Expo Project Engineering Services (P) ltd

Inspection And Test Plan For


Modification Work of Desal Tanks at DTA
Attachments
List of Referenced Forms:
No

Form No.

Description

1. Expo/IR/ 01 .Penetrate Test Inspection Report


2. Expo/IR/ 02 .Radiography Test Report
3. Expo/IR/ 03 .Fit-up and Weld Visual Report
4. Expo/IR/ 04 .Inspection Report for Tank Appurtenances
5. Expo/IR/ 05 .Inspection Report For Plumpness of Tank Shell
6. Expo/IR/ 06 .Inspection Report For Shell Peaking and Banding
7. Expo/IR/ 07 .Raw Material Identification Report
8. Expo/IR/ 08 .Inspection Report For Surface Preparation & Painting
9. Expo/IR/ 09 .Inspection Report for Water Filling and foundation Settlement of tank
10. Expo/IR/ 10 .Equipment/ Nozzle Fit-up, Weld visual& Dimensional Inspection
Report

11. Expo/IR/ 11 .R F Pad Pneumatic test


12. Expo/IR/ 12 .Welder Qualification Test Report
13. Expo/IR/ 13 .Post Weld Heat Treatment
Note:

1. Each specific ITP will have a revision numbers, which is individually, change as the

2.

ITP are revised. The referenced form are included document. Revision of these
times of initiation of the ITP, will be utilized. the referenced forms will be included
only during ITP review cycles prior to issue for construction (IFC)
This ITP shall be used as Inspection and Test Plan before execution of the job,
whereas during and after job execution it shall be used as checklist.

Legend of Inspection Requirements:


H:
Hold Point is a mandatory inspection Point and work shall not proceed without the presence of a
representative of Cognizant organization.
W:
Witness Inspection point: Designated Witness points for the Involved personnel, which are required
to be signed off by witness
personnel. All Activities, which Point, will require
a written notification to Client Inspector ,in the event that the Client Inspector does not attend within an
agreed period the work may proceed. In such c The Vendors/ Contractors will records in the appropriate the
work may proceed on the form s Not Witnessed, and shall sign and date such spaces.
W%: % Witness Inspection Point: Designated Percentage Witness Point assigned by the Client which will
require
written notification form the vendor/ Contractor. In the event Client
Inspector dose not attend within an agreed in the contract, however this may be Increased shall minimum of
10% inspector, if not otherwise agreed in the contract, however this
May be increased at discretion of the Client Inspector.
S:
Surveillance / Monitoring : Random observation of the controls of process activities . However,
such activities are not
required to be signed off by client Inspector .
DR : Document Review/Review: this entails review of appropriate documentation.

EXPO/QD/ITP/01

00

28.03.2015

Issued for
Implementat
ion

Rev

Date

Revision

Neeraj
Kumar

Harish
Sharma

Prepared By

Checked By

Approved
By