PROSEDUR KELULUSAN SISTEM

PEMBETUNGAN
April 2010
Ir. Sohaimi b. Kling

WSIA 2006- Act 655


Section 45-Provisions relating to Sewerage System &
Services:
(1) No person shall construct, alter, modify, disconnect or close-up
sewerage system, septic tank without approval in writing by the
Commission
(2) Rules to set out the standards as to type and extend of sewerage works
to be first approved by the Commission
(3) A person shall submit information & document in a form and manner
and within the time as may be provided in the Rules
(6) In granting approval, the Commission may impose such terms &
conditions as it deems fit
(7)A person commit offense upon conviction (fine <RM500,000 / < 5 years
prison or both); (a) sewerage works without having approval first in writing
(b) sewerage works not in accordance with approved plans & specs or (c)
makes alteration to approved plans & specs
(8) The Commission may (a) direct rectification works/ restore/ to condition
before construction or (b) cease construction and comply to requirement
(14) Offense Continue work after directed to cease fine <RM200,000/ <

Agensi Perakuan
Merujuk kpd WSIA 2006 (Akta 655):Seksyen 174 (1)- Suruhanjaya boleh mendaftarkan
agensi perakuan bagi maksud :(a) meluluskan pelan, spesifikasi atau reka bentuk
terperinci berkenaan dengan pembinaan sistem
bekalan air , sistem pembetungan, tangki septik,
perpaipan pembetungan
Seksyen 174 (2)-Sesuatu kelulusan oleh
agensi perakuan berdaftar hendaklah disifatkan
sebagai kelulusan oleh SPAN..

Roles And Responsibilities

Approving Authority
SPAN , under the WSIA 2006, is the approving
authority for any sewerage system.

Certifying Agency
- appointed by SPAN to examine all sewerage
proposals, make recommendations in meeting
sewerage needs of the development and assigned
to inspect construction and recommend for CF.

PERLANTIKAN IWK SEBAGAI


AGENSI PERAKUAN PEMBETUNGAN
IWK telah didaftarkan sebagai Agensi Perakuan Pembetungan oleh SPAN sejak
1/1/2008 bagi meluluskan pelan dan pembinaan sistem
pembetungan dan tangki septik.
SKOP PERKHIDMATAN AGENSI PERAKUAN :
1. Mengkaji cadangan perancangan sistem pembetungan.
2. Mengkaji cadangan rekabentuk sistem pembetungan.
3. Mengadakan pemeriksaan perantara sistem pembetungan.
4. Mengadakan pemeriksaan terakhir dan memberi surat
pengesahan bagi tujuan pengeluaran syor sijil kelayakan
atau perakuan siap dan pematuhan.
5. Mewakili SPAN di pelbagai mesyuarat agensi.
6. Menjalankan tugas-tugas lain yang diwakilkan.

WSIA 2006- Act 655

Section 46 Requirement for developer to


construct sewerage system:
Developer shall be required to construct
sewerage system/ part thereof in accordance
with requirement set in plan and specs
approved by the Commission.

DOKUMEN & RUJUKAN BAGI


PENGENDALIAN TUGAS
AGENSI PERAKUAN
1. Garispanduan, Jilid I
(Polisi Sistem Pembetungan) 6. Piawaian Malaysia,
MS 1228.
( Rekabentuk &
2. Garispanduan, Jilid II
Pemasangan Sistem
(Prosedur Kerja
Pembetungan)
Pembetungan)
3. Garispanduan, Jilid III
( Rangkaian Paip
Pembetungan & Stesyen
Pam)
4. Garispanduan, Jilid IV
( Logi Pengolahan
Kumbahan)
5. Garispanduan, Jilid V
( Tangki Septik)

7. Akta Industri
Perkhidmatan
Air 2006
8. Akta Keselamatan &
Kesihatan Pekerjaan
(OSHA 1994)
9. Akta Kualiti Alam
Sekeliling(EQA 1974)

Guidelines
-sets the minimum standard for certification of sewerage
works for developers and their consulting engineers
Qualified Person
-Person responsible to the design, construction and overall
quality of completed sewerage work
-Have sufficient sewerage technical expertise to ensure
sewerage works are properly engineered during design
and construction.

JENIS SISTEM PEMBETUNGAN


Tangki Septik Individu
Sambungan Paip Pembetungan
Rangkaian Paip Pembetungan
Stesyen Pam Kumbahan
Logi Pengolahan Kumbahan

PROSES KELULUSAN PERANCANGAN


SISTEM PEMBETUNGAN
Penyemakan perancangan pembetungan akan meliputi
perkara-perkara berikut:

1) Salinan surat dari Juruperunding yang Bertauliah.


