ATTENDANCE: Marcia Hadenfeldt, Joe Hurst Chrisi, Steven Redd, Jeff Nielson, Trent
Schafer, Kristin McKinnon, Carmella Galley, and staff Greg Adams, Presenters
for Latigo Wind Park, Christine Mikell, Michelle Stevens, and Spencer Martin.
16 others from the public in attendance.

There was no public comment.

2
3

The minutes were reviewed and approved with corrections, with a motion from

Trent and a second from Joe. Vote was year from Trent, Joe, Marcia, and Steven,

with abstentions from Kristin, Jeff, and Carmella.

6
7

A public hearing was opened at 7:10 PM with a motion from Marcia and a second

from Joe. The Purpose of the hearing was to hear w request and receive comment

from the public on a proposed wind farm north of Monticello..

10
11

This farm will cover approximately 3600 acres of private leased land. Metrological

12

towers have been place in the area for several years to measure the wind velocity

13

and availability. It is purposed that Rocky Mountain Power may be willing to

14

purchase 60 MW of power from this farm. The FAA has been notified and has

15

given approval for the turbines to be placed in the area. US Fish and Wildlife

16

service guidelines for birds and wildlife have been reviewed and met. Questions

17

and concerns were addressed about the location and number of turbines. It was

18

agreed that turbine # 10 would be eliminated or relocated. The lights at the

19

substation were a concern and we were informed that lights would only be on

20

when employees were present at the substation. Noise levels were discussed and

21

we were informed that they are minimal.

22
23

Construction would possibly begin in summer of 2013 or spring 2014. Impacts on

24

the community would be 20 year life. Estimated tax revenue of 10 million dollars
1

Comment [A1]:

over the 20 years. Turbines have a 25 year life span. There will be 3.4 miles of

overhead transmission lines. Construction would be 6-8 months. A reclamation

bond would be obtained for reclaiming the area after the life of the project.

Construction would bring about 4.3 million dollars to the economy of the area.

5
6

The hearing was closed a 8:53 PM with a motion from Trent and a second from

Joe. The commission then entertained a motion from Jeff to issue a conditional use

permit to Latigo Wind LLC to build a wind farm with a second from Trent. The

following conditions were listed for this permit: Tower # 10 is to be moved,

10

lighting at night will be shaded or guarded at the substation, and all Federal, State,

11

and Local regulations will be met. The vote to approve the conditional use permit

12

was unanimous in the affirmative.

13
14

The Brumley Ridge Subdivision amendment was considered after a discussion and

15

a review of the ordinance it was decided to deny the amendment based on the

16

following section of the ordinance 5b3 located on page 22 which says that no road

17

can bisect any given lot in a subdivision. The motion was made by Trent with a

18

second by Marcia. The vote was yea Marcia, Joe, Trent, Carmilla, and Kristin,

19

with Steve and Jeff voting nay.

20
21

The building permit list was reviewed.

22
23

Meeting was adjourned at 9:35 PM