JOB SAFETY ANALYSIS

PCD PROJECT: WATER TREATMENT FACILITIES 3


FACILITY/PLANT LOCATION:
WTF-3 PJ

DESCRIPTION OF WORK:

CONTRACTOR:

GROUNDING SYSTEM

JGULF Intl. Co.


Ltd.

INSTALLATION AND TESTING


JSA PARTICIPANTS:

REVISION: 0
JSA No.: MACE - 2008
M.S. No.: V-3154-004-A-353

APPROVED BY:
REVIEWED BY:

Aldrin C. Alcantara

Ghassan D. Matta

(Sub-contractor HSE / Construction Manager)


DATE:

S.NO.

1.

Jose N. Banugan

Andres C. Moreno

(Contractor HSE Manager/Engineer)

(PCD Safety Engineer)

DATE:

STEPS REQUIRED TO COMPLETE TASK

DATE:

IDENTIFY HAZARDS & ASSESS RISK

CONTROLS TO ELIMINATE/REDUCE RISK

Planning/Site preparation
Loading and Unloading of Cable by Boom

Incompetent Operator.

Truck.

Uncertified Lifting Equipment.

Load Movement.

Vehicle Movement.

Pinch Points.

Slip, Trips & Fall.

Page 1 of 4

Obtain PTW prior to the commencement of


the work and 1st copy to be kept at the work
site in compliance to KJO work permit
procedure.

Survey work area and address safe work


method, hazards and precautions.

Toolbox talk shall be conducted by the


concerned supervisor prior to start of work.

JSA shall be followed and to be explained


to all employees during Tool Box Talk prior
to start of activities and it must be made
available at the work site together with the
work permit.

All equipment as well as Operators and


truck drivers shall have in their possession
current 3rd party certificates and SAG
license respectively.

All lifting tackles use for lifting shall be


inspected and color coded prior to use.

2.

Grounding Cable Installation.

Grounding Installation above Ground.

Slip, Trips & Fall.

Sharp Edges.

Manual handling of Materials.

Fall from Heights.


Fall of tools/materials.
Sharp Edges.
Slip. Trip and fall.
Page 2 of 4

Proper tag lines shall be provided to control


the load while being lifted by boom truck.

Boom Truck shall be assisted by flagman all


the time of activity specially when
maneuvering for proper position.

If boom truck is used to load or unload


materials, outriggers shall be used fully.
Boom truck operator shall follow all the
safety precautions pertaining to boom truck
operation safety.

Boom truck operator shall have valid SAG


driving license.

Remove all debris from work area daily as


minimum. All tools and materials shall be
properly kept in in a safe are to avoid slip,
trips and fall.

Personnel shall be made aware trough tool


box talks and trainings about safe
movement and good housekeeping in the
area to avoid slip, trip & fall, pinch points,
safe.

Sharp edges shall be supported/covered to


prevent from causing injury to person.

Personnel shall be briefed / trained on


proper & safe manual material handling
techniques.

Wear appropriate and approved PPE at all


times.

Area shall be clear from slipping & tripping


hazards.

Cable drum support shall be rigid and


stable.

Supervisor concerned shall closely


supervise the job.
All personnel shall be oriented on work at
heights procedure prior to work.
Work at heights shall be done only when
there is safe work platform/s.Personnel

shall be required to wear full body harness


with 100% tie-off.
Hand/power tools as well as materials to be
used at heights shall be safely secured.
Tools shall be placed on tool box and shall
not be thrown from heights. Tool bags shall
be used to lower or raise required tools.
Power tools shall be plugged to GFCI
outlets and double insulated type.
Sharp edges shall be supported /covered to
prevent from causing injury to person.
Remove all debris from work area daily as
minimum. All tools and materials shall be
properly kept in a safe area to avoid slip,
trip and fall.
The surrounding area of activity must be
barricaded with safety signage posted.

3.

4.

Grounding Connection Termination.

Fire/Gas.

(Cad Welding)

Hot Surface.

Slip, Trip & Fall.

Grounding Electrode, Assembly and


Grounding Pit Installation.

Hit Against.

Pinch Points.

Sharp Edges.

Flying Particles.
Page 3 of 4

Prior to hot works in the area ( Cad Welding


of Joints) a hot work permit shall be
secured and gas test has been conducted.

A currently calibrated gas test detector shall


be used for gas testing and records shall be
maintained.

A fire watch shall be assigned with his


firefighting equipment( fire extinguisher)
and ensure that area is properly covered
with fire blankets before hot work starts.

Personnel shall be briefed not to touch


newly welded joints. Cover shall be
provided.

Only competent and experienced


electricians shall be allowed to do the job.

Work shall be closely monitored by


concerned supervisor.

Workers driving the grounding rod into


the ground shall wear leather hand and
other basic PPEs.

Pinch points shall be identified and


avoided during the course of work.

5.

Housekeeping

Underground Utility Damage.

Slips, Trip and falls incident

Accumulation of debris

Access obstruction

Parts of the body exposed for sharp


objects shall be protected.

Safety goggles shall be worn by workers


doing the job.

A cable/metal detector shall be used to


detect underground utilities or trial pit
shall be done prior to installation of
grounding electrode.

Remove all debris from work area daily


as minimum.

All tools shall be placed inside tool boxes


and should be scattered anywhere.

Maintain good housekeeping standardsall walkways/access ways are kept


obstruction free/small tools contained.

Keep all materials organized / secured/


free from potential displacement/falls.

Tidy up area at each end of the shift.

Close work permit promptly each day


before leaving the site.

Required Training.: Safety Orientation; Manual Handling; Hand and Power Tools; Hot Works, Fire Protection and Prevention; Fire
Watch Training; JSA and Risk Assessment; Crane and Rigging; Electrical Safety; Lock Out/Tag Out.
REQUIRED SAFETY EQUIPMENT
Hard Hats

Yes

Other Gloves

Yes

Face Shield

Yes

Safety Glass
Steel Toe
Boots
Leather
Gloves

Yes

Work Vest

Yes

Goggles

Yes

Hand Tools & Power


Tools
Compactor

Yes

Safety Harness

Yes

Barricades

Yes

Yes

Self Retracting Lifeline


(SRL)

No

Fire
Extinguihsers

Yes

Page 4 of 4

Yes

Cranes

Yes

No

Boom Truck

Yes

Lifting Gear

Yes

Jackhammer

No

Air Hoist/Man Rider

No

Other
Equipments/Materials