The Computer Program: PT Indocode Surya
The Computer Program: PT Indocode Surya
CHAPTER X
The example of calculation for a complete mill material balance as described above was done
manually with the use of an ordinary calculator. Perhaps it will take too much time to complete,
say sometimes for about 7 (seven) or 8 (eight) hours for a mill tandem, excluding the time to
compose its evaluation, conclusions and the recommendations.
With the computer program made by the writer a complete mill material balance will be
calculated instantly and the user needs only to fill the input data. But it is to be noted that, the
use of a computer program will be nothing if unreliable source of data used to the computer, the
same with the saying that when the garbage in, then will garbage also out.
There were 2 (two) programs made with Lotus-123, one for the tandem of 4 (four) mills and the
other for the tandem of 5 (five) mills. Each program consist of 2 (two) versions of calculation:
The Evaluation Program
The Projection Program
The evaluation program is use to evaluate the performance of the mill tandem respectively, using
its average daily analysis and data obtained from the operation of a week period or two weekly
as well during the milling season.
While the projection program is to be use for the planning of an optimal performance of a
tandem. Whereas the extractions value of Brix in mill #1 and the total, the total sugar, the %pol
and dry matter of the last mill bagasse could be determined based upon the tandems capability
and quality of the cane going to be milled.
Beside the items described above, the complete mill material balance also determining the gaps
between the rollers, i.e. the work opening for each mill. This means that the Projection Program
can also be use as reference of the setting for the next milling season, as well as the re-setting or
adjustment of the mills needed during the season. The program provided with such relevant
calculation including determination for the distances of feeder rollers and the Donnelly chutes.
10.1
Let us use the same example with the calculation on Chapter IX.
Fill in the data on Sheet-I (Evaluation Data), that are the blue letters or numbers only in the red
lined boxes and follow the instruction providing the sheet.
The ComputerProgram
X- 1
Sugar Factory
Mill Train
Milling Season (year)
Period of 15 milling days, number
Period dates evaluated up to
EXAMPLE
2 CC + 5 MILLS
1977
X
Last date
I
1.052,0
1.050,0
1.048,0
25,0
25,0
25,0
2.133
268
II
1.073,0
1.069,0
1.066,8
25,0
25,0
25,0
2.133
244
III
1.051,0
1.048,0
1.040,0
15,0
15,0
15,0
2.133
216
IV
1.050,0
1.048,0
1.040,0
15,0
15,0
15,0
2.133
191
V
1.064,0
1.052,0
1.048,0
15,0
15,0
15,0
2.133
193
41,23
2,20
6,0
78
36,33
2,00
6,0
78
27,79
2,00
6,0
78
26,14
2,00
6,0
78
24,62
2,00
6,0
78
II. M I L L I N G O P E R A T I O N
Cane:
crushed, total
Q
crushing duration
jg
pol
pt
brix
bt
fiber
f
Mixed juice:
gross
Gnm
brix
bnm
correction
knm
Imbibition water, total
Gi
Applied on:
bagasse 1
bagasse 2
bagasse 3
bagasse 4
Average value of fiber density
Brix ratio juice#1 to cane
bn1/bt =
4.351,0
24,00
10,32
13,41
16,07
3.718,7
14,69
1,00308
843,1
0
0
0
100
1,53924
1,30
I
17,46
14,05
10.1.2
TCD =
hours
%
%
% cane
Tons =
%, pol =
181,29 TCH
154.946
11,40
Purity =
76,96 %
kg/hr =
Purity =
85,47 % cane
77,62 %
Tons =
35.128
ltr/hr =
120,58 % fiber
%
%
%
%
kg/dm3
Last mill bagasse juice to fiber =
111,01%
II
12,48
9,29
III
8,90
6,45
IV
5,75
4,06
V
2,94
2,00
unit
%
%
The result of calculation made by the computer is shown on Sheet-II (Evaluation), such as:
The Material Balance, overall and individually (page: 1).
The overall performance of the tandem (page: 2).
The individual performance of each mill (page: 2).
The actual versus the projection of Brix Curves (page: 3).
The result of calculation made by the computer with the use of the same input, the same
example in Chapter IX is presented herein after for the overall as well as for the individual
performance of each mill in the tandem.
pt indocode surya
MILL I
- Juice
- Fiber
Total in
%
brix
Density
kg/dm3
Volume
dm3/hr.
Page : 1
Brix
kg/hr.
%
pol
Pol
kg/hr.
