Design of Reinforcement for RC Capping Beam

Project : C Contiguous Bored Pile (Check for Lateral Loads)


BEAM INFORMATION
Cover c
Width b
Depth h
Effective Depth d
Spacing Between Bar
Characteristics Strength of Concrete

(mm)
(mm)
(mm)
(mm)
(mm)
fcu

Left 1/4 Span

Middle Span

Right 1/4 Span

50
1000
800
684

50
1000
800
684

50
1000
800
684

(N/mm2)

35

35

35

Characteristics Strength of Reinforcement fy

(N/mm2)

460

460

460

Characteristics Strength of Reinforcement fyv

(N/mm2)

460

460

460

Left 1/4 Span

Middle Span

Right 1/4 Span

(KN-m/m)
(KN-m/m)

34.1
47.7

34.1
47.7

34.1
47.7

(KN-m)

47.7

47.7

47.7

0.10

0.10

0.10

0.0029

0.0029

0.0029

0.950

0.950

0.950
650

CHECK MOMENT
Maximum Moment per m run under service
Maximum Moment per beam per m under ultimate
Maximum Moment per beam (Ultimate) Mult
Mult/(bd2)
Mult/(bd2fcu)
la = Min(0.5+sqrt(0.25-k/0.9), 0.95)
Lever Arm z = la*d

(mm)

650

650

Asc = M/(0.87*460*z) or 0.13%*Asc

(mm2)

183

183

183

0.130

0.130

0.130

(mm2)
1
1
2
2
3
3

889
40
10
32
18
0
0

889
40
10
32
18
0
0

889
40
10
32
18
0
0

(mm2)
(%)

27054
3.955
60

27054
3.955
60

27054
3.955
60

5T20

5T20

5T20

100Asc/Ac
Area of Reinforcement Required Ast
Rebar Size For Layer
Rebar Nos. For Layer
Rebar Size For Layer
Rebar Nos. For Layer
Rebar Size For Layer
Rebar Nos. For Layer
Area Of Reinforcement Provided Ast
Reinforcement Ratio
Bar Spacing
Rebar Nos. & Size

OK

OK

OK

Left 1/4 Span

Middle Span

Right 1/4 Span

(KN/m)
(KN/m)

170.4
170.4

170.4
170.4

170.4
170.4

(KN)
(N/mm2)

238.5
0.349

238.5
0.349

238.5
0.349

1.020

1.020

1.020

Enhanced Factor g = 2d / aV

1.000

1.000

1.000

Enhanced Shear gvc

1.020

1.020

1.020

Max ((v-gvc), 0.4) required by Table3.7 of BS 8110

0.400

0.400

0.400

1.00
2T10-200
10
4
200

1.00
2T10-200
10
4
200

1.00
2T10-200
10
4
200

CHECK SHEAR
Maximum Shear per m run under service
Maximum Shear per beam under service
Maximum Shear per beam (Ultimate)
Vult
v=V/(b*d)
Design Concrete Stress vc (Table 3.8 of BS 8110)
Distance av (Note : leave blank if n.a.)

Remarks

Sagging Throughout

Remarks

(mm)

Asv/Sv required

(mm)

Links Provided
Size of Links
Nos. Of legs
Link Spacing c/c
Link area provided - Asv

(mm)
(mm)
(mm2)

Asv/Sv provided

X1
Y1

314

314

314

1.57

1.57

1.57

O.K.

O.K.

O.K.

Left 1/4 Span

Middle Span

Right 1/4 Span

(KN-m/m)
(KN-m/m)
(KN-m)
(mm)
(mm)
(mm)

0.00
0.00
0.00
900.00
690.00
10.00

0.00
0.00
0.00
900.00
690.00
10.00

0.00
0.00
0.00
900.00
690.00
10.00

CHECK TORSION
MAXIMUM TORSION PER m RUN
MAXIMUM TORSION
ULTIMATE TORSION
HORIZONTAL DISTANCE OF LINK
VERTICAL DISTANCE OF LINK
SIZE OF LINKS
AREA OF LINK - 2 LEGS Asv

(mm2)

157.08

157.08

157.08

STRENGTH OF LINKS fyv

(N/mm2)

460.00

460.00

460.00

LINKS SPACING Sv=0.8*X1*Y1*Asv*0.87*fyv/(T)

(mm)

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

PROVIDING
AREA OF LONGI. BARS INSIDE PERI. OF LINK As (mm2) (mm2)
PROVIDING

Remarks

ging Throughout