Pumping Station Brick Work
Pumping Station Brick Work
Sl.No Description
Size - 9.85m X 6.8m
1 Earth Work Excavation
Pump Room
Footing
Flow Meter Chamber
PB1 - 3.75m
PB2
PB3
PB1 - 3.70m
Cable Trench - 2Nos (600X600)
Cable Trench - 1No (550X2000)
Cable Trench - 1No (400X400)
Add for Variance in drawings
2 Back filling
Pump Room
Footing
Flow Meter Chamber
PB1 - 3.75m
PB2
PB3
PB1 - 3.70m
Cable Trench - 2Nos (600X600)
Cable Trench - 1No (550X2000)
Cable Trench - 1No (400X400)
Add for Variance in drawings
3 Pest Control
a) Raft
Sump slope
b) Footing - 5Nos
Chamber Raft
c) Plinth Beam
PB1 - 3.75m
PB2
PB3
PB1 - 3.70m
d) Control room
Generator room
Chlorination room
Add for Variance in drawings
4 PCC -SRC20
a) Raft
Sump slope
Nos
1
5
1
3
1
2
2
2
1
1
1
12
1.95
3.375
3.2
4.2
4.9
3.175
2.15
2.1
1.55
8.95
1.95
4.15
0.8
0.8
0.8
0.8
2.15
3.55
1.55
3.055
1.075
2.175
0.3
0.3
0.3
0.3
1.375
1.375
1.375
1
5
1
3
1
2
2
2
1
1
1
41.9
1.95
10.9
3.2
4.2
4.9
3.175
8.6
11.3
6.2
1
1.95
1
0.8
0.8
0.8
0.8
0.5
0.5
0.5
3.055
1.075
2.175
0.3
0.3
0.3
0.3
1.375
1.375
1.375
1
4
5
1
7.1
1.8
1.4
2.45
10.1
0.5
1.4
2.3
3
1
2
2
1
1
1
1
3.2
4.2
4.9
3.175
4.225
4.225
4.15
0.4
0.4
0.4
0.4
4.9
4.2
4.9
1
4
7.1
1.8
10.1
0.5
0.075
0.075
b) Footing - 5Nos
Chamber Raft
c) Plinth Beam
PB1 - 3.75m
PB2
PB3
PB1 - 3.70m
d) Control room
Generator room
Chlorination room
Add for Variance in drawings
5 Screed - SRC20
a) Raft
Sump slope
b) Footing - 5Nos
Chamber Raft
c) Plinth Beam
PB1 - 3.75m
PB2
PB3
PB1 - 3.70m
d) Control room
Generator room
Chlorination room
Add for Variance in drawings
6 Sub Structure RCC - SRC35/20
a) Basement Raft
Sump wall
b) Basement wall
Longer wall
Shorter wall
c) Pump Plinth
Stub column
Footing
Chamber Raft
d) PB4 - Longer
PB4 - Shorter
Utility Slab
Column-below FGL
e) Plinth Beam
PB1 - 3.75m
PB2
PB3
PB1 - 3.70m
f) ChamberWall
g) Grade Slab
5
1
1.4
2.45
1.4
2.3
0.075
0.075
3
1
2
2
1
1
1
1
3.2
4.2
4.9
3.175
4.225
4.225
4.15
0.4
0.4
0.4
0.4
4.9
4.2
4.9
0.075
0.075
0.075
0.075
0.075
0.075
0.075
1
4
5
1
7.1
1.8
1.4
2.45
10.1
0.5
1.4
2.3
0.05
0.05
0.05
0.05
3
1
2
2
1
1
1
1
3.2
4.2
4.9
3.175
4.225
4.225
4.15
0.4
0.4
0.4
0.4
4.9
4.2
4.9
0.05
0.05
0.05
0.05
0.05
0.05
0.05
1
1
6.8
4.6
9.8
0.3
0.4
0.5
2
2
2
1
5
1
1
1
1
5
9.8
6.5
1.8
0.25
1.2
2.3
3.75
2.02
4
0.45
0.3
0.3
0.85
0.25
1.2
2
0.2
0.2
2.17
0.2
2.68
2.68
0.15
2.53
0.3
0.2
0.45
0.45
0.15
0.85
3
1
2
2
1
3.2
4.2
4.9
3.175
6.2
0.2
0.2
0.2
0.2
0.2
0.45
0.45
0.45
0.45
2.05
Control room
Generator room
Chlorination room
Utility Slab
Add for Variance in drawings
7 Super Structure RCC - OPC35
g) Column above Plinth Beam
I Lift
C1 - 5Nos
C2- 4Nos
C3 - 1No
C4- 1No
II Lift
C1 - 5Nos
C2- 4Nos
C3 - 1No
C4- 1No
h) Roof Beam
RB1,RB4 & RB7
