Professional Documents
Culture Documents
Bill of Materials
Bill of Materials
EXCAVATION
=
=
=
TOTAL =
28.224 m3
1.053 m3
2.016 m3
31.293 m3
BACKFILLING
40.192 m2(0.2 m)
=
8.038 m3
(85.877 + 103.322)(0.25)=
47.300 m3
210.288(0.25)
=
52.572 m3
62.888(0.25)
=
12.578 m3
TOTAL =
120.488 m3
It is noticeable that an excavated earth volume 45.319 m3 used for backfilling is not sufficient
as a backfilling material, therefore, for the subgrade material used as an additional
backfilling material for floor elevation:
120.488 45.319
=
75.241 m3
A 75.241 m3 is the volume of subgrade material required as an additional backfilling material
is compacted and therefore is not quite sufficient to elevate the flooring of the structure.
Hence,
75.241(1.3)
=
97.813 m3
Now, a volume of 97.813 m3 is the compacted volume of subgrade material that is enough
to elevate the floor area of the structure.
@Section A
@Section B/C
@Section D
@Section 6
@Section 5
@Section 3
@Section 2
@Section 1
= 9.5 4(0.3)
=
= 9.5 4(0.3) 0.2
=
= 9.5 3(0.3) 0.3
=
= 6 3(0.2)
=
= 3.08 2(0.2)
=
=
=
= 2.93 0.075 0.2
=
= 0.5 + 2(0.707) + 0.8 + 0.775 + 2.93 2(0.2) 0.3=
TOTAL =
8.300 m
8.100 m
8.300 m
5.400 m
2.680 m
2.680 m
2.655 m
5.720 m
43.835 m
WALL FOOTING
2.630(9.0)
2.630(0.5)
2.630(1.0)
2.630 m3
@C1F1
@C1F2
@C2F1
= (1.2)2(0.3)(11)
= (0.9)2(0.3)(1)
= (1.2)2(0.3)(1)
=
=
=
TOTAL =
4.752 m3
0.243 m3
0.432 m3
5.427 m3
= 0.2(0.3)(3.43)(11)
= 0.2(0.3)(3.43)(1)
= (0.3)2(3.43)
=
=
=
TOTAL =
2.264 m3
0.206 m3
0.309 m3
2.779 m3
8.206 m3
COLUMNS
@C1F1
@C1F2
@C2F1
8.206(9.0)
8.206(0.5)
8.206(1.0)
ROOF BEAMS
Section A
Section B/C
Section D
Section 1
Section 2
Section 3
Section 5
Section 6
= [9.5 4(0.3)](0.2)(0.3)
= [9.5 4(0.3) 0.2](0.2)(0.3)
= [9.5 4(0.3)](0.2)(0.3)
= [6 2(0.2) 0.3](0.2)(0.3)
= [2.92 0.075 0.2](0.2)(0.3)
= [3.08 2(0.2)](0.2)(0.3)
=
= [6 3(0.2)](0.2)(0.3)
=
=
=
=
=
=
=
=
TOTAL =
0.498 m3
0.486 m3
0.498 m3
0.318 m3
0.159 m3
0.161 m3
0.161 m3
0.324 m3
2.605 m3
CHB WALL
Wall area
o Section A
o Section B/C
o Section D
o Section 1
o Section 2
o Section 3
o Section 5
o Section 6
Plastering:
o Quantity of CHB at Footing: Net length(h)(12.5)
= 43.835 (1) (12.5)
= 547.938 say 548 pieces
o Quantity of CHB wall plastered: 1829 548
= 1281 pieces
o 1281 [2(6) + 2(9.5)] (0.25)(12.5)
= 1184.125 say 1185 pieces
(Note: The 1185 pieces of CHB are the number of CHB that is to be plastered on both
sides.)
o Quantity of CHB that is to be plastered on one side only:
1281 1185
=
96 pieces
(Note: Now, the 96 pieces of CHB that is to be plastered on one side only are located
250 mm from the natural ground line.)
o Volume of plaster (16 mm plaster): [2(1185)(0.2)(0.4) + 1(96)(0.2)(0.4)]0.016]
=
3.156 m3
(Note: The volume obtained, which is 3.156 m3 is the amount of plaster of the wall
including both single and double-side plastering.)
