Professional Documents
Culture Documents
Shruti Tyagi: Masters of Bussiness Education 2014-2016
Shruti Tyagi: Masters of Bussiness Education 2014-2016
Shruti Tyagi
RAJ KUMAR GOEL INSTITUTE OF TECHNOLOGY
GHAZIABAD
ACKNOWLEDGEMENT
INDEX
COMPANY PROFILE
INTRODUCTION
SYSTEM ANALYSIS
FEASIBILITY STUDY
HARDWARE CONFIGURATION
SOFTWARE CONFIGURATION
SYSTEM REQUIREMENT
DATA FLOW DIAGRAM
DATABASE DESIGN
INTERFACE DESIGN
CODING
SYSTEM DESIGN
SYSTEM IMPLEMENTATION
SOFTWARE TESTING
CONCLUSION
BIBLIOGRAPHY
COMPANY PROFILE
Central Electronics Limited is a Public Sector Enterprise under the Department
of Scientific and Industrial Research (DSIR), Ministry of Science & Technology,
Government of India. It was established in 1974 with an objective to
commercially exploit the indigenous technologies developed by National
Laboratories and R&D Institutions in the country. CEL is one of the rare
companies, which utilized the homegrown technologies during all these years of
its existence.
CEL has developed a number of products for the first time in the country through
its own R&D efforts and in close association with the premier National &
International Laboratories including Defense Laboratories. In recognition of all
these efforts, CEL has been awarded a number of times with prestigious awards
including National Award for R&D by DSIR.
CEL is pioneer in the country in the field of Solar Photovoltaic (SPV) and it has
developed state-of-the-art technology with its own R&D efforts. Its Solar
products have been qualified to International Standards EC503/IEC1215 by
the European Commission, Joint Research Centre, and ISPRA, ITALY.
CEL, pioneer in the field of Railways Safety & Signaling, has been identified as a
major indigenous agency for design and development of modern electronic
Signaling and Safety equipment by Indian Railways. The equipment
manufactured in CEL finds extreme usage in Railways in the form of Axle
Counter, Axle Counter Block System and Train Approach Warning Devices.
CELs Digital Axle Counter is approved as per European CENELEC safety level
SIL-4 by RDSO (Research, Design and Standard Organization of Indian
Railways) as an approved source in Part-I (i.e. approved for bulk production) for
various Railway Safety and Signaling Equipments for more than 25 years.
CEL has developed a number of critical components for strategic applications and
is supplying these items to Defense.
STRENGTHS
Pioneer in India in Photovoltaic, Railway Signaling & safety
equipments, C-Band & X-Band phase shifters & Electronic Ceramics
Capability to meet competition in India and abroad
State-of-the-art solar cell process technology
Latest infrastructure & equipment for processing silicon solar cells &
modules
BUSINESS AREAS
Solar PhotoVoltaics
Strategic Electronics
Railway Electronics
Microwave Electronics
Solar PhotoVoltaics:
The function of this business unit is to manufacture and market Solar Voltaic
Cells, Modules and complete systems in India & Abroad.
Central Electronics Limited (CEL) is the pioneer and the largest
manufacturers of Solar-Photovoltaic (SPV) Cells, Modules and Systems in
India. Through sustained in-house development and constant R&D efforts,
spread over a decade of continuous efforts, the company has converted a
laboratory concept into an industrial technology.
Strategic Electronics:
PRODUCTS
Solar PhotoVoltaics
Others:
INTRODUCTION
Entry
Show
Update
Search
ENTRY
Under this module we used to update database on the basis of various document
types described as follow:
OPB (Opening Bill)
CSRV (Certified Stores Receipt Voucher )
MRN (Material return Note)
FGN (Finished Goods Note)
STV-R (Stock Transfer Voucher-Receive)
PHV-R (Physical Variant - Receive)
MIR (Material Issue Receipt)
STV-I (Stock Transfer Voucher-Issue)
PHV-I(Physical Variant - Issue)
SHOW
10
UPDATE
Using this module we can update the description of any item in the Openng bill
table
It also make the user to update the entry corresponding to a wrong BINCARD.
SEARCH
Using this module we can search various attributes of both opening_bill and
inventory table using their primary keys BINCARD and doc_merger respectively.