RB2, RB5 & RB8
RB3 & RB6
RB9
RB11 & RB13
RB10 & RB15
RB12 & RB14
Slab
Upstand
j) Parapet wall
West wall
East wall
North wall
South wall
Add for Variance in drawings
8 Base level Water Proofing
a Pumping Station
Raft Bottom
Sump Wall
Outer wall
b Flow Chamber
Raft Bottom
Outer wall
Sump Wall
c Footing
Bottom
All sides
1
1
1
1
1
4.225
4.225
4.15
3.975
4.9
4.2
4.9
2.3
0.15
0.15
0.15
0.15
5
4
1
1
0.2
0.2
0.2
0.2
0.45
0.45
0.45
0.6
2.4
2.4
2.4
2.4
5
4
1
1
0.2
0.2
0.2
0.2
0.45
0.45
0.45
0.6
1.775
1.775
1.775
1.775
3
3
2
1
2
2
2
1
1
3
3.2
6.25
3.35
4.2
3.75
4.9
4.4
10.4
3.7
1.8
0.2
0.2
0.2
0.2
0.2
0.2
0.2
9.7
5.3
0.15
0.275
0.425
0.275
0.275
0.425
0.275
0.425
0.175
0.175
0.3
1
1
1
1
1
14.1
10.4
13.6
9.5
0.125
0.125
0.125
0.125
1
1
1
1
1
4
1
9.8
1.6
33.2
6.8
0.5
3.299
1
1
4
2.3
6.6
0.7
2
1.85
0.3
5
20
1.2
1.2
1.2
0.3
Top area
Column deduction
d Column
Upto FGL
e Plinth Beam
PB1 - 3.75m Span
Beam bottom
Both sides upto FGL
PB2
Beam bottom
Both sides upto FGL
PB3
Beam bottom
Both sides upto FGL
PB1 - 3.70m Span
Beam bottom
Both sides upto FGL
f Ground Slab
Chlorination Room
Generator room
Control Room
Add for Variance in drawings
9 Roof Level Water proofing
Pump & Generator room
Cabla Trench room
Add for Variance in drawings
10 Block work - Solid
Wall 1
Wall 2
Wall 3
Wall 4
Add for Variance in drawings
11 Block work - Hollow
Wall 1
Wall 2
Wall 3
Wall 4
Wall 5
Wall 6
Deductions
D1 - Louver Door
D2 - Double Door
D3 - Single Door
D4 - Roll-up Shutter
D5 - Double Door
5
-5
1.2
0.45
1.2
0.2
1.3
0.7
3
6
3.4
3.4
0.2
0.3
1
2
4.2
4.2
0.2
0.3
1
2
4.9
4.9
0.2
0.3
2
4
3.2
3.2
0.2
0.3
1
1
1
1
4.9
4.2
4.9
3.45
3.2
3.45
1
1
1
10.2
5.1
9.5
3.7
2
1
2
1
1
3.75
9.9
3.7
5.1
0.6
0.6
0.6
0.6
1
1
1
2
1
1
13.9
9.5
10.2
9.5
3.7
5.1
3.9
3.9
3.9
3.9
3.9
3.9
-1
-1
-1
-1
-1
2.2
1.55
1
2.2
2
2.2
2.2
2.2
2.6
2.2
W1 to W10 Window
Louver L1
L2, L3, L4
L5 & L6
Substract for Variance in drawing
12 Doors
D1 - Louver Door
D2 - Double Door
D3 - Single Door
D4 - Roll-up Shutter
D5 - Double Door
13 Windows
W1 to W10 Window
14 Louver
Louver L1
L2, L3, L4
L5 & L6
15 Plastering
Outer
Wall 1
Wall 2
Wall 3
Wall 4
Wall 5
Wall 6
Inner
Generator room
Chlorination room
Control room
Pump Room
Parapet Wall
Deductions
D1 - Louver Door
D2 - Double Door
D3 - Single Door
D4 - Roll-up Shutter
D5 - Double Door
W1 to W10 Window
Louver L1
L2, L3, L4
L5 & L6
Ceiling
Control room
Generator Room
Pump Room
Chlorination room
-10
-1
-3
-2
1
0.8
1.6
1
0.3
1.5
2
1
0.3
1
1
1
1
1
2.2
1.55
1
2.2
2
2.2
2.2
2.2
2.6
2.2
10
0.8
1.5
1
3
2
1.6
1
0.3
2
1
0.3
1
1
1
1
1
1
13.9
9.5
10.2
4.4
3.7
5.1
5.075
5.075
5.075
5.075
5.075
5.075
1
1
1
1
1
16.3
17.7
17.6
31.9
46.8
4.175
4.175
4.175
4.175
1.2
-2
-2
-2
-2
-2
-20
-2
-6
-2
2.2
1.55
