Pumping Station

Sl.No Description
Size - 9.85m X 6.8m
1 Earth Work Excavation
Pump Room
Footing
Flow Meter Chamber
PB1 - 3.75m
PB2
PB3
PB1 - 3.70m
Cable Trench - 2Nos (600X600)
Cable Trench - 1No (550X2000)
Cable Trench - 1No (400X400)
Add for Variance in drawings
2 Back filling
Pump Room
Footing
Flow Meter Chamber
PB1 - 3.75m
PB2
PB3
PB1 - 3.70m
Cable Trench - 2Nos (600X600)
Cable Trench - 1No (550X2000)
Cable Trench - 1No (400X400)
Add for Variance in drawings
3 Pest Control
a) Raft
Sump slope
b) Footing - 5Nos
Chamber Raft
c) Plinth Beam
PB1 - 3.75m
PB2
PB3
PB1 - 3.70m
d) Control room
Generator room
Chlorination room
Add for Variance in drawings
4 PCC -SRC20
a) Raft
Sump slope

Nos

1
5
1
3
1
2
2
2
1
1
1

12
1.95
3.375
3.2
4.2
4.9
3.175
2.15
2.1
1.55

8.95
1.95
4.15
0.8
0.8
0.8
0.8
2.15
3.55
1.55

3.055
1.075
2.175
0.3
0.3
0.3
0.3
1.375
1.375
1.375

1
5
1
3
1
2
2
2
1
1
1

41.9
1.95
10.9
3.2
4.2
4.9
3.175
8.6
11.3
6.2

1
1.95
1
0.8
0.8
0.8
0.8
0.5
0.5
0.5

3.055
1.075
2.175
0.3
0.3
0.3
0.3
1.375
1.375
1.375

1
4
5
1

7.1
1.8
1.4
2.45

10.1
0.5
1.4
2.3

3
1
2
2
1
1
1
1

3.2
4.2
4.9
3.175
4.225
4.225
4.15

0.4
0.4
0.4
0.4
4.9
4.2
4.9

1
4

7.1
1.8

10.1
0.5

0.075
0.075

b) Footing - 5Nos
Chamber Raft
c) Plinth Beam
PB1 - 3.75m
PB2
PB3
PB1 - 3.70m
d) Control room
Generator room
Chlorination room
Add for Variance in drawings
5 Screed - SRC20
a) Raft
Sump slope
b) Footing - 5Nos
Chamber Raft
c) Plinth Beam
PB1 - 3.75m
PB2
PB3
PB1 - 3.70m
d) Control room
Generator room
Chlorination room
Add for Variance in drawings
6 Sub Structure RCC - SRC35/20
a) Basement Raft
Sump wall
b) Basement wall
Longer wall
Shorter wall
c) Pump Plinth
Stub column
Footing
Chamber Raft
d) PB4 - Longer
PB4 - Shorter
Utility Slab
Column-below FGL
e) Plinth Beam
PB1 - 3.75m
PB2
PB3
PB1 - 3.70m
f) ChamberWall
g) Grade Slab

5
1

1.4
2.45

1.4
2.3

0.075
0.075

3
1
2
2
1
1
1
1

3.2
4.2
4.9
3.175
4.225
4.225
4.15

0.4
0.4
0.4
0.4
4.9
4.2
4.9

0.075
0.075
0.075
0.075
0.075
0.075
0.075

1
4
5
1

7.1
1.8
1.4
2.45

10.1
0.5
1.4
2.3

0.05
0.05
0.05
0.05

3
1
2
2
1
1
1
1

3.2
4.2
4.9
3.175
4.225
4.225
4.15

0.4
0.4
0.4
0.4
4.9
4.2
4.9

0.05
0.05
0.05
0.05
0.05
0.05
0.05

1
1

6.8
4.6

9.8
0.3

0.4
0.5

2
2
2
1
5
1
1
1
1
5

9.8
6.5
1.8
0.25
1.2
2.3
3.75
2.02
4
0.45

0.3
0.3
0.85
0.25
1.2
2
0.2
0.2
2.17
0.2

2.68
2.68
0.15
2.53
0.3
0.2
0.45
0.45
0.15
0.85

3
1
2
2
1

3.2
4.2
4.9
3.175
6.2

0.2
0.2
0.2
0.2
0.2

0.45
0.45
0.45
0.45
2.05

Control room
Generator room
Chlorination room
Utility Slab
Add for Variance in drawings
7 Super Structure RCC - OPC35
g) Column above Plinth Beam
I Lift
C1 - 5Nos
C2- 4Nos
C3 - 1No
C4- 1No
II Lift
C1 - 5Nos
C2- 4Nos
C3 - 1No
C4- 1No
h) Roof Beam
RB1,RB4 & RB7
RB2, RB5 & RB8
RB3 & RB6
RB9
RB11 & RB13
RB10 & RB15
RB12 & RB14
Slab
Upstand
j) Parapet wall
West wall
East wall
North wall
South wall
Add for Variance in drawings
8 Base level Water Proofing
a Pumping Station
Raft Bottom
Sump Wall
Outer wall
b Flow Chamber
Raft Bottom
Outer wall
Sump Wall
c Footing
Bottom
All sides

