Concepts and Techniques of Responsibility Budgeting, Developing Responsibility Budgets and Budgeting With MBO System
Concepts and Techniques of Responsibility Budgeting, Developing Responsibility Budgets and Budgeting With MBO System
Concepts and Techniques of Responsibility Budgeting, Developing Responsibility Budgets and Budgeting With MBO System
Responsibility Budgeting,
Developing Responsibility
Budgets and Budgeting With MBO
System
Team Members
Nishit Shetty
Kamlesh Damania
Chetan Bhagwat
Melwyn Gonzalves
Viral Desai
Bhavesh Joshi
Amol Naik
Roll No
279
212
205
225
215
231
246
Sr.n
o
Particulars
Pg
#
Roll
No
3-5
205
6-7
231
8-10
215
11-16
279
17-19
246
20-25
225
Financial Budget
26-32
212
Page 2
Page 3
Page 5
Command. The notational revenue earned was $2.5 million per F16 (500) = $1.25 billion and $5 million per F-15 (200) = $1
billion, or $2.25 billion total. If the logistics center's operating
costs (including non cash expenses such as depreciation of plant
and equipment and imputed rents) were $1.8 billion, it would
earn a quasi-profit of $425 million ($2.25 billion - $1.8 billion).
These notational revenues (or transfer prices) usually reflect
historical costs or market prices.
Profit center managers are responsible for both revenues and costs.
Profit is the difference between revenue and cost. Thus, profit center
managers are evaluated in terms of both the revenues their centers
earn and the costs they incur.
Investment center managers are responsible for both profit and the
assets used in generating profit. Thus, an investment center adds more
to a manager's scope of responsibility than does a profit center, just as
a profit center involves more than a cost center. Investment center
managers are typically evaluated in terms of return on assets (ROA),
which is the ratio of profit to assets employed, where the former is
expressed as a percentage of the latter. In recent years many have
turned to economic value added (EVA), net operating "profit" less an
appropriate capital charge, which is a dollar amount rather than a
ratio. If, for example, the logistics center described earlier had assets
of $7.5 billion ($5 billion in fixed assets and $2.5 in current assets,
primarily work-in-progress and parts inventories) and the federal
government's cost of capital were 5 percent, its quasi-EVA would have
been $50 million ($425 million - $375 million); its ROA would have
been 5.7 percent.
The practice has also been described in terms of organizational design and
strategic management. In these terms, responsibility budgeting and
accounting takes place within an organizational configuration known as an Mform, where decisional authority over strategy formulation is reserved to top
management, while decisional authority over strategy implementation is
decentralized to business units headed by general managers (Mintzberg
1983).
From the management strategy perspective, a responsibility budget is
merely an artifact of the management process conducted within such a
structural set up. Specifically, the responsibility budget formalizes a
performance target for a given business unit over a specified time scale. In
the typical case, goals are expressed in terms of economic quantities that
reflect the utilization of resources and the financial results obtained as well
as other scorecard measures. Responsibility accounting systems are set up
to produce these measures so that divisional performance can be compared
with targets in a timely manner and, where necessary, adjusted. Because
business strategies are usually conceived along product-market lines (single
product, differentiated products, multiple products) and because the M-form
structures provide a general manager for each product line (rather than for
regions or functions), in the management control and strategic management
literatures, responsibility budgeting and accounting is broadly endorsed as
the mode of organizing and managing large, multiproduct firms whose
outputs are by definition heterogeneous.
Page 8
were allowed to be investment centers. The reasons for this are complex, but
they go to difficulties associated with expensing intermediate and joint
products. Mission centers in private sector organizations produce final
products that are easily priced and that are expensed following generally
accepted accounting practice. In contrast, support centers produce
intermediate products and these were, until recently, hard to cost, let alone
price, with accuracy. Attempts to do so were often either excessively
arbitrary or prohibitively costly.
support category and, for the most part, state and local governments are not
in the business of supplying pure public goods.
Transfer Pricing
Page 11
(A third method is based upon fully distributed average cost of the service or
product.)
However, the circumstances that justify large complex organizations -economies of scale and scope -- render these simple transfer-pricing
mechanisms problematic. Scale economies are usually the result of large,
lumpy investments in specialized resources -- technological knowledge,
product specific research and development, or equipment. These
investments tend to give rise to bilateral monopoly, a circumstance that
provides an ideal environment for opportunistic behavior on the part of
suppliers and customers. For example, once an intermediate product
producer has acquired a specialized asset, customers may be able to extract
discounts by threatening to switch suppliers. In that case, the supplier may
find it necessary to write off a large part of the specialized investment. Or, if
demand for the final good increases greatly, the intermediate product
supplier may be able to extort exorbitant prices from customers. Hence,
where the relationship between intermediate product supplier and customer
is at arm's length, opportunistic behavior may eliminate the payoff to what
would otherwise be cost effective investments.
