Professional Documents
Culture Documents
Iadc Bullhead Field 012214
Iadc Bullhead Field 012214
Iadc Bullhead Field 012214
Bullhead
Well Name: ____________________________ Completed By: ___________________________ Date: _____ / _____ / _____
___________ = ___________
% Efficiency
TPO (Bbls/Stk)
______________
Pump Output
(BBLS/STK)
______________
______________
Pump Output
(BBLS/STK)
______________
______________
Pump Output
(BBLS/STK)
_____________
_____________
_____________
Pump Rate
(STKS/MIN)
Pump Rate
(STKS/MIN)
Pump Rate
(STKS/MIN)
Tubing Length
Surface to E.O.T.
(MD FT)
_________
Capacity per Foot
in Tubing
(BBLS/FT)
_________
Tubing Volume
Surface to E.O.T.
(BBLS)
_________
Pump Output
(BBLS/STK)
___________
Strokes Surface
to E.O.T.
(STKS)
_________
_________
Casing Volume
E.O.T. to Perforations
(BBLS)
_________
Pump Output
(BBLS/STK)
Tubing Volume
Surface to E.O.T.
(BBLS)
_________
_________
Casing Volume
Surface to
E.O.T. to Perforations Perforations Volume
(BBLS)
(BBLS)
_________
Pump Output
(BBLS/STK)
Strokes E.O.T.
to Perforations
(STKS)
___________
Strokes Surface
to Perforations
(Kill Point STKS)
Surface to
Perforations Volume
(BBLS)
_________
Overdisplacement
if any
(BBLS)
_________
Total Volume
to Pump
(BBLS)
_________
Pump Output
(BBLS/STK)
___________
Total Strokes
to Pump
(Overdisplace STKS)
0.052
Formation
Pressure
(PSI)
___________
Depth to Perforations
Top/Middle/Bottom
(TVD FT)
___________
Kill Fluid Density
(PPG)
0.052
___________
Depth to Perforations
Top/Middle/Bottom
(TVD FT)
Formation
Pressure
(PSI)
______________
Initial Shut in
Tubing Pressure
(PSI)
___________
Estimated Formation
Integrity Pressure
(PSI)
Est. Formation
Integrity Pressure
(PSI)
______________
Average Hydrostatic
Pressure in Tubing
(PSI)
Kill Fluid
Density
(PPG)
0.052
PPG
PSI
PSI
Tree/Wellhead/
BOP Stack Rating
___________
PSI
___________
CASING
PPG
Packer Set
___________
TVD
FT
PACKER
Top Perforation
TVD
___________
FT
___________
Depth to Perforations
Top/Middle/Bottom
(TVD FT)
END OF
TUBING E.O.T.
Middle Perforation
___________
Average Hydrostatic
Pressure in Tubing
(PSI)
TVD
___________
FT
MD
Bottom Perforation
___________
Initial Estimated Max.
Pressure on Tubing
(PSI)
PSI
MD
MD
Pressure(psi)
BBL/MIN
___________
Pressure(PSI)
___________
STKS/MIN
Formation Pressure
Pump #2
Bbls/Stk @ 100%
Pump #3
___________
TVD
FT
MD
___________
Kill Fluid
Hydrostatic Pressure
(PSI)
__________
Est. Formation
Integrity Pressure
(PSI)
__________
Kill Fluid
Hydrostatic Pressure
(PSI)
___________
Final Estimated Max.
Pressure on Tubing
(PSI)
DISCLAIMER: This Well Control Worksheet is intended solely for the use of the IADC and IADC accredited schools and organizations engaging in the teaching of the IADC WellCAP
Well Control classes. The IADC, its employees or others acting on its behalf, makes no warranties or guarantees expressed, implied or statutory, as to any matter whatsoever, with
respect to the use of this Well Control Worksheet.
Bullheading method, US
Field Units
(psi, ft, ppg)
Tubing Collapse
___________
___________
___________
___________
___________
Outside Diameter
(INCHES)
Inside Diameter
(INCHES)
Length to E.O.T.