o
SLAB
10.808 m3
=
TOTAL =
39.949 m3
50.257 m3
STEEL REINFORCEMENT
REINFORCEMENT FOR CONCRETE HOLLOW BLOCKS
FOOTING REINFORCEMENT
Footing 1 (F1)
o Net length (consider 0.20 m bend): 1.2 2(0.075) + 0.2
o Qty. of cut bars (single footing):
8(2)
o Total cut bars for 11 footings:
16(12 footings)
o If 6.0 m length of steel bar is used:
6/1.25
o Required qty. of steel bars:
176/4
o Order: 44 pieces 16 mm diameter x 6.0 m long bars
= 1.25 m
= 16 pieces/footing
= 192 pieces
= 4.8 say 4 pieces
= 48 pieces
Footing 2 (F2)
o Net length (consider 0.20 m bend): 0.9 2(0.075) + 0.2
= 0.95m
o Qty. of cut bars (single footing):
6(2)
= 12 pieces/footing
o Total cut bars for 1 footing:
= 12 pieces
o If 6.0 m length of steel bar is used:
6/0.95
= 6.32 say 6 pieces
o Required qty. of steel bars:
12/6
= 2 pieces
o Order: 2 pieces 16 mm diameter x 6.0 m long bars
Total quantity of steel bars: 46 pieces 16 mm diameter x 6.0 m long bars
Tie Wires
o Footing 1 (F1)
No. of intersections:
8(8)
= 64 intersections
Total ties:
64(11)
= 704 ties
Using 30 cm long tie wire:
704(0.3)
= 211.2 m long G.I. wires
Mass:
211.2/53
= 3.98 say 4 kg #16 G.I. wires
o Footing 2 (F2)
No. of intersections:
6(6)
= 36 intersections
Total ties:
36(1)
= 36 ties
Using 30 cm long tie wire:
36(0.3)
= 10.8 m long G.I. wires
Mass:
10.8/53
= 0.20 say 1 kg #16 G.I. wires
o Order: 5 kg #16 G.I. wires
COLUMN REINFORCEMENT
Column 1 (C1)
o Bend at the base footing:
o Length from footing to ground line:
o Height from ground line to beam:
3.43 0.30 =
o Depth of beam:
o Dowel for roofing:
Total length of reinforcement
Total length for 11 posts:
4(11) =
Order: 44 pieces 16 mm diameter x 6.0 m long steel bars
Column 2 (C2)
o Bend at the base footing:
o Length from footing to ground line:
o Height from ground line to beam:
3.43 0.30 =
o Depth of beam:
o Dowel for roofing:
Total length of reinforcement
Total length for 11 posts:
4(1) =
Order: 4 pieces 16 mm diameter x 6.0 m long steel bars
Column 1 (C1)
o Bend at the base footing:
o Length from footing to ground line:
o Height from ground line to beam:
3.43 0.30 =
o Depth of beam:
o Dowel for roofing:
Total length of reinforcement
Total length for 11 posts:
4(1) =
Order: 4 pieces 16 mm diameter x 6.0 m long steel bars
Order: 52 pieces 16 mm diameter x 6.0 m long bars
0.20 m
1.10
3.13
0.30
0.40
5.13 m say 6 m
44 pieces
0.20 m
1.10
3.13
0.30
0.40
5.13 m say 6 m
4 pieces
0.20 m
1.10
3.13
0.30
0.40
5.13 m say 6 m
4 pieces
LATERAL TIES
16 x 16
48 x 10
Least side of column is 200 mm
=
=
256 mm
480 mm
ROOF BEAMS
Net length:
43.835 m
Length of reinforcement:
43.835 + 26(0.4) + 43.835(0.25) + 43.835(0.5) = 87.111 m long
Consider 10.5 m long bar, for 18 beams:
18(7)
=
126 pieces
Order: 126 pieces 16 mm diameter x 10.5 meter long bars
STIRRUPS
No. of stirrups:
Order:
{[43.835 2(0.85)]/0.2} + 16
=
227 stirrups
227/6 =37.83 say 38 pieces 10 mm diameter x 6.0 m long bars
Intersection:
7(227)
Consider 40 cm long tie wires:
Mass:
635.6/53
Order: 12kg #16 G.I. Wires
1589(0.4)
=
1589 ties
= 635.6 m long G.I. wires
=11.99 say 12 kg
SLAB REINFORCEMENT
Floor area:
40.192 + 62.888 + 399.487
=
502.567 m2
Using 6.0 m long bars, 15 cm spacing distance: 502.567 (2.584)=1298.633 say 1299pieces
Order: 1299 pieces 10 mm diameter x 6.0 m long bars
Tie wires
o Using 30 cm tie wire: 502.567 x 0.288
=
114.585 say 115 kg
o Order: 115 kg #16 G.I. wire
SUMMARY OF MATERIALS
EXCAVATION AND BACKFILLING
45.319 m3
97.813 m3
575 bags
115 bags
41.37 m3
63.70 m3
1829 pieces
METAL REINFORCEMENTS
CHB reinforcement
Footing reinforcement
Column reinforcement
Lateral ties
Roof beams
Stirrups
Slab reinforcement
Tie Wires
:
:
:
:
:
:
:
: