ID

Index

File

Discipline

294434 Q

P420041001VB

Civil

294435 Q
294436 Q

P420041001VB
P420041001VB

Civil
Civil

294437 Q

P420041001VB

Civil

294438 Q

P420041001VB

Civil

294869 S

P420013001VA

Civil

294870 S

P420013001VA

Civil

294871 S

P420013001VA

Civil

294872 S

P420013001VA

Civil

294873 S

P420013001VA

Civil

294874
294891
294457
294884
294475
294476

S
S
Q
S
Q
Q

P420013001VA
P420013001VA
P420078001VA
P420013001VA
P420050001VA
P420050001VA

Civil
Civil
Civil
Civil
Civil
Civil

294477 Q
294479 Q
294480 Q

P420050001VA
P420040001VA
P420040001VA

Civil
Civil
Civil

294481 Q
294483 Q
294484 Q

P420040001VA
P420039001VB
P420039001VB

Civil
Civil
Civil

294485 Q

P420039001VB

Civil

294488 Q
294489 Q

P420038001VB
P420038001VB

Civil
Civil

294490 Q
294491 Q
291776 M

P420033001VB
P420033001VB
P420051001VA

Civil
Civil
Structural

294468 Q

P420078001VA

Civil

294469 Q
294470 Q

P420078001VA
P420078001VA

Civil
Civil

291783
294432
294433
293875
293876

M
Q
Q
Q
Q

P420067001VA
P420041001VB
P420041001VB
P420034001VB
P420034001VB

Structural
Civil
Civil
Civil
Civil

293877 Q

P420034001VB

Civil

293878 Q

P420034001VB

Civil

293801 Q
293802 Q

P410011001VB
P410011001VB

Civil
Civil

293829 Q

P420015002VA

Civil

293791 Q
293792 Q

P420024001VB
P420024001VB

Civil
Civil

293866 Q
293867 Q
293833 Q

P420037001VB
P420037001VB
P420017002VA

Civil
Civil
Civil

293834 Q

P420017002VA

Civil

294447 Q
294448 Q

P420043001VA
P420043001VA

Civil
Civil

291771 M
294497 Q

P420047001VA
P420030002VA

Structural
Civil

294498 Q
294499 Q

P420030002VA
P420030002VA

Civil
Civil

294500 Q

P420030002VA

Civil

294501 Q

P420030002VA

Civil

294492 Q
294493 Q
291781 M

P420032001VB
P420032001VB
P400001001VA

Civil
Civil
Structural

293832 Q

P420016002VA

Civil

294247 Q

P420041001VB

Civil

294248 Q
294249 Q
294250 Q

P420041001VB
P420041001VB
P420041001VB

Civil
Civil
Civil

294251 Q

P420041001VB

Civil

294252 Q

P420041001VB

Civil

294253 Q
293810 Q
293815 Q

P420041001VB
P420015002VA
P420016002VA

Civil
Civil
Civil

293858 Q
293859 Q
293816 Q

P420036001VB
P420036001VB
P420016002VA

Civil
Civil
Civil

293817 Q
291786 Q

P420016002VA
P420017002VA

Civil
Structural

293837 Q
293838 Q

P420018002VA
P420018002VA

Civil
Civil

295088 Q
295089 Q

P420027001VA
P420027001VA

Civil
Civil

294922 S

R728411001V0A2

Civil

294923 S

R728411001V0A2

Civil

295092 Q
295093 Q
295143 Q

P420025001VB
P420025001VB
P420020001VA

Civil
Civil
Civil

295144 Q
295153 Q

P420020001VA
P420019001VA

Civil
Civil

295154 Q

P420019001VA

Civil

295085 Q
295086 Q

P420028001VB
P420028001VB

Civil
Civil

295136 Q
295137 Q

P420023001VB
P420023001VB

Civil
Civil

295138 Q
295139 Q

P420022001VB
P420022001VB

Civil
Civil

295140 Q
295141 Q

P420021001VB
P420021001VB

Civil
Civil

299061 Q

P420028001VB

Civil

Markup Type

Subject

Sticky Note
Sticky Note
Sticky Note
Sticky Note

Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Add drawing for manhole details
Sticky
Sticky
Sticky
Sticky

Note
Note
Note
Note

Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note

Sticky Note
Sticky Note
Sticky Note

Sticky Note
Sticky Note
Sticky Note
Sticky
Sticky
Sticky
Sticky
Sticky

Note
Note
Note
Note
Note

Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note

Sticky Note
Sticky Note

Sticky Note
Sticky Note

Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note

Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note

Sticky Note
Sticky Note

Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note
Sticky Note

Grout below base plate

Comment

Status

Provide invert elevation for the 8" Oily Water Inlet Pipe.