1
2.2
2
0.8
1.6
1
0.3
2.2
2.2
2.2
2.6
2.2
1.5
2
1
0.3
1
1
1
1
3.75
4.4
9.5
5.1
5.1
3.75
6.45
3.7
16 Epoxy Flooring
Control room
Generator room
Chlorination room
Utility Slab
Pump Room
Ramp
Plinths
FMC - Wall
FMC - Floor
Sump Wall
Add for Variance in drawing
1
1
1
1
1
3
2
1
1
1
1
4.225
4.225
4.15
3.975
9.5
1.5
1
7.6
2.1
4
4.9
4.2
4.9
2.3
6.45
2.2
0.85
2.05
1.6
0.5
1
1
1
1
1
1
13.9
9.5
10.2
4.4
3.7
5.1
5.075
5.075
5.075
5.075
5.075
5.075
1
1
1
1
16.3
17.7
17.6
31.9
4.175
4.175
4.175
6.855
1
1
1
1
1
4.4
5.1
5.1
9.5
46.8
3.75
3.75
3.7
6.45
1.2
-2
-2
-2
-2
-2
-20
-2
-6
-2
1
2.2
1.55
1
2.2
2
0.8
1.6
1
0.3
2.2
2.2
2.2
2.6
2.2
1.5
2
1
0.3
2.3
1.8
17 Painting
Outer Wall
Wall 1
Wall 2
Wall 3
Wall 4
Wall 5
Wall 6
Inner wall
Generator room
Chlorination room
Control room
Pump Room
Ceiling
Generator room
Chlorination room
Control room
Pump Room
Parapet Wall
Deductions
D1 - Louver Door
D2 - Double Door
D3 - Single Door
D4 - Roll-up Shutter
D5 - Double Door
W1 to W10 Window
Louver L1
L2, L3, L4
L5 & L6
Add for Variance in drawing
18 GI Gratings
FM Chamber
19 Chequered Plate
Chlorination Cable Trench
Control room cable Trench
Add for Variance in drawing
1
2
1
0.75
0.8
2.2
0.8
Pumping Station
Typical drawing No : GTC524-G-TEC-S-DRG-005
Date : 18.06.15
Rev : 0
Quantity Unit Rate
Amount
450
1 Excavation
Unit
m3
2 Back filling
m3
175.00
3 Pest Control
175.00
4 PCC
m3
13
5 Screed
80
m3
Kg
m2
40
14919
320
m2
125
20
m2
180
12 Plastering
750
13 Epoxy flooring
165
14 Painting
15 Doors
D1 - Louver Door
D2 - Double Door
D3 - Single Door
D4 - Roll-up Shutter
D5 - Double Door
16 Windows
W1 to W10 Window
17 Louvers
Louver L1
L2, L3, L4
L5 & L6
18 Rain Water Scrubber
19 GI Ladders with safe Gauge
20 GI Ladders without safe Gauge
m2
850
Nos
Nos
Nos
Nos
Nos
1
1
1
1
1
Nos
10
Nos
Nos
Nos
Nos
Nos
Nos
1
3
2
3
1
1
3
3
22 GI Grating
Nos
m2
1
5
23 Chequered Plate
m2
Quantity Total
FGL
328.107
20.44
30.46
2.30
1.01
2.35
1.52
12.71
10.25
3.30
128.00
20.44
23.71
2.30
1.01
2.35
1.52
11.83
7.77
4.26
41.65
412.463
37.53703
450
203.19
21.81
225
71.71
3.60
9.80
5.64
3.84
1.68
3.92
2.54
20.70
17.75
20.34
5.38
0.27
BSL
161.51
13.49
175.00
39.12
2.53
0.4
0.075
0.05
Total Depth
3.055
Pumping Station Excavated Earth level
482
38.595 m Lvl
0.74
0.42
0.29
0.13
0.29
0.19
1.55
1.33
1.53
12.11
0.89
13
3.59
0.18
0.49
0.28
0.19
0.08
0.20
0.13
1.04
0.89
1.02
8.08
0.92
9
26.66
0.69
15.76
10.45
0.46
0.16
2.16
0.92
0.34
0.18
1.30
0.38
0.86
0.38
0.88
0.57
2.54
41.8
39.12
2.68
41.8
39.75
3.11
2.66
3.05
1.37
2.05
74.88
5.12
80
83.01
36.18
3.82
40
32.37
1.08
0.86
0.22
0.29
0.80
0.64
0.16
0.21
0.53
1.59
0.37
0.23
0.64
0.54
0.75
17.65
3.43
0.24
1.76
1.30
1.70
1.19
66.64
3.2
109.5268
0
4.6
12.21
0.84
0
7.2