SYSTEM ANALYSIS
EXISTING SYSTEM
System Analysis is a detailed study of the various operations performed
by a system and their relationships within and outside of the system. Here
11
the key question is- what all problems exist in the present system? What
must be done to solve the problem? Analysis begins when a user or
manager begins a study of the program using existing system.
Problems with existing system:
It is not having the user friendly interface
Key based system
Cant restrict the negative value of quantity
PROPOSED SYSTEM
Proposed system solved all the problems of existing system It is having the
following features:
User friendly interface
You can use mouse as well
Look and Feel Environment
It restrict the negative value of quantity
FEASIBILITY ANALYSIS
Whatever we think need not be feasible .It is wise to think about the
feasibility of any problem we undertake. Feasibility is the study of impact, which
happens in the organization by the development of a system. The impact can be
either positive or negative. When the positives nominate the negatives, then the
system is considered feasible. Here the feasibility study can be performed in two
ways such as technical feasibility and Economical Feasibility.
12
Technical Feasibility:
We can strongly says that it is technically feasible, since there will not be much
difficulty in getting required resources for the development and maintaining the
application as well. All the resources needed for the development of the software
as well as the maintenance of the same is available easily here we are utilizing the
resources which are available already.
Economical Feasibility
Development of this application is highly economically feasible .I needed not
spend much money for the development of this application as I used the tool java
6 runtime environment and MySQL database which are the open sources.
The only thing is to be done is making an environment for the development with
an effective supervision. Therefore the system is economically feasible.
HARDWARE CONFIGURATION
Processor
RAM
2 GB
Hard Disk
1 TB
Monitor
Key Board
Dual Core
15 Color monitor
:
122 Keys
13
SOFTWARE CONFIGURATION
Operating System
Language
Database
: Mysql.
14
SYSTEM REQUIREMENTS
This application is platform independent as it used java at front end and
Mysql database at back end and both are the open sources therefore we
can use this application on any operating system i.e windows, UNIX,
LINUX etc.
15
INTERFACE DESIGN
This application is platform independent as it used java at front end and Mysql
database at back end and both are the open sources therefore we can use this
application on any operating system i.e windows, UNIX, LINUX
ENTRY MODULE
OPB : to add new BINCARD
16
CSRV
17
MIR
SHOW MODULE
18
UPDATE MODULE
Update description in Opening Bill table
19
SEARCH MODULE
Search various attributes of different items in table Opening
Bill corresponding to respective BINCARD.
DATABASE DESIGN
The general theme behind a database is to handle information as an integrated
whole. A database is a collection of interrelated data stored with minimum
redundancy to serve many users quickly and effectively. After designing input
and output, the analyst must concentrate on database design or how data
should be organized around user requirements. The general objective is to
20
make information access, easy quick, inexpensive and flexible for other users.
During database design the following objectives are concerned:
Controlled Redundancy
Data independence
Accurate and integrating
More information at low cost
Recovery from failure
Privacy and security
Performance
Ease of learning and use
SYSTEM IMPLEMENTATION
Implementation is the stage in the project where the theoretical design
is turned into a working system. The implementation phase constructs,
installs and operates the new system. The most crucial stage in
achieving a new successful system is that it will work efficiently and
effectively.
21
SOFTWARE TESTING
The purpose of the system testing is to consider all the likely variations
to which it will be suggested and push the systems to limits.
The testing process focuses on the logical intervals of the software
ensuring that all statements have been tested and on functional interval
is conducting tests to uncover errors and ensure that defined input will
produce actual results that agree with the required results. Program
level testing, modules level testing integrated and carried out.
There are two major type of testing they are
22
23
1) Interface errors
2) Performance in data structure
3) Performance errors
4) Initializing and termination errors
CONCLUSION
This project is only a humble venture to satisfy the needs in a
library. Several user friendly coding have also adopted. This package
shall prove to be a powerful package in satisfying all the
requirements of the organization.
The objective of software planning is to provide a frame work
that enables the manger to make reasonable estimates made within
a limited time frame at the beginning of the software project and
should be updated regularly as the project progresses.
24
BIBLIOGRAPHY
1) http://www.java2s.com/
2) http://java.sun.com
3) www.mysql.com
4) http://google.com
25