Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

WELL CONTROL DATA SHEET

Well Name: ???

for

VERTICAL WELLS Wt. & Wt. METHOD

Location: ???

Well TD ft
Drill Pipe OD in
Last Csg ID in
SIDPP psi
Pump Efficiency
Pump Liner Sz in

Rig: ???

Hole Size in
Drill Pipe ID in
Csg Wt. Lb/ft
SICP psi
Slow P.strks/min
Pump Rod Sz in

12000
4 1/2
8 1/8
500
96.0%
5 1/2

3 7/8
24.00
1040
1
0

bbl/ft Capacity gal/ft


0.0146
0.613
0.0406
1.704
0.0445
1.867

12000
3000
9000

Hole Totals
Mud Tanks
TOTAL MUD
Baryte Vol. Gain

###

16.4
9000
20.0

Mud Tank Volume


Working Pumps

700
12

Time (min)

Pump Strokes,

Time in Minutes,

Pump Strokes

1986
1381
4539
7905
9075
16980
692

CALCULATIONS for KILLING THE WELL

###

0.072 psi/ft
Initial Kick Fluid Gradient:
Gas
Possible Kick type:
9360 psi
Hydrostatic Pressure at TD =
9860 psi
Formation Press =
9000 psi
Csg Shoe Fracture Pressure =
1986 psi
MACP with Original mud in csg =
1610 psi
New MACP with Kill Mud =
8055 psi
Csg Shoe Pressure at Shut-in =
7966 psi
Csg Shoe Pressure with kick at Csg Shoe =
Rate of D.P. Pressure Drop from Surface to the Bit
<

bbl Volume gal


175.0
7352
121.7
5112
400.1
16805
696.9
29269
800.0
33600
1496.9
62869
61.0
2563

Engineer:

Drill Collar Length


Mud Weight p
Leak Off Gradient ps

6 1/4

VOLUMES and PUMPING TIMEs

Length ft
Drill Pipe
OH Annulus
Csg Annulus

Date: 99-10-22

Drill Collars OD in
Drill Pipe Wt. lb/ft
Last Csg Set at TD ft
Pit Gain bbl
Slow Speed P.Pressure psi
Stroke Length in

7 7/8

1986
1381
4539
7905
9075
16980
692
0.0846
1200
737
0.80
15.80
1.45
90912
1031

Pump Output=
I. C. Pressure (RSPP + SIDDP) =
Final Circulating Pressure =
Mud Wt. Increase =
Kill Mud Wt. =
Baryte Addition =
Total Baryte =
Number of 40kg Sacks Required =
0.06 40kg Sacks/min or
Mixing Rate of =
61.0
Volume Gain from Baryte Addition =
strokes
43
= 10
psi per

D.P. Pressure (in psi) Reduction Schedule

> Bit <

Steady D.P. Press to

1200 ICP

1154

1107

1061

1015

969

922

876

830

784

737 FCP

737

strokes 0

199

397

596

794

993

1191

1390

1588

1787

1986 bit

2676

min 0

199

397

596

794

993

1191

1390

1588

1787

1986

2676

737 psi

922 ps i

830 psi

737 psi

700

784 psi

800

876 psi

900

969 psi

1000

1015 psi

DRILL PIPE PRESSURE, psi

1100

1107 ps i

1200

1061 ps i

DRILL PIPE PRESSURE REDUCTION SCHEDULE

1154 ps i

1300

1986

2676

600
PUMP STROKES

500
0

199

397

596

794

993

1191

1390

1588

1787

KICK at Csg SHOE

500
500

1040

set @

Csg
Shoe

1040
1040

737
737

1017
1017

00

1017
1017

Pump is

Kill Mud at

The Well is

started

the Bit.

Shut-in &

and I.C.

and Final

Pump's Off

Pressures

Pressure

Circulating

and the

8055
8055

Pump Stks

1200

Stabilized

Pump Stks

40

established

Pump Stks

1986
1986

Pressure
is in Effect

944
944

951
951

737
737

Csg
7966 Shoe
7966

Old Mud Wt.

33

GAS to SURFACE

1922
1922

at Pump Stks

5919
5919

Kick's out
at Pump Stks

at Pump Stks

Pump Stks

Well is

Pump Stks

3366
3366

Pump Stks

1986
1986

Shut-in

1100
1100

New MACP

4757
4757

7905
7905
Kill Mud's up

7905

THOD
????

Collar Length ft
Mud Weight ppg
Gradient psi/ft
BOP psi
ank Volume bbl
rking Pumps No

600
15.00
1.00
5000
800
1 pump

ump Strokes
1986
1381
4539
7905
9075
16980
692
bbl/min
psi
psi
ppg
ppg
ppg
lbs
sacks
5 lbs/min
bbls

y D.P. Press to Surface

>

737

737

3366 csg

7905

3366

7905

737 psi

737 ps i

737 psi

HEDULE

2676

3366

7905

00

00
The Pump
Stopped
and the
Well is

Pump Stks

7905
7905

SHUT-IN

You might also like