Professional Documents
Culture Documents
Complete Profile
Complete Profile
Complete Profile
RV Akash Ganga Infrastructure Ltd. popularly known as RVAGIL based at A6, Room
No.209, LSC DDA Market, Paschim Vihar, Delhi - 110063 came into existence in July
2007 being the amalgamation of RV Associates and Akash Ganga Infrastructure Ltd.,
two of the pioneers in the field of RMC and Equipment Hiring in Delhi - NCR.
Akash Ganga Infrastructure Private Ltd., was incorporated in June 2005 and business
commenced on September 2005. In the first year of business, in the Financial Year
ending March 2006, the company clocked an annual turnover of Rs.2.36 Crores. RV
Associates came into existence on the 1st of April 2006 and in the first year of business
ending on March 2007 clocked an annual turnover of Rs.9.36 Crores with Akash Ganga
clocking Rs.4.96 Crores in the same period. In the period leading up to the merger of
the two companies, April 2007 to June 2007, Akash Ganga Infrastructure Ltd and RV
Associates posted turnovers of Rs.1.65 Crores and 5.98 Crores respectively.
RV Akash Ganga Infrastructure Ltd. rapidly grew post July 2007 and the financial year
ending on March 2008 saw the company posting a turnover of Rs.43.28 Crores. The
targeted turnover for the financial year 2008 – 09 has been projected at Rs.100 Crores.
To take care of the piling business, RVAG Suntech Infrastructure Ltd. was launched on
23rd April 2008, being a wholly owned subsidiary of RV Akash Ganga Infrastructure
Ltd. The turnover of RVAG Suntech has been projected at a figure in excess of Rs.50
Crores. In addition to the above, two new companies were launched – RVAG Centurion
Infra Solutions Ltd. and RVAG Boss Engineering Pvt. Ltd. to provide financial and
technical assistance to the construction industry in general.RV Akash Ganga
Infrastructure Ltd., are in the process of working towards our goal of the launch of our
IPO by the end of the fiscal 2009 -2010. RVAGIL has recently bagged the prestigious
order for widening of NH1 worth Rs,250 Crores from Jalandhar to Panipat on the
Rajpura – Mandi Govind Section (a stretch of 55 kms. From KM 212.2 to KM 267.4)
whereby complete Structural Works and Piling being in the scope of RVAGIL. The
company has also bagged an order worth Rs.12 Crores from IRCON International for
supplies of RMC to the tune of 30,000 cum.
The amalgamation of these two companies has enhanced the equipment strength
consisting of the following:
• 7 Hydraulic Piling Rigs of boring capacities of 50 meters depth and 600 to 1500
mm diameter
• 75 Transit Mixers of capacities of 7 cum each
• 5 Placer Booms of capacities of 17, 20, 28, 32 and 36 meters
• 4 Loaders and 5 Back Hoe Loaders
• 5 Cranes and 1 Excavator
• 20 Batching Plants of capacities of 30 cum per hour including Silos, 5 Batching
Plants of capacities of 20 cum per hour and 1 WMM Plant of capacity of 200 tons
per hour
• 20 Concrete Pumps of capacities of 35 cum to 90 cum
• 3 Soil Compactors and 2 Tandem Rollers
• 2 Bitumen Browsers
operated and maintained by a skilled and dedicated workforce of operators and
technicians
MANAGEMENT PROFILE
CHAIRMAN: VAKIL CHAND SINGHAL
BOARD OF DIRECTORS:
• ROHIT BHAGAT
• MANOJ BANSAL
• SURINDER SINGHAL
• PRADEEP AGGARWAL
• ANANYO MAITRO
• RAJIV GILANI
Mr. Bansal has also been actively associated with a lot of social
activities by being on the trusts of several charitable organizations
like the Maharaja Agrasen Charitable Trust & Hospital, West College
Education Society, Rohtak, Maharaja Agrasen Kidney & General
Hospital (Founder Member). Mr.Bansal is also one of the patriarchs of
RVGIL and is always available with sound business suggestions at
any point of time.
BOARD OF DIRECTORS
ROHIT BHAGAT
MANOJ BANSAL
PRADEEP AGGARWAL
RAJIV GILANI
• JCB 3DX 4
• LOADER 5
• BATCHING PLANT
18
• SILO 10
• D.G 42
• PLACER BOOM 5
• VIBRATOR ROLLER 5
• HYDRA 5
• WMM PLANT 1
• EXCALATOR 2
• PILING RIG 6
• 320-CRANE 2
• HYDRAULIC CRANE 2
• TIPPER 3
• BITU SPRAYER 1
• LIGHT SOURCES 7
Services Delivered
The Company take extreme pride in the fact that in all the above mentioned projects
which include both RMC supplies and Piling works, it has been able to achieve
complete customer satisfaction by delivering works within budget & schedule while
conforming in totality with the Quality & SHE standards of DMRC which are the
current benchmarks for any Construction Project in India.