1
1
1
1
1

4.225
4.225
4.15
3.975

4.9
4.2
4.9
2.3

0.15
0.15
0.15
0.15

5
4
1
1

0.2
0.2
0.2
0.2

0.45
0.45
0.45
0.6

2.4
2.4
2.4
2.4

5
4
1
1

0.2
0.2
0.2
0.2

0.45
0.45
0.45
0.6

1.775
1.775
1.775
1.775

3
3
2
1
2
2
2
1
1
3

3.2
6.25
3.35
4.2
3.75
4.9
4.4
10.4
3.7
1.8

0.2
0.2
0.2
0.2
0.2
0.2
0.2
9.7
5.3
0.15

0.275
0.425
0.275
0.275
0.425
0.275
0.425
0.175
0.175
0.3

1
1
1
1
1

14.1
10.4
13.6
9.5

0.125
0.125
0.125
0.125

1
1
1
1

1
4
1

9.8
1.6
33.2

6.8
0.5
3.299

1
1
4

2.3
6.6
0.7

2
1.85
0.3

5
20

1.2
1.2

1.2
0.3

Top area
Column deduction
d Column
Upto FGL
e Plinth Beam
PB1 - 3.75m Span
Beam bottom
Both sides upto FGL
PB2
Beam bottom
Both sides upto FGL
PB3
Beam bottom
Both sides upto FGL
PB1 - 3.70m Span
Beam bottom
Both sides upto FGL
f Ground Slab
Chlorination Room
Generator room
Control Room
Add for Variance in drawings
9 Roof Level Water proofing
Pump & Generator room
Cabla Trench room
Add for Variance in drawings
10 Block work - Solid
Wall 1
Wall 2
Wall 3
Wall 4
Add for Variance in drawings
11 Block work - Hollow
Wall 1
Wall 2
Wall 3
Wall 4
Wall 5
Wall 6
Deductions
D1 - Louver Door
D2 - Double Door
D3 - Single Door
D4 - Roll-up Shutter
D5 - Double Door

5
-5

1.2
0.45

1.2
0.2

1.3

0.7

3
6

3.4
3.4

0.2
0.3

1
2

4.2
4.2

0.2
0.3

1
2

4.9
4.9

0.2
0.3

2
4

3.2
3.2

0.2
0.3

1
1
1
1

4.9
4.2
4.9

3.45
3.2
3.45

1
1
1

10.2
5.1

9.5
3.7

2
1
2
1
1

3.75
9.9
3.7
5.1

0.6
0.6
0.6
0.6

1
1
1
2
1
1

13.9
9.5
10.2
9.5
3.7
5.1

3.9
3.9
3.9
3.9
3.9
3.9

-1
-1
-1
-1
-1

2.2
1.55
1
2.2
2

2.2
2.2
2.2
2.6
2.2

W1 to W10 Window
Louver L1
L2, L3, L4
L5 & L6
Substract for Variance in drawing

12 Doors
D1 - Louver Door
D2 - Double Door
D3 - Single Door
D4 - Roll-up Shutter
D5 - Double Door
13 Windows
W1 to W10 Window
14 Louver
Louver L1
L2, L3, L4
L5 & L6
15 Plastering
Outer
Wall 1
Wall 2
Wall 3
Wall 4
Wall 5
Wall 6
Inner
Generator room
Chlorination room
Control room
Pump Room
Parapet Wall
Deductions
D1 - Louver Door
D2 - Double Door
D3 - Single Door
D4 - Roll-up Shutter
D5 - Double Door
W1 to W10 Window
Louver L1
L2, L3, L4
L5 & L6
Ceiling
Control room
Generator Room
Pump Room
Chlorination room

-10
-1
-3
-2
1

0.8
1.6
1
0.3

1.5
2
1
0.3

1
1
1
1
1

2.2
1.55
1
2.2
2

2.2
2.2
2.2
2.6
2.2

10

0.8

1.5

1
3
2

1.6
1
0.3

2
1
0.3

1
1
1
1
1
1

13.9
9.5
10.2
4.4
3.7
5.1

5.075
5.075
5.075
5.075
5.075
5.075

1
1
1
1
1

16.3
17.7
17.6
31.9
46.8

4.175
4.175
4.175
4.175
1.2

-2
-2
-2
-2
-2
-20
-2
-6
-2

2.2
1.55
1
2.2
2
0.8
1.6
1
0.3

2.2
2.2
2.2
2.6
2.2
1.5
2
1
0.3

1
1
1
1

3.75
4.4
9.5
5.1

5.1
3.75
6.45
3.7

Add for Variance in drawing

16 Epoxy Flooring
Control room
Generator room
Chlorination room
Utility Slab
Pump Room
Ramp
Plinths
FMC - Wall
FMC - Floor
Sump Wall
Add for Variance in drawing

1
1
1
1
1
3
2
1
1
1
1

4.225
4.225
4.15
3.975
9.5
1.5
1
7.6
2.1
4

4.9
4.2
4.9
2.3
6.45
2.2
0.85
2.05
1.6
0.5

1
1
1
1
1
1

13.9
9.5
10.2
4.4
3.7
5.1

5.075
5.075
5.075
5.075
5.075
5.075

1
1
1
1

16.3
17.7
17.6
31.9

4.175
4.175
4.175
6.855

1
1
1
1
1

4.4
5.1
5.1
9.5
46.8

3.75
3.75
3.7
6.45
1.2

-2
-2
-2
-2
-2
-20
-2
-6
-2
1

2.2
1.55
1
2.2
2
0.8
1.6
1
0.3

2.2
2.2
2.2
2.6
2.2
1.5
2
1
0.3

2.3

1.8

17 Painting
Outer Wall
Wall 1
Wall 2
Wall 3
Wall 4
Wall 5
Wall 6
Inner wall
Generator room
Chlorination room
Control room
Pump Room
Ceiling
Generator room
Chlorination room
Control room
Pump Room
Parapet Wall
Deductions
D1 - Louver Door
D2 - Double Door
D3 - Single Door
D4 - Roll-up Shutter
D5 - Double Door
W1 to W10 Window
Louver L1
L2, L3, L4
L5 & L6
Add for Variance in drawing
18 GI Gratings
FM Chamber

