Site Handover Document

Site ID

Site Owner

MIC Tanzania Ltd

Other

Latitude :

SHO : /2015

Subcontractor

Ericsson

Dar es salaam

Longitude:

RFA Date

DAR001

Site Type
Region

Antenna Parts Installation

28/7/2015

Pass

1. Antennas and their respectively brackets are well fixed & tightened

Yes

2. All antennas installed according to designed specifications

Yes

3. Antenna Type :

Comments

LTE

4. GSM Antenna Quantity

Sector 1:

EXISTING

Sector 2:

EXISTING

Sector 3:

5. Antenna Height (AGL)(LTE)

Sector 1:

EXISTING

Sector 2:

EXISTING

Sector 3:

6. Azimuth(LTE)

Sector 1:

Sector 2:

240

Sector 3:

7. Electrical Downtilt(LTE)

Sector 1:

Sector 2:

Sector 3:

Sector 1:

Sector 2:

Sector 3:

8. Mechanical Downtilt(LTE)

RF VSWR & DTF Test & Measurements [ANT_TX/RXA | ANT_RXB]


SECTOR A

SECTOR B

SECTOR C

900M

1800M

2100 M

900M

1800M

2100 M

900M

1800M

1. VSWR 1.5

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

2. DTF 1.05

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

BTS Installation & Basic Functionality Testing

Pass

1. Cabinets are installed in accordance to Site Installation Documents

N/A

2. BTS and DC Power cabinets are secured to floor and leveled

N/A

3. BTS and DC Power Cabinet are grounded properly and neatly

N/A

4. All trip switch connections tightly fastened

Yes

5. All wiring neatly wired and cable tied

Yes

6. RRU/GRFU Boards and cables are installed according to Vendor diagram & specifications
Basic Functionality Testing (Voice & Data )

Pass

Comments

Yes

Environmental Power Alarm Functionality Testing

Pass

1. Circuit Switching by Voice Calls

N/A

AC Input Power-Cut Alarm

N/A

2. Short Message Services

N/A

DC Input Undervoltage Alarm

N/A

3. Packet Switching by Packet Calls

N/A

Rectifier and/Or battery Failure Alarm

N/A

4. Packet Switching by Packet Calls

N/A

Breaker Acording to power ratinting diagarm

MW Link Installation

N/A

Pass

1. IDU installed in the standard 19' Rack properly & Tributary properly connected to DDF

N/A

2. The ODU fastening done properly and (Wave guides are fastened and sealed If Apply)

N/A

3. IF cables attached properly (Tiereps/clamps) and water sealing and insulation done

N/A

4. Antenna installed , oriented to the correct direction and tightened properly

N/A

5. All Grounding ( IDU, ODU , IF cable) are done properly

N/A

6. All Labeling (Outdoor Antenna / IF , Indoor E1 / IF / Fiber / IDU )


Item

Value

Comments

N/A
Item

Standard

Value

Link Configuration

N/A

Transmitter Output Power Dbm

N/A

N/A

Link Capacity ( Mbps)

N/A

Additional fixed attenuation (if any) Dbm

N/A

N/A

Frequency (Tx) Mhz

N/A

Designed RF Input Level (F-end 1/ F-end 2) Dbm

N/A

N/A

Transmitter Power (Near E)

N/A

Designed RF Input Level (N-end 1/ N-end 2) Dbm

N/A

N/A

Transmitter Power (Far E)

N/A

N/A

N/A

DCN Value (Far End)

N/A

N/A

N/A

Prepared by :
Issued on :

ELISIA EDWIN
28/07/2015

DCN Value ( Near End)

MS Team Representative Name


MS-Team Representative Signature

All rights reserved 2015

Site Handover Document


MIC Tanzania Ltd
Ericsson
28/7/2015

Comments

EXISTING
EXISTING
360
6
0
SECTOR C
2100M
N/A
N/A

Comments

Comments

Comments

Comment

All rights reserved 2015

RRU,RRU POWER CABLE AND RRU OIL CABLE

ANTENNA

DUS

AND RRU OIL CABLE

POWER CABLE CONNECTION ON MCB

RRU GROUNDING