DESCRIPTION OF WORK:
ABOVEGROUND PIPING
INSTALLATION WORKS
APPROVED BY:
CONTRACTOR:
JGULF Intl. Co.
Ltd.
REVISION: 0
JSA No.: MACE - 2017
M.S. No.: V-3154-004-A-265
REVIEWED BY:
Aldrin C. Alcantara
Ghassan D. Matta
S.NO.
1.
Jose N. Banugan
Andres C. Moreno
DATE:
DATE:
Movement of Vehicle/Equipment.
Sharp Edges.
Personal Injury
Pinch point.
1 of 6
2.
Material Handling
Flying Object.
Equipment/Vehicle Movement.
Manual Lifting. Ergonomic Hazard
Rigging Equipment Failure.
Incompetent Operator or Rigger.
Improper Pipe Supports.
Pinch Points.
Slip. Trips & Fall.
Crane Failure.
Failure of ground supporting the
crane.
Entry of unauthorized persons in
lifting area.
2 of 6
3.
Equipment/Vehicle Movement.
Manual Lifting.
Rigging Equipment Failure.
Incompetent Operator or Rigger.
Improper Pipe Supports.
Pinch Points.
3 of 6
4.
Fire
Hot Surface.
Pinch Point.
Welding Sparks.
Damage to equipment.
Incompetent welder.
Welding rays.
Electrical hazard.
4 of 6
5.
Improper access
Unsafe Scaffold.
5 of 6
6.
7.
Non-observance of personnel on
proper techniques in manual
handling / lifting of materials.
Over exertion.
Housekeeping.
Accumulation of debris.
Tripping hazards.
Access obstruction.
Required Training.: Safety Orientation; Manual Handling; Hand and Power Tools; Hot Works, Fire Protection and Prevention; Fire
Watch Training; JSA and Risk Assessment; Crane and Rigging; Electrical Safety.
REQUIRED SAFETY EQUIPMENT
Hard Hats
Yes
Other Gloves
Yes
Face Shield
Yes
Safety Glass
Steel Toe
Yes
Yes
Work Vest
Safety Harness
Yes
Yes
Goggles
Barricades
Yes
Yes
6 of 6
Yes
Cranes
Yes
No
Yes
Forklift
Jackhammer
No
No
Boots
Leather
Gloves
Yes
No
Fire
Extinguihsers
7 of 6
Yes
No
Other
Equipments/Materials
Yes