Page 12
For example, the Report of the Commission on Roles and Missions of the
Armed Forces (Commission, 1995; see also Thompson & Jones, 1994)
suggested that budget authority should flow through the combatant
commands to the military departments. Were that the case, lacking a longterm credible commitment on the part of the Joint Chiefs and the combatant
commanders, the navy's investment in specialized assets like aircraft carriers
would permit it to be exploited in peacetime. In wartime, of course, the
tables would be turned.
The new economics of organizations tells us that vertical integration occurs
because it can mitigate this problem, in part through the substitution of
direct supervision for remote control (see Williamson, 1985). For example, in
a study of military procurement, Scott Masten (1984) demonstrated that
specialized investments are critical to vertical integration. Where
intermediate products were both complex and highly specialized (used only
by the buyer), there was a 92 percent probability that they would be
produced internally; even 31 percent of all simple, specialized components
were produced internally. The probability dropped to less than 2 percent if
the component was unspecialized, regardless of its complexity.
Unfortunately, the problems that arise in arm's length transactions where
there are few alternative suppliers/customers also arise where one attempts
to replicate free market forces within the organization, allowing buying and
selling responsibility centers complete freedom to negotiate prices (laissezfaire transfer pricing). Traditionally, economists have argued that services
should be transferred at marginal or incremental cost to the buying
responsibility center. But this can seriously distort the evaluation of support
center performance and tend to eliminate incentives to improvement.
As a result, organizations face a serious dilemma. They can maximize short
run performance by using marginal cost in internal transactions, thereby
seriously distorting performance measurement and incentives, which will
cause shortfalls in long-run performance. Or they can sacrifice short-term
performance by relying on laissez-faire transfer pricing, thereby obtaining
superior measures of the support center's contributions to organizational
performance, and improve the chances of maximizing performance in the
long term. Organizations can, promote short-run performance by using
incremental cost pricing or they can promote long-term performance by
using laissez-faire pricing, but they cannot do both simultaneously using
either of these simple transfer pricing mechanisms.
Page 13
Unbalanced transfer prices are rarely used, however, where market prices
are available. Under, multi-part transfer prices, the service delivered is
decomposed to reflect underlying cost drivers and priced accordingly (your
home phone bill is an excellent example of a multi-part tariff). Under quasivertical integration, the buyer invests in specialized resources and loans,
leases, or rents them to their suppliers. Quasi-vertical integration is common
in both the automobile and the aerospace industries, and, of course, it is
standard procedure for the Department of Defense to provide and own the
equipment, dies, and designs that defense firms use to supply it with
weapons systems and the like (See Monteverde & Teece, 1982). Other
organizations that rely on a small number of suppliers or a small number of
distributors write contracts that constrain the opportunistic behavior of those
with whom they deal.
In still other cases, desired outcomes can be realized through alliances based
on the exchange of hostages (e.g., surety bonds, exchange of debt or equity
positions) or just plain old-fashioned trust based on long-term mutual
dependence. Toyota, for example, relies on a few suppliers that it nurtures
and supports (Womack, Jones, Roos, 1990). They have substantial crossholdings in each other and Toyota often acts as its suppliers' banker. Toyota
maintains tight working links between its manufacturing and engineering
departments and its suppliers, intimately involving them in all aspects of
product design and manufacture. Indeed, it often lends them personnel to
deal with production surges and its suppliers accept Toyota people into their
personnel systems.
Toyota's suppliers are not completely independent companies with only a
marketplace relationship to each other. In a very real sense, they all share a
common purpose and destiny. Yet Toyota has not integrated its suppliers into
a single, large bureaucracy. It wanted its suppliers to remain independent
companies with completely separate books -- real profit/investment centers,
rather than merely notational ones -- selling to others whenever possible.
Toyota's solution to the bilateral monopoly problem appears to work just fine.
In fact, with the exception of unbalanced transfer prices, none of the
Page 14
Page 16
Page 18
for prompt payment, collections for credit sales are typically spread out over
several months. The examples illustrated below provide some of the
possibilities.
2. PRODUCTION BUDGET
Preparing a production budget includes consideration of the desired
inventory change as follows:
Units To Be Produced = Budgeted Unit Sales (from 1) + Desired Ending
Finished Goods - Beginning Finished Goods
The desired ending inventory is usually based on the next periods sales
budget. Considerations involve the time required to produce the product,
(i.e., cycle time or lead time) as well as setup costs and carrying costs. In a
just-in-time environment the desired ending inventory is relatively small, or
theoretically zero in a perfect situation. In the examples and problems in this
chapter, the ending finished goods inventory is stated as a percentage of the
next period's (month's) unit sales.
