Site Folder Flexi MME
Site Folder Flexi MME
Site Folder Flexi MME
Site Drawings
Outstanding Tasks
Site Inventory
Installation Checklist
Commissioning Checklist
Integration Checklist
Project Name:
PROJECT NAME
Site Name / Site Number:
SITE NAME / SITE NUMBER
Revision History
Date
Sept 2013
Rev.
1
Originator
Bubun A
Summary of Change
First Version of Flexi NS Site Folder
Document Approval
Rev.
Role
Name
Signature
Date
The information in this document is subject to change without notice and describes only the product defined in the
introduction of this documentation. This document is intended for the use of Nokia Siemens Networks Almadars
only for the purposes of the agreement under which the document is submitted, and no part of it may be used,
reproduced, modified, or transmitted in any form or means without the prior written permission of Nokia Siemens
Networks. The document has been prepared to be used by professional and properly trained personnel, and the
Almadar assumes full responsibility when using it. Nokia Siemens Networks welcomes Almadar comments as part
of the process of continuous development and improvement of the documentation.
The information or statements given in this document concerning the suitability, capacity, or performance of the
mentioned hardware or software products are given as is and all liability arising in connection with such
hardware or software products shall be defined conclusively in a separate agreement between Nokia Siemens
Networks and the Almadar. However, Nokia Siemens Networks has made all reasonable efforts to ensure that the
instructions contained in the document are adequate and free of material errors and omissions. Nokia Siemens
Networks will, if deemed necessary by Nokia Siemens Networks, explain issues which may not be covered by the
document.
Nokia Siemens Networks will correct errors in the document as soon as possible. IN NO EVENT WILL NOKIA
SIEMENS NETWORKS BE LIABLE FOR ERRORS IN THIS DOCUMENT OR FOR ANY DAMAGES, INCLUDING BUT NOT
LIMITED TO SPECIAL, DIRECT, INDIRECT, INCIDENTAL OR CONSEQUENTIAL OR ANY MONETARY LOSSES, SUCH
AS BUT NOT LIMITED TO LOSS OF PROFIT, REVENUE, BUSINESS INTERRUPTION, BUSINESS OPPORTUNITY OR
DATA THAT MAY ARISE FROM THE USE OF THIS DOCUMENT OR THE INFORMATION IN IT
This document and the product it describes are considered protected by copyrights and other intellectual property
rights according to the applicable laws.
Wave logo is a trademark of Nokia Siemens Networks Oy. Nokia is a registered trademark of Nokia Corporation.
Siemens is a registered trademark of Siemens AG.
Other product names mentioned in this document may be trademarks of their respective owners, and they are
mentioned for identification purposes only.
Copyright Nokia Siemens Networks 2010. All rights reserved.
Version 1.0.2
Page 2 of 40
Table of Contents
1
6.4
6.5
6.6
6.7
6.8
6.9
Version 1.0.2
Page 3 of 40
Version 1.0.2
Page 4 of 40
Site Drawings
Site-specific drawings that apply to Nokia Siemens Networks equipment installation
are developed by Nokia Siemens Networks Site Engineering Site Solutions and contain
site-specific installation information, such as:
Cable drawings
Version 1.0.2
Page 5 of 40
2
Item
Outstanding Tasks
Description of Outstanding Work
10
11
12
13
14
15
Version 1.0.2
Raised by:
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Completed by:
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Sig.
Name
Date
Page 6 of 40
Site Inventory
3.1
Version 1.0.2
Serial Number
OLD UNIT
Name / Version
Serial Number
NSN
FAULT
REPORT #
Page 7 of 40
Notes on Inventory
Lists:
Version 1.0.2
Page 8 of 40
Version 1.0.2
Page 9 of 40
Installation Checklist
The Installation Team is to carry out the Installation in accordance with the Installation
Site Requirements for Flexi NS, Unpacking ATCA Cabinets and Installing ATCA
Hardware included in Nokia Siemens Networks Flexi Network Server Operating
Documentation SAE/MME User Manual.
The Installation Team Supervisor is responsible for:
4.1
Ensuring that each team member has the correct tools, installation materials,
and User Manual.