Apart from the above, we are now venturing into works like manufacture of
reinforcement to shapes, lengths & sizes as required by the Bar Bending schedule,
preparation and laying of Wet Mix Macadum, Fabrication and Handling of Barricades.
RVAGIL can therefore offer its services to you in the following areas of works where it
provides a complete package:
i. Production & Supply of Concrete including pumping and placing
ii. Installation of Bored Cast In Situ Piles
iii. Manufacture of Reinforcement as per drawing
iv. Preparation & Laying of Sub-base & Base (Wet Mix Macadam -WMM)
v. Fabrication & Handling of Barricades
A brief write up describing the technical aspects and detailing our responsibilities for
the above mentioned items of work follows:
The mix design for various grades of concrete is normally provided by the Client,
however RVAGIL provides fully functional laboratory and complete technical back for
designing the various grades of concrete.
Transit mixers will carry the concrete upto the place of pouring. Concrete pouring may
be done in different methods e.g. boom placer, concrete pump, crane-bucket
arrangement, through steel chutes and manually.
Number of Batching plants will vary as per project requirement. The plant will have
adequate arrangement of cement and admixture storage, water vat, aggregate bins etc.
Cement go-down of suitable size to accommodate 15 days stock shall be set up and
consumption will be monitored to follow first in first out system.
On receipt of requisition from respective site engineer, laboratory in-charge will hand
over the mix proportion data to batching plant operator who will input the data to the
system and start production of concrete.
The loaded transit mixer will be directed towards pouring point for final discharge.
Each transit mixer will carry a delivery record containing all relevant information
regarding mix proportion, vehicle no., quantity, time, and also a column for remarks
like re-dosing of admixture, addition of water, if any at site etc to be noted.
Transit mixer of capacities ranging from 4 cu.m. to 6 cu.m. will be used for
transportation of ready mix concrete at site from Batching plant to pouring point.
Boom placer & concrete pumps will be used for cement concrete placement. For
locations where direct placement of concrete is not possible, "Elephant Trunks",
M.S.Chute etc., will be used with suitable drops.
Installation of Bored Cast In Situ Piles
• Measuring cylinder,
• Mud Balance Hydrometer
• Marsh cone
• Weighing balance
• Hot plate
• pH papers
Sodium based bentonite will be used with pH of Fluid between 9.5 and 11.5. Bentonite
powder shall conform to requirements given in IS: 2911 (Part -1/Sec -2). All batches of
bentonite powder delivered & suspension fluid made there from shall be tested to
satisfy requirements failing which they shall be rejected.
Bentonite powder shall be mixed with clean water to make a suspension of density as
specified. The suspension shall be regularly tested to ensure its suitability for use as
drilling mud.
Concrete as per approved mix design will be supplied from centralized batching plant
for all piles. Slump test will be done to check the workability of Tremie Concrete &
Concrete. The Concrete shall generally be poured with minimum interruption.
Grade, length, diameter etc. shall be as per design requirement shown on relevant
drawings. Concrete cover blocks to ensure proper concrete covering shall be tied to
rings of the cage.
Setting of Piling Rig: Rig will be centered on pile point. Drilling will be carried out
using auger/bucket to a depth of approx. 2 to 3 meters. Then a temporary MS casing for
about 4 to 6 m (approx) length from the ground level will be driven to protect loose soil
from falling in the bore hole at locations where the soil is in loose state and there is a
tendency of collapse of bore hole. After driving the casing its verticality will be checked
by plumb bob.
Boring of Piles: The excavation is generally performed by rotation using a rotary drill,
composed of a rotary table.
Borehole Stabilization: During the entire operation, the pile bore will be kept stable
with bentonite solution.
Determination of Density: The bentonite sample from the bottom of borehole will be
collected and its density will be measured by Hydrometer having a range of 1.001 to
1.300 gm/ml.
Reinforcement Fixing: Pile reinforcement cage shall be fabricated as per the details
given in drawing and Bar Bending Schedule.
Flushing the Borehole: After cage lowering is completed the bore will be flushed with
Bentonite Flushing shall be done continuously with bentonite till consistency of bottom
slurry becomes less than 1.20.
Concreting: Minimum time interval between the completion of boring and placing of
concrete will be maintained. The gap between the bottom of the bore to the end of
tremie pipe will be min 300mm. The dia of the tremie pipe will be not less than 200mm.
