EXAMPLE

PROJECTS

104

GOOD INDUSTRY PRACTICES

a.

CITY SQUARE RESIDENCES

CONQUAS SCORE: 95.6

AVERAGE QUALITY MARK SCORE: 91.7


6 Blocks of 28/30-Storey Condominium (Total 910 Units)

DESIGN AND MATERIALS FOR QUALITY

105

Rectified homogeneous tiles


Better dimensional and tonal consistency.

Modular system RC wall


Less joints & better flat surfaces.

Drywall partitions

Rebate door with pre-installed architrave

Eliminate wet trades.

Good alignment between door frame & leaf.

Tidy process.

No nail-hole patch up.

Capping for M&E pipe protrusion


Hide untidy joints.

PPR (Poly Propylene Random


copolymer) Pipes
Ease of installation.
No corrosion.

106

GOOD INDUSTRY PRACTICES

b.

THE SAIL @ MARINA BAY

CONQUAS SCORE: 94.8

AVERAGE QUALITY MARK SCORE: 87.4


2 Towers of 70/63-Storey Condominium (Total 1111 Units)

DESIGN AND MATERIALS FOR QUALITY

Prefabricated Bathroom
Speedy construction & consistency in workmanship.

Curtain wall facade


Dry and faster installation.

Polymer modified adhesive


Better compatibility to tiles.

Drywall partitions
Better control on alignment and evenness.

Rectified ceramic tiles


Consistent joint width.

Screed-less flooring
No wet works.
Better productivity.

107

108

GOOD INDUSTRY PRACTICES

C.

PARC EMILY

CONQUAS SCORE: 94.1

AVERAGE QUALITY MARK SCORE: 91.4


5 Blocks of 8-Storey Condominium (Total 295 Units)

DESIGN AND MATERIALS FOR QUALITY

Precast components
Quality surface finish and buildabilty.

Prefabricated bathrooms
Less workmanship issues and off site production.

Epoxy pointing for marble floor


Smooth joints and better aesthetics.

Screed-less flooring
More productive.
Minimize de-bonding issues.

Honey comb door with lift-off hinges

Inner beading between


ceiling and wall

Faster installation and better alignment.

Improves alignment and joints.

109

110

GOOD INDUSTRY PRACTICES

d.

ST REGIS RESIDENCES

CONQUAS SCORE: 89.4

AVERAGE QUALITY MARK SCORE: 88.9


A Mixed Development of 201 Residential and 13 Commercial Units

DESIGN AND MATERIALS FOR QUALITY

Prefabricated bathrooms
Faster and dry construction.

Curtain wall facade


No scaffolding.
No wet works.

Drywall partitions
Ease of installation and consistent finish.

Modular system cabinets


Factory assembled and good dimensional accuracy.

Rectified tiles
Stable dimension.

Click-fit sockets
Installed after final painting.

111

112

GOOD INDUSTRY PRACTICES

e.

INFINIUM @ EVELYN

CONQUAS SCORE: 91.6

AVERAGE QUALITY MARK SCORE: 84.5


2 Blocks of 33-Storey Condominium Housing Development
(Total 208 Units)

DESIGN AND MATERIALS FOR QUALITY

Precast components
Better quality surface finish.
Faster construction.

Drywall partitions
No wet work.
Consistent finish.

Modular system cabinets


Less manual work and faster installation.

Internal spray painting


Consistent finish.

Rebate door with lift off hinges

Epoxy grouted marble floor

Better alignment between frame and panel.

Smooth and consistent finish after polishing.

113

114

GOOD INDUSTRY PRACTICES

f. THE AZURE
CONQUAS SCORE: 93.6

AVERAGE QUALITY MARK SCORE: 87.42


Total number of units 116

DESIGN AND MATERIALS FOR QUALITY

115

Modular system components

2-component adhesive for marble floor

Factory assembled minimize workmanship issues.

Compatible to soft stones.

Rectified ceramic tiles


Epoxy joints for marble floor

Joint consistency.

Durable joints and easy maintenance.

Timber strip with plywood base


Better levelness and invisible nailing.

Honey comb veneer door


Light weight and warp resistant.