Professional Documents
Culture Documents
Gen Seal Oil Sys
Gen Seal Oil Sys
Sheet 1 of 20
PLANT DETAILS
2.0
OBJECTIVE
3.0
PROPOSALS
4.0
SERVICES REQUIRED
5.0
SAFETY PRECAUTIONS
6.0
EMERGENCY PROCEDURE
7.0
8.0
METHOD
9.0
COMPLETION CRITERIA
10.0
APPENDICES
a)
Drawing
b)
Log Sheets
Sheet 2 of 20
STATUS
1.0
PLANT DETAILS
1.1
1.2
1.3
1.4
1.5
b)
Signatures
NTPC
BHEL
Sheet 3 of 20
STATUS
2.0
OBJECTIVE
Signatures
NTPC
BHEL
Sheet 4 of 20
STATUS
3.0
TESTING PROPOSAL
3.2
BHEL
Sheet 5 of 20
STATUS
4.0
SERVICES REQUIRED
4.1
4.2
4.3
4.4
4.5
4.6
4.7
Signatures
NTPC
BHEL
Sheet 6 of 20
STATUS
5.0
SAFETY PRECAUTIONS:
5.1
5.2
5.3
5.4
5.5
Ensure the availability of first aid kit near the process area.
5.6
5.7
5.8
Load on Pumps shall not exceed full load current of the motor.
5.9
5.10
5.11
5.12
Signatures
NTPC
BHEL
Sheet 7 of 20
STATUS
6.0
EMERGENCY PROCEDURES:
6.1
6.2
6.3
6.4
6.5
Signatures
NTPC
BHEL
Sheet 8 of 20
STATUS
7.0
7.1
7.1.1
7.1.2
7.1.3
7.1.4
7.1.5
Signatures
NTPC
BHEL
Sheet 9 of 20
STATUS
7.1.6
7.1.7
7.1.8
7.1.9
2 nos.
b.
1 no.
1 no.
c.
7.1.10
Signatures
NTPC
BHEL
Sheet 10 of 20
STATUS
7.1.12
7.1.13
7.1.14
7.1.15
7.1.16
7.1.17
7.1.18
Signatures
NTPC
BHEL
Sheet 11 of 20
NTPC Ref No. SIM/1/TS/2/005
PROCEDURE FOR HYDRAULIC TEST AND OIL FLUSHING OF GENERATOR
SEAL OIL SYSTEM
Sl. No.
STATUS
8.0
METHOD
Seal oil system is filled with oil by taking the oil
supply from seal oil storage tank. To ensure oil
level in seal oil storage tank, lub oil pump should
be kept running during this process or oil should
be filled manually in this tank. Seal oil system is
filled up in two stages as follows (ensure that all
shut off and gate valves are closed).
Signatures
NTPC
BHEL
Sheet 12 of 20
STATUS
Signatures
NTPC
BHEL
Sheet 13 of 20
STATUS
8.1.2
8.1.3
8.1.4
8.1.5
Signatures
NTPC
Station: NTPC - Simhadri
BHEL
BHEL Ref No. PS-DC-186-500-0006
Sheet 14 of 20
STATUS
8.2
8.2.1
8.2.2
Signatures
NTPC
Station: NTPC - Simhadri
BHEL
BHEL Ref No. PS-DC-186-500-0006
NTPC Ref No. SIM/1/TS/2/005
Sheet 15 of 20
STATUS
8.2.3
8.2.4
8.2.5
8.2.6
8.2.7
Signatures
NTPC
Station: NTPC Simhadri
BHEL
BHEL Ref No. PS-DC-186-500-0006
NTPC Ref No. SIM/1/TS/2/005
Sheet 16 of 20
STATUS
8.4.0
8.4.1
Signatures
NTPC
Station: NTPC Simhadri
BHEL
BHEL Ref No. PS-DC-186-500-0006
Sheet 17 of 20
Sl. No.
STATUS
8.4.2
8.4.3
8.4.4
8.4.5
8.4.6
8.4.7
Signatures
NTPC
BHEL
Sheet 18 of 20
STATUS
8.4.9
8.5.0
8.5.1
8.5.2
8.5.3
8.5.4
8.5.5
8.5.6
Signatures
NTPC
Station: NTPC Simhadri
BHEL
BHEL Ref No. PS-DC-186-500-0006
Sheet 19 of 20
Sl. No.
STATUS
9.0
COMPLETION CRITERIA
Oil flushing for each stage may be declared
completed on the following basis.
Signatures
NTPC
BHEL
Sheet 20 of 20
Oil temperature
Sl.No
Date/Time
Pump Dis.Pr.
Bef.
Cooler
After
Cooler
Thermal
Shock
Signatures
NTPC
BHEL
Remarks