Add for Variance in drawing

19 Chequered Plate
Chlorination Cable Trench
Control room cable Trench
Add for Variance in drawing

1
2
1

0.75
0.8

2.2
0.8

Pumping Station
Typical drawing No : GTC524-G-TEC-S-DRG-005

Abstract :Sl.No Description

Date : 18.06.15
Rev : 0
Quantity Unit Rate
Amount
450

1 Excavation

Unit
m3

2 Back filling

m3

175.00

3 Pest Control

175.00

4 PCC

m3

13

5 Screed

6 RCC - Sub Structure

80

7 RCC - Super Structure


8 Reinforcement
9 Base levelWater Proofing

m3
Kg
m2

40
14919
320

10 Roof level water proofing

m2

125

11 Block Work - Solid

20

m2

180

12 Plastering

750

13 Epoxy flooring

165

14 Painting
15 Doors
D1 - Louver Door
D2 - Double Door
D3 - Single Door
D4 - Roll-up Shutter
D5 - Double Door
16 Windows
W1 to W10 Window
17 Louvers
Louver L1
L2, L3, L4
L5 & L6
18 Rain Water Scrubber
19 GI Ladders with safe Gauge
20 GI Ladders without safe Gauge

m2

850

Nos
Nos
Nos
Nos
Nos

1
1
1
1
1

Nos

10

Nos
Nos
Nos
Nos
Nos
Nos

1
3
2
3
1
1

Block Work - Solid

3
3

22 GI Grating

Nos
m2

1
5

23 Chequered Plate

m2

21 MS Ladder with Hand rail

Quantity Total
FGL
328.107
20.44
30.46
2.30
1.01
2.35
1.52
12.71
10.25
3.30

128.00
20.44
23.71
2.30
1.01
2.35
1.52
11.83
7.77
4.26

41.65

412.463
37.53703
450

203.19
21.81
225

71.71
3.60
9.80
5.64
3.84
1.68
3.92
2.54
20.70
17.75
20.34

5.38
0.27

BSL

161.51
13.49
175.00

39.12

2.53
0.4
0.075

0.05
Total Depth
3.055
Pumping Station Excavated Earth level
482

38.595 m Lvl

0.74
0.42
0.29
0.13
0.29
0.19
1.55
1.33
1.53

12.11
0.89
13

3.59
0.18
0.49
0.28
0.19
0.08
0.20
0.13
1.04
0.89
1.02

8.08
0.92
9

26.66
0.69
15.76
10.45
0.46
0.16
2.16
0.92
0.34
0.18
1.30
0.38
0.86
0.38
0.88
0.57
2.54

41.8
39.12
2.68

41.8
39.75

3.11
2.66
3.05
1.37

2.05

74.88
5.12
80

83.01

36.18
3.82
40

32.37

1.08
0.86
0.22
0.29
0.80
0.64
0.16
0.21
0.53
1.59
0.37
0.23
0.64
0.54
0.75
17.65
3.43
0.24
1.76
1.30
1.70
1.19

66.64
3.2
109.5268
0
4.6
12.21
0.84
0
7.2
7.2

7.2
-0.45
0
4.55
0
0
2.04
6.12
0
0.84
2.52
0
0.98
2.94
0
1.28
3.84
0
16.905
13.44
16.905 290.5268
29.4732
320
96.9
18.87

4.5
5.94
4.44
3.06

54.21
37.05
39.78
74.1
14.43
19.89
-4.84
-3.41
-2.2
-5.72
-4.4

115.77
9.23
125

17.94
2.06
20
46.15
41.8
0.45
3.9

-12
-3.2
-3
-0.18

200.51
20.51
180

4.84
3.41
2.2
5.72
4.4

20.57

12

12

3.2
3
0.18

6.38

70.54
48.21
51.77
22.33
18.78
25.88

46.15
41.8
0.45
5.075

46.15
41.8
0.175
4.175

68.05
73.90
73.48
133.18
56.16
-9.68
-6.82
-4.4
-11.44
-8.8
-24
-6.4
-6
-0.18
19.125
16.5
61.275
18.87

680.33

69.67
750
20.70
17.75
20.34
9.14
61.28
9.90
1.70
15.58
3.36
2.00

161.74
3.26
165

739.05

41.8
39.75
2.05
150.37

70.54
48.21
51.77
22.33
18.78
25.88

46.15
41.8
0.45
5.075

46.15
41.8
0.175
4.175

68.05
73.90
73.48
218.67
16.50
19.13
18.87
61.28
56.16
-9.68
-6.82
-4.4
-11.44
-8.8
-24
-6.4
-6
-0.18

4.14

765.82
84.18
850
4.14

912.52

e : 18.06.15
Rev : 0
Amount

0.86
5
1.65
1.28

2.93
0.07
3

DG Building (625 KVA) 1 UNIT


Sl.No Description
1 Excavation
Footing
Plinth Beam PB1
Plinth Beam PB2
Cable Trench
Generator Plinth
Add for variance in drawing

Nos

Length

Breadth Height

4
2
2
1
1

3.15
4.8
8.6
2.83
6.4

3.15
0.95
0.95
2
3.2

1.075
0.35
0.35
1.3
0.3

2 Back filling
Footing
Plinth Beam PB1
Plinth Beam PB2
Cable Trench
Generator Plinth
Grade Slab
Add for variance in drawing

4
2
2
1
1
1
1

3.15
4.8
8.6
9.6
16.8
10

3.15
0.75
0.75
0.3
0.3
5.8

1.075
0.35
0.35
1.3
0.3
0.275

3 Pest Control
Footing
Deduction
Plinth Beam PB1
Plinth Beam PB2
Generator Plinth
Cable Trench
Grade Slab
Add for variance in drawing

4
-4
2
2
1
1
1
1

2.15
0.8
4.8
8.6
5.95
2.63
10

2.15
0.8
0.35
0.35
2.75
1.75
5.8

4 PCC
a) Footing
Deduction
b) Plinth Beam PB1
Plinth Beam PB2
c) Generator Plinth
d) Cable Trench
e) Grade Slab
Add for variance in drawing

