JKR Panduan Teknik Mekanikal MS1525:2007
JKR Panduan Teknik Mekanikal MS1525:2007
CKM.BPK.EE/PTM/09/01
VERSI
01
PTM.01-2009: REV 1
Tarikh: 1 hb Jun 2009
JADUAL KANDUNGAN
1.
LATARBELAKANG....................................................................................... 2
2.
TUJUAN ....................................................................................................... 2
3.
SKOP............................................................................................................ 2
4.
TARIKH KUATKUASA.................................................................................. 3
5.
TANGGUNGJAWAB..................................................................................... 3
6.
LAMPIRAN A:
MS 1525:2007
LAMPIRAN B:
LAMPIRAN C:
LAMPIRAN D:
__________________________________________________________________________________
PTM.01-2009: REV 1
Tarikh: 1 hb Jun 2009
1. LATARBELAKANG
Malaysia sebagai sebuah negara yang pesat membangun telah mewujudkan
permintaan yang tinggi kepada tenaga domestik dan juga sumber asli negara.
Operasi bangunan adalah di antara pengguna tenaga yang tinggi dan
penyumbang kepada pencemaran alam sekitar bersama-sama sektor lain
seperti pengangkutan dan industri pembuatan. Bagi mengurangkan kos tenaga
dan pemcemaran kepada alam sekitar, aspek kecekapan tenaga perlu diberi
penekanan sewajarnya.
2. TUJUAN
Tujuan garis panduan ini adalah untuk memastikan rekabentuk sistem
mekanikal dan sistem sokongan mematuhi keperluan minimum MS 1525:2007.
3. SKOP
Skop perlaksanaan;
i.
Jenis Bangunan
-
Bangunan
baru
bukan
kediaman
yang
mempunyai
kadar
__________________________________________________________________________________
PTM.01-2009: REV 1
Tarikh: 1 hb Jun 2009
ii.
Kaedah Rekabentuk
-
4. TARIKH KUATKUASA
Semua projek yang menerima ringkasan projek selepas 1hb Mei 2009.
5. TANGGUNGJAWAB
Head of Design Team (HODT) adalah bertanggungjawab untuk memastikan
pematuhan kepada garis panduan ini.
6. KAEDAH PEMATUHAN
HODT hendaklah menggunakan senarai semak berserta dokumen-dokumen
sokongan berkaitan seperti di Lampiran B, C & D. Senarai semak perlu
disediakan di peringkat Verifikasi Rekabentuk dan dikepilkan bersama-sama
dengan Borang JKR.PK(0).02-2 (Borang Kajian Semula/Verifikasi/Validasi).
__________________________________________________________________________________
PTM.01-2009: REV 1
Tarikh: 1 hb Jun 2009
SENARAI LAMPIRAN
Lampiran A: MS 1525:2007
Lampiran B: Senarai Semak
Lampiran C: Contoh Dokumen Sokongan
Lampiran D: Borang JKR.PK(0).02-2 -Borang Kajian Semula/Verifikasi/Validasi
__________________________________________________________________________________
LAMPIRAN A:
MS 1525:2007
LAMPIRAN B:
DESIGN COMPLIANCE CHECKLIST
LOAD CALCULATIONS
SYSTEMS AND EQUIPMENT SIZING
SEPARATE AIR DISTRIBUTION SYSTEMS
CONTROLS
PIPING INSULATION
AIR HANDLING DUCT SYSTEM INSULATION
DUCT CONSTRUCTION
BALANCING
ACMV SYSTEM
AIR LEAKAGE
BUILDING PARTICULARS
Name of development:
Total gross floor area (m 2)
Total air conditioning area (m 2)
Building Purpose:
Operating hours
SECTION 1: AIR-CONDITIONING AND MECHANICAL VENTILATION SYSTEM
PART 1
LOAD CALCULATIONS
S1-1-1
S1-1-2
EXPLAINATORY NOTES
SUPPORTING
EVIDENCE (to be
attached together
with the checklist)
iv). Recommended air movement; 0.15 m/s - 0.5 m/s (Max 0.7 m/s)
SE-1
S1-1-3
PART 2
Outdoor air-ventilation rates should comply with Third Schedule (By Law
41) Article 12(1) of Uniform Building by Laws, 1984. Exception: Outdoor
air quantites may exceed those shown, if required due to special
occupancy or process requirements or source control of air contamination
or indoor air quality consideration.
Self explainatory
EXPLAINATORY NOTES
S1-2-1
ACMV system and equipment sizing is sized to provide no more than the
space and loads calculated.
S1-2-2
S1-2-3
For chiller design load (plant capacity) greater than 1000 kWr (280
RT), a minimum of two(2) chillers or a single multi-compressor chiller shall
be provided to meet the required load.
