Details of Infrastructural Facilities Available For Proposed Programme/course

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

National Council For Teacher Education

Details of infrastructural facilities available for proposed programme/course :


Area of the land in possession (in sq.mts)
Built up area earmarked for the course (in sq.mts)
Whether the building constructed/proposed on the same land

BUILDING
(Please refer to Clause 8 of NCTE.)
Date of completion of Construction of the Building
Existing
Expected completion of Extension
Name of the Competent authority for approval of building plan and issue
of completion Certificate
Address of the competent authority for approval building plan and issue
of completion Certificate
Whether building is disabled- friendly as per Law

Total Built Up Area(in sq.m)


Total Built Up Area(in sq.ft)

on

programme/course :
5829.12
3736.00
Yes

31/4/2016
Nadia Zilla
Parishad
Krishnagar, Nadia
Yes

3736
40199

Specification of Rooms and other infrastructural facilities

Sl No.

Description

GROUND FLOOR
1 Administrative Office
2 Pricipal
3 Visitors Room
4 Store Room-1
5 Store Room-2
6 Store (Sports)
7 Boys toilet
8 Girls' Toilet
9 Store (Sports)
10 Common Room Girls
11 Class Room-1
12 Class Room-2
13 Stair Case -1
14 Stair Case -2
15 Corridor
16 Passage-1
17 Lobby
18 Prov. For Lift
19 Class Room-3
20 Common Room Boys-1
21 Common Room Boys-2
22 Boys toilet
23 Girls toilet
24 Toilet for PWD
25 Secuity Guard Room
26 Portico
27 Passage-2
28 Verandah-1
29 Verandah-2
30 Verandah-3
FIRST FLOOR
1 Ante Room
2 Seminer Hall
3 Ladies Toilet
4 Library & Reading room
5 Stair Case-1
6 Stair Case-2
7 Corridor
8 Passage

Room No. Length(m)

1
2
3
4
5
6
7
8

9
10
11

12
13
14

Breadth(m)

3.875
3.75
6.375
3.125
3.125
1.8
5.1
3.125
1.8
4.5
6.375
6.375
7.325
3
27.25
8
3.75
1.525
9.525
3.225
6.275
4.35
4.35
1.275
3.92
6.225
4.3
16.7
4.275
19.65

7.625
7.625
7.625
7.625
7.625
2.4
3.125
3.25
2.4
7.625
7.625
7.625
3.75
4.325
2.45
1.585
7.75
1.6
6.15
6.15
8
2
1.985
1.5
2.12
14.675
1.95
1.8
1.85
1.925

4.05
24.125
4.45
19.375
7.325
3
24.675
14.75

2.765
7.625
3.25
7.825
3.75
4.275
2.45
1.2

9 Lobby-1
10 Class Room -4
11 Class Room -5
12 Staff Room -1
13 Lobby-2
14 Verandah-1
15 Verandah-2
16 Verandah-3
17 Girls Toilet
18 Boys toilet
SECOND FLOOR
1 Guest Room
2 Curriculum Lab.
3 Biology Lab.
4 Art & Craft Resource Centre-1
5 Toilet Gents
6 Toilet Ladies
7 Stair Case-1
8 Faculty 1
9 Phsycology Resource Centre
10 Geography Lab
11 Stair Case-2
12 Corridor
13 Lobby-1
14 Lift
15 Lobby-2
16 Verandah-1
17 Verandah-2
18 Verandah-3
19 ICT Resource Centre(Computer Lab)
20 Class Room-6
21 Class Room-7
22 Girls Toilet
23 Boys Toilet
THIRD FLOOR
1 Sports Store Room
2 Class Room-8
3 Health & Physical Education -1
4 Health & Physical Education -2
5 Stair Case-1
6 Toilet
7 Girls Common Room-2
8 Store Room-3
9 Art & Craft Resource Centre-2
10 Faculty-2

