Professional Documents
Culture Documents
Sieve Analysis: Kingdom of Saudi Arabia
Sieve Analysis: Kingdom of Saudi Arabia
Sieve Analysis: Kingdom of Saudi Arabia
Ministry of Transport
Material Research & Testing Department
CONSULTANT:
DAR AL RIYADH
CONTRACTOR: AL
MOBTY COMPANY
SIEVE ANALYSIS
Project:
Description:
Request No.:
Sta. 19+550
Sampled by:
399645
Oven Dry, g:
Checked by:
Indv. Wt.
Retained
0
0
63656
40354
37987
32943
29540
28123
28546
25367
27999
18765
2756
2398
Cum. Wt.
Retained
0
0
63656
104010
141997
174940
204480
232603
261149
286516
314515
333280
336036
338434
Cum.
Passing
399645
399645
335989
295635
257648
224705
195165
167042
138496
113129
85130
66365
63609
61211
Cum. %
Passing
100
100
84.1
74.0
64.5
56.2
48.8
41.8
34.7
28.3
21.3
16.6
15.9
15.3
Cum. %
Retained
Specifications
Remarks:
M.E. CONTRACTOR
M.E. CONSULTANT
RESIDENT ENGINEER
CONSULTANT:
DAR AL RIYADH
CONTRACTOR: AL
MOBTY COMPANY
SIEVE ANALYSIS
Project:
Description:
Request No.:
Sta. 19+550
Sampled by:
399645
Checked by:
Pan
Wash
Total
Remarks:
Indv. Wt.
Retained
2013
6176
7945
8945
8234
2045
2398
1159
1239
Cum. Wt.
Retained
338434
344610
352555
361500
369734
371779
374177
375336
376575
Cum.
Passing
61211
55035
47090
38145
29911
27866
25468
24309
23070
Cum. %
Passing
15.3
13.8
11.8
9.5
7.5
7.0
6.4
6.1
5.8
Cum. %
Retained
Specifications
M.E. CONTRACTOR
M.E. CONSULTANT
RESIDENT ENGINEER
CONSULTANT:
DAR AL RIYADH
CONTRACTOR: AL
MOBTY COMPANY
SIEVE ANALYSIS
Project:
Description:
Request No.:
Sta. 19+550
Sampled by:
399645
Oven Dry, g:
Checked by:
Pan
Wash
Total
Remarks:
Indv. Wt.
Retained
1369
845
Cum. Wt.
Retained
376575
377420
Cum.
Passing
23070
22225
Cum. %
Passing
5.8
5.6
712
678
378132
378810
21513
20835
5.4
5.2
787
379597
20048
5.0
1105
380702
18943
4.7
Cum. %
Retained
Specifications
25 % Maximum
M.E. CONTRACTOR
M.E. CONSULTANT
RESIDENT ENGINEER
Wo
Wd
6452
6352
1.574
CONSULTANT:
DAR AL RIYADH
CONTRACTOR: AL
MOBTY COMPANY
10"
12"
14"
16"
18"
20"
22"
24"26"
28"
8"
6"
2.5"
3"
2"
1.5"
1/2"
3/8"
#4
#10
# 30
# 40
# 80
# 200
4"
Sta. 19+550
Sampled at:
Request No.:
1"
Description:
Completion Of Tow Roads From South To North, East To West, Jizan Area (FAIFA)
Rockfilling Stock Pile .
March. 05, 2
Date Sampled:
3/4"
Project:
% Passing
100
90
80
70
60
1; 60
50
40
30
20
10
1; 10
0
0.01
Remarks:
0.1
D60 = 480
D10 = 48
10
100
Cu =
10
1000
Contractor M.E.
28"
26"
24"
22"
20"
18"
16"
14"
12"
10"
8"
6"
4"
3"
21/2"
2"
11/2"
1"
3/4"
1/2"
3/8"
No,4
No,10
No,30
No,40
No,80
No,200
700
650
600
550
500
450
400
350
300
250
200
150
100
75
63
50
37.5
25
19
12.5
9.5
4.75
2
0.6
0.425
0.18
0.075
Consultant M.E.
100
100
84
74
64.5
56.2
48.8
41.8
34.7
28.3
21.3
16.6
15.9
15.3
13.8
11.8
9.5
7.5
7.0
6.4
6.1
5.8
5.6
5.4
5.2
5.0
4.7
mm
D10
D60
48
480
Resident Engineer
%
10
60
22"