Professional Documents
Culture Documents
Advanced Foundation Engineering
Advanced Foundation Engineering
Q6
www.jntuworld.com
Q6
Q6
Q6
www.android.jntuworld.com
Q6
Q6
Q6
www.jwjobs.net
R09
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
1.a)
Q6 b)
Q6
Q6
Q6
Q6
Q6
D
L
Q6
Q6
Q6
Q6
Q6
Q6
T
N
W
U
Q6
Q6
Q6
Q6
Q6
Q6
1m
2.a)
Q6
Q6
Q6
0.5m
Q6
Q6
R
O
3
1.0m
Q6
Q6
Q6
Q6
1 = 18 kN/m
1 = 0
Cu = 45 kN/m2
2 = 17.0 kN/m3
2 = 0
Cu = 30 kN/m2
Q6
What do you understand by negative skin friction in pile foundation. State the
situation which causes negative skin friction.
A R.C.C. pile of size 30cm30cm and 10m long is driven into coarse sand with
unit weight of 16kN/m3 and angle of internal friction of 310. What is the
allowable load on the pile? For =310, Nq= 16 and N = 14.Take K=1.0 and
factor of safety of 3.0.
Contd.2
Q6
Q6 b)
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
www.jntuworld.com
Q6
Q6
www.jntuworld.com
Q6
Q6
Q6
Q6
Q6
www.jwjobs.net
www.android.jntuworld.com
Q6
::2::
Q6
Q63.
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
1m
= 16 KN/m3
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Determine the settlement of square pile group shown in the figure below.
Diameter of Pile is 30cm.
2000kN
Sand
GWT
Q6
15 m
Clay
16m
2.4m
Q6
Q6
Q6
Q6
Q6
Q6
4.a)
b)
Q6
Q6
5.
Q6
Q6
4m
W
U
Rock
Q6
D
L
Q6
Q6
Q6
Q6
Q6
Q6
R
O
Clay
Q6
sat = 18 kN/m3
eo = 0.8
Cc = 0.3
Q6
Q6
sat = 19 kN/m3
eo = 0.7
Cc = 0.2
T
N
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
1.5m
1.0m
Q6
Q6
Q6
3.5m
Q6
Dredged line
Sand
=17 kN/m3
sat =18 kN/m3
c= 0,
=350
Q6
Sand
=18 kN/m3
c= 0, =380
Q6
Q6
Q6
Q6
Contd.3
Q6
www.jntuworld.com
Q6
Q6
Q6
Q6
Q6
Q6
www.jntuworld.com
Q6
Q6
Q6
Q6
www.jwjobs.net
www.android.jntuworld.com
Q6
::3::
Q6
Q66.a)
b)
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Draw the apparent pressure envelope for cuts in various types of soils.
Determine the factor of safety against bottom heave for the braced cut in clay
having length of cut=20m, width of cut=3m and depth of cut=5m and thickness
of clay below the base of the excavation=1.5m. The clay has =16kN/m3, c=30
kN/m2, 1=300 and has no surcharge adjacent to the excavation.
7.a)
b)
8.a)
What are Tilts and Shifts in well foundations and state the methods adopted for
rectifying them.
Describe Janbus method for estimation of elastic settlement.
Q6
b)
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
****
Q6
D
L
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
T
N
W
U
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
Q6
R
O
www.jntuworld.com