7.2
7.2
-0.45
0
4.55
0
0
2.04
6.12
0
0.84
2.52
0
0.98
2.94
0
1.28
3.84
0
16.905
13.44
16.905 290.5268
29.4732
320
96.9
18.87
4.5
5.94
4.44
3.06
54.21
37.05
39.78
74.1
14.43
19.89
-4.84
-3.41
-2.2
-5.72
-4.4
115.77
9.23
125
17.94
2.06
20
46.15
41.8
0.45
3.9
-12
-3.2
-3
-0.18
200.51
20.51
180
4.84
3.41
2.2
5.72
4.4
20.57
12
12
3.2
3
0.18
6.38
70.54
48.21
51.77
22.33
18.78
25.88
46.15
41.8
0.45
5.075
46.15
41.8
0.175
4.175
68.05
73.90
73.48
133.18
56.16
-9.68
-6.82
-4.4
-11.44
-8.8
-24
-6.4
-6
-0.18
19.125
16.5
61.275
18.87
680.33
69.67
750
20.70
17.75
20.34
9.14
61.28
9.90
1.70
15.58
3.36
2.00
161.74
3.26
165
739.05
41.8
39.75
2.05
150.37
70.54
48.21
51.77
22.33
18.78
25.88
46.15
41.8
0.45
5.075
46.15
41.8
0.175
4.175
68.05
73.90
73.48
218.67
16.50
19.13
18.87
61.28
56.16
-9.68
-6.82
-4.4
-11.44
-8.8
-24
-6.4
-6
-0.18
4.14
765.82
84.18
850
4.14
912.52
e : 18.06.15
Rev : 0
Amount
0.86
5
1.65
1.28
2.93
0.07
3
Nos
Length
Breadth Height
4
2
2
1
1
3.15
4.8
8.6
2.83
6.4
3.15
0.95
0.95
2
3.2
1.075
0.35
0.35
1.3
0.3
2 Back filling
Footing
Plinth Beam PB1
Plinth Beam PB2
Cable Trench
Generator Plinth
Grade Slab
Add for variance in drawing
4
2
2
1
1
1
1
3.15
4.8
8.6
9.6
16.8
10
3.15
0.75
0.75
0.3
0.3
5.8
1.075
0.35
0.35
1.3
0.3
0.275
3 Pest Control
Footing
Deduction
Plinth Beam PB1
Plinth Beam PB2
Generator Plinth
Cable Trench
Grade Slab
Add for variance in drawing
4
-4
2
2
1
1
1
1
2.15
0.8
4.8
8.6
5.95
2.63
10
2.15
0.8
0.35
0.35
2.75
1.75
5.8
4 PCC
a) Footing
Deduction
b) Plinth Beam PB1
Plinth Beam PB2
c) Generator Plinth
d) Cable Trench
e) Grade Slab
Add for variance in drawing
4
-4
2
2
1
1
1
1
2.15
0.8
4.8
8.6
5.95
2.63
10
2.15
0.8
0.35
0.35
2.75
1.75
5.8
0.075
0.075
0.075
0.075
0.075
0.075
0.075
5 Screed - SRC20
a) Footing
Deduction
b) Plinth Beam PB1
Plinth Beam PB2
c) Generator Plinth
d) Cable Trench
e) Grade Slab
4
-4
2
2
1
1
1
2.15
0.8
4.8
8.6
5.95
2.63
10
2.15
0.8
0.35
0.35
2.75
1.75
5.8
0.05
0.05
0.05
0.05
0.05
0.05
0.05
4
-4
4
2
2
1
-1
-1
1
2
0.8
1.2
4.8
8.6
9.6
5.8
2.48
5.8
2
0.8
0.2
0.2
0.2
5.8
2.6
1.6
2.6
0.4
0.4
1.1
0.5
0.5
0.15
0.15
0.15
0.6
1
2
2
4
1
2.48
1.2
2.48
1.2
1.6
0.2
0.2
0.2
0.2
1
1
4.675
2
2
1
1
1
1
4.8
8.6
5.8
10
31.6
0.2
0.2
0.2
6.2
0.2
0.575
0.575
0.425
0.175
1.2
2
2
1
8.6
4.8
0.6
0.6
2
2
8.6
4.8
4.1
4.1
-1
-1
-2
-1
2.6
1.05
3
2.6
2.2
2.2
3.4
2
-5
1.2
2
2
6.2
10
6.55
6.55
Inner plastering
Shorter Wall
Longer Wall
Ceiling Plastering
Door & Window deduction
Add for variance in drawing
9 Base Level Water Proofing
a) GENERATOR ROOM
Raft Bottom
b) Footing
Bottom
All sides
Top area
Column deduction
c) Column
Upto FGL
d) Plinth Beam
PB1
Beam bottom
Both sides
PB2
Beam bottom
Both sides upto FGL
Add for variance in drawing
