C ode as per the prevailing C irc ular of
Government for the employees on work. T he proc ess for preparation of bill will be
taken up only afte r s ubmiss ion of the Challan for the amount o f P .F. depos ited
every month for the employees on work, whic h will binding to the c ontrac tor. T he
required doc uments s hall have to be s ubmitted every month by the contractor to
the c ompetent authority.

Addl.A .E.
R. M.C.

Dy.Ex.Engineer

R.M.C.

Addl. City Enginee r

R.M.C.

Signat ure of Contract or.

107

PART - III
BILL OF QUANTITIES

108

BID FORM (WITH PRICE)

109
Bidders a re required to fill up all bla nk spaces in this B id Form
The Com missioner
Rajkot Municipal Corporation
Dr. Am bedkar Bhavan
Dhebar Road
Rajkot
Dear Sir,
SUB :

CEMENT
CO NCRETE
ROAD
INSTI TUTE IN WA RD NO.6

WORK

INSIDE

PEDA K

Having visited the site and examined the Bid Docum ents, Drawings, Conditions of Contract,
Specifications, Schedules, Annex ures, Pream ble to Price Schedules, Price Schedules etc.
includin g Addenda/Am en dments to the above, for the execution of the above Contract, we
the under signed offer to carry out as given in Con ditions of Contract an d in conformity with
the Drawin gs, Con ditions of Contract, Specifications, Preamble to Price Schedules, Price
Schedules,
Annex ures,
Biddin g
Docum ents,
including
Adden da
Nos._______________( insert
num ber s)
for
_____________%age
(in
figure)
_______________________________________________________ (in wor ds) below /
abov e than the rates given in Price Sch edule.
2.

I / W e agree that
(a)

(b)

(c)

if we fail to provide required f acilities to the Employer's repr esentative


or any other per son/agency by the em ployer to perform on his behalf
for carryin g o ut the inspection and testing of materials and
workmanship
or
if we incorporate into the Works, materials before they are tested and
approved by the En gineers representative
or
if we fail to deliver r aw water of required quantity according to the
conditions/stip ulations of the Contract, the Engineer will be at liberty
to take any action includin g termination of Contract and im pose at his
absolute discretion any penalties, and/or reject the work.

3.

W e un dertake, if our Bid is accepted, to complete and deliver the Works in accor dan ce
with the Contract within 3 m onths, from the date of W ork order issued to us by you.

4.

W e agree to abide by this Bid for a perio d of 120 days from the date fixed for receiving
the same and it shall rem ain bin din g upon us and may be accepted at any time before
the expiry of that period.

5.

In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract thereto annexed but until
such agreement is prepared this Bid together with your wr itten acceptance thereof shall
constitute a bindin g Contract bet ween us.

110

6.

W e agree, if our Bid is accepted, to f urnish Perform ance Bond/Security in the forms
and of value specified in the Conditions of Contract of a sum equivalent to 5% of the
Contract price for due performance of the Contract.

7.

W e have independently consider ed the amounts of liquidated damages sho wn in


Appen dix to Bid an d agree that they represent a fair estim ate of the dam ages lik ely to
be suffer ed by yo u in the event of the W ork not being com pleted by us in tim e.

8.

W e un der stand that you are not boun d to accept the lo west or any Bid yo u may receive.
Dated this _____________________day of___________________________ 2014.
___________________________
( Signat ure)
___________________________
(Nam e of the person)
___________________________
(In the capacity of)

Com pany Seal


___________________________
(Nam e of firm)
Duly authorised to sign Bid for an d on beh alf of
(Fill in block capitals)
______________________________________________________________
______________________________________________________________
______________________________________________________________
Witness
Signature
Nam e
Address

_______________________
_______________________
_______________________
______________________

111

PREAMBLE TO
PRICE SCHEDULES

112

Note on Schedule
T he bid is percentage rate bid for CEMENT CO NCRETE ROAD WO RK INSIDE

PEDAK INSTITUTE IN WARD NO.6


1.

T he rates and pric es s hall be s ubmitted in the formats given in the online P rice
Schedules . Rates and prices rec eived in any other formats will be rejected and
the Bids will be dis qualified.

2.

I t will be entirely at the disc retion of the E mployer to acc ept or rejec t the bidders
propos al, witho ut giving any reas ons whats oever.

3.

I n P ric e Sc hedule, bidder shall quote his perc entage above/belo w fo r items lis ted
in the schedule. Pric es quoted in Sc hedule only will be cons idered for price
evaluation & s hall form a part of the Contrac t A greement.

4.

O nly Price Schedule will be c ons idered for financial evaluation of the bid with the
s ucc ess ful bidder.

5.

T he bidder s hall be deemed to have allowed in his pric e for provis ion,
maintenanc e and final removal of all temporary works of whats oever nature
required for c ons truc tion inc luding temporary bun ds , diverting water , pumping,
dewate ring etc . for the proper exec ution of wo rks . The rates s hall als o be deemed
to include any works and setting out that may be required to be c arried out for
laying out o f all the wo rks involved.

6.

Where there is a disc repanc y between the unit rates and the amount entered, the
latter s hall govern.

7.

T he Pric e Sc hedules are to be read in c onjunc tion with the C onditions of Contract,
the Specifications and other s ec tions of thes e bid doc uments and these
doc uments are to be take n as mutually explanatory o f one anot her.

8.

P ric es quoted by the bidder s hall be firm for the entire period of Contract witho ut
any esc alation.

9.

T he bidder shall interpret the data fur nished and c arry o ut any additional s urvey
work, or inves tigation wo rk re quired at his o wn cos t.

1 0.

T he pric es quoted s hall als o include the c os t of materials utilized for tes ting.

1 1.

T he bidder should ac quaint hims elf with the site c onditions including the acc ess to
Worksite. T he succes sful bidder shall have to make s uitable ac cess to works ites
at his own c os t. T hes e acces ses will be us ed by the other c ontractors working for
RMC .

Signature of contractor.

113

PRICE SCHEDULE

114

Rajkot Municipal Corporation


Price Schedule
Name of work:

CEMENT CO NCRETE RO AD WORK INSID E P ED AK INSTITUTE I N WA RD


NO.6
Item
No.
1

Q nty.

Short Description of work

Rate
Rs.
7 2 .00

7 50.00

2 50.00

3
4

2 50.00
9 38.00

E xcavation in s oft soil up to


0 .00 to 1 .5mt depth
Lime concrete work in blac k 1 259 .0 0
trap metal (Lime mortar P rop.
1 :2)
C C work in 1 :2 :4
3 842 .0 0
Removing of exc avated stuff
107 .00

Unit

Total
am ount Rs.
54000 .00

3 14750 .00

9 60500 .00
1 00366 .00
14,29,616.00

M
3
M
Total
Contribu tion fro m Govern ment of Gujarat 70 %
10,01,000.00
Corp oratorsh ri Grant 20%
2,86,000.00
Sup ervis ion ch arges 6 .25%
17,875.00
Contribu tion of Rajkot Mu nicipal C orporation 10 %
1,43,000.00
Total
14,47,875.00
(Rupees Fourteen lac s forty s even thous and eight hundred
Say
seventy five only)

14,47,875.00

I/W e agree to carry out the above said work at _____________


_____________ __________________ __________ ________% equal/above/
below on the tendered rates shown in Schedule.

Addl.A.E.
R.M.C.

Dy.Ex.Engineer

R.M. C.

Addl. City Engineer

R.M. C.

Signature of C ontractor.

115