The Tremie pipe shall be removed in stages during pouring of concrete ensuring that the
Tremie bottom is always inside the concrete.
Manufacture of Reinforcement as per drawing
Bar Bending & Cutting machines of required capacities would be set up in the Client’s
work yard inside a covered shed that would function as a reinforcement factory.The
factory will also be equipped with necessary tables for working, electricity, other tools
as required and overhead EOT if so required.
Normally full length reinforcement bars would be procured by the client and issued to
us.Reinforcement will be cut, bend and manufactured to required lengths, shapes and
sizes as per the approved Bar Bending schedule which shall be provided to us.
The reinforcement thus manufactured will be tagged off mentioning the length, drawing
no, structure identification etc and will be stacked in a designated location for
transportation to the construction site as per the schedule provided to us.
Preparation & Laying of Sub-base & Base (Wet Mix Macadam -WMM)
Sieve Analysis.
Blending.
Graph of combined gradation.
Modified proctor density.
Soaked CBR
1. Sieve analysis.
2. Los Angeles abrasion.
3. Aggregate impact value.
4. Combined flakiness & elongation indices.
5. Blending (Mix Design).
6. Modified proctor density.
7. Liquid limit & plasticity index of portion through 425 micron sieve.
Each layer will be compacted with 10 T Vibro Roller, to achieve required degree
of compaction i.e. 98% of modified density. The areas not accessible to roller will be
compacted with plate compactor/ or mini rollers.
Top surface will be checked for its designed levels, before & after compaction &
material will be removed or added as required.
Surface finish and quality control of work: - Segregated material will not be
allowed to be placed. The tolerance on levels shall not exceed 12 mm and deviation
from 3000mm straight edge shall not exceed 10mm.
Rectification of defects: After final compaction, surface will be checked for its
finish and top levels. Any segregated material like only coarse or only fine will be
removed and the pocket will be filled with premixed material.
While checking the top surface levels it may be necessary to remove excess material or
to add material.
Barricade Boards, which demarcate the working area from the traffic movement
corridor, would be fabricated, painted & marked as per the drawings and specifications.
The fabricated barricade boards would be installed in position and locked.
Re-handling of barricades by lifting from the previously installed positions and placing
at the new locations would be carried out as per the requirement of the client.
Maintenance, repainting and cleaning of the installed barricade boards would be carried
out.
As always we promise state of the art equipment, transparent, honest and diligent
service and a product conforming to schedule, budget and the strictest standards of
quality and safety.
PROJECTS UNDERTAKEN
MAJOR PLANTS
It gives us a lot of pride and pleasure today to state that RVAGIL have now grown to be
the single largest supplier of RMC to some of the most prestigious infrastructure
projects in Delhi & NCR with total supplies of RMC in excess of to the tune of approx.
10 lac cubic metres. Concrete supplies are effected with dedicated state of the art
Batching Plants, Transit Mixers & Concrete Pumps/ Boom Placers etc. Supplies are
made from our centralized Commercial Plant and /or Captive Concrete Plants set up in
the Company’s Client’s Work Yard as per requirement. The clientele includes DSC
Ltd., HCC Ltd., SOMA Constructions, ITD Cementation India Ltd, IDEB Projects Ltd,
Larsen & Toubro, Reliance Energy, MTNL, Amrapali Group to name a few. The details
of some of the major projects are tabled here below for your reference:
Name of Project Name of our Quantity of RMC Our Order Start Date Status
Client To be supplied Value
(cum) (Rs. In Lacs)
DMRC BC7 IDEB Projects 55,000 cu.m 893.00 July 2006 Ongoing
Ltd.
DMRC BC26 IDEB Projects 70,000 cu.m 119.00 January 2008Ongoing
Ltd.
DMRC BC34 IDEB Projects 46,000 cu.m 760.00 December 2007
Completed
Ltd.