4
-4
2
2
1
1
1
1

2.15
0.8
4.8
8.6
5.95
2.63
10

2.15
0.8
0.35
0.35
2.75
1.75
5.8

0.075
0.075
0.075
0.075
0.075
0.075
0.075

5 Screed - SRC20
a) Footing
Deduction
b) Plinth Beam PB1
Plinth Beam PB2
c) Generator Plinth
d) Cable Trench
e) Grade Slab

4
-4
2
2
1
1
1

2.15
0.8
4.8
8.6
5.95
2.63
10

2.15
0.8
0.35
0.35
2.75
1.75
5.8

0.05
0.05
0.05
0.05
0.05
0.05
0.05

Add for variance in drawing


6 Sub structure SRC35/20
a) Footing
Deduction
b) Column upto plinth beam
c) Plinth Beam PB1
Plinth Beam PB2
d) Grade Slab
Deduction Generator Plinth
Deduction Cable Trench
e) Generator Plinth
f) Cable Trench
Raft
Shorter Wall
Longer Wall
Column above Plinth Beam
Add for variance in drawing

4
-4
4
2
2
1
-1
-1
1

2
0.8
1.2
4.8
8.6
9.6
5.8
2.48
5.8

2
0.8
0.2
0.2
0.2
5.8
2.6
1.6
2.6

0.4
0.4
1.1
0.5
0.5
0.15
0.15
0.15
0.6

1
2
2
4
1

2.48
1.2
2.48
1.2

1.6
0.2
0.2
0.2

0.2
1
1
4.675

7 Super structure SRC35


d) Roof Beam RB1
Roof Beam RB2
Roof Beam RB3
e) Slab
f) Parapet wall
Add for variance in drawing

2
2
1
1
1
1

4.8
8.6
5.8
10
31.6

0.2
0.2
0.2
6.2
0.2

0.575
0.575
0.425
0.175
1.2

8 Block work - solid


Grid A1-A3 & B1-B3
Grid A1-B1 & A3-B3
Add for variance in drawing

2
2
1

8.6
4.8

0.6
0.6

2
2

8.6
4.8

4.1
4.1

-1
-1
-2
-1

2.6
1.05
3
2.6

2.2
2.2
3.4
2

-5

9 Block Work - Hollow


a) Grid A1-A3 & B1-B3
b) Grid A1-B1 & A3-B3
Deductions
Louver Door
Single Door
Louver
Louver
Aluminium framed Glazed
Window
Add for variance in drawing
8 Plastering
Outer Plastering
Shorter Wall
Longer Wall

1.2

2
2

6.2
10

6.55
6.55

Inner plastering
Shorter Wall
Longer Wall
Ceiling Plastering
Door & Window deduction
Add for variance in drawing
9 Base Level Water Proofing
a) GENERATOR ROOM
Raft Bottom
b) Footing
Bottom
All sides
Top area
Column deduction
c) Column
Upto FGL
d) Plinth Beam
PB1
Beam bottom
Both sides
PB2
Beam bottom
Both sides upto FGL
Add for variance in drawing
10 Roof water proofing
Add for variance in drawing
11 Epoxy Flooring
Floor & Foundation
Foundation side
Add for variance in drawing
12 Painting
Inner side painting
Outter side Painting
Ceiling
Add for variance in drawing
13 Doors
Louver Door, D1
Single Door, D2
14 Window
Aluminium framed Glazed
Window, W1 to W5
15 Louver
L1 & L2
L3

2
2
1

5.8
9.6
9.6

4.675
4.675
5.8

6.2

10

4
16
4
-4

2
4
2
0.2

2
0.4
2
0.5

0.6

2
4

8.8
8.8

0.2
0.5

2
4
1

5
5

0.2
0.5

1
1

9.6

5.8

1
1
1

9.6
16.8

5.8
0.15

1
1
1
1

30.8
32.4
9.6

5.88
6.55
5.8

1
1

2.6
1.05

2.2
2.2

1.2

2
1

3
2.6

3.4
2

16 Chequered Plate
Cable Trench
Add for variance in drawing

1
1

2.28

1.4

Typical Drawing No: TEC-GTC-524-C-GEN-DG-0062 to 0065


Sl.No Description
Unit
Quantity Unit Rate
m3
60
1 Excavation
2 Back filling

m3

75

3 Pest Control

110

4 PCC

5 Screed

m3

6.00

6 RCC - Sub Structure

35.00

7 RCC - Super Structure


8 Reinforcement
9 Base levelWater Proofing

m
Kg
m2

25.00
5586
170

10 Roof level water proofing

m2

60

11 Block Work - Solid

20.00

12 Block Work - Hollow

75.00

12 Plastering

m2

400

13 Epoxy flooring

60

14 Painting
15 Doors
i) D1
ii) D2
16 Windows
i) W1 to W5
17 Louver
i) L1 & L2
ii) L3
18 GRC Rain Water Scubber
19 GI Ladder with safe gauge