10 Roof water proofing
Add for variance in drawing
11 Epoxy Flooring
Floor & Foundation
Foundation side
Add for variance in drawing
12 Painting
Inner side painting
Outter side Painting
Ceiling
Add for variance in drawing
13 Doors
Louver Door, D1
Single Door, D2
14 Window
Aluminium framed Glazed
Window, W1 to W5
15 Louver
L1 & L2
L3
2
2
1
5.8
9.6
9.6
4.675
4.675
5.8
6.2
10
4
16
4
-4
2
4
2
0.2
2
0.4
2
0.5
0.6
2
4
8.8
8.8
0.2
0.5
2
4
1
5
5
0.2
0.5
1
1
9.6
5.8
1
1
1
9.6
16.8
5.8
0.15
1
1
1
1
30.8
32.4
9.6
5.88
6.55
5.8
1
1
2.6
1.05
2.2
2.2
1.2
2
1
3
2.6
3.4
2
16 Chequered Plate
Cable Trench
Add for variance in drawing
1
1
2.28
1.4
m3
75
3 Pest Control
110
4 PCC
5 Screed
m3
6.00
35.00
m
Kg
m2
25.00
5586
170
m2
60
20.00
75.00
12 Plastering
m2
400
13 Epoxy flooring
60
14 Painting
15 Doors
i) D1
ii) D2
16 Windows
i) W1 to W5
17 Louver
i) L1 & L2
ii) L3
18 GRC Rain Water Scubber
19 GI Ladder with safe gauge
500
Nos
Nos
1
1
Nos
Nos
Nos
Nos
Nos
m2
2
1
2
1
4
20 Chequered Plate
2
3
2
2
2
2
Date : 20.06.15
Rev : 0
Amount
NIT
Quantity Total
42.67
3.19
5.72
7.36
6.14
42.67
2.52
4.52
3.74
1.51
15.95
18.49
-2.56
3.36
6.02
16.36
4.60
58.00
1.39
-0.19
0.25
0.45
1.23
0.35
4.35
0.92
-0.13
0.17
0.30
0.82
0.23
2.90
55.83
4.17
60
70.91
4.09
75
104.28
5.73
110
7.82
1.18
9
5.21
0.79
6.00
6.40
-1.02
1.06
0.96
1.72
8.35
-2.26
-0.60
9.05
0.79
0.48
0.99
4.49
1.10
1.98
0.49
10.85
7.58
10.32
5.76
30.41
4.59
35.00
22.01
2.99
25.00
16.08
3.92
20.00
70.52
39.36
-5.72
-2.31
-20.40
-5.20
-6.00
81.22
131
70.25
4.75
75.00
0
54.23
89.76
55.68
-39.63
372.26
27.74
400
62
16
25.6
16
-0.4
4.8
3.52
17.6
2
10
55.68
55.68
2.52
181.104
212.22
55.68
157.12
12.88
170
55.68
4.32
60
58.2
1.8
60
449.00
51.00
500
5.72
2.31
8.03
20.4
5.2
25.6
3.192
Date : 20.06.15
Amount
3.192
0.808
4
No.of
No. per
Member member
12
12
12
12
20
10
10
20
16
16
8
20
25
16
16
20
8
20
16
16
20
8
25
20
16
16
25
20
8
150
150
150
150
4
4
4
4
2
2
2
2
8
5
8
5
150
150
4
4
4
1
2
2
12
43
43
200
2
2
2
2
2
1
1
1
2
2
2
25
200
2
2
2
2
2
2
2
2
1
2
1
1
2
2
2
2
2
44
200
2
2
2
2
2
2
1
2
1
1
2
2
2
2
24
150
2
2
2
2
2
2
1
2
2
1
2
1
1
2
2
2
2
2
2
2
22
Lings - Middle
RB3 - 200 X 600
Top Main rod
Bottom Main rod
Middle Extra rod
Lings - Left & Right
Lings - Middle
4 Roof Slab
S4 & S6
Bottom Main Rod
S3 & S5
BottomDist. Rod
S4 & S6
Top Main rod
200
16
16
25
20
8
8
150
200
1
1
1
1
1
1
1
1
2
1
2
2
2
14
10
10
150
39
10
150
32
12
10
10
150
150
150
1
1
1
2
1
2
32
32
32
10
200
160
10
200
10
10
10
200
200
200
1
1
1
2
2
1
29
13
4
10
10
200
200
1
1
2
2
13
8
10
10
200
200
1
1
2
2
37
6
10
10
200
200
1
1
2
2
49
30
SUMMARY DETAILS
Dia of Bar
8
10
12
16
20
25
428.56
303.15
1222.32
400.46
21.43
15.16
61.12
20.023
449.99
318.31
1283.44
420.483
Total
tor Room
