Professional Documents
Culture Documents
Iruppiddy SWE - Final
Iruppiddy SWE - Final
Irrigation Department, NP
Irrigation
Rehabilitation of SWE
schemes
Implementing Agency
Sector
Project Component
1. Project Title:
Reconstruction of the Iruppiddy Salt Water Exclusion Scheme.
2. Background of the Project:
This is one of the SWE scheme in the island area with a length of 2.50km bund, situated at the sea
side of the Urathivu Kerathivu road starting from Soolanodai regulator to Iruppiddy regulator,
which covers the Urathivu, Kerathivu and Iruppiddy villages, under the administration of the
Velanai Divisional Secretariat. This earthen bund is almost eroded of its full length& has many
breaches. As there is no concrete structure on this bund, the rising sea water level during high tide
is entering freely into the land and at the same time the Urathivu Kerathivu road also gets
eroded by the sea waves. Further, during the rainy season, the utilizable water within the
cultivable land area is flowing out directly into the sea without any restriction. As a result, farmers
who are engaged in paddy cultivation for their livelihood are mostly affected without any return
for their toil. Due to the seawater intrusion salinity infiltrates into the ground water which leads to
wanting of drinking water.
3. Objective of the Project:
Objective of the Project is to restore the SWE scheme parameters to the original design profile
through rehabilitation to alleviate poverty of the beneficiaries and to ensure prevention flooding
and saltwater intrusion. In addition, the rehabilitation of the scheme will ensure SWE facilities to
the entire farmers of this scheme for increasing the cultivation extent which would enhance
economic development of the region.
4. Justification and Rationale :
Rehabilitation of this Scheme will be carried out to bring the scheme back to
the design for safe discharging of flood water preventing inundation and
seawater intrusion.
1
In specifically,
Saving the rain water to the optimum safe level in the inland & paddy land area.
Protecting the paddy cultivation from sea.
Giving relief to the farmers who are engaged in paddy cultivation.
Preventing the sea water intrusion into these peripheral areas.
Increasing the quality of the ground water.
5. Implementing Arrangement :
The Project would be implemented under the overall guidance of the Secretary, Ministry of
Agriculture & Agrarian Services, Animal Husbandry, Irrigation, Environment, Water Supply,
Food Supply and distributions and Co-operative Development of the Northern Provincial Council.
Infrastructure Development would be implemented by the Irrigation Department. District level
coordination would be facilitated by the District Secretary, Jaffna, while the project will be
monitored by the Chief Secretary through the PPCC held quarterly. Farmers Organization will
take active role and participate at all level of its implementation and take over the responsibility
for the Operation and maintenance of this asset with the collaboration of the Irrigation
Department.
6. Target Groups and Beneficiaries :
Specially, there is a no of beneficiaries from 420 families of the Urathivu, Kerathivu &
Iruppidddy villages under the GN division of J/22, J/32 & J/33 respectively. Most of them are
doing the paddy cultivation in this area for their livelihood and the rest doing fishing & as daily
wage servant.
7. Project Period:
06 months from the date of work awarding.
8. Required Human Resource (Government /Non Government)
All types of Human resources are available for this work
9. Supporting Agencies :
Agrarian Development Department, Jaffna
Agriculture Department, Jaffna
10. Major Activities :
Recondition the SWE & Flood Bunds with necessary regulator structures.
Details
TEC
Rs.in MN
Based Cost
18.80
0.94
0.94
VAT- 11%
2.07
Total
22.75
2015
Q
Q
2
3
Q
4
Q
1
2016
Q
Q
2
3
Q
4
i.
Output
Reconstructed Iruppiddy SWE
ii.
Outcome/ Results
Increase the amount of Fresh
iii.
iv.
yield.
Having good transportation in the
v.
vi.
ground water.
Enhance the quality of the ground
vii.
water.
Enrich the quality of the life of
- Technical officer (TO) at site and report to Irrigation Engineer (IE) - daily,
- IE at office / site with TO, Contractors & Farmers representatives and report DDI - weekly,
-DDI at office with IE & other required persons, and report to Director Fortnightly
- Director at office with DDI other required persons, and report to Secretary monthly
- Secretary at office with Director and other required persons, and report to Chief Secretary
Quarterly,
- Chief Secretary at office, only if necessary.
19. Responsibility for the Project Proposal Submission
Department of Irrigation, Northern Province
Head of Department:
Name
:Eng.S.Shanmugananthan
Designation: Director of Irrigation
Institution : Irrigation Department, NP
Address
:Kachcheri Lane, Klinochchi
Date
Signature :
Name
:Mr.M.Patrick Diranjan
Designation :Secretary
Institution
:Ministry of Agriculture & Agrarian Services, Animal Husbandry,
Irrigation,
Environment,
Water
Supply,
Food
Supply
Address
Date
and
Date