500

Nos
Nos

1
1

Nos

Nos
Nos
Nos
Nos
m2

2
1
2
1
4

20 Chequered Plate

2
3

2
2

2
2

Date : 20.06.15
Rev : 0
Amount

NIT
Quantity Total
42.67
3.19
5.72
7.36
6.14

42.67
2.52
4.52
3.74
1.51
15.95

18.49
-2.56
3.36
6.02
16.36
4.60
58.00

1.39
-0.19
0.25
0.45
1.23
0.35
4.35

0.92
-0.13
0.17
0.30
0.82
0.23
2.90

55.83
4.17
60

70.91
4.09
75

104.28
5.73
110

7.82
1.18
9

5.21

0.79
6.00
6.40
-1.02
1.06
0.96
1.72
8.35
-2.26
-0.60
9.05
0.79
0.48
0.99
4.49

1.10
1.98
0.49
10.85
7.58

10.32
5.76

30.41
4.59
35.00

22.01
2.99
25.00

16.08
3.92
20.00

70.52
39.36
-5.72
-2.31
-20.40
-5.20
-6.00

81.22
131

70.25
4.75
75.00

0
54.23
89.76
55.68
-39.63

372.26
27.74
400

62
16
25.6
16
-0.4
4.8

3.52
17.6
2
10

55.68

55.68
2.52

181.104
212.22
55.68

157.12
12.88
170
55.68
4.32
60

58.2
1.8
60

449.00
51.00
500

5.72
2.31

8.03

20.4
5.2

25.6

3.192

Date : 20.06.15
Amount

3.192
0.808
4

625KVA 1 UNIT - Generator Room

Typical Drawing No: TEC-GTC-524-C-GEN-DG-0062 to 0


Sl.No Description
1 Footing
a) F1 - 'L' shape Footing
Top & Bottom Main
Top & Bottom Dist.
Column
C1 - Column
Main Rod
Links
C bar
2 Plinth Beam
PB1 200 X 500
Top Main Rod(L & R)
Top Middle Rod
Bottom Main Rod
Lings
PB2 - 200 X 500
Top Main
Left& Right
Middle rod
Bottom Main rod(L&R)
Middle
Lings
3 Roof Beam
RB1 - 200 X 750
Top Main Rod
Left & Right Rod
Middle
Bottom Main rod(L&R)
Middle Rod
Lings
RB2 - 200 X 750
Left & Right Main rod
Middle Top Rod
Bottom Main Rod(L&R)
Middle Extra Rod
Lings - Left & Right

No.of
No. per
Member member

Dia (mm) Spacing Nos

12
12
12
12

20
10
10

20
16
16
8

20
25
16
16
20
8

20
16
16
20
8
25
20
16
16
25
20
8

150
150
150
150

4
4
4
4

2
2
2
2

8
5
8
5

150
150

4
4
4

1
2
2

12
43
43

200

2
2
2
2

2
1
1
1

2
2
2
25

200

2
2
2
2
2
2

2
2
1
2
1
1

2
2
2
2
2
44

200

2
2
2
2
2

2
1
2
1
1

2
2
2
2
24

150

2
2
2
2
2
2
1

2
2
1
2
1
1
2

2
2
2
2
2
2
22

Lings - Middle
RB3 - 200 X 600
Top Main rod
Bottom Main rod
Middle Extra rod
Lings - Left & Right
Lings - Middle
4 Roof Slab
S4 & S6
Bottom Main Rod
S3 & S5
BottomDist. Rod
S4 & S6
Top Main rod

Left & Right support


main rod
Middle Main rod
Distributor
5 Parapet Wall
Main Rod
Inner & Outer
Distributor
Inner & Outer
6 Generator Plinth
Top & Bottom Main Rod
Top & Bottom Dist.
Around Dist.
7 CableTrench
Raft
Top & Bottom Main
Top & Bottom Dist.
Wall
Inner & Outer Main
Inner & Outer Dist.
8 Grade Slab
Main Rod top & Bottom
Dist.

200

16

16
25
20
8
8

150
200

1
1
1
1
1

1
1
1
2
1

2
2
2
14
10

10

150

39

10

150

32

12
10
10

150
150
150

1
1
1

2
1
2

32
32
32

10

200

160

10

200

10
10
10

200
200
200

1
1
1

2
2
1

29
13
4

10
10

200
200

1
1

2
2

13
8

10
10

200
200

1
1

2
2

37
6

10
10

200
200

1
1

2
2

49
30

SUMMARY DETAILS
Dia of Bar
8
10

Quantity Lap & Wastages (Add-5%) Total Kg


156.73
7.84
164.57
3074.24
153.71
3227.95

12
16
20
25

428.56
303.15
1222.32
400.46

21.43
15.16
61.12
20.023

449.99
318.31
1283.44
420.483
Total

tor Room
DATE:20.06.2015

N-DG-0062 to 0065
Cut
Length

REV:0B

Total

Unit Wt

Total Wt

2.5
1.2
2.5
1.2

160

0.889

160
48

0.889
0.889

142.22 7.333333
4
142.22
42.67

6.85
1.58
0.22

328.8
543.52
75.68

2.469
0.617
0.617

811.85
335.51
46.72

1000
43

1.266667
2.4
3.6
6.8
1.18

19.20
14.4
27.2
59

2.469
1.580
1.580
0.395

4.06
4.06
4.86
3.66
5.26
1.18

32.48
32.48
19.44
29.28
21.04
103.84

2.469
3.858
1.580
1.580
2.469
0.395

2.65
3.6
2.65
4
1.68

21.20
14.40
21.20
16.00
80.64

2.469
1.580
1.580
2.469
0.395

47.41
22.76
42.98
23.31

4.8
2.1

80.20 3.266667
125.31
30.72
46.27
51.95
41.02
8.6
1.266667
2.133333
52.35
22.76
33.50
39.51
31.86

24

43

24
3.266667

3.91
3.91
4.86
3.91
5.76
5.26
1.68

31.28
31.28
19.44
31.28
23.04
21.04
73.92

3.858
2.469
1.580
1.580
3.858
2.469
0.395

120.68
77.23
30.72
49.43
88.89
51.95
29.20

9.5 3.266667 21.73333

1.68

26.88
0.00
15.20
17.00
4.00
38.64
13.80
0.00
0.00
393.90
0.00
403.20
0.00
0.00

0.395
0.000
1.580
3.858
2.469
0.395
0.395
0.000
0.000
0.617
0.000
0.617
0.000
0.000