3. DIRECT MATERIAL BUDGET
The direct materials budget includes five separate calculations.
a. Quantity of Material Needed for Production = (Units to be Produced)
(Quantity of Material Budgeted per Unit)
The quantity of material required per unit of product is determined by the
industrial engineers who designed the product. Materials requirements are
frequently described in an engineering document referred to asa "bill of
materials".
b. Quantity of Material to be Purchased = Quantity of Material Needed
for Production + Desired Ending Material - Beginning Material
This calculation is more involved than equation 3b appears to indicate
because it includes information for two future periods. The desired ending
materials quantity is normally based on the next period's (month's) materials
Page 20
needed for production and this amount depends on the third period's
budgeted unit sales. Of course inventories of raw materials (just like finished
goods) are kept to a minimum in a JIT environment. Factors that influence the
desired inventory levels include the reliability of the company's suppliers, as
well as ordering and carrying costs.
c. Budgeted Cost of Material Purchases = (Quantity of Material to be
Purchased)(Budgeted Material Prices)
b. Cash Payments for Overhead = Budgeted Factory Overhead Cost Depreciation and other costs that do not require cash payments
Page 23
Since the difference is caused by the way fixed overhead costs are treated, it
can be illustrated by comparing standard fixed overhead costs with budgeted
fixed overhead costs. Figure 9-1 shows that if planned or budgeted hours
(BH1) are less than denominator hours (DH), the planned production volume
variance (PPVV) is unfavorable and represents underapplied fixed overhead.
However, if planned or budgeted hours (BH2) are greater than denominator
hours (DH), then the planned production volume variance (PPVV) is favorable
and represents overapplied fixed overhead.
The difference between budgeted and standard total factory overhead costs
can be illustrated by simply adding variable overhead costs to the graph.
Since budgeted and standard variable overhead costs are always equal at
any level of production, the difference between standard and budgeted total
Page 24
the difference between budgeted and standard total overhead costs. When
working with a budget this difference is referred to as the planned production
volume variance.
6. ENDING INVENTORY BUDGET
The dollar amount for the ending inventory of finished goods is needed below
to determine cost of goods sold. The dollar amounts for ending direct
materials and finished goods are needed for the balance sheet.
a. Ending Direct Materials = (Desired Ending Materials from 3b)
(Budgeted Prices)
b. Budgeted or Standard Unit Cost = (Quantity of D.M. required per
Unit)(Budgeted Prices) + (D.L. Hours required per Unit)(Budgeted Rate)
+ (Total Overhead Rate)(D.L. Hours required per Unit)
The budgeted or standard unit cost can be calculated at any time after the
budgeted quantities per unit and input prices are obtained. The calculation is
placed here because it is needed for 6c.
c. Ending Finished Goods = (Desired Ending Finished Goods from 2)
(Budgeted Unit Cost)
7. COST OF GOODS SOLD BUDGET
Cost of goods sold is needed for the income statement. One method of
determining budgeted COGS involves accumulating the amounts from the
previous sub-budgets as follows.
a. Budgeted Total Manufacturing Cost = Cost of Direct Material Used
(from 3d.) + Cost of Direct Labor Used (from 4b.)
+ Total Factory Overhead Costs (from 5a.)
Page 26
The financial budget includes the cash budget, the capital budget and the
budgeted balance sheet. The cash budget, budgeted balance sheet & Capital
budget are discussed below.
CASH BUDGET:
-The cash budget is prepared after the operating budgets (sales,
manufacturing expenses or merchandise purchases, selling expenses, and
general and administrative expenses) and the capital expenditures budget
are prepared.
-The cash budget starts with the beginning cash balance to which is added
the cash inflows to get cash available.
-Cash outflows for the period are then subtracted to calculate the cash
balance before financing. If this balance is below the company's required
balance, the financing section shows the borrowings needed.
-The financing section also includes debt repayments, including interest
payments. The cash balance before financing is adjusted by the financing
activity to calculate the ending cash balance.
-The ending cash balance is the cash balance in the budgeted or pro forma
balance sheet.
BUDGETED BALANCE SHEET
Preparing the budgeted balance sheet involves accumulating information
from the previous periods balance sheet, the various operating sub-budgets,
the cash budget and other accounting records.
ASSETS
a. Current Assets:
Cash (from the cash budget 10c)
Accounts Receivable (from the sales budget and previous balance
sheet)
Direct materials (from the ending inventory budget 6a)
Finished goods (from the ending inventory budget 6c)
b. Long Term Assets:
Land (from previous balance sheet and budgeted activity)
Buildings (from previous balance sheet and budgeted activity)
Page 30
project B.
substitute projects: taking project A decreases the cash flow of project
B.
d) By degree of statistical dependence
Positive dependence
Negative dependence
Statistical independence.
Page 31
Page 32
Page 33
achieving the targets for each department, operation and (ideally) each
manager, to anticipate and give the organization purpose and direction.
- Promotes coordination and communication. Clearly defines areas of
responsibility. Requires managers of budget centres to be made
responsible for the achievement of budget targets for the operations
under their personal control.
-Enables remedial action to be taken as variances emerge.
-Motivates employees by participating in the setting of budgets.
-Improves the allocation of scarce resources.
-Economizes management time by using the management by exception
principle.
Page 34
Page 35
Page 36