Professional Documents
Culture Documents
Multiple Works PWO Request - V6
Multiple Works PWO Request - V6
www.contextures.com
Desc
[STD] EDGE - Activation on site
[STD] Extra Talk II power refurbishment - PDU Swap on site
[STD] Extra Talk II power refurbishment - SiNA
[STD] Feeder measurements on site
[STD] Full IP integration on site
[STD] FXEA v2 Swap on site
[STD] install RET on 2G&3G - Non service afecting - Site
[STD] New 2G and 3G technology implementation [STD] New 2G and LTE technology implementation [STD] New 2G technology implementation [STD] New 2G technology on existing site
[STD] New 2G, 3G and LTE technology implementation [STD] New 3G and LTE technology implementation [STD] New 3G technology implementation [STD] New 3G technology on existing site
[STD] New Ethernet over SDH service for pAbis interface on site
[STD] New LTE technology implementation [STD] New LTE technology on existing site including 2G and 3G recomisioning
[STD] New patching for EDGE - Activation on site
[STD] Patching for Packet Abis Activation on site
[STD] PIM on site
[STD] RAN Renewal Project - Additional Work Optical Repeater on site
[STD] RAN Renewal Project Swap 2G on site
[STD] RAN/TX Single site field intervention - CES Installation
[STD] RAN/TX Single site field intervention - CES pre-Install
[STD] RAN/TX Single site field intervention - CES Site Survey
[STD] RAN/TX Single site field intervention NIS measurements on site
[STD] RAN/TX Single site field intervention - Optical Fiber Installation
[STD] RAN/TX Single site field intervention SFP card exchange
[STD] RAN/TX Single site field intervention - Site visit
[STD] Recommissioning due to MHA swap on site
[STD] Reconfiguration of existing LTE technology on site
[STD] RF repeater swap on site
[STD] Swap of antennas on site
[STD] Swap of technology including recommissioning G900 - G1800 on site
www.contextures.com
Notes:
PWO iD: leave blank if PWO does not exist. Site iD must be as per normal name convention: XX_
Actual Planned Date is the actual date when work will be done. It has to be accurate.
Job re-scheduling must be minimum or rescheduled one day before the planned date.
Name company and engineer contact details must be provided. Phone number is mandatory
Ensure to provide the list of sites impacted if more than one site is affected
If there are any repetitive changes to be added on the drop-down list, please send e-mail to cha
Example of PWO request ==>
Select below the program name from the menu then fill
Site Id, date, and contact details. Summary will be filled
automatically
Menu
[STD] Full IP integration on site
[STD] Full IP integration on site
[STD] Full IP integration on site
[STD] Full IP integration on site
[STD] Full IP integration on site
[STD] Full IP integration on site
[STD] Full IP integration on site
PWO iD
123456
Site Id
VD_0123A
PWO iD
Site Id
GE_0087D
VD_0500C
VD_0515A
VD_0743C
VD_2208A
VD_2229A
VD_3003A
integration
integration
integration
integration
integration
integration
integration
on
on
on
on
on
on
on
site
site
site
site
site
site
site
GE_0087D
VD_0500C
VD_0515A
VD_0743C
VD_2208A
VD_2229A
VD_3003A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A