SSI will provide scheduled maintenance visits monthly for an annual maintenance contract on a concrete pump. SSI will make 12 scheduled visits per year and provide 6 additional emergency visits at no extra charge. Any additional visits will cost Rs. 5000 per visit plus taxes. SSI is responsible for maintaining the equipment according to the service schedule and deploying service personnel. The employer is responsible for making the equipment available for maintenance, providing clean fuel and lubricants, and purchasing all necessary wear parts and services from SSI.
SSI will provide scheduled maintenance visits monthly for an annual maintenance contract on a concrete pump. SSI will make 12 scheduled visits per year and provide 6 additional emergency visits at no extra charge. Any additional visits will cost Rs. 5000 per visit plus taxes. SSI is responsible for maintaining the equipment according to the service schedule and deploying service personnel. The employer is responsible for making the equipment available for maintenance, providing clean fuel and lubricants, and purchasing all necessary wear parts and services from SSI.
SSI will provide scheduled maintenance visits monthly for an annual maintenance contract on a concrete pump. SSI will make 12 scheduled visits per year and provide 6 additional emergency visits at no extra charge. Any additional visits will cost Rs. 5000 per visit plus taxes. SSI is responsible for maintaining the equipment according to the service schedule and deploying service personnel. The employer is responsible for making the equipment available for maintenance, providing clean fuel and lubricants, and purchasing all necessary wear parts and services from SSI.
General Terms and Conditions for Annual Maintenance contract.
Scheduled maintenance visits.
1.1. SSI shall prepare a Service Schedule and Check Sheet detailing therein the necessary periodic inspections and servicing of the equipment prior to the commencement date of the AMC. 1.2. SSI Service Engineer shall make 12 scheduled visits for your Concrete pump, in a year in the frequency of 1 scheduled visit per month for the period of contract. Apart from these 12 scheduled visits, 6 extra visits in case of any emergency or breakdown shall be made if need arises and this will be at no extra charge. 1.3. Any more visits, apart from the above, will be on chargeable basis @ Rs.5000/- per visit + taxes. 1.4. SSI shall carry out the maintenance of the equipment as per program mentioned above and shall ensure that all the activities listed in the Service Schedule and Check Sheet are performed on schedule dates mentioned in the program as well as the check list referred to above. 1.5. SSI and the Employer shall maintain the dates mutually agreed for the routine & preventive maintenance services of the equipment. 1.6. The routine and preventive maintenance, monitoring and servicing of equipment shall include, service, minor repairs, replacement of parts, components or sub-assembly, inspections and condition appraisal. Major repairs or dismantling, re-commissioning and shifting of the machine or part of it are excluded from this contract. 1.7. Maintenance of Engine/ Prime mover will not be covered under this contract. In case of failure, Employerer has to arrange for repair/ replacement of the same. 1.8. SSI shall provide report against routine and preventive maintenance together with monitoring and servicing carried out on the equipment 1.9. The Employer shall inform SSI about any problem noticed by it during the operation/ inspection of the equipment immediately. 1.10. The Employer shall maintain logbook for the above purpose. Format of Daily Log Sheet shall be provided by SSI. Unscheduled maintenance 1.11. If at any time the operator notices any operational problem of equipment, the same shall be reported to the SSI representative and the customer if need arises, shall stop
operating the equipment till the defect is rectified.
SSIs Responsibility 1.12. SSI shall deploy the service person to oversee the maintenance of the equipment 1.13. SSI to use complete & effective check sheet and other report to ensure proper maintenance. 1.14. Whenever a machine will be attended for a particular job, SSIs representative will raise necessary Service Report and the same has to be duly signed by the customers representative. 1.15. Calibration certificate will be provided Quarterly one time. However customer has to provide the Necessary Standard weight for calibration. Employers Responsibility 1.16. The Employer shall use and provide clean fuel, lubricant, lubricating oils, as per specifications furnished by SSI. 1.17. The Employer shall make equipment available as per advance schedule for routine maintenance, periodic maintenance and repairs. 1.18. The Employer shall provide necessary manpower, tools and tackles to SSI Engineers to carry out preventive maintenance and repairs. 1.19. The Employer shall employ well trained operators. SSI Engineer shall provide basic training to operators to enhance their skill levels. The Employer may choose to enroll the operator in SSI in house training school at the normal fee applicable to all. 1.20. The Employer shall take corrective action on SSIs suggestion if an employee is found not performing the job required to maintain health and safety of the equipment. 1.21. The Employer shall purchase ALL NECESSARY WEAR PARTS & SERVICE FROM SSI for SCHWING Stetter Equipment, unless otherwise excluded from SSIs scope. 1.22. Purchase of spurious parts by the customer will exclude SSI from its obligations under the contract 1.23. Necessary Standard weight to be provided for calibration. 1.24. These Service charges are for the equipments working in and within a radius of 50 km from Bangalore only. If the equipment is shifted to sites other the above locations to and fro travel expenses and stay expenses will have to be paid at actual by the Employer.