Professional Documents
Culture Documents
Benefits of Cylindrical FPOs
Benefits of Cylindrical FPOs
Benefits of Cylindrical FPOs
Contents
Introduction and projects
Features of the cylindrical hull
Operational experience
Permanent mooring in Cyclonic Conditions
FPSO with SCRs in harsh deep environments
FLNG application
20 000 bod
20 000 bwd
30 000 bld
20 000 bod
20 000 bwd
30 000 bld
2*800kW
30 000 bod
48 000 bwd
60 000 bld
38 mmscfd
(20)
(20)
(30)
(none)
Technology license
Norwegian Barents Sea
400m (Harsh and sub-arctic)
Hyundai Heavy Industries
Sevan1000
100 000 bod
125 000 bwd
140 Mill Scfd
1 000 000 bbls
60 MW
Hull construction
10
Technology license
UK Northern North Sea
165m
COSCO Qidong Yard
Sevan 400
40 000 bod
40 mmscfd
400 000 bbls
11
12
13
14
Contents
Introduction and projects
Features of the cylindrical hull
Operational experience
Permanent mooring in Cyclonic Conditions
FPSO with SCRs in harsh deep environments
FLNG application
15
WAVESs
Sevan
16
17
18
Contents
Introduction and projects
Features of the cylindrical hull
Operational experience
Permanent mooring in Cyclonic Conditions
FPSO with SCRs in harsh deep environments
FLNG application
19
20
21
Contents
Introduction and projects
Features of the cylindrical hull
Operational experience
Permanent mooring in Cyclonic Conditions
FPSO with SCRs in harsh deep environments
FLNG application
22
23
24
25
Contents
Introduction and projects
Features of the cylindrical hull
Operational experience
Permanent mooring in Cyclonic Conditions
FPSO with SCRs in harsh deep environments
FLNG application
26
27
28
28
SCR Termination
12 deg.
Umbilical
termination/hangoff at el. 46m
SCR hang-off
deck at el.18m
Umbilical entry in
guide tubes .
SCR
TDZ
29
Contents
Introduction and projects
Features of the cylindrical hull
Operational experience
Permanent mooring in Cyclonic Conditions
FPSO with SCRs in harsh deep environments
FLNG application
30
SEVAN FLNG
31
LNG Tanks
Condensate Tanks
Ballast Tanks
32
106 m
120 m
130 m
37 m
58 m
~20 -22 m
Process deck
Utility deck
Main deck
~13 000 m2
~5 000 m2
~4 300 m2
Double bottom
33
34
35
Large cooling water requirement typical for 2.4 MTPA 18 000 m3/h
Seawater intake from cold deepwater
Stationary unit-> no interference with mooring and risers
-> no swivel for cooling water required
36
36
Tandem Offloading
Sea states Hs = 3.5 / 4.5 m
37
38
39
40