Checking the delivery against the packing list and placing it in Section 3 of the
Site Folder.
COMPLETED
Check the availability of the documents needed for installation. Record the
shortages. Acquire the missing documents.
Check the availability of the tools needed for Installation. Acquire missing
tools.
4.2
COMPLETED
Check that the installation room is clean. Check that all basic work such as
installation of lighting, fire extinguishing, and air conditioning equipment is
completed.
Check against the floor plan for the site that all cable shelves and gratings
separate from the equipment itself are ready.
Check that the ventilation equipment has been properly installed and that the
temperature in the equipment room is within the limits allowed by the system.
Version 1.0.2
Page 10 of 40
INSTALLATION PHASE
COMPLETED
Check that the materials of the floors and desks in the equipment room are
anti-static (EPA). Insure anti-static wrist straps are checked and used by
Installation personnel. Provide anti-static materials and mats where
necessary.
Check the conformance of the room to the Installation floor plan drawing.
Record the differences.
Protect the gangways in the exchange room with cardboard.
Construct, measure, and mark out the positions of the cabinet (rows) and
other equipment on the floor.
Check the routes for external cabling and install cable ladders. Record the
differences to site drawings.
Make the needed additional holes in raised floors. Clean the room. Correct
installation floor plan.
4.3
COMPLETED
Visually check the transport packages for external damage. Record any
possible damage.
Remove equipment from the transport packages. Check the number of cases
against the packing list. Record shortages.
Unpack the cases.
Inspect equipment for internal or external damage. Record any possible
damage.
4.4
COMPLETED
Version 1.0.2
Page 11 of 40
INSTALLATION PHASE
COMPLETED
Check to insure that isolation pads (i.e., plastic plate) are installed between
the base frame and cabinet, and that the attachment bolts have insulation
washers installed. Then tighten the bolts.
Use an ohmmeter to check that the attachment bolts are not electrically
connected to the base frame, and that no electrical conductivity exists between
the base frame and the floor.
The total leak resistance of all floor rails to the main grounding busbar must be
greater than 100k.
4.5
COMPLETED
Other documents relevant for this task are Installing ATCA hardware and
external cabling plan.
Check that the pre-assembled components are properly attached. The delivery
includes the following pre-assembles components:
Shelf
Check that the pre-assembled internal grounding cables are properly attached.
They are connected from the shelves and from the PDUs to the cabinet
grounding rail.
Check that the internal power cables between PDUs and PEMs are properly
connected.
Check that all other pre-assembled internal cabling is properly connected.
4.6
COMPLETED
Version 1.0.2
Page 12 of 40
4.7
SDR &
INITIALS
Prepare the cables and connectors. Use 45 degree angle cable lugs
Connect the power supply cables (+UB and UB) to the PDU power supply
terminals and secure with the washers and nuts. Tighten the nuts to 5.1Nm.
Fasten the PDU covers in place
4.8
COMPLETED
Ensure that the polarities of the supply lines are correct and main fuse size
Main fuse:
VDC
4.9
COMPLETED
Version 1.0.2
Page 13 of 40
INSTALLATION PHASE
COMPLETED
Switch off the main power supply and the circuit breakers of the PDUs before
installing the blades and other units.
Install the two AHUB3-A Hub Blades to slot 8 and 9 in the shelf.
Install the ACPI4-A CPU Blades and CPRT4-A and CPRT4-B RTMs according to
the configuration. Check that they have been installed firmly, and see that
they have been pushed all the way in and there are no misalignments.
Check that the blade and RTM handles are turned inwards and all screws have
been tightened.