DATE:20.06.2015
N-DG-0062 to 0065
Cut
Length
REV:0B
Total
Unit Wt
Total Wt
2.5
1.2
2.5
1.2
160
0.889
160
48
0.889
0.889
142.22 7.333333
4
142.22
42.67
6.85
1.58
0.22
328.8
543.52
75.68
2.469
0.617
0.617
811.85
335.51
46.72
1000
43
1.266667
2.4
3.6
6.8
1.18
19.20
14.4
27.2
59
2.469
1.580
1.580
0.395
4.06
4.06
4.86
3.66
5.26
1.18
32.48
32.48
19.44
29.28
21.04
103.84
2.469
3.858
1.580
1.580
2.469
0.395
2.65
3.6
2.65
4
1.68
21.20
14.40
21.20
16.00
80.64
2.469
1.580
1.580
2.469
0.395
47.41
22.76
42.98
23.31
4.8
2.1
80.20 3.266667
125.31
30.72
46.27
51.95
41.02
8.6
1.266667
2.133333
52.35
22.76
33.50
39.51
31.86
24
43
24
3.266667
3.91
3.91
4.86
3.91
5.76
5.26
1.68
31.28
31.28
19.44
31.28
23.04
21.04
73.92
3.858
2.469
1.580
1.580
3.858
2.469
0.395
120.68
77.23
30.72
49.43
88.89
51.95
29.20
1.68
26.88
0.00
15.20
17.00
4.00
38.64
13.80
0.00
0.00
393.90
0.00
403.20
0.00
0.00
0.395
0.000
1.580
3.858
2.469
0.395
0.395
0.000
0.000
0.617
0.000
0.617
0.000
0.000
10.62
0.00
24.02
65.59
9.88
15.27
5.45
0.00
0.00
243.15
0.00
248.89
0.00
0.00
1.78
7.53
6.3
114.13
241.07
403.20
0.889
0.617
0.617
101.45
148.81
248.89
1.75
560.00
0.617
345.68
31.6
35.6
427.20
0.617
263.70
5.5
3.5
6.7
18.8
203.00
174.20
75.20
0.617
0.617
0.617
125.31
107.53
46.42
28.5
12.5
3.5
6.5
1.7
2.58
44.20
41.28
0.617
0.617
27.28
25.48
11.9
7.5
2.48
1.75
9.56
129.50
114.72
0.617
0.617
79.94
70.81
35.8
5
568.40
582.00
Total
0.617
0.617
350.86
359.26
5585.47
48
29
7.6
8.5
2
1.38
1.38
10.1
6.3
5.8
9.7
Total MT
0.2
3.3
16.3
13.33333
10
5.8 38.66667
4.7 31.33333
160
7.16
0.95
0.5
0.35
1.3
0.45
6.1
2.5
1.5
Description
1 Excavation
a) Footing - F1
Footing - F2
Footing - F3
b) Plinth Beam PB1
Plinth Beam PB2
Plinth Beam PB3
Plinth Beam PB4
Plinth Beam PB5
Plinth Beam PB6
c) Generator Plinth
d) Cable Trench
Add for Variance in drawing
2 Back filling
Footing - F1
Footing - F2
Footing - F3
Plinth Beam PB1
Plinth Beam PB2
Plinth Beam PB3
Plinth Beam PB4
Plinth Beam PB5
Plinth Beam PB6
Generator Plinth
Cable Trench
Generator Room
Fuel Pump Room
Grade Slab
Add for Variance in drawing
3 Pest Control
a) Footing -F1
Deduction
Footing -F2
Deduction
Footing -F3
b) Plinth Beam PB1
Plinth Beam PB2
Plinth Beam PB3
Plinth Beam PB4
Plinth Beam PB5
Plinth Beam PB6
c) Generator Plinth
Nos
Length
Breadth Height
5
1
1
2
1
1
1
1
1
1
1
1
2.85
2.55
2.15
3.8
6.3
2.6
5
6.4
9.5
7.25
3.08
2.85
2.55
2.15
0.95
0.95
0.95
0.95
0.95
0.95
3.25
2.1
1.075
1.075
1.075
0.4
0.4
0.4
0.4
0.4
0.4
0.825
1.3
5
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
2.85
2.55
2.15
3.8
6.3
2.6
5
6.4
9.5
18
7.96
5.7
4.7
7.5
10.7
2.85
2.55
2.15
0.75
0.75
0.75
0.75
0.75
0.75
0.3
0.3
10.7
7.5
4.7
5.7
1.075
1.075
1.075
0.4
0.4
0.4
0.4
0.4
0.4
1
1.3
0.5