New

Provide invert elevation for the 16" Oily Water Inlet Pipe.
Provide elevations.

New
New

Provide distance of vent pipe from the edge of the wall.

New

Recommendation: Top surface of cover slab should sloped


outward from the center to the edge of the pit to avoid
accumulation of wash down or rain water.

New

Vent is required here as per SAES-S-020 para 4.12.1 "e)


Downstream of the farthest catch basin."

New

Vent is required here as per SAES-S-020 para 4.12.1 "e)


Downstream of the farthest catch basin."

New

Vent is required here as per SAES-S-020 para 4.12.1 "e)


Downstream of the farthest catch basin."

New

Vent is required here as per SAES-S-020 para 4.12.1 "e)


Downstream of the farthest catch basin."

New

Vent is required here as per SAES-S-020 para 4.12.1 "e)


Downstream of the farthest catch basin."

New

Show manhole seal as required by SAES-S-020 this apply to


all.
Add drawing for manhole details
Provide structural details for the foundations.
Show invert level for Manholes
Provide structural details for the pipe sleepers.
Provide details for the embedded bearing plate.

New
New
New
New
New
New

Apply bitumen coating conforms with APCS-10 or coal tar


epoxy conforms with APCS-3 as per SAES-H-101V, for
underground concrete structure.
Provide structural details for the foundations.
Provide derails of sliding plate.

New
New
New

"bitumen that conforms to APCS-10 or coal tar epoxy that


conforms to APCS-3 as per SAES-H-101V.
Provide structural details for the foundations.
Provide derails of sliding plate.

New
New
New

"bitumen that conforms to APCS-10 or coal tar epoxy that


conforms to APCS-3 as per SAES-H-101V.

New

"bitumen that conforms to APCS-10 or coal tar epoxy that


conforms to APCS-3 as per SAES-H-101V.
Provide structural details for the foundation.

New
New

"bitumen that conforms to APCS-10 or coal tar epoxy that


conforms to APCS-3 as per SAES-H-101V.
Provide structural details for the foundation.
RESOLVE THE HOLD ITEM

New
New
New

Apply underground bitumen coating conforms with APCS-10


or coal tar epoxy conforms with APCS-3 as per SAES-H-101V. New
Anchor bolts shall be in accordance with SASD AA-036322001.
Exposed concrete edges shall be chamfered.

New
New

you should differentiate between the old and new structure.


legend are same.
New
Provide structural details for the Oily Sewer Pit.
New
Provide c/c distance between the two pumps.
New
Provide structural details for the foundation.
New
Provide structural detail for the piles.
New
Provide projection height of the piles from the bottom of the
footing.
New
"bitumen that conforms to APCS-10 or coal tar epoxy that
conforms to APCS-3 as per SAES-H-101V.

New

"bitumen that conforms to APCS-10 or coal tar epoxy that


conforms to APCS-3 as per SAES-H-101V.
Provide structural details for the foundation

New
New

Minimum projection of concrete pedestals shall be 150mm in


accordance with SAES-Q-005 Sec. 4.3.2a
New
"bitumen that conforms to APCS-10 or coal tar epoxy that
conforms to APCS-3 as per SAES-H-101V.
Provide structural details for the foundation

New
New

"bitumen that conforms to APCS-10 or coal tar epoxy that


conforms to APCS-3 as per SAES-H-101V.
Provide structural details for the foundation.
Provide structural details for the foundations.

New
New
New

Minimum projection of concrete pedestals shall be 150mm in


accordance with SAES-Q-005 Sec. 4.3.2a
New
"bitumen that conforms to APCS-10 or coal tar epoxy that
conforms to APCS-3 as per SAES-H-101V.
Provide structural details of the foundation.

New
New

Why not to align this portion of the pipe rack with grid A and
D. this is for better force path and avoid excessive beam
size. this comments is applicable for similar cases.
New
Provide structural details for the foundation.
New

Provide projection height of the piles from the bottom of the


footing.
New
Provide structural detail for the piles.
New
Apply bitumen coating (APCS-10) or coal tar epoxy (APCS-3)
as per SAES-H-101V, for concrete surface directly in contact
to the ground.
New
Anchor bolts shall be in accordance with SASD AA-036322001.