Install a filler unit to every blade and RTM slot or AMC bays that do not contain
a module in the configuration. Most of the filler units are pre-installed at the
factory
COMPLETED
COMPLETED
Connect the other internal cables on the rear side of the cabinet
Connect the internal cables on the front side of the cabinet
Place all excess cable length in the cable storage shelves and cable trays, tie
the cables to bundles with cable ties and attach them to the front and rear
trays and to the walls of the cabinet
COMPLETED
Version 1.0.2
Page 14 of 40
COMPLETED
Version 1.0.2
Page 15 of 40
Notes on Installation
Version 1.0.2
Page 16 of 40
Site Address:
Contract
Number:
Delivery
Number:
Site Name:
Site Number:
INSTALLATION STAGE
CHECKED
(INITIALS)
COMMENTS
Date:
Version 1.0.2
Date:
Page 17 of 40
Version 1.0.2
Page 18 of 40
COMMISSIONING CHECKLIST
The Commissioning Engineer is to carry out all commissioning tests in accordance with
the Flexi NS Commissioning Procedure, using the Flexi NS User Manual and other
approved reference material. Almadar-Specific Parameters are to be used where
applicable. A signed Certificate of Completion for the Commissioning work must be
included in Section 5.13 of the Site Folder, certifying that the Installation work has
been completed to the required standard. The Commissioning Engineer is responsible
for:
5.1
Informing the Site Manager of work progress, including any problems as they
arise
Commissioning Preparations
COMMISSIONING PHASE & RELATED DOCUMENTS
COMPLETED
Version 1.0.2
Page 19 of 40
COMPLETED
Related documents
5.2
COMPLETED
Checked
Unit
ACPI2-A
HDSAM-A
AHUB2-A
PEM
ARTM2-A
PDU
ASMGR-A
SHALD-A
Checked
ETHAM-A
Check the functionality of the Intelligent Platform Management Controller
(IPMI) shelf manager(s)
Log on to the shelf manager
User name
Default password
root
shmm_root
admin
shmm_admin
monitor
shmm_monitor
Version 1.0.2
Page 20 of 40
COMPLETED
Checked
5.3
COMPLETED
Log on to the OMUs and MCHUs one by one and execute Steps 2 and 3 to each
unit.
Check if the disk can be read
00-MAN> ZMQ:W0
00-MAN> ZMQ:W1
Check that the disk units are initialized
00-MAN>ZMX:W0
00-MAN>ZMX:W1
Unit
OMU-0
Version 1.0.2
Checked
Unit
Checked
MCHU-0
Page 21 of 40
OMU-1
5.4
MCHU-1
COMPLETED
Connect the USB memory stick to the USB port in the front panel of the active
OMU.
Check its working state with the MML command ZISI.
Create a bootable USB media with minidebugger
File system
Checked
1. FAT16 filesystem
2. FAT32 filesystem
Updating minidebugger build and copying it to USB memory stick.
5.5
COMPLETED
Version 1.0.2
Page 22 of 40
COMPLETED
Checked
1. OMU
2. MCHU
3. SMMU
4. CPPU
Monitor the start-up of the units
Check Ethernet Message Bus (EMB) connections
Flexi NS
EMB address
OMU-0
0000
OMU-1
0001
CPPU-0
CPPU-1
MCHU-0
Checked
0042
0043
0004
0005
MCHU-1
0010
SMMU-0
0011
SMMU-1
Check states of the LAN ports in the ACPI2-A blades (QHQ).
Check states of the computer units (USI).
Check that there are no LAN-related alarms active (AHO).
Check that the data in the computer units MAC address table is correct.
00:ZEBS>A:0x000:0xFFFF
Check from the print-out
1. All computer units have been listed.
2. There are two MAC addresses for each computer.
3. Both EMB0 and EMB1 are OK for all units and no units are
listed at the end of the execution print-out.
Check the error logs
42:ZEBS>L
00:ZEBS>LI;
Version 1.0.2
Page 23 of 40
5.6
COMPLETED
______________
______________
______________
5.7
______________
SW Version
Blade Unit
SW Version
COMPLETED
Version 1.0.2
Page 24 of 40
COMPLETED
Checked
WDU
VTP
VPP
UPP
VDS
5.8
COMPLETED
5.9
COMPLETED
Version 1.0.2
Page 25 of 40
COMPLETED
COMPLETED
Version 1.0.2
Page 26 of 40
Checked
Unit
OMU-0
SMMU-0
OMU-1
SMMU-1
CPPU-0
SMMU-2
CPPU-1
MCHU-0
CPPU-2
MCHU-1
CPPU-3
IPDU-0
CPPU-4
IPDU-1
COMPLETED
Checked
COMPLETED
COMPLETED
Record the item codes and serial numbers of the network element.