MILL I
Dk =
L=
n=
h=
i=
Vlbo =
Vlb =
10,02
21,33
268
0,4123
2,20
74.154
73.107
r=
r' =
u=
h' =
K=
HKnp =
kB =
1,3289
1,3172
0,34
0,4065
2,20
80,47
1,089
Evalu
15,98
24.311
12,30
- Fiber
Total
152.158
29.133
181.291
68.761
83.397
29.133
112.530
13,41
17,46
14,80
24.311
11.969
12.342
10,32
14,05
10,89
10,97
12.342
8,07
MILL II
- Juice
- Fiber
145.368
29.133
12,28
17.858
8,99
MILL II
Dk =
L=
10,23
21,33
r=
r' =
1,3081
1,3062
174.501
86.185
59.183
29.133
88.316
10,23
12,48
12,06
17.858
10.723
7.135
7,49
9,29
8,61
8,08
7.135
5,77
n=
h=
i=
Vlbo =
Vlb =
244
0,3633
2,00
60.737
57.376
u=
h' =
K=
HKnp =
kB =
0,34
0,3432
2,73
74,44
1,013
109.253
29.133
138.386
61.971
47.282
29.133
76.415
9,17
10.014
6,52
7,24
8,90
9,51
10.014
5.515
4.498
5,15
6,45
6,62
5,89
4.498
4,09
MILL III
Dk =
L=
n=
h=
i=
Vlbo =
Vlb =
10,21
21,33
216
0,2779
2,00
41.048
49.645
r=
r' =
u=
h' =
K=
HKnp =
kB =
1,2940
1,2954
0,35
0,3361
2,49
72,47
0,971
89.272
29.133
118.405
50.070
39.202
29.133
68.335
6,42
5.733
4,45
4,84
5,75
7,28
5.733
2.879
2.854
3,35
4,06
4,94
4,18
2.854
2,83
MILL IV
Dk =
L=
n=
h=
i=
Vlbo =
Vlb =
10,20
21,33
191
0,2614
2,00
34.108
44.395
r=
r' =
u=
h' =
K=
HKnp =
kB =
1,2802
1,2846
0,36
0,3402
2,38
70,61
0,895
74.330
29.133
103.463
41.990
32.340
29.133
61.473
3,84
2.854
2,60
2,76
2,94
5,01
2.854
1.235
1.619
1,87
2,00
3,39
2,63
1.619
1,78
1.936 1,01772
1,53924
1.936 1,12506
840 1,01772
1.096 1,01772
1,53924
1.096 1,21241
MILL V
Dk =
L=
n=
h=
i=
Vlbo =
Vlb =
10,34
21,33
193
0,2462
2,00
32.907
39.937
r=
r' =
u=
h' =
K=
HKnp =
kB =
1,2696
1,2696
0,36
0,2988
2,30
68,03
0,766
Total in
- Fiber
Total
MILL III
- Juice
- Fiber
Total in
- Fiber
Total
MILL IV
- Juice
- Fiber
Total in
- Fiber
Total
MILL V
- Juice
- Fiber
Total in
- Fiber
Total
The ComputerProgram
73.036
18.926
91.962
41.259
31.777
18.926
50.703
X- 2
pt indocode surya
- Juice
En =
Normal
- Pol
- Brix
Compres
Juice
extracted
by
Roller
feed
opening
shell
deflectio - noBagasse
void
- ditto,
density
-%
- pol
- brix
- dry
Fiber:
- index
- loading
-%
The ComputerProgram
Ep =
Eb =
K =
y =
I
II
III
IV
V
45,19
59,29
56,72
56,09
56,49
> 60
> 60
> 60
> 60
> 60
51,48
61,05
56,09
51,22
43,38
49,23
60,05
55,08
50,22
43,26
2,20
2,73
2,49
2,38
2,30
2,4-3,3 2,6-3,5 2,6-3,3 2,5-3,2 2,4-3,0
-0,20
0,59
0,32
0,19
0,11
meaning = no extion
l =
meaning
da =
r =
r' =
gat =
pa =
ba =
zk =
c =
q =
q' =
Normal value =
kf =
Normal
extted
extted
extted
Page : 2
%
%
%
%
extted
-0,03
-0,09
0,27
0,37
0,25
safe
safe
danger danger danger
1,1583 1,1767 1,1895 1,2024 1,2124
1,3289 1,3081 1,2940 1,2802 1,2696
1,3172 1,3062 1,2954 1,2846 1,2696
62,07
48,72
42,15
37,69
33,91
8,07
5,77
4,09
2,83
1,78
10,97
8,08
5,89
4,18
2,63
36,86
41,07
44,01
46,81
50,03
0,40
0,51
0,59
0,66
0,73
161,98 174,26 197,24 223,27 217,97
123,18 129,80 147,20 166,80 160,63
120 130 grams/dm2 escribed surface
25,89
32,99
38,12
42,63
47,39
25-35
28-38
32-42
37-47
45-50
%
kg/dm3
%
%
%
%
kg/dm3
gr/dm2
gr/dm2
%
%
X- 3
pt indocode surya
EXAMPLE
MILL TRAIN
2 CC + 5 MILLS
CANE QUALITY
MILLING SEASON :
% pol =
Va l u e
10,32
% brix =
f o r -------------->
4.351,0 TCD
Page : 3
PERIOD NO.
1977
Date
13,41
% fiber =
16,07
Last date
Mill I
Mill II
Mill III
Mill IV
Mill V
15,90
9,90
5,60
3,10
1,90
17,46
12,48
8,90
5,75
2,94
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Mill I
Mill II
Mill III
Expected Curve
The ComputerProgram
Mill IV
Mill V
Actual Curve
X- 4
pt indocode surya
The ComputerProgram
X- 5