Federal Register / Vol. 71, No.

193 / Thursday, October 5, 2006 / Notices 58879

b. Gulf Coast Rebuilding Initiative. Nuclear Regulatory Commission, NUCLEAR REGULATORY


c. CFO Update. Washington, DC 20555–0001 Attention: COMMISSION
d. GSE Housing Fund Update. Rulemakings and Adjudications Staff, or
e. Center for Foreclosure Solutions. may be delivered to the Commission’s [Docket Nos. STN 50–528, Stn 50–529, and
f. NHSA Update. Public Document Room (PDR), located STN 50–530]
VIII. Training Division Update. at One White Flint North, Public File
IX. Adjournment. Palo Verde Nuclear Generating Station,
Area O1 F21, 11555 Rockville Pike (first
Units 1, 2, and 3; Notice of
Jeffrey T. Bryson, floor), Rockville, Maryland, by the Consideration of Issuance of
General Counsel/Secretary. above date. Because of possible delays Amendment to Facility Operating
[FR Doc. 06–8538 Filed 10–3–06; 1:19 pm] in delivery to mail to U.S. Government License, Proposed No Significant
BILLING CODE 7570–02–M offices, it is requested that petitions for Hazards Consideration Determination,
leave to intervene and requests for and Opportunity for a Hearing
hearing be transmitted to the Secretary
NUCLEAR REGULATORY of the Commission either by means of The U.S. Nuclear Regulatory
COMMISSION facsimile transmission to 301–415–1101 Commission (the Commission) is
or by e-mail to hearingdocket@nrc.gov. considering issuance of an amendment
[Docket No. 50–382] to Facility Operating License No. NPF–
A copy of any petitions should also be
sent to the Office of the General 41, Facility Operating License No. NPF–
Entergy Operations, Inc.; Notice of
Counsel, U.S. Nuclear Regulatory 51, and Facility Operating License No.
Partial Denial of Amendment to Facility
NPF–74, issued to Arizona Public
Operating License and Opportunity for Commission, Washington, DC 20555–
Service Company (the licensee) for the
Hearing 0001, and because of possible delays in
operation of Palo Verde Nuclear
delivery of mail to the U.S. Government
The U.S. Nuclear Regulatory Generating Station, Units 1, 2, and 3,
offices, it is requested that copies be respectively.
Commission (NRC or the Commission)
transmitted either by means of facsimile The proposed amendment would
has denied a portion of an amendment
request by Entergy Operations, Inc. (the transmission to 301–415–3725 or by e- modify requirements of Technical
licensee), for an amendment to Facility mail to OGCMailCenter@nrc.gov. A copy Specification (TS) 3.7.2, ‘‘Main Steam
Operating License No. NPF–38, issued of any petitions should also be sent to Isolation Valves (MSIVs),’’ to include
to the licensee for operation of the N. S. Reynolds, Esquire, Winston & specific requirements (Conditions,
Waterford Steam Electric Station, Unit Strawn, 1700 K Street, NW., Required Actions, and Completion
3, located in St. Charles Parish, Washington, DC 20006–3817, attorney Times) for the MSIV actuator trains.
Louisiana. The Notice of Consideration for the licensee. Additionally, surveillance requirement
of Issuance of this amendment was For further details with respect to this (SR) 3.7.2.1 will be revised to clearly
published in the Federal Register on action, see (1) The application for identify that each MSIV actuator train is
December 7, 2004 (69 FR 70717). amendment dated November 5, 2004, required to be tested to support the
The purpose of the licensee’s and (2) the Commission’s letter to the operability of the associated MSIV.
amendment request was to revise licensee dated September 28, 2006. Before issuance of the proposed
Technical Specifications (TS) 3.7.4, license amendment, the Commission
‘‘Ultimate Heat Sink,’’ to provide Documents may be examined, and/or will have made findings required by the
clarification that the ambient copied for a fee, at the NRC’s PDR, Atomic Energy Act of 1954, as amended
temperature monitoring requirement located at One White Flint North, Public (the Act), and the Commission’s
that is specified in TS 3.7.4.d only File Area O1 F21, 11555 Rockville Pike regulations.
applies when the affected ultimate heat (first floor), Rockville, Maryland, and The Commission has made a
sink train is considered to be operable will be accessible electronically through proposed determination that the
and to delete TS 3.7.4.c. Deleting TS the Agencywide Documents Access and amendment request involves no
3.7.4.c would allow the plant to take Management System’s (ADAMS) Public significant hazards consideration. Under
credit for the dry cooling tower fans that Electronic Reading Room link at the the Commission’s regulations in Title 10
are not protected from tornado missiles NRC Web site http://www.nrc.gov/ of the Code of Federal Regulations (10
when a tornado warning is in effect. reading-rm/adams.html. Persons who CFR), Section 50.92, this means that
The NRC staff has concluded that the do not have access to ADAMS or who operation of the facility in accordance
portion of the licensee’s request encounter problems in accessing with the proposed amendment would
regarding deletion of TS 3.7.4.c cannot documents located in ADAMS, should not (1) involve a significant increase in
be granted. The licensee was notified of contact the NRC PDR Reference staff by the probability or consequences of an
the Commission’s denial of the telephone at 1–800–397–4209, 301– accident previously evaluated; or (2)
proposed change by a letter dated 415–4737, or by e-mail to pdr@nrc.gov. create the possibility of a new or
September 28, 2006. different kind of accident from any
By 30 days from the date of Dated at Rockville, Maryland, this 28th day accident previously evaluated; or (3)
publication of this notice in the Federal of September 2006. involve a significant reduction in a
Register, the licensee may demand a For the Nuclear Regulatory Commission. margin of safety. As required by 10 CFR
hearing with respect to the denial Catherine Haney, 50.91(a), the licensee has provided its
described above. Any person whose Director, Division of Operating Reactor analysis of the issue of no significant
interest may be affected by this Licensing, Office of Nuclear Reactor hazards consideration, which is
mstockstill on PROD1PC61 with NOTICES