New

"bitumen that conforms to APCS-10 or coal tar epoxy that


conforms to APCS-3 as per SAES-H-101V.
Provide structural details for the foundation.
Correct the typo error.

New
New
New

Minimum projection of concrete pedestals shall be 150mm in


accordance with SAES-Q-005 Sec. 4.3.2a
New
Internal wall of Oily Sewer Pit shall also be coated with APCS3.
New
Provide Sump Pit. Top surface of the bottom slab shall be
sloped towards the Sump Pit.
Provide height of the kicker.
Provide spacing of the ladder rungs.

New
New
New

Manhole cover shall be in accordance with SASD AE-036083. New


Provide detail of pipe sleeve and specify the material for
vent pipe.

New

Provide the embedment length of ladder rung to the


concrete wall and specify the material to be use.
Provide structural details for the foundation
Provide structural details for the foundations

New
New
New

"bitumen that conforms to APCS-10 or coal tar epoxy that


conforms to APCS-3 as per SAES-H-101V.
Provide structural details for the foundation.
Provide structural details for the piles

New
New
New

Provide projection height of the piles from the bottom of the


footing.
New
anchor bolts diameter should be in metric units.
New
Minimum projection of concrete pedestals shall be 150mm in
accordance with SAES-Q-005 Sec. 4.3.2a
New
Provide structural details for the foundation.
New
"bitumen that conforms to APCS-10 or coal tar epoxy that
conforms to APCS-3 as per SAES-H-101V.
Provide structural detail of the foundation.

New
New

Please confirm that catch basin as drawn for the OWS is


equipped with a 150 mm minimum liquid seal per SAES-S020 paragraph 4.2.21.

New

Ensure manhole is sealed per SAES-S-020 paragraph 4.10.1

New

"bitumen that conforms to APCS-10 or coal tar epoxy that


conforms to APCS-3 as per SAES-H-101V.
Provide structural details for the foundation.
Provide structural details for the foundation.

New
New
New

Minimum projection of concrete pedestal from the finish


grade shall be 150mm in accordance with SAES-Q-005.
Provide structural details of the foundation.

New
New

Minimum projection of concrete pedestal from the finish


grade shall be 150mm in accordance with SAES-Q-005.

New

"bitumen that conforms to APCS-10 or coal tar epoxy that


conforms to APCS-3 as per SAES-H-101V.
Provide structural details of the foundation.

New
New

"bitumen that conforms to APCS-10 or coal tar epoxy that


conforms to APCS-3 as per SAES-H-101V.
Provide structural details of the foundation.

New
New

"bitumen that conforms to APCS-10 or coal tar epoxy that


conforms to APCS-3 as per SAES-H-101V.
Provide structural details for the foundation.

New
New

"bitumen that conforms to APCS-10 or coal tar epoxy that


conforms to APCS-3 as per SAES-H-101V.
Provide structural details for the foundation.

New
New

Grout shall be either non-shrink or epoxy grout depending


on the specification of equipment being installed in the
foundation refer non shrink grout specification with SAES Q
010 and epoxy grout with SAES Q 011

New

JZ Responses
LSTK Contractor to provide during detailed design
LSTK Contractor to provide during detailed design
Agreed
Agreed

LSTK Contractor to provide during detailed design

LSTK
LSTK
LSTK
LSTK
LSTK
LSTK

Contractor
Contractor
Contractor
Contractor
Contractor
Contractor

to
to
to
to
to
to

provide
provide
provide
provide
provide
provide

during
during
during
during
during
during

detailed
detailed
detailed
detailed
detailed
detailed

design
design
design
design
design
design

Refer, Dwg No. 400002 "General Notes & Legends Concret


LSTK Contractor to provide during detailed design
LSTK Contractor to provide during detailed design
Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
LSTK Contractor to provide during detailed design
LSTK Contractor to provide during detailed design
Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
LSTK Contractor to provide during detailed design

Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
LSTK Contractor to provide during detailed design
Noted, Hold will be removed

Refer, Dwg No. 400002 "General Notes & Legends Concret


Dwg No. 400002 "General Notes & Legends Concrete Works"
Noted, exposed concrete edges will be chamfered
Agreed
LSTK Contractor to provide during detailed design
Agreed
LSTK Contractor to provide during detailed design
LSTK Contractor to provide during detailed design
LSTK Contractor to provide during detailed design
Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
LSTK Contractor to provide during detailed design
Minimum pedestal projection ensured. HPP has been kept
Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
LSTK Contractor to provide during detailed design
Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
LSTK Contractor to provide during detailed design
LSTK Contractor to provide during detailed design
Minimum pedestal projection ensured. HPP has been kept
Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
LSTK Contractor to provide during detailed design

The Arrangement followed as given by piping department.


