What are the factors that effect on the development of the bridge?
Q.2
Q.3
What points should be considered for preparation of report for final selection of bridge site?
Q.4
Q.5
Q.6
Catchment area of river is 17000 hactares, the length of the catchment area is 23 Kin and the fall in
levels from the critical point to the site of Bridge is 150 metres. The soil of catchment area is loamy
lightly covered with vegetations. Find the peak run off to design a bridge if the severest storm
yielded 38 cm of rain in 6 hours if values of factors P and f are 0.26 and 0.68 respectively.
Q.7
Describe the different types of equipment which are used for driving the piles.
Q.8
Q.9
Q.10
Q.H
Q.12
Discuss different types of test applied for checking the strength of a bridge structure.