10.62
0.00
24.02
65.59
9.88
15.27
5.45
0.00
0.00
243.15
0.00
248.89
0.00
0.00

1.78
7.53
6.3

114.13
241.07
403.20

0.889
0.617
0.617

101.45
148.81
248.89

1.75

560.00

0.617

345.68

31.6

35.6

427.20

0.617

263.70

5.5

3.5
6.7
18.8

203.00
174.20
75.20

0.617
0.617
0.617

125.31
107.53
46.42

28.5
12.5
3.5

6.5

1.7
2.58

44.20
41.28

0.617
0.617

27.28
25.48

11.9
7.5

2.48

1.75
9.56

129.50
114.72

0.617
0.617

79.94
70.81

35.8
5

568.40
582.00
Total

0.617
0.617

350.86
359.26
5585.47

48
29

7.6
8.5
2
1.38
1.38

10.1
6.3

5.8
9.7

Total MT
0.2
3.3

16.3

13.33333
10

5.8 38.66667
4.7 31.33333

160

7.16
0.95

0.5
0.35
1.3
0.45
6.1

2.5

1.5

DG Building (635-1250 KVA) 1 UNIT - Type 2


Sl.No

Description
1 Excavation
a) Footing - F1
Footing - F2
Footing - F3
b) Plinth Beam PB1
Plinth Beam PB2
Plinth Beam PB3
Plinth Beam PB4
Plinth Beam PB5
Plinth Beam PB6
c) Generator Plinth
d) Cable Trench
Add for Variance in drawing
2 Back filling
Footing - F1
Footing - F2
Footing - F3
Plinth Beam PB1
Plinth Beam PB2
Plinth Beam PB3
Plinth Beam PB4
Plinth Beam PB5
Plinth Beam PB6
Generator Plinth
Cable Trench
Generator Room
Fuel Pump Room
Grade Slab
Add for Variance in drawing
3 Pest Control
a) Footing -F1
Deduction
Footing -F2
Deduction
Footing -F3
b) Plinth Beam PB1
Plinth Beam PB2
Plinth Beam PB3
Plinth Beam PB4
Plinth Beam PB5
Plinth Beam PB6
c) Generator Plinth

Nos

Length

Breadth Height

5
1
1
2
1
1
1
1
1
1
1
1

2.85
2.55
2.15
3.8
6.3
2.6
5
6.4
9.5
7.25
3.08

2.85
2.55
2.15
0.95
0.95
0.95
0.95
0.95
0.95
3.25
2.1

1.075
1.075
1.075
0.4
0.4
0.4
0.4
0.4
0.4
0.825
1.3

5
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1

2.85
2.55
2.15
3.8
6.3
2.6
5
6.4
9.5
18
7.96
5.7
4.7
7.5
10.7

2.85
2.55
2.15
0.75
0.75
0.75
0.75
0.75
0.75
0.3
0.3
10.7
7.5
4.7
5.7

1.075
1.075
1.075
0.4
0.4
0.4
0.4
0.4
0.4
1
1.3
0.5
0.5
0.275
0.275

5
-5
1
-2
1
2
1
1
1
1
1
1

1.85
0.8
1.55
0.7
1.15
3.8
6.3
2.6
5
6.4
9.5
6.65

1.85
0.8
1.55
0.3
1.15
0.35
0.35
0.35
0.35
0.35
0.35
2.65

d) Cable Trench
e) Daily Tank Plinth
f) Fuel Pump skid
g) Grade Slab
Deduction

Add for Variance in drawing


4 PCC
a) Footing -F1
Deduction
Footing -F2
Deduction
Footing -F3
b) Plinth Beam PB1
Plinth Beam PB2
Plinth Beam PB3
Plinth Beam PB4
Plinth Beam PB5
Plinth Beam PB6
c) Generator Plinth
d) Cable Trench
e) Daily Tank Plinth
f) Fuel Pump skid
g) Grade Slab
Deduction

Add for Variance in drawing


5 Screed SRC20
a) Footing -F1
Deduction
Footing -F2
Deduction
Footing -F3
b) Plinth Beam PB1
Plinth Beam PB2
Plinth Beam PB3
Plinth Beam PB4
Plinth Beam PB5
Plinth Beam PB6
c) Generator Plinth

1
1
1
1
1
-1
-1
-1
-1
1

2.63
2.95
1.25
7.5
10.7
6.5
2.8
1.1
2.4

1.65
1.65
0.95
4.7
5.7
2.5
1.5
0.8
1.5

5
-5
1
-2
1
2
1
1
1
1
1
1
1
1
1
1
1
-1
-1
-1
-1
1

1.85
0.8
1.55
0.7
1.15
3.8
6.3
2.6
5
6.4
9.5
6.65
2.63
2.95
1.25
7.5
10.7
6.5
2.8
1.1
2.4

1.85
0.8
1.55
0.3
1.15
0.35
0.35
0.35
0.35
0.35
0.35
2.65
1.65
1.65
0.95
4.7
5.7
2.5
1.5
0.8
1.5

0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075

5
-5
1
-2
1
2
1
1
1
1
1
1

1.85
0.8
1.55
0.7
1.15
3.8
6.3
2.6
5
6.4
9.5
6.65

1.85
0.8
1.55
0.3
1.15
0.35
0.35
0.35
0.35
0.35
0.35
2.65

0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

d) Cable Trench
e) Daily Tank Plinth
f) Fuel Pump skid
g) Grade Slab
Deduction

Add for Variance in drawing


6 Sub Structure- SRC35/20
a) Footing - F1
Deduction
Footing - F2
Deduction
Footing - F3
Column C1
Column C2
Column C3
c) Plinth Beam PB1
Plinth Beam PB2
Plinth Beam PB3
Plinth Beam PB4
Plinth Beam PB5
Plinth Beam PB6
f) Grade Slab
Deduction Generator Plinth
Daily Tank Plinth
Fuel Pump Skid
Deduction Cable Trench
g) Generator Plinth
h) Daily Tank Plinth
i) Fuel Pump Skid
j) Cable Trench
Raft
Shorter Wall
Longer Wall
Add for Variance in drawing
Sub Structure
7 Super Structure OPC35
b) Column C1
Column C2
Column C3
c) Roof Beam RB1
Roof Beam RB2
Roof Beam RB3