2) Borang SSA/PDC/1 yang lengkap (+senarai-semak).
3) Pelan susunatur yang mengandungi pelan kunci & lokasi.
4) Perkiraan penduduk setara (PE) untuk keseluruhan
pembangunan.
5) Laporan kejuruteraan* (pembangunan >150 PE).
6) Tandatangan pemilik pada setiap pelan cadangan.
7) Tandatangan pihak Juruperunding pada setiap
dokumen.
*Laporan kejuruteraan hendaklah meliputi deskripsi cadangan pembetungan, pembangunan
sediada di sekeliling, topograpi, sungai di mana efluen dialirkan dan sebagainya.

Planning Approval Process

Initial consultation with CA.

Preferably before submitting for layout approval.

To determine existing sewerage facilities.

To enable the owner/consultant to establish the


appropriate sewerage works for submission and
approval.

SEWERAGE WORKS PLANNING


APPROVAL

The Engineering report consists of :

Project brief
Sewerage proposal
PE derivation
In line with catchment strategy
Adjacent lot development
STP area and buffer zone
Siting area
Effluent discharge & Water catchment

Review and approval of


planning submission
Planning submission covers :
1) Sewerage system > 150PE (commonly for complete
system, sewer network, NPS and STP)
2) Sewerage system < 150PE (commonly for septic
tanks and connection)

PROSES KELULUSAN REKABENTUK


SISTEM PEMBETUNGAN

Appendix A

Figure A.4

: Standard Precast Concrete Manhole with 4 way Base Arrangement


( Ground level to top of benching 2.5 to 5 metres)

Standard Manhole C.I Or D.I Frame And Cover To


DGSS Specification including Figures A.1 / A.2
Fill With 1 : 3 Cement Mortar Mix
Precast R.C. Make Up Rings As Required
To match Top Of Manhole Cover To

450 Min. 600 Max.


To Top Step

600

Finished Surface Level

Precast R.C. Taper Top painted internally


with 2 layers of coal tar epoxy
Precast R.C. Chamber Ring with 12
min. internal lining of high alumina
cement mortar

Cast Insitu Concrete Surround


(150 min Thickness)

Concrete Benching

Penyemakan permohonan rekabentuk pembetungan hanya


akan diproses selepas kelulusan permohonan perancangan
diperolehi dan ianya meliputi perkara-perkara berikut:

1) Salinan surat dari Juruperunding yang


bertauliah.

"Rocker" Pipe
200 min 500 max

1:12

150 min
600
Max

300 Min.

Grade 20/20 Conc. Base

50 Thk. Cementitious
Blinding

Invert Elevation Of Manhole

Form channel using 40 Thick High


Alumina Cement Mortar where change in
direction or diameter occurs through
manhole or there are 2 or 3 incoming
sewers
1. All precast manhole component joints shall be filled with 1:3 cement mortar mix.
2. Rocker pipes shall be 600 long for sewers up to 300 diamet er and 760 long for larger
diameter sewers.

Appendix A

Figure A.16 : Vacuum Sewerage System, House Connection and exa mple of
Vacuum Station

Sewerage Treatment Works


Vacuum
Station

Vacuum Sewer

Vacuum sewerage system

2) Surat kelulusan perancangan dari Pihak Berkuasa


Tempatan.

Service
Gravi ty
Drai n

Connection
Collecti on
Chamber

Vacuum
sewer

House connection
Inspection
Chamber

Vacuum sewer profile with sewer inspection point

Vent
W here Required

Vacuum reservoi r
moisture removal tank
Gravity Inlet

Control

3) Borang SSA/PDC/2 yang lengkap (+senarai-semak).

Vacuum Sewer

Emergenc y Overflow

Panel
Vacuum
Pumps

Vacuum
Sewers

Rising Main

Rising Main

Forwarding Pumps

Forwarding Pump

Vacuum Vessels

Sewage

Vacuum Station with


House Collection Vessel

4) Pelan-pelan rekabentuk terperinci.


Appendix A

Figure A.15

: Typical Details of Dry Well Pump Station


Control Panel

6) Laporan dan kiraan kejuruteraan.

Hours Run Meter

Ammeter
Motor

Isolator Switch

Coupling

Shaft
Delivery
Valve

Gland

Volute Case
Access Cover

Rising Main
Suction Valve
Impeller

7) Tandatangan pemilik pada setiap pelan cadangan.