(MD FT)
Tubing Collapse
(PSI)
Tubing
___________
___________
Safety Factor
(0.70 or Less)
___________
___________
___________
Adjusted Tubing
Collapse (PSI)
Tubing Yield
___________
___________
___________
___________
___________
Weight
(LBS/FT)
Grade
Internal Yield
(PSI @ 100%)
Collapse
(PSI @ 100%)
Tubing Yield
(PSI)
CASING DATA:
Casing
Safety Factor
(0.70 or Less)
Adjusted Tubing
Internal Yield
(PSI)
___________
___________
___________
___________
___________
Outside Diameter
(INCHES)
Inside Diameter
(INCHES)
Length
(MD FT)
Casing Internal
Yield (PSI)
___________
___________
___________
___________
Weight
(LBS/FT)
Grade
Internal Yield
(PSI @ 100%)
TREE/BOP
Rated Pressure (PSI)
___________
Safety Factor
(0.70 or Less)
Adjusted Casing
Yield (PSI)
Casing
PRESSURE CONSIDERATIONS:
Pressure Consideration PSI per Step
__________A
Initial Max.
Pressure on Tubing
(PSI)
B
__________
Final Max.
Pressure on Tubing
(PSI)
10
Number
of Steps
___________
PSI per Step
(PSI/STEP)
Lesser value of Tubing Yield or Initial Estimated Maximum Pressure on Tubing results
(see page 1)
Lesser value of Tubing Yield or Final Estimated Maximum Pressure on Tubing (Static) results
(see page 1)
Surface to
Perforations
Volume (BBLS)
10
Number
of Steps
42
___________
__________
Stroke Surface
to Perforations
(STKS)
10
Number
of Steps
___________
Strokes per Step
(STKS/STEP)
PRESSURE CHART
Strokes
Volume in BBLS
Volume in GALS
Kill Point
Estimated Max.
Static Pressure
Actual Tubing
Pressure
Casing
Pressure
Pump Rate
Notes
Initial
Final
Overdisplace
DISCLAIMER: This Well Control Worksheet is intended solely for the use of the IADC and IADC accredited schools and organizations engaging in the teaching of the IADC WellCAP
Well Control classes. The IADC, its employees or others acting on its behalf, makes no warranties or guarantees expressed, implied or statutory, as to any matter whatsoever, with
respect to the use of this Well Control Worksheet.
Bullheading method, US
Field Units
(psi, ft, ppg)
FORMULAS
1. Pressure Gradient (psi/ft) = Mud Weight (ppg) x 0.052
2. Hydrostatic Pressure (psi) = Mud Weight (ppg) x 0.052 x Depth (ft, TVD)
3. Capacity (bbls/ft) = Inside Diameter2 (in.) 1029.4
4. Annular Capacity(bbls/ft) = (Inside Diameter of Casing2 (in.) or Hole Diameter2 (in.) - Outside Diameter of Pipe2 (in.)) 1029.4
5. Pipe Displacement (bbls/ft) = (Outside Diameter of pipe2 (in.) - Inside Diameter of pipe2 (in.)) 1029.4
6. Maximum Allowable Mud Weight (ppg) =
7. MAASP (psi) = [Maximum Allowable Mud Weight (ppg) - Present Mud Weight (ppg)] x 0.052 x Shoe TVD (ft)
8. Formation Pressure (psi) = Hydrostatic Pressure Mud in Hole (psi) + SIDPP (psi)
9. Sacks (100 lb) of Barite Needed to Weight-Up Mud =
NOTE: This formula assumes that the average density of Barite is 35.4 ppg and the average number of sacks (100lb) per barrel is 14.9.
10. Volume Increase from Adding Barite (bbls) = Number of Sacks (100 lb) added 14.9
11. Equivalent Mud Weight (ppg) @ __________ depth (ft) =
12. Estimated New Pump Pressure at New Pump Rate (psi)
(ppg)
(ft, TVD)
(psi)
13. Estimated New Pump Pressure with New Mud Weight (psi) = Old Pump Pressure (psi) x
COMMENTS
DISCLAIMER: This Well Control Worksheet is intended solely for the use of the IADC and IADC accredited schools and organizations engaging in the teaching of the IADC WellCAP
Well Control classes. The IADC, its employees or others acting on its behalf, makes no warranties or guarantees expressed, implied or statutory, as to any matter whatsoever, with
respect to the use of this Well Control Worksheet.
Bullheading method, US
Field Units
(psi, ft, ppg)