CLIENT CONSULTANT CONTRACTOR PROJECT:

PACKAGE-II : DOWN HILL CONVEYOR SYSTEM


DOC. NAME : DESIGN CALCULATION SHEET 51NS CORE FOR NEUTRAL CT OF
ConverterdutyTRANSFORMEROFSS1
DOCUMENT NO. 1.1

1.2

1.3

1.4

REV.-00

Dated:01/07/2014

SystembasicInputData
Transformerrating

2000KVA

CTratios

800/1A

Design

3PH4WIRE

Voltage

690

Frequency

50

Hz

Ratio

800

AccuracyclassforCoreII(51NS)

5P

15

AccuracyclassforCoreI

PS

SelectedBurden(VA)forcoreI(PS)

10

VA

PrimaryVoltage(v)

6.6

kV

SecondaryVoltage(V)

690

Transformerrating

2.000

Impedenceoftransformer

%impedancevariationonnegativeside

VAC

BasicInputDataofCurrentTransformer:
1

BasicInputDataofDistributionTransformer:

MVA
%
(nonegativetolerance
forcalculationpurpose)

DistributionSystemFaultCurrent:
Fullloadcurrent,IFL

(MVAX106)
(3XSec.Voltage)
6

=
=
MinTransformerImpedance,ZM

=
=
=

MaximumthroughfaultcurrentonLVsideoftransfromer, =
MVA,IF
=
IF
Max.throughFaultcurrentatCTSecondarySideIfs

=
=
=

1 of 2

(2x10)
(1.7322x690)
1673.53

(%impedancex(100%tolerance))/100
5x(1000))/100
6.25
%
(IFx100)/ZM
(1673.53x100)/6.25)
26776.48 Amp
IF/CTR
33.48 Amp

CT(CoreI)sizingcalculationfor51NSProtectionFor2MVAConverterTrafoSS1c/SS2
CoreI:
2.0

CTsizingcalculationforIDMTEarthFaultprotectionRelay(51NS)
=
NumberofIdenticalCTS
LocationofCTS

2.1

2.2

2.3

Core_1ofNCTonTrafoorseperateCT

IDMTEarthFaultprotectionRelay(51NS)Inputdata
RelayModule

E/FSetting

10

CurrentI/Pburden,VA

0.1

VA

RelatyoperatingCurrent,IR

0.1

Amp

CoreICTInputdata
Ratio

800

/1A

SelectedBurden(VA)

10

VA

AccuracyClass

5P

15

CalculatedofCTBurdens:
=

50

Leadresistanceat70Cfor2.5mm copper(/km)

8.87

/km

LeadResistance(RL)()

0.89

()

LeadBurden(VA)

0.89

VA

TotalMeterBurden(VA)

0.1

VA

TotalBurdenonCT(VA)

0.99

VA

CTSecondaryresistanceat750C(Rct)
(DuetoDesignlimitationofCTmanufacturer,Rct)

CableLengthl(m)
2

Selectedburdenismorethanrequired.
2.4

1 NOS

HENCESAFE.

WhenCT,CoreIisusedwithratio2500/1A,Incaseofphasetophasefaultmaximumprimarycurrenttobe
measuredbytherelayforoperation
20%If
=
FaultcurrentatSecondary

If

VoltagedevelopedbyCTVct

26.8

kA

If X(Rct+Rl)
Pri.CTRatio

=
CTVct
2.5

26.8X1000X(4+0.887)/800)
163.72

AccordinglyminimumVAburdenofconsideredCTRatingwithALF15
ALF
VA

VA
Hence10VACThaving5P15accuracyisadequate

=
=

15
((Vct/ALF)xCTseccurrent)(RctxCTsecCurrent)

((163.72/15)X1)(4X1)

10.91

6.91

HenceNCTcore1orseperateCTon2MVADistributiontrafoCT800/1A,5P15,10VA,RCT=<4ohm