1
1
1
1
1
-1
-1
-1
-1
1

2.63
2.95
1.25
7.5
10.7
6.5
2.8
1.1
2.4

1.65
1.65
0.95
4.7
5.7
2.5
1.5
0.8
1.5

0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

5
-5
1
-1
1
5
1
1
2
1
1
1
1
1
1
1
-1
-1
-1
-1
1
1
1

1.7
0.8
1.4
0.7
1
1.2
1
0.6
3.8
6.3
2.6
4.8
6.4
10.5
10.5
7.3
6.5
2.8
1.1
2.48
6.5
2.8
1.1

1.7
0.8
1.4
0.3
1
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
5.5
4.5
2.5
1.5
0.8
1.5
2.5
1.5
0.8

0.4
0.4
0.4
0.4
0.4
1.1
1.1
1.1
0.5
0.5
0.5
0.5
0.5
0.6
0.15
0.15
0.15
0.15
0.15
0.15
0.9
0.3
0.3

1
2
2

2.48
1.5
2.08

1.5
0.2
0.2

0.2
1
1

5
1
1
2
1
1

1.2
1
0.6
3.8
6.3
2.6

0.2
0.2
0.2
0.2
0.2
0.2

5.95
5.95
5.95
0.4
0.4
0.4

Roof Beam RB4


Roof Beam RB5
Roof Beam RB6
Roof Beam RB7
d) Slab
Slab
e) Parapet wall
Add for Variance in drawing
Super Structure
8 Block Work - Solid
Grid A1-B1 & A3-B3
Grid A1-A3
Grid B3-B4
Grid B1-C1
Grid B4-C4
Grid C1-C4
Add for variance in drawing

1
1
1
1
1
1
1

4.8
5.5
6.4
10.5
10.9
7.7
42.2

0.2
0.2
0.2
0.2
5.8
4.8
0.2

2
1
1
1
1
1
1

3.8
6.3
2.6
4.8
5
9.5

1
1
1
1
1
1

9 Block Work - Hollow


a) Grid A1-B1 & A3-B3
b) Grid A1-A3
c) Grid B1-B3
d) Grid B3-B4
e) Grid B1-C1
f) Grid B4-C4
g) Grid C1-C4
Deductions
i) Louver Door
ii) Single door

2
1
1
1
1
1
1

3.8
6.3
6.4
2.6
4.8
5
9.5

5.35
5.35
5.2
5.35
5.35
5.1
5.35

-2
-1

2.6
1.05

2.2
2.2

Aluminium Framed Glazed


iii) window (Sliding)

-1

0.8

1.2

-3
-1
-2
-1

1
2.5
4
2.3

1.2
2
4.5
3

1
1
1
1
1
1

10.6
4.9
4.8
3.2
5.9
10.9

7.65
7.65
7.65
7.65
7.65
7.65

10

5.75

Aluminium Framed Glazed


iv) window (Sliding)
v) Louver
vi) Louver
vii) Louver
Add for Variance in drawing
10 Plastering
Outer Plastering
Wall 1
Wall 2
Wall 3
Wall 4
Wall 5
Wall 6
Inner Plastering
Wall 1

0.4
0.4
0.55
0.65
0.2
0.2
1.2

Wall 2
Wall 3
Wall 4
Wall 5
Wall 6
Middle
Parapet wall
Inner Plastering
Add for Variance in drawing
11 Water Proofing
Footing - F1
Deduction
All sides
Top Area
Footing - F2
Deduction
All sides
Top Area
Footing - F3
All sides
Top Area
Column
C1 Upto FGL
C2 Upto FGL
C3 Upto FGL
Grade Slab
Grade Slab
Generator Plinth room
Daily Tank Plinth room
Add for Variance in drawing
12 Roof Level Water Proofing

1
1
1
1
1
1

4.5
4.6
10.5
5.5
10.5
7.3

5.75
5.75
5.75
5.75
5.75
5.75

42.2

1.4

5
-5
5
5
1
-1
1
1
1
1
1

1.7
0.8
6.8
1.7
1.4
0.7
5.6
1.4
1
4
1

1.7
0.8
0.4
1.7
1.4
0.3
0.4
1.4
1
0.4
1

5
1
1
1
1
1
1
1

1.2
1
0.6
4.7
10.7
10.7
7.5

0.6
0.6
0.6
7.5
5.7
5.7
4.7

1
1

4.7
10.7

7.5
5.7

1
1
1
1
1

7.5
10.7
18
8.6
3.8

4.7
5.7
0.15
0.15
0.15

1
1

10.6
4.9

7.65
7.65

Add for Variance in drawing


13 Epoxy Flooring
Fuel Pump skid
Generator room
Generator Plinth side
Daily Tank Plinth
Fuel Pump skid
Add for Variance in drawing
14 Painting
Outer Painting
Wall 1
Wall 2

Wall 3
Wall 4
Wall 5
Wall 6
Inner Painting
Wall 1
Wall 2
Wall 3
Wall 4
Wall 5
Wall 6
Middle
Parapet wall
Inner Painting
Ceiling