DMRC BC21 ITD – ITD 166,000 cu.m 2689.00 February 2007
Ongoing
CEM JV
DMRC BC24 ITD – ITD 210,000 cu.m 3375.00 November 2007
Ongoing
CEM JV
DIAL (International
Larsen & Toubro 60,000 cu.m extended 149.00 Completed
Airport) To the next 60,000 149.00 Completed
Cum
Ultra Home Amrapali Group 80,000 cu.m 2480.00 April 2008 Ongoing
Constructions
Hissar Thermal Reliance Energy 15,000 cu.m extended 213.75 June 2007 Completed
Power Project To further 25,000 356.00 Copleted
Cu.m
DMRC Punj Lloyd 1000 cu.m 32.00 Completed
DMRC BC16 SOMA-CEC JV Transportation & 500.00 July 2007 Ongoing
Pumping
DIAL (International
Larsen & Toubro 100,000 cu.m 95.00 June 2008 Completed
Airport)
Elevated Road overDSC Limited 20,200 cu.m 1641.00 16.11.2008 Ongoing
Barapulla Nalla from
Mathura Rd. to JLN
Stadium
6*660 MW Ultra Reliance 2,00,000 cu.m 1145.32 19.06.2009 Ongoing
Mega Power Project,
Infrasructure
Sasan,MP–work order
Limited
for Operation &
Maintenance of
Batching plant
PILLING PLAN
PILLING PLANTS
We are executing Piling jobs using our own fleet of Hydraulic Piling Rigs and have a current
job in hand of more than 25,000 running meters. Piling is executed on a running metre basis
with all equipments like Pile Rigs, Service Cranes, Plate bending machines, Bentonite mixing
plants, manpower, Bentonite solution etc being in our scope.
The details of our current Piling projects are as follows:
Sl. Name of Name of our Pile No Total Our Start Date Status
No Project Client Diameter of RM of Order
Pile Piles Value
s (Rs. In
Lacs)
01 DMRC BC 21 ITD – ITD 1200 mm 100 2250 70.00 27.8.2007 Complet
CEM JV 21.11.20
02 DMRC IDEB 1000 mm 462 11000 464.00 25.1.2008 Ongoing
BC 26 Projects Ltd. (Soil)
1000
(Rock)
03 DMRC Airport L&T 800 mm 60 1200 35.00 12.5.2008 Complet
Link
04 Ultra Home Amrapali 800 mm 120 22,800 364.80 29.4.2008 Complet
Constructions Group 0
05 Commonwealt Ahluwalia 600 mm 440 9000 135.00 15.2.2008 Complet
h Village Contracts 18.4.200
Infrastructure
Ltd.
06 Elevated Road DSC Limited 100 mm 100 16.11.200 Ongoing
over Barapulla 1221.00 8
Nalla from 1200 mm 19000
Mathura Road
to
Jawaharlal
Nehru Stadium
07 Badarpur HCC Ltd. 1200 mm 212 5300 361.00 16.11.200 Ongoing
Elevated KM18+900 8
Highway to KM 1500 mm 12 300
Project 20+500
Delhi Agra
Section of
NH2 in 1200 mm 108 2700 403.00 Ongoing
Haryana 16.11.200
1500 mm 108 2700 8
KM16+000
to KM
18+900
Delhi Agra
Section of
NH2 in
Delhi
08 Six Laning of SOMA Construction 21948.1 01.04.200
Panipat- Enterprises of Structure 0 9
Jalandhar KM 212.161 including all
Section of NH1 to KM structures/
267.600 bridges and
(Length – RE Walls
KM 55.439)
Punjab from
Rajpura to 01.04.200
Mandi 9
Govind
LIST OF CLIENTS
1.SOMA ENTERPRISES LTD. – WIDENING OF NH1 – JALANDHAR TO
PANIPAT (NHAI)
40. ISHAN SYSTEMS PVT. LTD., DELHI (NOIDA I.T. PARK PROJECT)
I hereby declare that the work presented in the project report ‘RVAGIL – Scope and Overview’
was carried out by me as a part of BBA curriculum during of 8-weeks summer training program
in the 4th Semester. The report is an authentic record of my work carried out under the guidance
of Mr. Vijay Yadav in RV Akash Ganga Infrastructure Pvt. Ltd.. It is further declared that the
report has not been submitted earlier for any other degree or diploma.
Rahul Mehta
Enrollment No.-0261221807
(Candidate)
Counter signed
Internal Supervisor
PREFACE
It is said that the world is different on paper creating and this something is realized in the two
months of my summer training. The knowledge that I gained form the text is useful only if we
implement it in practical life.
The project was one such experience where I got to implement what I had studied in books. The
project ‘RVAGIL - Scope and Overview’ has been very extensive.
I would like to say that I am feeling overwhelmed and privileged to present the report that is
my first work in the corporate world.
I would like to pay my sincere thanks to all those who gave me constructive suggestions for the
improvement of all the aspects related to this project.
In particular, I would like to thank Mr. H.C. Joshi for assisting me to carry on project work. I
also owe a great deal of thanks to my parents who always boosted my morale and encouraged
me the suggestion period to this project.
I have a great pleasure and thanking all the faculty members as well for their generous help in
this project.
SUMMER TRAINING PROJECT REPORT
ON
SUBMITTED BY :-
RAHUL MEHTA
BBA(B & I) – V SEM
0261221807
Delhi College of Advanced Studies
B-7, Shanker Garden, Vikas Puri,