proceeding may file a written petition Regulation. presented below:


for leave to intervene pursuant to the [FR Doc. E6–16448 Filed 10–4–06; 8:45 am] 1. Does the proposed change involve a
requirements of 10 CFR 2.309. significant increase in the probability or
BILLING CODE 7590–01–P
A request for hearing or petition for consequences of an accident previously
leave to intervene must be filed with the evaluated?
Secretary of the Commission, U.S. Response: No

VerDate Aug<31>2005 15:42 Oct 04, 2006 Jkt 211001 PO 00000 Frm 00096 Fmt 4703 Sfmt 4703 E:\FR\FM\05OCN1.SGM 05OCN1
58880 Federal Register / Vol. 71, No. 193 / Thursday, October 5, 2006 / Notices

The proposed changes to incorporate does not alter the manner in which safety Document Room (PDR), located at One
requirements for the MSIV actuator trains do limits or limiting safety system settings are White Flint North, Public File Area
not involve any design or physical changes determined. No changes to instrument/ O1F21, 11555 Rockville Pike (first
to the facility, including the MSIVs and system actuation setpoints are involved. The floor), Rockville, Maryland.
actuator trains themselves. The design and safety analysis acceptance criteria are not
functional performance requirements,
The filing of requests for hearing and
impacted by this change and the proposed
operational characteristics, and reliability of change will not permit plant operation in a
petitions for leave to intervene is
the MSIVs and actuator trains remain configuration outside the design basis. discussed below.
unchanged. Therefore, there is no impact on Therefore, the proposed change does not Within 60 days after the date of
the design safety function of the MSIVs to involve a significant reduction in the margin publication of this notice, the licensee
close (as an accident mitigator), nor is there of safety. may file a request for a hearing with
any change with respect to inadvertent respect to issuance of the amendment to
closure of an MSIV (as a potential transient The NRC staff has reviewed the
the subject facility operating license and
initiator). Since no failure mode or initiating licensee’s analysis and, based on this
any person whose interest may be
condition that could cause an accident review, it appears that the three
(including any plant transient) evaluated in affected by this proceeding and who
standards of 10 CFR 50.92(c) are wishes to participate as a party in the
the Palo Verde Nuclear Generating Station satisfied. Therefore, the NRC staff
(PVNGS) Updated Final Safety Analysis proceeding must file a written request
proposes to determine that the for a hearing and a petition for leave to
Report (UFSAR) described safety analyses is
created or affected, the change cannot amendment request involves no intervene. Requests for a hearing and a
involve a significant increase in the significant hazards consideration. petition for leave to intervene shall be
probability of an accident previously The Commission is seeking public filed in accordance with the
evaluated. comments on this proposed Commission’s ‘‘Rules of Practice for
With regard to the consequences of an determination. Any comments received
accident and the equipment required for Domestic Licensing Proceedings’’ in 10
within 30 days after the date of CFR Part 2. Interested persons should
mitigation of the accident, the proposed publication of this notice will be
changes involve no design or physical consult a current copy of 10 CFR 2.309,
changes to the MSIVs or any other equipment
considered in making any final which is available at the Commission’s
required for accident mitigation. With respect determination. PDR, located at One White Flint North,
to MSIV actuator train Completion Time, the Normally, the Commission will not Public File Area O1F21, 11555
consequences of an accident are independent issue the amendment until the Rockville Pike (first floor), Rockville,
of equipment Completion Time as long as expiration of 60 days after the date of Maryland. Publicly available records