15
16
17

18
19
20
21

22
23
24

25
26
27

28
29
30
31

32
33
34
35

4.75
9.56
9.54
3.9
7.9
3.65
28.75
12.75
4.8
4.8

4.56
8
8.2
8.2
4.175
8.575
1.8
1.35
2.325
2.325

4.025
7.75
6.5
6.25
3.125
4.45
7.325
6.375
6.375
6.375
3
27.65
4.75
1.525
7.9
3.65
28.75
12.75
7
9.6
6.375
4.8
4.8

2.765
7.625
7.625
7.625
5.75
3.25
3.75
7.625
7.625
7.625
4.275
2.45
4.56
1.6
4.175
8.575
1.8
1.35
8.2
8.2
8.2
2.325
2.325

1.825
7.75
6.5
9.625
7.325
4.45
3.125
3.125
6.375
6.375

3.785
7.625
7.625
7.625
3.75
3.25
7.625
7.625
7.625
7.625

11 Stair Case-2
12 Passage-1
13 Passage-2
14 Passage-3
15 Lift
16 Lobby-1
17 Verandah-1
18 Verandah-2
19 Verandah-3
20 Multipurpose Hall
21 Girls Toilet
22 Boys Toilet

36

3
27.65
14.7
1.8
1.525
7.945
8.575
28.735
12.75
23.25
4.8
4.8

4.275
2.45
1.2
6.5
1.6
4.175
3.92
1.8
1.35
8
2.325
2.325

Carpet Area
Remarks
in sq.mts
29.55 Existing
28.59 Do
48.61 Do
23.83 Do
23.83 Do
4.32 Do
15.94 Do
10.16 Do
4.32 Do
34.31 Do
48.61 Do
48.61 Do
27.47 Do
12.98 Do
66.76 Do
12.68 Do
29.06 Do
2.44 Prop.Extn.
59.00 Prop.Extn.
20.00 Prop.Extn.
50.20 Prop.Extn.
8.70 Prop.Extn.
8.63 Prop.Extn.
1.91 Prop.Extn.
8.30 Prop.Extn.
91.35 Prop.Extn.
8.39 Prop.Extn.
30.06 Prop.Extn.
7.91 Prop.Extn.
37.83 Prop.Extn.

11.13 Existing
184.00 Do
14.50 Do
147.73 Do
27.47 Do
12.83 Do
60.45 Do
17.70 Do

A
A
A
A
A
A
Am
Am
A
Am
I
I
Cir
Cir
Cir
Cir
Cir
Cir
I
Am
Am
Am
Am
Am
A
Cir
Cir
Cir
Cir
Cir

21.66 Do
78.31 Prop.Extn.
78.31 Do
31.98 Do
21.66 Do
21.66 Do
51.75 Do
17.21 Do
11.16 Do
11.16 Do

11.13 Existing
59.09 Existing
49.56 Existing
47.65 Existing
17.97 Existing
14.46 Existing
27.47 Existing
48.60 Existing
48.60 Existing
48.60 Existing
12.83 Existing
67.74 Existing
21.66 Existing
2.44 Prop.Extn.
21.66 Prop.Extn.
21.66 Prop.Extn.
51.75 Prop.Extn.
17.21 Prop.Extn.
57.40 Prop.Extn.
78.72 Prop.Extn.
52.28 Prop.Extn.
11.16 Prop.Extn.
11.16 Prop.Extn.

6.90 Existing
59.00 Existing
50.00 Existing
73.00 Existing
27.47 Existing
14.00 Existing
24.00 Existing
24.00 Existing
49.00 Existing
48.60 Existing

12.83 Existing
67.74 Existing
17.64 Existing
11.70 Existing
2.44 Prop.Extn.
33.17 Prop.Extn.
33.61 Prop.Extn.
51.72 Prop.Extn.
17.21 Prop.Extn.
186.00 Prop.Extn.
11.16 Prop.Extn.
11.16 Prop.Extn.

You might also like