LSTK Contractor to provide during detailed design

LSTK Contractor to provide during detailed design


LSTK Contractor to provide during detailed design

Refer, Dwg No. 400002 "General Notes & Legends Concret


Dwg No. 400002 "General Notes & Legends Concrete Works"
Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
LSTK Contractor to provide during detailed design
Agreed
Minimum pedestal projection ensured. HPP has been kept
Agreed
Agreed
Agreed
Agreed
Agreed
LSTK Contractor to provide during detailed design
LSTK Contractor to provide during detailed design
LSTK Contractor to provide during detailed design
LSTK Contractor to provide during detailed design
Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
LSTK Contractor to provide during detailed design
LSTK Contractor to provide during detailed design
LSTK Contractor to provide during detailed design
Agreed
Minimum pedestal projection ensured. HPP has been kept
LSTK Contractor to provide during detailed design
Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
LSTK Contractor to provide during detailed design

LSTK Contractor to provide all details during detailed desig


LSTK Contractor to provide all details during detailed desig
Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
LSTK Contractor to provide during detailed design
LSTK Contractor to provide during detailed design

Minimum pedestal projection ensured. HPP has been kept


LSTK Contractor to provide during detailed design

Minimum pedestal projection ensured. HPP has been kept


Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
LSTK Contractor to provide during detailed design
Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
LSTK Contractor to provide during detailed design
Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
LSTK Contractor to provide during detailed design
Refer sec. 2.11 of Dwg No. 400002 "General Notes & Legen
LSTK Contractor to provide during detailed design

Grout type is mentioned in Note-11 in this drawing.

Action

Status

No Action Required

No Action Required

No Action Required
Will Comply

No Action Required
In progress

Will Comply

In progress

No Action Required

No Action Required

No
No
No
No
No
No

No
No
No
No
No
No

Action
Action
Action
Action
Action
Action

Required
Required
Required
Required
Required
Required

Action
Action
Action
Action
Action
Action

Required
Required
Required
Required
Required
Required

No Action Required
No Action Required
No Action Required

No Action Required
No Action Required
No Action Required

Will Comply
No Action Required
No Action Required

In progress
No Action Required
No Action Required

Will Comply

In progress

Will Comply
No Action Required

In progress
No Action Required

Will Comply
No Action Required
Will Comply

In progress
No Action Required
In progress

No Action Required

No Action Required

No Action Required
Will Comply

No Action Required
In progress

Will Comply
No Action Required
Will Comply
No Action Required
No Action Required

In progress
No Action Required
In progress
No Action Required
No Action Required

No Action Required

No Action Required

Will Comply

In progress

Will Comply
No Action Required

In progress
No Action Required

No Action Required

No Action Required

Will Comply
No Action Required

In progress
No Action Required

Will Comply
No Action Required
No Action Required

In progress
No Action Required
No Action Required

No Action Required

No Action Required

Will Comply
No Action Required

In progress
No Action Required

No Action Required
No Action Required

No Action Required
No Action Required

No Action Required
No Action Required

No Action Required
No Action Required

No Action Required

No Action Required

No Action Required

No Action Required

Will Comply
No Action Required
Will Comply

In progress
No Action Required
In progress

No Action Required

No Action Required

Will Comply

In progress

Will Comply
Will Comply
Will Comply

In progress
In progress
In progress

Will Comply

No Action Required

No Action Required

No Action Required

No Action Required
No Action Required
No Action Required

No Action Required
No Action Required
No Action Required

Will Comply
No Action Required
No Action Required

In progress
No Action Required
No Action Required

No Action Required
Will Comply

No Action Required
In progress

No Action Required
No Action Required

No Action Required
No Action Required

Will Comply
No Action Required

In progress
No Action Required

No Action Required

No Action Required

No Action Required

No Action Required

Will Comply
No Action Required
No Action Required

In progress
No Action Required
No Action Required

No Action Required
No Action Required

No Action Required
No Action Required

No Action Required

No Action Required

Will Comply
No Action Required

In progress
No Action Required

Will Comply
No Action Required

In progress
No Action Required

Will Comply
No Action Required

In progress
No Action Required

Will Comply
No Action Required

In progress
No Action Required

No Action Required

No Action Required

No Action Required
Will Comply
Clarification Required
Implemented
In Progress
No Action Required

You might also like