Description Unit Qty Extended Price Price: Hydrate Dissociation Curve

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 3

Description

Unit
Price

Extended

Qty

Price

Hydrate Dissociation Curve


Hydrate dissociation curve (4 points) constant pressure

$ 7,200.00

7,200.00

$ 7,200.00

7,200.00

$ 110.00
$ 1,680.00

1
1

$
$
$

110.00
1,680.00
16,190.00

consists of constant pressure evaluation to determine the dissociation


temperature for hydrates (4 point curve to establish trend for dissociation).

Hydrate Dissociation Curve of Inhibited sample


Hydrate dissociation curve (4 points) constant pressure
consists of constant pressure evaluation to determine the dissociation
temperature for hydrates (4 point curve to establish trend for dissociation).

Miscellaneous Recovery Costs


Hazardous waste disposal fee, per project
Customized gas synthesis, 500cc mixture (if applicable)

TOTAL for Hydrate Dissociation Curve Evaluation


Anticipated Turnaround Time:

Anticipated turnaround for the above testing program is six (6) weeks from receipt of the samples. Turnaround
times depend on the work load in-house at the time samples are received and on timely communication of the
testing parameters and requirements. Projects are processed through the laboratory on a "first come, first served"
basis. Rush surcharges will be applied when expedited turnaround is requested.
Westport Contact Personnel:
Project Manager - Jeremy Rohan, 713-479-8418
Sales Representative - Stephanie Heard, 713-479-8437
BD Manager - Pat Jacobs, 713-479-8436
VP of Operations - Edmond Shtepani, 713-479-8425

jeremy.rohan@intertek.com
stephanie.heard@intertek.com
pat.jacobs@intertek.com
edmond.shtepani@intertek.com
Prices are valid for 90 days from the date of
this quotation.

Standard Terms and Conditions may be found at:


www.intertek-cb.com/termsandconditions

Westport Technology Center

2007 US Price Book

SAMPLE STORAGE / CYLINDER RENTAL


2007 Price Schedule (effective 1-Jan-06), price per container or cylinder

Atmospheric Sample Storage Container


Size and Type
1-liter capacity or less
up to 1-gallon can1
up to 5-gallon can1
>5-gallon can (up to 20-gallon)1

Storage/Rental Period
Container

--$
$
$

5
10
55

For refrigerated storage, add per sample


1

Refrigerated storage is not available for volumes over 1 gallon.

One-time charge for the sample container, hazmat packaging and labeling.

---

Monthly

6-Month

Annual

$
$
$
$

20
93
155
250

$
$
$
$

115
536
893
1,441

$
$
$
$

219
1,018
1,697
2,738

29

55

Low Pressure Cylinder Storage/Rental (<5,000 psig MAWP) Wesport Cylinder


Size and Type
Flow-through Cylinder, 1-liter capacity or less
Flow-through Cylinder, 10-liter capacity or less
Flow-through Cylinder, 20-liter capacity or less
Storage of Non-Westport Cylinder, 20-liter or less

Storage/Rental Period
Monthly
6-Month

Daily
$
$
$
$

6
15
20
5

$
$
$
$

180
450
600
150

$
$
$
$

928
2,321
3,094
774

Annual
$
$
$
$

1,533
3,833
5,110
1,278

High Pressure Cylinder Storage/Rental (>=5,000 psig MAWP) Westport Cylinder


Size and Type
Flow-through Cylinder, 1-liter capacity or less
Flow-through Cylinder, 1-gallon capacity or less
Piston Cylinder, 25,000 psig or less (700-850cc)
Single-Phase Type 6 DOT Cylinder (700cc; 15,000 psig)
Storage of Non-Westport Cylinder, 1-liter capacity or less

Storage/Rental Period
Monthly
6-Month

Daily
$
$
$
$
$

16
18
20
33
6

$
$
$
$
$

480
540
600
990
180

$
$
$
$
$

2,621
2,948
3,276
5,405
928

Pricing Policies:
1) Long term storage is discounted for prepaid semi-annual or annual storage agreements. Otherwise, monthly
storage/rental rates apply.
2) The storage/rental period starts when sample is placed in a container or the container leaves the Intertek Westport
Technology Center, whichever occurs first.
3) Monthly storage fees are automatically accrued and invoiced every month until the containers are emptied or a
long term storage agreement takes effect.
4) At the sole discretion of Intertek Westport Technology Center, containers may be provided free of charge for
any, or all, samples which are being utilized in a laboratory testing program.
5) A hazardous waste disposal fee and/or re-dressing charge will be prepaid as part of each storage agreement.
6) All third party fees (e.g., shipping) are prepaid and re-billed with a 15% processing fee.

Annual
$
$
$
$
$

4,964
5,585
6,205
10,238
1,533

Westport Technology Center

2007 US Price Book

You might also like