Version 1.0.2
Page 27 of 40
COMPLETED
Version 1.0.2
Page 28 of 40
Notes on Commissioning
Version 1.0.2
Page 29 of 40
Site Address:
Contract
Number:
Delivery
Number:
Site Name:
Site Number:
COMMISSIONING STAGE
CHECKED
(INITIALS)
COMMENTS
Commissioning Preparations
Checking the settings and the configuration
Inspecting the storage devices
Creating a bootable USB stick and copying a minidebugger to it
Open MML session
Inspect Flexi NS software versions
Inspect I/O devices
Inspect maintenance system
Check the hardware configuration
Checking unit diagnostics and working states
Copying additional software
Finishing Commissioning
Commissioning Certificate of Completion
Nokia Siemens Networks hereby states that the whole of supplies detailed above have been inspected, tested and unless
otherwise stated conform to the specified requirements in the contract or order identified above.
Nokia Siemens Networks Site
Representative (print name):
Nokia Siemens Networks Site
Representative (signature):
Date:
Version 1.0.2
Date:
Page 30 of 40
Version 1.0.2
Page 31 of 40
Integration Checklist
6.1
Integration Checks
The Flexi NS Integration Engineer is to carry out all integration and tests in accordance
with the Flexi NS User Manual and other approved Integration Procedures. The
Integration Engineer is responsible for:
Version 1.0.2
Verifying that Flexi system has been integrated and is ready for System
Acceptance Test.
Page 32 of 40
6.2
COMPLETED
Interface descriptions
S1 interface description
Checked
6.3
Create IP connectivity
6.3.1
COMPLETED
6.3.2
COMPLETED
Version 1.0.2
Page 33 of 40
6.3.3
COMPLETED
6.4
COMPLETED
6.5
COMPLETED
6.6
COMPLETED
Version 1.0.2
Page 34 of 40
COMPLETED
Checked
6.7
COMPLETED
Checked
S1HANDLER.INI
sctp_server_port = 49152
MMETRH.INI
GWLocalPort =2123
GWIPAddressRemote=10.102.182.184
GWRemotePort=2123
PGWIPAddressRemote=10.102.182.184
After modifying the settings, copy the files back to the packet directory.
Restart MCHU to activate the new parameters (ZUSU).
6.8
Create PLMN
INTEGRATION PHASE & RELATED DOCUMENTS
COMPLETED
Version 1.0.2
Page 35 of 40
COMPLETED
6.9
COMPLETED
COMPLETED
Version 1.0.2
Page 36 of 40
Notes on Integration
Version 1.0.2
Page 37 of 40
Site Address:
Contract
Number:
Delivery
Number:
Site Name:
Site Number:
INTEGRATION STAGE
CHECKED
(INITIALS)
COMMENTS
Integration Checks
Prerequisites for integration
Create IP connectivity
Creating IP configuration for MCHU
Creating IP configuration for SMMU
Creating IP configuration for CPPU
Set network-specific numbers
Create network element interfaces
Configure S6a interface
Configure S1 and S11 interfaces
Create PLMN
Create IMSI analysis
Synchronizing in Flexi NS
Nokia Siemens Networks hereby states that the whole of supplies detailed above have been inspected, tested and unless
otherwise stated conform to the specified requirements in the contract or order identified above.
Nokia Siemens Networks Site
Representative (print name):
Nokia Siemens Networks Site
Representative (signature):
Date:
Version 1.0.2
Date:
Page 38 of 40
Version 1.0.2
Page 39 of 40
Almadar Name:
Date:
Site Location/Number:
Project Description:
Nokia Siemens Networks P. O. Number(s):
Almadar P. O. Number(s):
The above referenced site project (i) has passed all applicable Acceptance Tests, (ii) has been installed
properly, subject to resolution of outstanding SDR items, and (iii) is ready to be placed in service.
Any discrepancies are specified on the following SDR or attachment (s).
No
Discrepancies
Not Applicable
No
Discrepancies
Not Applicable
Almadar Representative
Signature:
Signature:
Printed
Name:
Printed
Name:
Title:
Title:
Date:
Date:
Distribution:
Version 1.0.2
Almadar
Accounting
Project Manager
Page 40 of 40