adequate equipment availability is publication of this notice. The
maintained. The proposed Condition A Note will be accessible from the Agencywide
Commission may issue the license Documents Access and Management
takes into account the redundancy of the amendment before expiration of the 60-
actuator trains and the accident analysis System’s (ADAMS) Public Electronic
assumption that only 3 of 4 MSIVs close in day period provided that its final Reading Room on the Internet at the
the accident. Adequate equipment determination is that the amendment NRC Web site, http://www.nrc.gov/
availability would therefore continue to be involves no significant hazards reading-rm/doc-collections/cfr/. If a
available and Condition C [of TS 3.7.2] for an consideration. In addition, the request for a hearing or petition for
inoperable MSIV would continue to support Commission may issue the amendment leave to intervene is filed by the above
the Palo Verde safety analysis. On this basis, prior to the expiration of the 30-day date, the Commission or a presiding
the consequences of applicable analyzed comment period should circumstances
accidents (such as a main steam line break) officer designated by the Commission or
change during the 30-day comment by the Chief Administrative Judge of the
are not significantly impacted by the
proposed changes. period such that failure to act in a Atomic Safety and Licensing Board
Therefore, the proposed changes do not timely way would result, for example, Panel, will rule on the request and/or
involve a significant increase in the in derating or shutdown of the facility. petition; and the Secretary or the Chief
probability or consequences of an accident Should the Commission take action Administrative Judge of the Atomic
previously analyzed. prior to the expiration of either the Safety and Licensing Board will issue a
2. Does the proposed change create the comment period or the notice period, it notice of a hearing or an appropriate
possibility of a new or different kind of will publish in the Federal Register a
accident from any accident previously
order.
notice of issuance. Should the As required by 10 CFR 2.309, a
evaluated?
Response: No.
Commission make a final No Significant petition for leave to intervene shall set
The proposed changes to incorporate Hazards Consideration Determination, forth with particularity the interest of
requirements for the MSIV actuator trains do any hearing will take place after the petitioner in the proceeding, and
not involve any design or physical changes issuance. The Commission expects that how that interest may be affected by the
to the facility, including the MSIVs and the need to take this action will occur results of the proceeding. The petition
actuator trains themselves. No physical very infrequently. should specifically explain the reasons
alteration of the plant is involved, as no new Written comments may be submitted why intervention should be permitted
or different type of equipment is to be by mail to the Chief, Rulemaking, with particular reference to the
installed. The proposed changes do not alter
any assumptions made in the safety analyses,
Directives and Editing Branch, Division following general requirements: (1) The
nor do they involve any changes to plant of Administrative Services, Office of name, address and telephone number of
procedures that could cause a new or Administration, U.S. Nuclear Regulatory the requestor or petitioner; (2) the
different kind of accident from any Commission, Washington, DC 20555– nature of the requestor’s/petitioner’s
previously evaluated are being introduced. 0001, and should cite the publication right under the Act to be made a party
Therefore, the proposed change does not date and page number of this Federal to the proceeding; (3) the nature and
create the possibility of a new or different Register notice. Written comments may extent of the requestor’s/petitioner’s
mstockstill on PROD1PC61 with NOTICES