1
1
1
1

4.8
3.2
5.9
10.9

7.65
7.65
7.65
7.65

1
1
1
1
1
1
1

10
4.5
4.6
10.5
5.5
10.5
7.3

5.75
5.75
5.75
5.75
5.75
5.75
5.75

1
1
1

42.2
7.5
10.7

1.4
4.7
5.7

Add for Variance in drawing


15 Doors
Louver Door D1 & D2
Single door D3
16 Windows

2
1

2.6
1.05

2.2
2.2

Aluminium Framed Glazed


window (Sliding) W1

0.8

1.2

Aluminium Framed Glazed


window (Sliding) W1,W2&W3
17 Louver
Louver
Louver
Louver
18 Chequered Plate
Cable Trench
Add for variance in drawing

1.2

1
2
1

2.5
4
2.3

2
4.5
3

1
1

2.28

1.3

DG Building (635-1250 KVA) 1 UNIT - Type 2 Date : 18.06.15


Rev : 0
Typical Drawing No: TEC-GTC-524-C-GEN-DG-0068 to 0070
Sl.No Description
Unit
Quantity Unit Rate
Amount
3
m
110
1 Excavation
2 Back filling

m3

160

3 Pest Control

140

4 PCC

m3

10

5 Screed

m3

6 RCC - Sub Structure

45

7 RCC - Super Structure


8 Reinforcement
9 Base levelWater Proofing

m
Kg
m2

50
8446
250

10 Roof level water proofing

m2

100

11 Block Work

170

12 Plastering

750

13 Epoxy flooring

m2

110

14 Painting
15 Doors
i) D1 & D2
ii) D3
16 Windows
i) Window W1

800

Nos
Nos

2
1

Nos

3
3

ii) W2, W3 & W4


17 Louver
i) Louver L1
ii) L2 & L3
iii) L4
18 GRC Rain Water Scubber
19 GI Ladder with safe gauge
20 Chequered Plate

Nos

Nos
Nos
Nos
Nos
Nos
m2

1
2
1
2
1
3

Type 2
Quantity Total
43.66
6.99
4.97
2.89
2.39
0.99
1.90
2.43
3.61
19.44
8.41

43.66
6.99
4.97
2.28
1.89
0.78
1.50
1.92
2.85
5.40
3.10
30.50
17.63
9.69
16.77

17.11
-3.20
2.40
-0.42
1.32
2.66
2.21
0.91
1.75
2.24
3.33
17.62

97.68
12.32
110

149.93
10.07
160

4.34
4.87
1.19
35.25
60.99
-16.25
-4.20
-0.88
-3.60

1.28
-0.24
0.18
-0.03
0.10
0.20
0.17
0.07
0.13
0.17
0.25
1.32
0.33
0.37
0.09
2.64
4.57
-1.22
-0.32
-0.07
-0.27

0.86
-0.16
0.12
-0.02
0.07
0.13
0.11
0.05
0.09
0.11
0.17
0.88

129.63
10.37
140

9.72
0.28
10

0.22
0.24
0.06
1.76
3.05
-0.81
-0.21
-0.04
-0.18

6.48
0.52
7

5.78
-1.28
0.78
-0.08
0.40
1.32
0.22
0.13
0.76
0.63
0.26
0.48
0.64
1.26
8.66
4.93
-2.44
-0.63
-0.13
-0.56
14.63
1.26
0.26
0.74
0.60
0.83

7.14
1.19
0.71
0.61
0.50
0.21

39.46
5.54
45

59.7
5.95

0.38
0.44
0.70
1.37
12.64
7.39
10.13

7.60
6.30
2.60
4.80
5.00
9.50

43.42
6.579
50

35.80
4.20
40

40.66
33.71
33.28
13.91
25.68
25.50
50.83
-11.44
-2.31
-0.96
-3.60
-5.00
-36.00
-6.90

81.09
37.49
36.72
24.48
45.14
83.39
57.50

157.35
12.65
170

25.88
26.45
60.38
31.63
60.38
41.98
59.08

14.45
-3.20
13.60
14.45
1.96
-0.21
2.24
1.96
1.00
1.60
1.00
0.00
3.60
0.60
0.36
35.25
60.99
60.99
35.25

35.25
60.99

35.25
60.99
2.70
1.29
0.57

81.09
37.49

671.55
78.45
750

245.89
4.11
250
96.24
3.76
100

100.80
9.20
110

723.92

36.72
24.48
45.14
83.39
57.50
25.88
26.45
60.38
31.63
60.38
41.98
59.08
35.25
60.99

767.79
32.21
800

11.44
2.31

0.96

3.60
5.00
36.00
6.90
2.96

2.96
0.04
3

725

Date : 18.06.15
Amount

ETFS PUMPING STATION - WATER PROOFING


Date :29.04.2015
Typical Drawing No: GTC524-G-TEC-S-DRG-005
Sl.No

Description
3 Footing
Bottom
All sides
Top area
Column deduction
4 Column
Upto FGL
5 Plinth Beam
PB1 - 3.75m Span
Beam bottom
Both sides upto FGL
PB2
Beam bottom
Both sides upto FGL
PB3
Beam bottom
Both sides upto FGL
PB1 - 3.70m Span
Beam bottom
Both sides upto FGL
4 Ground Slab
Chlorination Room
Generator room
Control Room

Nos

Rev 1A

Length(m)

Breadth(m)

5
20
5
-5

1.2
1.2
1.2
0.45

1.2
0.3
1.2
0.2

1.3

0.7

3
6

3.4
3.4

0.2
0.3

1
2

4.2
4.2

0.2
0.3

1
2

4.9
4.9

0.2
0.3

2
4

3.2
3.2

0.2
0.3

1
1
1

4.9
4.2
4.9

3.45
3.2
3.45
Total

G
Date :29.04.2015

Area (Sq.m)
7.2
7.2
7.2
-0.45
0
4.55
0
0
2.04
6.12
0
0.84
2.52
0
0.98
2.94
0
1.28
3.84
0.00
16.91
13.44
16.91
93.51

You might also like