Non -R eturn Valve


Duck Foot Bend

Auxillary Suction Pipe

Components Of A Typical Pump Installation


Extractor fan

Travelling Gantry
Crane

Screen
Mechanism
Skip To
remove
Screenings

Control Panel With


Ammeter, Isolator
Switch And Hours
Run Meter

Extractor Fan

Motor

8) Tandatangan dan cop perakuan oleh Jurutera


Bertauliah pada dokumen.

Ventilation
Duct

Control
Gates

Mechanically
Cleaned
Screen

Coupling

Shaft With
Mesh Guard

Ventilation Inlet
Duct

Rising Main

Bracket

Alarm Level

GRP Ventilation
Inlet Duct

Pump

Top W ater Level


Bottom. Water
Level
Flexible
Coupling
Sluice Valve

Incom ing Trunk


Sewer
Drainage
Sump With
Sump Pump

Check Valve
Reducer
Concrete Plinth

Design criteria for sewer network


Drawings
Layout
To indicate MH no., type of MH, type of pipe and
size, gradient and length of pipe, invert level and
depth of MH

Longitudinal section
Ground level, invert level, depth, distance
Gradient, pipe size, type of pipe, type of bedding,
type of MH
All utilities crossing

Other detailing refer Guideline vol.3

DESIGN APPROVAL FOR STP


Details design for STP shall include;
- Hydraulic design calculation,
- process design,
- Equipment sizing
- complete with clauses from relevant standards,
- SI report,
- material type, etc.

Inspection And Testing


The Qualified Person is fully responsible to the design
construction and overall quality of works.
The QP shall be responsible to comply with all
requirements for testing in accordance to relevant
Guidelines
When any works are ready for inspection, the
developer shall inform CA via Form SSA/PDC/7

Intermediate Inspection - sewerline


All work shall not be covered up until SPANs authorised
person (CA) has conducted inspection at the agreed date
and time
The Qualified Person shall ensure that all equipment,
product and system installed at the work are from the
SPAN approved list
All sewer and ancillary works shall be tested and
inspected by the QP to ensure the pipes are laid correctly
according to the approved design and plan and other
regulatory requirements.

Sewer-line Inspection and Testing


Test for sewer:
Leakage Test Straightness, Obstruction and Grade Test
CCTV inspection
any other testing and method approved.
Test may be conducted at random at any
section of sewer and ancillary works
QP to carry out leakage test and submit
endorsed report to CA
CA shall determine selection of sewers to
be inspected

Submissions for Final Inspection


The Qualified Person must ensure all work are
in accordance to approved design & drawings.

All works shall be COMPLETED and in functional


condition when applying for final inspection.

Final Inspection Requirement


Qualified Person (QP) to submit to CA the following:
-

Form SSA/PDC/8
Checklist for Final Inspection -Checklist PDC 8a
Related Checklist PDC 8b/c/d
STP & NPS -Checklist PDC 8e & 8f
Copy of Sewerage Works Approval
A3 plans indicating related works under construction
Copy of valid contractors license

FINAL INSPECTION
Developer to carry out remedial works for
deficiencies and/or unsatisfactory quality of
works identified by SPANs Authorised Person
CA may request for re-inspection due to bad
workmanship
CA may withhold recommendation for CF
when the works deemed unfit and/ or lead to
safety/ health risk.

FINAL INSPECTION / CF
When sewerage system( network, NPS and
STP are in full compliance to Guidelines and
approved drawings, CA shall recommend for
CF to LA
Owner to provide letter of
undertaking for the transfer
of STP and/PS land title to
the Government.

ISU
1. Keperluan sistem pembetungan tidak dipatuhi
sepenuhnya semasa mengemukakan
permohonan.
2. Ulasan yang dikeluarkan tidak dipinda semasa
permohonan- semula.
3. Kedudukan logi tidak mengambilkira kesesuaian
berdasarkan kriteria teknikal, persekitaran dan
sensitiviti penduduk berdekatan.
4. Pembinaan sistem pembetungan tidak
mengikut pelan yang diluluskan.
5. Memastikan agar jururunding yang
berkelayakan dibenarkan mengemukakan
permohonan sistem pembetungan.

WSIA 2006

Section 47 - the developer to hand over sewerage system


of new development to Service Licensee:
Developer of new development & within service area
upon issuance of CC by the QP, handover the sewerage
system to SL .
SL shall accept the sewerage system after SL is satisfied
that the system meet requirement set out in approved
plans, specification and standards.
Upon Hand-over, SL to operate & maintain.
Owner of the land to provide access for O&M.

CONCLUSION
Wastewater engineering is a specialised field,

proper engineering experience and exposures.

Structured long-term technical training is essential

local sewerage industry.

Engineers to keep abreast with changes and

challenges.

TERIMA KASIH