Self explainatory
SUPPORTING
EVIDENCE (to be
attached together
with the checklist)
SE-1
SE-2
BUILDING PARTICULARS
Name of development:
Total gross floor area (m 2)
Total air conditioning area (m 2)
Building Purpose:
Operating hours
SECTION 1: AIR-CONDITIONING AND MECHANICAL VENTILATION SYSTEM
S1-2-4
S1-2-5
PART 3
S1-3-1
S1-3-2
Multiple unit of the same equipment type, such as multiple chillers, with
combined capacities exceeding the design load shall be specified to
operate concurrently only if controls are provided which sequence or
otherwise optimally control the operation of each unit based on the
required cooling load (Energy Management Control System)
SE-2
Self explainatory
Refer specification
EXPLAINATORY NOTES
SUPPORTING
EVIDENCE (to be
attached together
with the checklist)
Self explainatory
S1-3-3
S1-3-4
For air conditioned space requiring exhaust air volume in excess of 3400
3
m /h (2000 cfm), not less than 85% of non conditioned make-up air
should be introduced directly into the space concerned unless the
exhausted conditioned air is utilised for secondary cooling purposes.
Altenatively,heat recovery devices should be provided.
PART 4
S1-4-1
CONTROLS
Each system should be provided with at least one (1) thermostat. Each
thermostat should be capable to set between 22C to 27C. Multi stage
thermostat should be provided for equipment exceeding 35/65 kWr
(multicompressors).
Self explainatory
EXPLAINATORY NOTES
SUPPORTING
EVIDENCE (to be
attached together
with the checklist)
Refer specification
BUILDING PARTICULARS
Name of development:
Total gross floor area (m 2)
Total air conditioning area (m 2)
Building Purpose:
Operating hours
SECTION 1: AIR-CONDITIONING AND MECHANICAL VENTILATION SYSTEM
S1-4-2
S1-4-3
Self explainatory
Self explainatory
S1-4-4
For multi zone system, other than those employing the variable air volume
for temperature control, should be provided with controls that will
automatically reset the off-coil supply to the highest temperature that will Thermostat shall be located within zone with
substantially highest cooling load requirements.
satisfy the zone requiring the coolest air.
S1-4-5
S1-4-6
S-1-4-7
S1-4-8
SE-4
Self explainatory
SE-3
BUILDING PARTICULARS
Name of development:
Total gross floor area (m 2)
Total air conditioning area (m 2)
Building Purpose:
Operating hours
SECTION 1: AIR-CONDITIONING AND MECHANICAL VENTILATION SYSTEM
S1-4-9
Systems that serve zones which can be expected to operate nonsimultaneously for more than 750 hours per year should include isolation
devices and controls to shut off the supply of cooling to each zone
independently. Isolation is not required for zones expected to operate
continuously.
Self explainatory
SE-3
S1-4-11
S1-4-12
S1-4-13
S1-4-14
PART 5
S1-5-1
For buildings where occupancy patterns are not known at time of system
design, isolation areas should be pre-designed.
Zones may be grouped into a single isolation area provided the total
conditioned floor area does not exceed 250 sq.m per group nor include
more than one floor unless variable air volume or equivalent devices are
incorporated. Use of outside economy air cycle design where feasible
should be considered.
Each mechanical ventilation system (supply and/or exhaust) should be
equipped with a readily accessible switch or other means for shut-off or
volume reduction when ventilation is not required. Examples of such
devices would include timer switch control, thermostat control, duty cycle
programming and CO/CO2 sensor control.
3
For fan system with air-flow rate exceeding 17000 m /hr and operating
more than 750 hours a year, the power required by the motor for entire
3
fan system should not exceed 0.45 W per m /hr of air flow rate.
PIPING INSULATION
Self explainatory
For central systems and plants, controls and
devices shall be provided to allow stable system
and equipment operation for any length of time
while serving only the smallest isolation areas
served by the system or plant.
Self explainatory
EXPLAINATORY NOTES
SUPPORTING
EVIDENCE (to be
attached together
with the checklist)
Self explainatory
Refer specification
BUILDING PARTICULARS
Name of development:
Total gross floor area (m 2)
Total air conditioning area (m 2)
Building Purpose:
Operating hours
SECTION 1: AIR-CONDITIONING AND MECHANICAL VENTILATION SYSTEM
PART 6
S1-6-1
EXPLAINATORY NOTES
SUPPORTING
EVIDENCE (to be
attached together
with the checklist)
Self explainatory
a). Where the design temperature differential between the air in the duct
and the surrounding air is 8C or less provided that the duct is within the
air-conditioned space.
b). When the heat gain or loss of the ducts, without insulation, will not
increase the energy requirements of the buildings.
Refer specification
PART 7
S1-7-1
S1-7-2
S1-7-3
S1-7-4
S1-7-5
PART 8
S1-8-1
DUCT CONSTRUCTION
All ductwork was constructed and erected in accordance with
ANSI/SMACNA 006-2006 HVAC Duct Construction Standards-Metal and
Flexible published by SMACNA or other equivalent duct construction
standards.
