Professional Documents
Culture Documents
Drainage Q Rev4
Drainage Q Rev4
5
Accessibility
Distance to
community drains
Connectivity to
community drain
Quantity
Percentage of
streets length
having drains
Percentage of
streets length
having pucca drains
Quality
Dissipation time of
water after heavy
rain from drains
Design of
community drains
Cleanliness of
community drains
Frequency of drain
channel cleaning
Frequency of
occurrence of
diseases
Frequency of water
logging
Distance of waste
water disposal site
System for waste
water disposal
Sustainability
Maintenance ease
Life span
Efficiency of
organization for
cleaning drains
Meters
Very good.
Very bad
%
Minutes
Very good.
Very bad
Very clean..
Very dirty
No. of
times/year
No. of
times/year
No. of
times/year
Km
Adequate
Very easy /
Very tough
Years
Efficient
Inefficient
Important
Important
Important
How satisfied are you with the present percentage of streets having drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Percentage of Streets length having Pucca drains (%)
What percentage of streets length have pucca drains at present in your village ..%
What percentage of streets length should have pucca drains
Maximum desired..%
Minimum acceptable..%
How satisfied are you with the present percentage of streets length having drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Percentage of Streets length having covered drains (%)
What percentage of streets length have covered drains at present in your village ..%
What percentage of street length should have covered drains
Maximum desired..%
Minimum acceptable..%
How satisfied are you with the present percentage of street length having covered drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Percentage of different types of streets having drains
Street Type Drain type
Existing (%) Desired (%) Acceptable (%)
Pucca covered
Major street Pucca uncovered
Kutcha
Underground pipe
Pucca covered
Minor street Pucca uncovered
Kutcha
Underground pipe
Pucca covered
Lane
Pucca uncovered
Kutcha
Underground pipe
How satisfied are you with the present percentage of street length having drains for following types of streets?
Major street
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Minor street
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Lane
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Quality
Dissipation time of drain water after heavy rain (Hours)
What is the present time of dissipation of drain water after heavy rain Hours
In what time drain water should dissipate after heavy rain
Minimum desired time Hours
Maximum acceptable time Hours
How satisfied are you with the present drain water dissipation time
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Frequency of water logging (No of times/year)
What is the present frequency of water logging at present ... No of times/year
Reasons for water logging
Existing cond.
Problems with community
drain
Level of Importance
Very
Important
Yes
Important
Moderately
Important
Less
Important
No
Not
Important
5
4
3
2
1
Inadequate channel width
Inadequate channel Depth
Inadequate slope of channel
High sedimentation in
channel
Uncontrolled disposal of
solid waste
Lack of street cleaning
Inadequate arrangement for
cleaning
Lack of Community
participation
Inadequate number of
drainage channel
Design of community drains
How satisfied are you with the present design of community drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Cleanliness of community drains (Sedimentation, waste disposal, etc.)
How clean are community drains at present?
Very clean Clean Moderately clean Dirty Very Dirty
How satisfied are you with the cleanliness of following types of drains?
Pucca uncovered drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Pucca covered drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Kutcha drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Underground drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Who cleans the community drains? Household / Gram Panchayat /NGO / SHG /Community participation / Other
In your opinion who should clean the community drains?
Frequency of drain channel cleaning (Times/Year)
How frequently community drains are cleaned at present Times/Year
What is the frequency of community drains cleaning desirable to you Times/Year
What is the minimum frequency of community drains cleaning acceptable to you Times/Year
How satisfied are you with the frequency of community drains cleaning
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Frequency of occurrence of diseases (No. of times/year)
List the details about the incidence of drainage related diseases
Type of Diseases
Number of
occurrence/year
Impact/year
No. of days
suffer
No. of
deaths
Old
Adult
Children
<14
14-18
Malaria
Meningitis
Schistosomiasis
Filariasis
Typhoid
Bothered
4
Moderately
Bothered
3
Less
Bothered
2
Not
Bothered
1
Sustainability
Consider the following types of community drains and rate them on following features
Maintenance ease (in terms of cost, labour, time, etc.)
Pucca uncovered drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Pucca covered drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Kutcha drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Underground drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Life span
Pucca uncovered drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Pucca covered drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Kutcha drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Underground drain
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Overall satisfaction for community drains
Pucca uncovered drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Pucca covered drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Kutcha drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Underground drains
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
Disposal of waste water from community drains
Place of waste water disposal: agricultural field/community land/river/canal/tank/pond/stabilization pond
Distance of waste water disposal site (Kilometre)
At what distance community waste water is disposed from your house.. Kilometre
At what distance waste water should be disposed from the house
Desired distance Kilometre
Acceptable distance.. Kilometre
How satisfied are you with the present distance of waste water disposal site?
Very Satisfied Satisfied Moderately satisfied Less Satisfied Not Satisfied
4
3
2
1
5
What problems do you face due to community waste water disposal?
Problems
Important
No
Foul odor
Waste of fertile land
Mosquitoes
Flies
Insects
1.
2.
Which agency should carry on the improvement work?
Government / Gram Panchayat / NGO / SHG / Community / Other / Cant say / Dont know
Who should Execute the improvement work:
Private contractor alone / Private contractor with Gram Panchayat / Community / Other / Cant say / Dont know
For improvement of drainage infrastructure as per your desires and needs you have to contribute in terms
of money, time, labour, etc. from your side.
Q1. Would you contribute some amount for the improvement of drainage infrastructure in your village?
Yes
No
Dont know
Cant say
Q2.Would you contribute in labour for the improvement of drainage infrastructure in your village?
Yes
No
Dont know
Cant say
If yes, how many days:
Q3.Would you contribute in material for the improvement of drainage infrastructure in your village
Yes
No
Dont know
Cant say
If yes, what amount and what material
If yes to Q1 ,
How much would you contribute? (The maximum amount of Rs.) .
If the scheme undertaken is better than your desire/expectation Would you contribute more than the maximum
stated amount?
Yes
No
Dont know
Cant say
Attributes
Improved condition
Accessibility
Do you have stated more amount than actually you can contribute
Yes / No / Cant say / Dont know
Do you have stated more amount than actually you can contribute
Yes / No / Cant say / Dont know