0.5
0.275
0.275
5
-5
1
-2
1
2
1
1
1
1
1
1
1.85
0.8
1.55
0.7
1.15
3.8
6.3
2.6
5
6.4
9.5
6.65
1.85
0.8
1.55
0.3
1.15
0.35
0.35
0.35
0.35
0.35
0.35
2.65
d) Cable Trench
e) Daily Tank Plinth
f) Fuel Pump skid
g) Grade Slab
Deduction
1
1
1
1
1
-1
-1
-1
-1
1
2.63
2.95
1.25
7.5
10.7
6.5
2.8
1.1
2.4
1.65
1.65
0.95
4.7
5.7
2.5
1.5
0.8
1.5
5
-5
1
-2
1
2
1
1
1
1
1
1
1
1
1
1
1
-1
-1
-1
-1
1
1.85
0.8
1.55
0.7
1.15
3.8
6.3
2.6
5
6.4
9.5
6.65
2.63
2.95
1.25
7.5
10.7
6.5
2.8
1.1
2.4
1.85
0.8
1.55
0.3
1.15
0.35
0.35
0.35
0.35
0.35
0.35
2.65
1.65
1.65
0.95
4.7
5.7
2.5
1.5
0.8
1.5
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
5
-5
1
-2
1
2
1
1
1
1
1
1
1.85
0.8
1.55
0.7
1.15
3.8
6.3
2.6
5
6.4
9.5
6.65
1.85
0.8
1.55
0.3
1.15
0.35
0.35
0.35
0.35
0.35
0.35
2.65
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
d) Cable Trench
e) Daily Tank Plinth
f) Fuel Pump skid
g) Grade Slab
Deduction
1
1
1
1
1
-1
-1
-1
-1
1
2.63
2.95
1.25
7.5
10.7
6.5
2.8
1.1
2.4
1.65
1.65
0.95
4.7
5.7
2.5
1.5
0.8
1.5
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
5
-5
1
-1
1
5
1
1
2
1
1
1
1
1
1
1
-1
-1
-1
-1
1
1
1
1.7
0.8
1.4
0.7
1
1.2
1
0.6
3.8
6.3
2.6
4.8
6.4
10.5
10.5
7.3
6.5
2.8
1.1
2.48
6.5
2.8
1.1
1.7
0.8
1.4
0.3
1
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
5.5
4.5
2.5
1.5
0.8
1.5
2.5
1.5
0.8
0.4
0.4
0.4
0.4
0.4
1.1
1.1
1.1
0.5
0.5
0.5
0.5
0.5
0.6
0.15
0.15
0.15
0.15
0.15
0.15
0.9
0.3
0.3
1
2
2
2.48
1.5
2.08
1.5
0.2
0.2
0.2
1
1
5
1
1
2
1
1
1.2
1
0.6
3.8
6.3
2.6
0.2
0.2
0.2
0.2
0.2
0.2
5.95
5.95
5.95
0.4
0.4
0.4
1
1
1
1
1
1
1
4.8
5.5
6.4
10.5
10.9
7.7
42.2
0.2
0.2
0.2
0.2
5.8
4.8
0.2
2
1
1
1
1
1
1
3.8
6.3
2.6
4.8
5
9.5
1
1
1
1
1
1
2
1
1
1
1
1
1
3.8
6.3
6.4
2.6
4.8
5
9.5
5.35
5.35
5.2
5.35
5.35
5.1
5.35
-2
-1
2.6
1.05
2.2
2.2
-1
0.8
1.2
-3
-1
-2
-1
1
2.5
4
2.3
1.2
2
4.5
3
1
1
1
1
1
1
10.6
4.9
4.8
3.2
5.9
10.9
7.65
7.65
7.65
7.65
7.65
7.65
10
5.75
0.4
0.4
0.55
0.65
0.2
0.2
1.2
Wall 2
Wall 3
Wall 4
Wall 5
Wall 6
Middle
Parapet wall
Inner Plastering
Add for Variance in drawing
11 Water Proofing
Footing - F1
Deduction
All sides
Top Area
Footing - F2
Deduction
All sides
Top Area
Footing - F3
All sides
Top Area
Column
C1 Upto FGL
C2 Upto FGL
C3 Upto FGL
Grade Slab
Grade Slab
Generator Plinth room
Daily Tank Plinth room
Add for Variance in drawing
12 Roof Level Water Proofing
1
1
1
1
1
1
4.5
4.6
10.5
5.5
10.5
7.3
5.75
5.75
5.75
5.75
5.75
5.75
42.2
1.4
5
-5
5
5
1
-1
1
1
1
1
1
1.7
0.8
6.8
1.7
1.4
0.7
5.6
1.4
1
4
1
1.7
0.8
0.4
1.7
1.4
0.3
0.4
1.4
1
0.4
1
5
1
1
1
1
1
1
1
1.2
1
0.6
4.7
10.7
10.7
7.5
0.6
0.6
0.6
7.5
5.7
5.7
4.7
1
1
4.7
10.7
7.5
5.7
1
1
1
1
1
7.5
10.7
18
8.6
3.8
4.7
5.7
0.15
0.15
0.15
1
1
10.6
4.9
7.65
7.65
Wall 3
Wall 4
Wall 5
Wall 6
Inner Painting
Wall 1