All AHU & FCU shall have minimum straight duct length of 2 1/2 times
duct diameter or longest side for rectrangular duct after the fan outlet
before any bend.
High pressure and medium pressure ducts should be leak tested in
accordance with HVAC Air Duct Leakage Test Manual published by
SMACNA or any other equivalent standards, with the rate of leakage not
to exceed the maximum rate specified.
When low pressure supply air ducts are located outside of the
conditioned space (except return air plenums), all transverse joints should
be sealed using mastic plus tape or equivalent material. For fibrous glass
ductwork, pressure sensitive tape is acceptable.
BALANCING
The system design should provide means for balancing the air and water
system such as but limited to dampers, temperature and pressure test
connections and balancing valve.
EXPLAINATORY NOTES
SUPPORTING
EVIDENCE (to be
attached together
with the checklist)
Self explainatory
Refer specification
SMACNA recommendation
Refer specification
or standard detail
drawings
Self explainatory
Refer specification
Self explainatory
Refer specification
Self explainatory
Refer specification
EXPLAINATORY NOTES
SUPPORTING
EVIDENCE (to be
attached together
with the checklist)
Self explainatory
BUILDING PARTICULARS
Name of development:
Total gross floor area (m 2)
Total air conditioning area (m 2)
Building Purpose:
Operating hours
SECTION 1: AIR-CONDITIONING AND MECHANICAL VENTILATION SYSTEM
PART 9
S1-9-1
S1-9-2
S1-9-3
EXPLAINATORY NOTES
SUPPORTING
EVIDENCE (to be
attached together
with the checklist)
Self explainatory
Refer specification
Self explainatory
Refer specification
Self explainatory
Refer specification
ACMV SYSTEM
BUILDING PARTICULARS
Name of development:
Total gross floor area (m2)
Total air conditioning area (m2)
Building Purpose:
Operating hours
SECTION 2: AIR LEAKAGE
PART 1
S2-1-1
S2-1-2
S2-1-3
S2-1-4
AIR LEAKAGE
EXPLAINATORY NOTES
Architects to be advised
Self explainatory
SE-3
Self explainatory
Self explainatory
BUILDING PARTICULARS
Name of development:
Total gross floor area (m2)
2
PART 1
S3-1-1
S3-1-2
S3-1-3
S3-1-4
PART 2
S3-2-1
S3-1-2
CABLING
The cross section of cable and wires should comply with the
provisions of MS IEC 60364 on Electrical Installations of
Buildings.
All inverters or devices with electronic switching gates shall be of
at least th 12-pulse type. The 24-pulse type is recommended to
minimse harmonic distortion.
EXPLAINATORY NOTES
ACCEPTANCE
CRITERIA
SUPPORTING
EVIDENCE (to be
attached together with
the checklist)
Self explainatory
Yes
Refer specification
Self explainatory
Yes
Refer specification
Self explainatory
Yes
Refer specification
Yes
Refer specification
EXPLAINATORY NOTES
ACCEPTANCE
CRITERIA
SUPPORTING
EVIDENCE (to be
attached together with
the checklist)
Self explainatory
Yes
Refer specification
Self explainatory
Yes
Refer specification
PROOF OF COMPLIANCE TO MS 1525: 2007 ( CODE OF PRACTISE ON ENERGY EFFICIENCY AND USE OF RENEWABLE ENERGY FOR
NON-RESIDENTIAL BUILDINGS)
BUILDING PARTICULARS
Name of development:
Total gross floor area (m 2)
Total air conditioning area (m 2)
Building Purpose:
Operating hours
SECTION 4: ENERGY MANAGEMENT SYSTEM
PART 1
S4-1-1
EXPLAINATORY NOTES
SUPPORTING EVIDENCE
(to be attached together
with the checklist)
Refer specification
Index
Description
SE-1
Peak Air Conditioning load calculation OR computerised air conditioning load load calculation using
E20-II, TRACE 700, CAMEL, IES or any equivalent softwares
SE-2
SE-3
SE-4
Submitted (Y/N)
LAMPIRAN C:
SAMPLE OF SUPPORT EVIDENCE
DOCUMENTS
LAMPIRAN D:
Borang JKR.PK(0).02-2 (Borang
Kajian Semula / Verifikasi / Validasi)
Borang JKR.PK(O).02-2
KAJIAN SEMULA / VERIFIKASI / VALIDASI (*)
TAJUK PROJEK
NO. PROJEK
NO. FAIL
SKOP
PERBINCANGAN
TEMPAT/
TARIKH/MASA
KEHADIRAN
Nama
Jawatan
DOKUMEN TERKAWAL
Bil.
Ulasan
HOPT/ HODT*
Tanda tangan, Tarikh
Nota: * - mengikut peringkat mana yang berkenaan.
@ HAKCIPTA JKR MALAYSIA
DOKUMEN TERKAWAL