kind of accident from any accident also be delivered to Room 6D59, Two property, financial, or other interest in
previously evaluated.
3. Does the proposed change involve a
White Flint North, 11545 Rockville the proceeding; and (4) the possible
significant reduction in a margin of safety? Pike, Rockville, Maryland, from 7:30 effect of any decision or order which
Response: No. a.m. to 4:15 p.m. Federal workdays. may be entered in the proceeding on the
The proposed change to incorporate Documents may be examined, and/or requestor’s/petitioner’s interest. The
requirements for the MSIV actuator trains copied for a fee, at the NRC’s Public petition must also identify the specific

VerDate Aug<31>2005 15:42 Oct 04, 2006 Jkt 211001 PO 00000 Frm 00097 Fmt 4703 Sfmt 4703 E:\FR\FM\05OCN1.SGM 05OCN1
Federal Register / Vol. 71, No. 193 / Thursday, October 5, 2006 / Notices 58881

contentions which the petitioner/ Office of the Secretary of the NUCLEAR REGULATORY
requestor seeks to have litigated at the Commission, U.S. Nuclear Regulatory COMMISSION
proceeding. Commission, Washington, DC 20555–
Each contention must consist of a [Docket Nos. 50–361 and 50–362; License
0001, Attention: Rulemaking and Nos. NPF–10 and NPF–15]
specific statement of the issue of law or Adjudications Staff; (2) courier, express
fact to be raised or controverted. In mail, and expedited delivery services: In the Matter of Southern California
addition, the petitioner/requestor shall Office of the Secretary, Sixteenth Floor, Edison Company the City of Anaheim,
provide a brief explanation of the bases One White Flint North, 11555 Rockville CA; San Onofre Nuclear Generating
for the contention and a concise
Pike, Rockville, Maryland 20852, Station, Units 2 and 3; Order
statement of the alleged facts or expert
Attention: Rulemaking and Approving Transfer of Licenses and
opinion which support the contention
Adjudications Staff; (3) E-mail Conforming Amendments
and on which the petitioner intends to
rely in proving the contention at the addressed to the Office of the Secretary,
I.
hearing. The petitioner/requestor must U.S. Nuclear Regulatory Commission,
HEARINGDOCKET@NRC.GOV; or (4) Southern California Edison Company
also provide references to those specific
facsimile transmission addressed to the (SCE), San Diego Gas and Electric
sources and documents of which the
Office of the Secretary, U.S. Nuclear Company (SDG&E), the City of
petitioner is aware and on which the
Regulatory Commission, Washington, Riverside, California (Riverside), and
petitioner intends to rely to establish
DC, Attention: Rulemakings and the City of Anaheim, California
those facts or expert opinion. The
petition must include sufficient Adjudications Staff at 301–415–1101, (Anaheim), are the owners of San
information to show that a genuine Onofre Nuclear Generating Station,
verification number is 301–415–1966. A
dispute exists with the applicant on a Units 2 and 3 (SONGS 2 and 3), located
copy of the request for hearing and
material issue of law or fact. in San Diego County, California. With
petition for leave to intervene should
Contentions shall be limited to matters respect to their ownership, they co-hold
also be sent to the Office of the General the Facility Operating Licenses Nos.
within the scope of the amendment Counsel, U.S. Nuclear Regulatory
under consideration. The contention NPF–10 and NPF–15, for SONGS 2 and
Commission, Washington, DC 20555– 3. SCE is authorized to act as agent for
must be one which, if proven, would 0001, and it is requested that copies be
entitle the petitioner to relief. A the other co-owners and has exclusive
transmitted either by means of facsimile responsibility and control under the
petitioner/requestor who fails to satisfy transmission to 301–415–3725 or by e-
these requirements with respect to at licenses over the physical construction,
mail to OGCMailCenter@nrc.gov. A copy operation, and maintenance of the
least one contention will not be
of the request for hearing and petition facility.