Wall 2
Wall 3
Wall 4
Wall 5
Wall 6
Middle
Parapet wall
Inner Painting
Ceiling
1
1
1
1
4.8
3.2
5.9
10.9
7.65
7.65
7.65
7.65
1
1
1
1
1
1
1
10
4.5
4.6
10.5
5.5
10.5
7.3
5.75
5.75
5.75
5.75
5.75
5.75
5.75
1
1
1
42.2
7.5
10.7
1.4
4.7
5.7
2
1
2.6
1.05
2.2
2.2
0.8
1.2
1.2
1
2
1
2.5
4
2.3
2
4.5
3
1
1
2.28
1.3
m3
160
3 Pest Control
140
4 PCC
m3
10
5 Screed
m3
45
m
Kg
m2
50
8446
250
m2
100
11 Block Work
170
12 Plastering
750
13 Epoxy flooring
m2
110
14 Painting
15 Doors
i) D1 & D2
ii) D3
16 Windows
i) Window W1
800
Nos
Nos
2
1
Nos
3
3
Nos
Nos
Nos
Nos
Nos
Nos
m2
1
2
1
2
1
3
Type 2
Quantity Total
43.66
6.99
4.97
2.89
2.39
0.99
1.90
2.43
3.61
19.44
8.41
43.66
6.99
4.97
2.28
1.89
0.78
1.50
1.92
2.85
5.40
3.10
30.50
17.63
9.69
16.77
17.11
-3.20
2.40
-0.42
1.32
2.66
2.21
0.91
1.75
2.24
3.33
17.62
97.68
12.32
110
149.93
10.07
160
4.34
4.87
1.19
35.25
60.99
-16.25
-4.20
-0.88
-3.60
1.28
-0.24
0.18
-0.03
0.10
0.20
0.17
0.07
0.13
0.17
0.25
1.32
0.33
0.37
0.09
2.64
4.57
-1.22
-0.32
-0.07
-0.27
0.86
-0.16
0.12
-0.02
0.07
0.13
0.11
0.05
0.09
0.11
0.17
0.88
129.63
10.37
140
9.72
0.28
10
0.22
0.24
0.06
1.76
3.05
-0.81
-0.21
-0.04
-0.18
6.48
0.52
7
5.78
-1.28
0.78
-0.08
0.40
1.32
0.22
0.13
0.76
0.63
0.26
0.48
0.64
1.26
8.66
4.93
-2.44
-0.63
-0.13
-0.56
14.63
1.26
0.26
0.74
0.60
0.83
7.14
1.19
0.71
0.61
0.50
0.21
39.46
5.54
45
59.7
5.95
0.38
0.44
0.70
1.37
12.64
7.39
10.13
7.60
6.30
2.60
4.80
5.00
9.50
43.42
6.579
50
35.80
4.20
40
40.66
33.71
33.28
13.91
25.68
25.50
50.83
-11.44
-2.31
-0.96
-3.60
-5.00
-36.00
-6.90
81.09
37.49
36.72
24.48
45.14
83.39
57.50
157.35
12.65
170
25.88
26.45
60.38
31.63
60.38
41.98
59.08
14.45
-3.20
13.60
14.45
1.96
-0.21
2.24
1.96
1.00
1.60
1.00
0.00
3.60
0.60
0.36
35.25
60.99
60.99
35.25
35.25
60.99
35.25
60.99
2.70
1.29
0.57
81.09
37.49
671.55
78.45
750
245.89
4.11
250
96.24
3.76
100
100.80
9.20
110
723.92
36.72
24.48
45.14
83.39
57.50
25.88
26.45
60.38
31.63
60.38
41.98
59.08
35.25
60.99
767.79
32.21
800
11.44
2.31
0.96
3.60
5.00
36.00
6.90
2.96
2.96
0.04
3
725
Date : 18.06.15
Amount
Description
3 Footing
Bottom
All sides
Top area
Column deduction
4 Column
Upto FGL
5 Plinth Beam
PB1 - 3.75m Span
Beam bottom
Both sides upto FGL
PB2
Beam bottom
Both sides upto FGL
PB3
Beam bottom
Both sides upto FGL
PB1 - 3.70m Span
Beam bottom
Both sides upto FGL
4 Ground Slab
Chlorination Room
Generator room
Control Room
Nos
Rev 1A
Length(m)
Breadth(m)
5
20
5
-5
1.2
1.2
1.2
0.45
1.2
0.3
1.2
0.2
1.3
0.7
3
6
3.4
3.4
0.2
0.3
1
2
4.2
4.2
0.2
0.3
1
2
4.9
4.9
0.2
0.3
2
4
3.2
3.2
0.2
0.3
1
1
1
4.9
4.2
4.9
3.45
3.2
3.45
Total
G
Date :29.04.2015
Area (Sq.m)
7.2
7.2
7.2
-0.45
0
4.55
0
0
2.04
6.12
0
0.84
2.52
0
0.98
2.94
0
1.28
3.84
0.00
16.91
13.44
16.91
93.51