Professional Documents
Culture Documents
Cheat Sheet
Cheat Sheet
the env. Hidden flows should be included as well. When measure kwh, we simulation modelling (trucks noise conc of conta.), MFA LCA used to show
measure weight of coal goes into the plant. Quick, cheap, screening.
the transparency. Management report mitigation facilities, procedures,
Planning tool for design, monitoring tool. Transport system. Nokia too
design monitoring sys, develop contingency plan
complicated. Data only available via Wuppertal. Cant dif between
material. be consuming locally grown foods, public transport, car pooling EMS ISO 14001 the organisational structure, responsibilities, practices,
lanes, less processed food with less packing. 10,000km travel per person procedures, processes and resources for implementing envi. Management,
each year in Sydney. Make a road that conveys more people per. Use a which shall be documented. For regulatory and assessment purposes,
demonstration of then implementation of identified elements in the sys is
vehicle that conveys more people per unit mass of vehicle (e.g buses).
Use a vehicle that is most efficient in consumption of energy materials per required. The organisation shall establish and maintain an env.
Management sys. Top management shall define the organisations env
person km travelled. Vehicles mass per km emission. convey 10,000
policy commitment, public, documented. Training, awareness and
words from one person to 10 people.
competence, communication to ppl. Formal audits. BHP 3+1 outsider,
NMA Can systematically track the physical flows od natural resources
collect info prior site visit, visit and talk to people and EMS, prepare
through extraction, production, fabrication, use and recycling and final
detailed report. Outcome awareness raised, org. structure reviewed,
disposal. Economic growth decouple resource use and waste generation. env. Policy developed. Company environmental policies & objectives can
Mining bauxite extract & convert then to AL ingot & export. TMA total
identify specific areas of concern with corresponding preventative and
material req. DMI Direct material input. Hidden portion of total material control measures. companies an edge to competitors. By allowing
that never enters the economy. Input indicators TMR DMI Overall Mat. companies to set their own targets, companies can focus on priority areas
Intensity = TMR/GDP (decrese, The best scenario: GDP increase while TMR that are specific to their operation/supply chain.
decrease. Overall TMR/GDP decrease, the less, the better) Direct input
mat. Intensity = DMI/GDP. No weighting initially. Brown coal Germany. Aus that it:i)Is appropriate to the nature, scale and environmental impacts of
Gold, black coal, iron. Outputflow indicators DPO Domestic Process its activities, products or services ii)Includes a commitment to continual
improvement and prevention of pollution iii)Includes a commitment to
Output DHF Domestic hidden flows TDO. Input per capita resource
requirement rose, need to understand the link between economic activity comply with relevant environmental legislation, and with other
requirements iv)Provides the framework for setting and reviewing
+ env degradation. Output industrial economies are becoming more
efficient still more waste, exaction & use of fossil energy dominates. Need environmental objectives an targets v)documented, implemented and
maintained and communicated to all employees vi)Is available to the
a metric for material accounting, flow model, use of info to develop
public.2) Public environmental report and documentation i)The
policies . need parallel material accountin to SNA.
organization shall establish and maintain information , in paper or
EIA whole process, dept assessing, making changes, courts if needed
electronic form, to (1)Describe the core elements of the management
EIS the whole proposal u submit. Who prepare Legal req. the proponent! system and their interaction (2)Provide direction to related documentation
Adv. forces consideration at early stage, can write it nicely. Dis. Public ii)The organization shall establish and maintain procedures for controlling
perception of bias & lack of credibility. Alter Independent appointment of all documents required by this standard to ensure that: (1)They can be
consultant or an authority cost money, public prefer, but they are
located (2)They are periodically reviewed, revised (3)The current versions
independent from the rest of the team. Community participation
of relevant documents are available at all locations (4)Obsolete
must go on public 4 weeks. Addi Info provision during EIS preparation, documents are promptly removed from all points of issue and points of
consultaion but survey, public meeting, community consultation
use or otherwise assured against unintended use Reporting we cant
committee. Get involve into design. We can model this, open and nave
measure happiness, health, welfare in $. Policy, monitoring, control and
approach (go speak). EIS why this project is needed? EIS study teams are reporting. SOE( state of env)
multi-disciplinary, PM, docu editor, design. Site selection consider value,
sceneic, forest, water etc lay all the constraints on top. Identify impacts Material Flux Analysis (the focus is on substances, and they are
evaluated by the substances fluxes): Mineral phosphorus stocks are
previous/similar projects, study team brainstorm, community consult,
declining, exhaustion of the limited reserves will affect the global food
checklist, gov dept. Interaction matrix. Analyse/eva expert opinion,
supply. The major flows of phosphorus through the Sydney region need to building bikelanes or new roads. Ecological Footprints (focus on
be mapped to identify wether flows are sustainable.
consumption/head in a region evaluated by environmental space
occupied) : Global resources are decreasing, and being shared unevenly.
LCA (focus on goods or a process, and evaluated using environmental
Is the consumption of Sydney's population unsustainable?
indexes): A window manufacturing company wants to identify the
environmental impacts (global warming potential, human toxicity etc)
EF - enables us to estimate the resources consumption and waste
associated with each window they produce. This information will be used assimilation requirements of a defined human population or economy in
to identify priority areas in their supply chain and processing to be further terms of corresponding productive land use.but not fresh water
investigated. Assisting in the design of new products, especially for
withdrawal, soil contamination, and pollution without CO2 and ozone
comparative analysis among alternative designs.2) Improving the design depletion. Food east less processed food, eat less outside, try being vegetarian
of existing products3) Improving environmental management of facilities Housing solar panel for heating, plant more vegetation, make maximum use of
producing products.4) A marketing tool to show one product is better than natural light, cladded wall for insulation against heat & cold // Transportation
use less personal vehicle, use hybrid vehicles, use more cycling, more public
another.
MIPS (Focus on infrastructure and evaluated using bulk amounts of
materials) : A council is evaluating options to spend their budget on
transport Consumer Goods - use recycled goods, use paper bags, use
biodegradable goods, Services no use of dryers, less telephone usage, less
entertainment, distance learning, online learning materials Waste.