permitted to participate as a party.
Those permitted to intervene become for leave to intervene should also be
sent to Michael G. Green, Senior II.
parties to the proceeding, subject to any
limitations in the order granting leave to Regulatory Counsel, Pinnacle West By application dated March 10, 2006,
intervene, and have the opportunity to Capital Corporation, P.O. Box 52034, as supplemented May 16, 2006, SCE,
participate fully in the conduct of the Mail Station 8695, Phoenix, Arizona acting on behalf of itself and Anaheim,
hearing. 85072–2034, attorney for the licensee. requested pursuant to Title 10, Section
If a hearing is requested, the 50.80 of the Code of Federal Regulations
For further details with respect to this
Commission will make a final (10 CFR 50.80), that the Nuclear
action, see the application for
determination on the issue of no Regulatory Commission (NRC) consent
amendment dated September 26, 2006, to certain license transfers to permit the
significant hazards consideration. The which is available for public inspection
final determination will serve to decide transfer of Anaheim’s 3.16-percent
at the Commission’s PDR, located at undivided ownership interest in SONGS
when the hearing is held. If the final
One White Flint North, File Public Area 2 and 3 to SCE, excluding Anaheim’s
determination is that the amendment
O1F21, 11555 Rockville Pike (first interest in its spent fuel and in the
request involves no significant hazards
floor), Rockville, Maryland. Publicly SONGS 2 and 3 independent spent fuel
consideration, the Commission may
issue the amendment and make it available records will be accessible from storage installation (ISFSI). The initial
immediately effective, notwithstanding the ADAMS Public Electronic Reading application and the supplement are
the request for a hearing. Any hearing Room on the Internet at the NRC Web hereinafter referred to as ‘‘the
held would take place after issuance of site, http://www.nrc.gov/reading-rm/ application’’ unless otherwise indicated.
the amendment. If the final adams.html. Persons who do not have SCE also requested, pursuant 10 CFR
determination is that the amendment access to ADAMS or who encounter 50.90, approval of conforming license
request involves a significant hazards problems in accessing the documents amendments to reflect the transfer. The
consideration, any hearing held would located in ADAMS, should contact the conforming license amendments would
take place before the issuance of any NRC PDR Reference staff by telephone address Anaheim’s transfer of its above
amendment. at 1–800–397–4209, 301–415–4737, or stated ownership interests in the
Nontimely requests and/or petitions by e-mail to pdr@nrc.gov. facility. Anaheim will retain its
and contentions will not be entertained Dated at Rockville, Maryland, this 28th day
ownership interests in its spent nuclear
absent a determination by the of September 2006. fuel and the facility’s ISFSI located on
Commission or the presiding officer of the facility’s site, and financial
For the Nuclear Regulatory Commission.
the Atomic Safety and Licensing Board responsibility for its spent fuel and a
that the petition, request and/or the Mel B. Fields, portion of the facility’s
mstockstill on PROD1PC61 with NOTICES

contentions should be granted based on Senior Project Manager, Plant Licensing decommissioning costs. Anaheim
a balancing of the factors specified in 10 Branch IV, Division of Operating Reactor proposes to remain a licensee for the
CFR 2.309(c)(1)(i)–(viii). Licensing, Office of Nuclear Reactor purposes of its retained interests and
A request for a hearing or a petition Regulation. liabilities.
for leave to intervene must be filed by: [FR Doc. E6–16445 Filed 10–4–06; 8:45 am] Notice of consideration of approval of
(1) First class mail addressed to the BILLING CODE 7590–01–P the transfer of the Facility Operating

VerDate Aug<31>2005 15:42 Oct 04, 2006 Jkt 211001 PO 00000 Frm 00098 Fmt 4703 Sfmt 4703 E:\FR\FM\05OCN1.SGM 05OCN1